ofthe following project design with
Project information
Project name
Detector group
Address
Project manager
Company name
city
‘The design planning withthe parameters
Air sampling smoke detector
‘Type of module
Sensitivity
Fan votage
Fiter
Pipe accessories
ificate of conformi
the requirements according to EN 54.20 /1SO 7240-20
‘TITANUS Pipexpress V2.00.04, print date 31.08.2021. 10:05, page 1 of 2
West ca
B
T shape DS, 0h, 08
pyatx-10
0,200 8 Light obscuration/m
o0¥
LE-AD (as well as several in parallel)
without pipe
complies with the following pipe configuration
Pipe systom (@ 25 mm)
‘Mex. pipe length
No. of aie sampling apertures
to the following normative requirements
EN 54-20 1180 7240-20
fer]
Ti enet cans
130 =
12 per pipe system
class 8
31.08.2024
tne folowing soar na ue er prj design of the stove gen ject TITANS Ppexpese
\V2n0Gn The swore aproved by Ve ote je abo he above gr ASD spt ad eed me corseporng
Eeaieate a coformty aor to C°DICPR. The wage othe stares els rege bye lane agreement
‘eh WAGNER Grup Groh Forte prot deta ecemands an sas ha eoreapondeg lati rata have De
eyed Sune! o congener nolce Ab igs WAGNER Group Gr. Dspetien compen cpp aa aN oF
‘Severinaion at WAGNER Group Gmbh Changen ihe sofware net pera[Attachment to certificate of conformity
TITANUS PipeXsress V2.00.04, print date 31.08.2021, 10:05, page 2 of 2
Project
WEST GATE 8, zona 2 ~ dizala 5 do KROv
Selected project planning
‘TETANUS PRO/TOP SENS, I pipe, 22 Apertures
Design with acceleration apertures.
Defined diameters of the aspiration apertures (mm). Type AXx.x
A 8 ¢ DEF GHI
Branch 2,0 2,0 2,0 2,0 2,0 2,0 2,8 3,0 3,2
Position ofthe apertures per branch (schematic diagram)
a 8 c
Aso" o-oo - = - +
“ASD = Aspateg Sake Daa (ramping 0k dct)
When using this design the following acceleration apertures must be
used at the end of each pipe branch: Diemeter 7,0 mm
Liriting values
Min, distance between 2 air sampling apertures: 250
Max. distance between 2 ar sampling apertures 2a
Notes:
‘The number of 90 degree pipe bends thats to be expected in practice has already been considered forthe
project design ofthe air sampling smoke detection system.
‘When using celing lead throughs in false celing appications, the ai sampling hose type AS-12x9 can be
used with a max. length of 1m per aspiration aperture taking Into account the alowed total ppe length.
‘A second pipe system can be applied with the same or a different design according tothe selected standard