TENDER
CITY ENGINEER DEPARTMENT
NMMC / CITY ENGINEER /85(02)/2021-22
Tender for The Work Of
1
Schedule ‘A’
NMMC invites Tenders in B-1 form through E-Tendering system from Contractors (Registered or unregistered)
who completes terms & condition mentioned in tender document for Works above 1.50 Cr. Blank Tender forms
will be available from 01/07/2021 upto 07/07/2021 15:00 p.m. on E-Tendering website www.nmmc.etenders.in
To download the blank tenders, the bidders shall pay tender cost paid through online payment gateway by using
Credit Card/Debit Card of any bank or by Net Banking in favour of NMMC. The Tender should be submitted
through E-Tendering system only on the web site www.nmmc.etenders.in before -07/07/2021 upto 15.00 p.m .
5) Cost Of Each Tender Form :- Rs. 1000 + Rs. 180 (18% GST)= Total Rs. 1,180/-
Payable through online payment gateway by Debit/Credit
Card of any Bank or by Net Banking from
bidders/Agencies bank account only, in favour of Navi
Mumbai Municipal Corporation. Online receipt for the
same should be uploaded with the technical documents.
2
9) Eligibility
I) Turn Over :- Annual Financial turnover during the last 5 Years, Ending 31st
march of the previous financial year, should be at least 75% of the
annual cost of this work.
Annual Cost = (Total Cost of the Work)
(Completion period in years)
Equipment
IV) :- As requi red for wor k
Required
10) Validity Period – The Offer Of The Contractor Shall Remain Valid For 120 Days From The Date Of
Opening Of Tender.
3
13) Percentage To Be Charges As Supervision Charges For The Work Got Executed Through Other
Means. - 24.50 Percent.
17) 1) Tenderer/Bidder Should Submit Affidavit & Undertaking In Requisite Format On .500/-
Stamp Paper & All Schedules are in prescribed format & updated upto date.
2) Tenderes/Bidders Should Note That As Per The Construction Workers Welfare Act 1996,
1% Cess Of Contract Value Towards The Welfare Of Construction Workers Will Be
Deducted From The Bills.
18) Additional Performance Security Deposit - The agency have to submit an undertaking along with
Techical documents mentioned that “Additional Performance Security Deposit submitted in envelope
No.2” in the form of Demand Draft as follows within 8 days from the opening date of tender.
The agency will have to furnish an additional 1 % Security Deposit quoted by it below 10%
and in case the agency quotes 14% below the cost put to tender, it will have to furnish an additional
security deposit of (14%) –(10%) = 4% i.e. (1%) + (4% ) = 5% . If agency quotes 15% Below the
cost put to tender,it will have to furnish an additional security deposit of (19%)-(15%)=4% x 2= 8%
in financial Envelope No.(2) in the form of Bank Guarantee/FDR of any Govt. Bank or Schedule
Bank having MICR and IFSC Code in the name of concern authority. The validity of Bank Guarantee
should be upto defect liability period of works from the date of issue (For detail Please refer the GR
No. /2017/ . .08/ -2, .27/09/2018, For online Tender, The Agency Should upload the
Scan Copy of Bank guarantee/FDR with Technical Document.
If contractor not submitted online Additional Performance Security Deposit then he has to submit it
within maximum 08 days without fail as per the GR No. /2017/ . .08/ -2, .26/11/2018.
19) The bidder must have to submit the Hard Copy within 72 hours after the bid lock. Every Document is
self attested by the bidder.
20) The Agency must submit the Royalty Challans at the time of R.A. Bills; if not the necessary charges
will be deducted from the R.A. Bills.
21) Royalty including ह !" (District Mineral Foundation Trust -DMFT) of only
excavated disposed material will be reimbursed by NMMC after submission of challans by agency as
per GR " #$%&,# ' ( ) & (* & ! + ,-0615/ . ! .34/#$%&-9, .01/09/2016 & letter of
" #$%&,# ' ( ) & (* & ! + ,-2016/ . ! .69/#$%&-9, .20/09/2016
22) As Per Government of Maharashtra Circular, GST has been come into account from 1st July, 2017 So
Henceforth while quoting tender, Tenderer has to consider the GST factor
(GR No " 0 102) - -2017/ . .81/)1 3 / .19/08/2017 and .11/09/2017)
23) The GST Amount i.e.12% or as mentioned in schedule -B will be paid separately on work
done amount at the time of bill.
4
24) If the bidder is Unemployed Engineer ( 9 " : ;<1% & 1 *=! ),He have to submit Undertaking in
the technical documents as per GR No. 2017/ . ! .69/ 1 -2, !) 31 < ,2018.
25) Tenderer / Bidder should submit Affidavit on Rs.500/- Stamp Paper in the prescribed format attached
herewith regarding the false documents submitted in the tender as per the GR
No. /2018/ . ! .127/ -2, .28/11/2018.
27) The Bidder shall disclose the litigation history along with supporting documents in Technical Documents
under the Head The “Details of Litigation History”
If there is no Litigation History, The Bidder shall specifically mention that there is no Litigation History
against him as per the clause of Litigation History, in case there is litigation History
Litigation History must cover- Any action of blacklisting, debarring, banning, suspension, deregistration and
cheating with any Local self-Government Authority, State Govt., Central Govt., or any authority under state or
Central Govt./ Govt., Organization initiated against the company firm, directors partners or Authorized signatory
shall be disclosed for last 5 years from the date of submission of bid.
Also, Bidder must disclose the litigation history for last 5 years from the date of submission of bid about any
action like show cause issued, blacklisting, debarring, banning, suspension, deregistration, Court cases, Arbitration,
Payment disputes and cheating with any Government Authority. Any Government Authority is party in the litigation
against the company, firm, directors, and partners or authorized signatory for carrying out any work for Any
Government. Authority and the orders passed by the competent authority or by any Court where Any Government
Authority is a party.
While taking decision on litigation history please submit with technical bid, The Municipal Commissioner ,as
may be the case, should consider the details submitted by bidder and take decision to reject /accept tender based on
the gravity of the litigation and also the details submitted by the bidder and take decision based on the gravity of the
litigation and the adverse effect of the act of company, firm, directors, partners or authorized signatory on the Any
Government Authority works which can spoil the quantity, output, delivery of any goods or any work execution and
within the timeframe.
NOTE :-
Tender conditions mentioned in SCHEDULE- 'A' will supersede Tender condition mentioned in
DETAILED TENDER NOTICE TO CONTRACTOR, GENERAL CONDITIONS OF CONTRACT
& elsewhere in Tender document wherever applicable.
5
Navi Mumbai Municipal Corporation.
Name Of Work :- Supply installation testing commissioning of Oxygen generation plant of 200 Jumbo Oxygen Cylinder per day (minimum 1000LPM) capacity at Radhaswami seva
satsung Trust Sect-24 Turbhe Navi Mumbai
Short Tender Notice No. NMMC/CE/85(02)/2021-2022
SCHEDULE ‘B’
Sr. Estimated Total Amt
Qty Description of Item Specification Unit
No Rate ( .)
Supply installation testing commissioning of Oxygen generation plant of 200 Jumbo Oxygen
Cylinder per day (minimum 1000LPM) capacity at Radhaswami seva satsung Trust Sect-24 Turbhe As directed by
1 1.00 Navi Mumbai (Compressor, Dryer, Air tanks, Oxygen Tank, PSA Tank with necessary valve & engineer in Job 14000000.00 14000000.00
piping system etc.) as per detailed specification and as per special condition of contract. charge
CGST & SGST will be paid as per Government GR. Say As 1,40,00,000.00
Signature of Tenderer No. of corrections Signature of Executive Engineer (Turbhe) Signature of City Engineer
6
Detail Technical Specification
& SPECIAL CONDITIONS OF CONTRACT
PSA Oxygen Generators
1. This document is basically intended to serve the purpose of verifying correct installation as well as ensuring
routine operations and maintenance of OGP at various hospitals in Maharashtra
3.2 As the flow decides the number of patients who can be treated, it is necessary to ensure that expected
flow is generated. A flow meter should be available in OGP line to measure this.
3.4 Flow of Oxygen varies depending on ambient temperature. Flow should not be less than the capacity
for the particular ambient temperature (See Table-l). lf it is below, the generator is not economical to
use and the supplier has to make necessary modifications in the system to produce enough flow.
3.1 As mentioned above , purity and flow are inversely proportional and hence higher flow is possible
with reduced purity. This can be achieved by the adjusting flow/control valve. However, it should be
ensured that the purity does not go below the permitted limit of 90%. Normally the rated flow for the
generator is at 93% purity. The flow can go up @ 10% if the purity is kept at 90% and the flow can go
down by @ 10% if the purity is kept at 95%.
5. Effective Parameters:
5.1 Compressor should run to maintain the pressure at the outlet at 7.5 bars and at the air-storage vessel at
7 bars.
5.2 Clean air supplied to the Oxygen Generator should be within acceptable limits of pressure (6.5) and
inlet air dew point (3"C PDP).
5.3 Pipe size carrying the air and oxygen should be of appropriate diameter for the particular pressure and
flow.
7
modifications considering higher ambient temperature in lndia. Orygen buffer tank should have a
safety pressure relief valve (PRV) and a pressure gauge.
6.2 Plants certified for medical use by national or international bodies need to be preferred. Likewise, pipes
certified by Lloyds may be preferred.
6.3 Access to PSA plant area should be adequately secured and the plant is protected from bad weather
while ensuring proper ventilation.
8
DETAILED TENDER NOTICE TO CONTRACTOR
1.0 Sealed bids are invited by and on behalf of Commissioner, Navi Mumbai Municipal Corporation from
Eligible bidders for the proposed Work specified in Schedule ‘A’.
2.0 ISSUE OF TENDER
2.1. Tender book will be made available at E-tendering cell, Navi Mumbai Municipal
Corporation,CBD from date of publication of Tender Notice on News paper to the Contractors for work
of Tender Amount upto .03 lacs & above amount tender book may buy from E- tendering website (
www.nmmc.etenders.in) & www.nmmc.gov.in
2.2 For work of tender amount above Rs. 03 lacs above, tender book will be issued online though E-
tendering Website ( www.nmmc.etenders.in) & www.nmmc.gov.in to Contractor.
2.3 Price of Blank Tender form cost must be paid by online and Receipt of the same should be given
to NMMC with hard copy.
.
2.4 The Tender Document is not transferable. Only the Tenderer who has purchased the tender form
shall be entitled to bid in the Tender.
6.1 The Tenderer shall deposit the amounts indicated in the Tender Notice as Earnest Money Deposit
(EMD). The Earnest Money shall be deposited by online only demand draft / pay order will not be
accepted. The failure or omission to deposit the Earnest Money shall disqualify the Tender and the
Corporation shall exclude from its consideration such disqualified Tender(s). No interest shall be
payable by the Corporation in respect of such deposited Earnest Money.
Alternatively The Tenderer can also deposit a Fix EMD at NMMC office which will be credited
to his account.
The tenderer should refer user’s guide while depositing EMD though the e-tendering website (
www.nmmc.etenders.in) & www.nmmc.gov.in
9
The Tenderer shall bear all costs associated with the preparation and submission of its Tender. The
Corporation shall in no case be responsible or liable for these costs, regardless of the Conduct or the
out come of the Tendering process.
10
The tenders estimated cost above .03 lacs should be submitted online at website (
www.nmmc.etenders.in) & www.nmmc.gov.in
19.0 CONTENTS
19.1 Online & Offline Tenders are invited in two envelope system. The completed Tender shall be
submitted in sealed envelope, superscribing the name of Work & C.A.No mentioned in the Tender
notice.
19.2 Full name and address of the Tenderer shall be written in the bottom left corner of each envelope.
19.3 The envelope shall contain the following
Envelope No.1 (Technical Bid) :
This should contain all the documents mentioned below. This Envelope may contain other documents
also such as Technical bids, drawings, etc as mentioned in the Tender notice.
11
20.0 IMPORTANT POINTS TO BE NOTED BY THE TENDERER
a) On receipt of blank Tender form the Tenderer should ensure that no corrections or over writings or
erasures are left to be attested by the competent authority of the Corporation.
b) The price-bid shall be inclusive of all taxes, Octroi, Local taxes, etc. to be paid by the Tenderer for
the Work and claim for extra payment on any such account shall not be entertained.
Any change that will be made in the Tender paper by the competent authority after issue of the
Tender will be intimated to the Tenderer in the form of Corrigendum/Addendum for incorporating
the same in the Tender before submitting the Tender.
c) Price-bid should be written both in words and figures in the Schedule ‘B’, at appropriate places.
d) No alterations and additions any where in the Tender Document are permitted. If any of these are
found, the Tender may be summarily rejected. The Tenderer should get his doubts cleared during
pre-Tender meeting only if provided in the Tender. In case if no pre-bid meeting is to be held the
Tenderer should seek clarification or any doubt in writing 7 days before the last date for receipt of
Tenders.
e) In case of firm, each partner or power of attorney holder shall sign the Tender and the signatures
shall be attested as witness by a reputed person in the space provided for the purpose. The attested
copies of power of attorney of person signing the Tender shall be enclosed with the Tender. The
power of attorney shall be signed by all partners.
In case of private limited/public limited companies, the power of attorney shall be supported by
Board resolutions and appropriate and adequate evidence in support of the same shall be given.
f) All pages and pasted slips should be signed by the Tenderer.
g) No page shall be added or removed from the set of Tender Document.
h) Tenderer shall be deemed to have studied the schedule of Works / Items / Quantities / Rates, all
plans, specifications, terms and conditions, shall inspect and examine the site and its surrounding
and shall satisfy himself before submitting his Tender as to the nature of the ground and subsoil (so
far as is practicable), the form and nature of the site, nature of the Work and materials necessary for
the completion of the Works and means of access to the site, the accommodation he may require and
in general shall himself obtain all necessary information as to risk, contingencies, obligations under
the Contract and all matter and things necessary for proper completion and maintenance of the
Works. No extra charges consequent on any misunderstanding. A declaration and an undertaking to
this effect should be singed by the Tenderer in the form attached at an Annexure - 2.
i) The Tenderer shall submit the Tender which satisfies each and every condition laid down in this
Tender notice, failing which the Tender will be liable to be rejected conditional Tenders will be
rejected.
a) “corrupt practice” means the offering, giving, receiving or soliciting of any thing of value to
influence the action of the public official in the procurement process or in contract execution; and
b) “fraudulent practice” means a misrepresentation of facts in order to influence a procurement process
or a execution of a contract to the detriment of the Corporation, and includes collusive practice among bidders
(prior to or after bid submission) designed to establish bid prices at artificial non-competitive levels and to
deprive the Corporation of the benefits of the free and open competition;
The Corporation will reject a proposal for award if it determines that the Bidder recommended for
award has engaged in corrupt or fraudulent practices in competing for the contract in question; The
Corporation will a firm ineligible, either indefinitely or for a stated period of time, to be awarded a
contract if it at any time determines that the firm has engaged in corrupt and fraudulent practices in
competing for, or in executing, a contract.
For the Work of . 03 lakhs above, tender will be open online in the presence of Tender Committee
and e-tendering Administrator.
12
23.0 PROCESS TO BE CONFIDENTIAL
Information relating to the examination, clarification, evaluation and comparison of bids and the award
of a Contract shall not be disclosed to Bidders or any other person not officially concerned with such
process until the award to the successful Bidder has been announced.
13
29.2 The Corporation is not bound to accept the lowest or any Tender. The Corporation reserves the right to
reject any or all Tenders received without assigning any reason whatsoever.
14
36.0 INTERPRETATION OF THE CLAUSES IN THE TENDER DOCUMENT / CONTRACT
DOCUMENT
In case of any ambiguity in the interpretation of any of the clauses in Tender Document or the Contract
Document, interpretation of the clauses by the Corporation shall be final and binding on all parties.
15
Annexure –1
FORM OF BANK GUARANTEE BOND
In Consideration Of The Navi Mumbai Municipal Corporation (Hereinafter Called ‘The NMMC’) Having Agreed
To Exempt _____________________________________ (Hereinafter Called “The Said Contractor(S)’) From The
Demand Under The Terms And Conditions Of An Agreement Dated _____________________________ Made Between
_____________________________________ And _______________________________ For
____________________________________ (Hereinafter Called “The Said Agreement Of Security Deposit For The Due
Fulfillment By The Said Contractor (S) Of The Terms And Conditions Contained In The Said Agreement, On Production
Of A Bank Guarantee For .. ______________________________
(Rupees___________________________________________Only) We,
_________________________________________ (Hereinafter Referred To As ‘The Bank’) At The Request
( Indicate The Name Of The Bank)
Of ______________________________ [( Contractor (S) Do Hereby Undertake To Pay The NMMC An Amount Not
Exceeding . _____________________________ Against Any Loss Or Demand Caused To Or Suffered Or Would Be
Caused To Or Suffered By The NMMC By Reason Of Any Branch By The Said Contractor (S) Of Any Of The Terms Or
Conditions Contained In The Said Agreement.
2. We _____________________________________________ Do Hereby Undertake To Pay The
( Indicate The Name Of The Bank)
Amounts Due And Payable Under This Guarantee Without Any Demur, Meerely On A Demand From The NMMC
Stating That The Amount Claimed Is Due By Way Of Loss Or Damage Caused To Or Would Be Caused To Or Suffered
By The NMMC By Reason Of Breach By The Said Contractor (S) Of Any Of The Terms Or Conditions Contained In
The Said Agreement Or By Reasons Of The Contractor (S) Failure To Perform The Said Agreement . Any Such Demand
Made On The Bank Shall Be Conclusive As Regards The Amount Due And Payable By The Bank Under This Guarantee.
However, Our Liability Under This Guarantee Shall Be Restricted To An Amount Not Exceeding . ...................
3. We, Undertake To Pay To The NMMC Any Money So Demanded Not With Standing Any Dispute Or
Disputes Raised By The Contractor (S) / Supplier (S) In Any Suit Or Proceeding Pending Before Any Court Or Tribunal
Relating Thereto Our Liability Under This Present Being Absolute And Unequivocal.
The Payment So Made By Us Under This Bond Shall Be A Valid Discharge Of Our Liability For Payment There
Under And The Contractor (S) / Supplier (S) Shall Have No Claim Against Us For Making Such Payment.
4. We, ____________________________ Further Agree That The Guarantee Herein
(Indicate The Name Of Bank)
Contained Shall Remain In Full Force And Effect During The Period That Would Be Taken For The Performance Of The
Said Agreement And That It Shall Continue To Be Enforceable Till All The Dues Of The NMMC Under Or By Virtue Of
The Said Agreement Have Been Fully Paid And Its Claims Satisfied Or Discharged Or Till The City Engineer Of NMMC
(Indicate The Name Of Administrative Department ) Certifies That The Terms And Conditions Of The Said Agreement
Have Been Fully And Properly Carried Out By The Said Contractor (S) And Accordingly Of The Said Agreement Have
Been Fully And Properly Carried Out By The Said Contractor (S) And Accordingly Discharges This Guarantee. Unless A
Demand Or Claim Under This Guarantee Is Made On Us In Writing On Or Before The ..................We Shall Be
Discharged From All Liability Under This Guarantee Thereafter.
5. We ......................................................... Further Agree With The NMMC That
(Indicate The Name Of Bank)
The NMMC Shall Have The Fullest Liberty Without Our Consent And Without Affecting In Any Manner Our
Obligations Hereunder To Vary Any Of The Terms And Conditions Of The Said Agreement Or To Extend Time To
Performance By The Said Contractor (S) From Time To Time Or To Postpone For Any Time Or From Time To Time
Any Of The Powers Exercisable By The NMMC Against The Said Contractor (S) And To Forbear Or Enforce Any Of
The Terms And Conditions Relating To The Said Agreement And We Shall Not Be Relieved From Our Liability By
Reason Of Any Such Variation, Or Extension Being Granted To The Said Contractor (S) Or For Any Forbearance, Act Or
Commission On The Part Of The NMMC Or Any Indulgence By The NMMC To The Said Contractor (S) Or By Any
Such Matter Or Thing Whatsoever Which Under The Law Relating To Sureties Would But For This Provision, Have
Effect Of So Relieving Us.
6. This Guarantee Will Not Be Discharged Due To The Change In The Constitution Of The Bank Or The
Contractor (S) / Supplier (S).
7. We, ......................................................... Lastly Undertake Not To Revoke This
( Indicate The Name Of Bank)
Guarantee During Its Currency Except With The Previous Consent Of The NMMC In Writing.
16
Annexure –2
UNDERTAKING
(On A . 500/- Stamp Paper)
The Information / Documents Submitted By Us Are True To Our Knowledge And If The
Information / Documents So Furnished Shall Be Found To Be Untrue Or False, The Tender Shall Be
Liable To Be Disqualified And Our Earnest Money Accompanying Tender Will Be Forfeited.
Also I/We Aware That If The Information / Document Found To Be Untrue Or False During
The Currency Of Contract, Our Contract Liable To Be Terminated.
I/ We Agree That The Amount Of Earnest Money Shall Not Bear Interest And Shall Be Liable To
Be Forfeited To The Corporation, Should I/We Fail To (I) Abide By The Stipulation To Keep The
Offer Open For The Period Of 120 Days From The Date Fixed For Opening The Same And
Thereafter Until It Is Withdrawn By Me/ Us By Notice In Writing Duly Addressed To The
Authority Opening The Tenders. (Ii) Security Deposit As Specified In Schedule ‘A’ And Within
The Time Limit Laid Down In 24 Of Detailed Tender Notice. The Amount Of Earnest Money
May Be Adjusted Towards The Security Deposit Or Refunded To Me /Us If So Desired By Me/Us
In Writing, Unless The Same Or Any Part Thereof Has Been Forfeit As Aforesaid.
Should This Tender Be Accepted I/ We Hereby Agree To Abide By And Fulfill All The Terms
And Provisions Of The Conditions Of Contract Annexed Hereto So Far As Applicable And In
Default Thereof To Forfeited And Pay To NMMC The Sums Of Money Mentioned In The Said
Conditions.
17
Annexure –3
Firm Details
18
Annexure –4
Details Of Works Of Similar Type And Magnitude Carried Out By The Tenderer (Last 3 Years)
Name Of The Tenderer :
Sr. Name Of Type Of Work Name Of Cost Of Date Of Stipulated Actual Remarks
No. Work Department & Work Starting Date Of Date Of
Address Completion Completion
1 2 3 4 5 6 7 8 9
1)
2)
3)
✳ Note: - The Turnover Amount Should Be Certified And Audited By CA Of Firm And Separate Sheet Should Be Enclosed
19
Annexure –5
Sr. No. Name Of Work Name Of Deptt. & Work In Hand Anticipated Date Remark
Adress Of Completion
Tender Cost Cost Of Remaining
Work
1. 2. 3. 4. 5. 6. 7.
Total
20
Annexure –6
List Of Works Tendered As On The Date Of Submission Of This Tender
Sr. No. Name Of Work Name Of Deptt. Works Tendered For Remark
& Adress
Estimated Cost Date When Stipulated Date Of
Decisions Period Of
Expected Completion
1. 2. 3. 4. 5. 6. 7.
Note : 25% To 50% Estimated Amount Shall Be Consider Based On Stipulated Period Of Completion
21
Annexure –7
A) Immediately Available
B) Proposed To Be Procured
For The Work.
22
Annexure – 8
Details Of Technical Personnel Available With The Contractor
Name Of The Tenderer :
Sr. Name Of Work Technical Whether Working Experience Of Period For Which Remarks
No. Qualification In Field Or In Execution Of The Person Is
Office Similar Works Working With
The Tenderer
1 2 3 4 5 6 7
23
GENERAL CONDITIONS OF CONTRACT
PART - I
INTERPRETATIONS AND DEFINITIONS
1 S i ngul ar And W here The C ont ex t S o R equi res , W ords Im port i n g The
P l ural . S i ngul ar S hal l Al s o M ean The P l ural An d Vi ce Ve rs a.
2. Gender W ords Im port i n g The M as cul i ne Ge nder S hal l Al s o
In cl ude The Fem i ni ne Gende r.
3. Defi ni t i ons (a) ‘C orporat i on’ S hal l M ean Navi M um bai
M uni ci pal C orpora t i on As Inco rporat ed Under
The BP M C Act , 194 9.
25
Neces s ar y Duri n g T he P rogres s Of Th e W ork To
Obvi at e An y R i s k Of Acci d ent Or Fai l ure Or
W hi ch Becom e N ec e s s ar y For S e curi t y.
( k) T h e ‘ Wo r ks ’ S h al l Me a n T h e T a s ks T o B e E x e c u t e d
In A c c o r d a n ce Wi t h T h e C o nt r a ct O r P a r t ( S ) T he r e o f ,
A s T h e C a s e Ma y B e , A n d S ha l l In c l u d e A l l E x t r a Or
A d d i t i o n al , Al t er e d O r S u b st i t ut e d W o r ks As
R e q u i r e d F or P er f or m a n c e O f T h e C o nt r a c t .
26
S hal l M eans The R el evant Annex ure Ap pended To
The Tende r P apers Is s ued B y The C orpo rat i on.
PART – II
INSTRUCTIONS TO CONTRACTOR
4. S cope Of The W ork To Be C a rri ed Out Unde r The C ont ract S hal l ,
W ork Ex cept As Ot herwi s e P rovi ded In Thes e C ondi t i ons ,
In cl ude Al l Labour, M at eri al s , Tool s , P l ant , Equi pm ent
And Trans po rt W hi ch May Be R equi red In
P reparat i on O f And For And In The Ful l And Ent i re
Ex ecut i on And C om pl et i on Of The W orks .
The Des c ri pt i ons G i ven In Th e S ch e dul e Of W orks
/ It em s / Quant i t i es , And The Bi l l s Of Quant i t i es S hal l ,
Unl es s Ot herwi s e S t at ed, Be H el d To Incl ude W as t e On
M at eri al s , C arri a ge And C art age, C arr yi ng In, R et urn Of
Em pt i es , Hoi s t i ng, S et t i ng, Fi t t i ng And Fi x i ng In
P os i t i on And Al l Ot her La bour N ec e s s ar y In And For
The Ful l And Ent i re Ex ecut i on And C om pl et i on As
Afores ai d In A cc ordance W i t h Good P ract i ce And
R ecogni z ed P ri nci pl es .
5. C orrupt Or The C orporat i on R equi res That The Bi dders / S uppl i ers /
Fraudul e nt C ont ract ors Under Thi s Tender Obs erve The Hi ghes t
P ract i ces S t andards Of Et hi cs Duri n g The P rocurem ent And
Ex ecut i on Of S uch C ont ract s . In P ur s uance Of Thi s
P ol i c y, The C orpor at i on Defi nes Fo r The P urpos es O f
Thi s P rovi s i on, The Term s S et Fort h As Fol l ows :
A)“C orrupt P ra ct i ce” M eans The O fferi n g, Gi vi n g,
R ecei vi ng O r S ol ici t i ng Of An y Thi ng Of Val ue To
In fl uenc e The Act i on Of The P ubl i c Offi ci al In The
P rocurem ent P roc es s Or In C ont ract Ex ecut i on; And
B)“ Fr audul ent P ract i ce” M e ans A M i s r epres ent at i on Of
Fact s In O rder To Infl uence A P ro cure m ent P roces s Or A
Ex ecut i on Of A C ont ract To Th e D et ri m ent Of Th e
C orporat i on, And In cl udes C ol l us i ve P ract i ce Am ong
Bi dders (P ri or To O r Aft er Bi d S ubm i s s i on) Des i gn ed To
Es t abl i s h Bi d P rices At Art i fi ci al Non-C om pet i t i ve
Lev el s And To Depr i ve The C orpor at i on Of The B enefi t s
Of The Fre e And Op en C om pet i t i on;
The C orporat i on W i l l R ej ect A P ropos al For Awa rd If It
Det erm i nes That T he Bi dder R ecom m ended For Aw ard
Has Enga ged In C orrupt Or Fraudu l ent P ract i ces In
C om pet i ng For The C ont ract In Ques t i on; The
C orporat i on W i l l A Fi rm Inel i gi bl e, Ei t her Indefi ni t el y
Or For A S t at ed P eri od Of Ti m e, To Be A ward ed A
C ont ract If It At A n y Ti m e Det erm i ne s That The Fi rm
Has Enga ged In C orrupt And Fraudu l ent P ract i ces In
C om pet i ng For, Or In Ex ecut i ng, A C ont ract .
27
Opt i onal To The C ont ract or To M ake The C ont ract
Depos i t In One O f T he Ot her O f The Fol l owi ng W a ys :
i) W hol l y In C as h Or.
ii) W hol l y In Fo rm Of Nat i onal S avi ng C ert i fi cat e
P l edged In F avour Of The C orporat i on Or Bank
Guarant e es / Fi x ed Depos i t From Nat i onal i s ed /
S chedul ed B anks In The Encl os ed Form a t .
iii) P art l y In C as h And P art l y In Form Of Nat i onal
S avi ng C ert i fi c at e P l edged In F avour Of The
C orporat i on Or Bank Gu arant ees / Fi x ed
Depos i t From Nat i onal i s ed / S chedul ed Banks
In Th e Encl os ed For m at
R et ent i on M one y:
The R em ai ni n g Am o unt Of Th e S ecu ri t y Depos i t I.E. 2%
S hal l Be R ecove re d From The C ont r act or’s R unni n g
Bi l l s At The R at e Of Fi ve P e rcent An d S uch R et ent i on
Toget h er W i t h The C ont ract Depos i t M ade As Afores ai d
S hal l Not Ex ceed In The Aggre gat e Fi v e P ercent O f The
C ont ract S um Aft er W hi ch S uch R et ent ion W i l l C eas e.
29
Agreem ent W here Under Th e P a rt ner s hi p Fi rm W oul d
Have The R i ght To C arr y Out Th e W ork H ereb y
Undert aken B y Th e C ont ract or. If P r i or Approval As
Afores ai d Is Not Obt ai ned The C ont ract S hal l Be
Deem ed To H ave B een As s i gned In C ont ravent i on Of
The C l aus e N o. 10 8 Her eof And The S am e Act i on M a y
Be Taken And T he S am e C ons equenc es S hal l Ens ure As
P rovi ded For In Th e S ai d C ondi t i on.
19. P ower Of The C ont ract or S ha l l Not Is s ue An y K i nd Of P ower Of
At t orne y At t orne y In F avo ur Of Hi s Banke rs Fo r R out i ne
P a ym ent s To The C ont ract ors Throu gh Bank.
20. C ont ract ors The C ont ra ct or S hal l Em pl o y In And About Th e
S t aff Ex ecut i on Of W orks Onl y S uch P ers on s As Are S ki l l ed
And Are Ex peri enc ed In Thei r S ever al Trades And The
Engi ne er S hal l B e At Li be rt y To Obj ec t To And R equi re
The C ont ract or To R em ove From The W orks An y P ers on,
Em pl o yed B y Th e C ont ract or In Or Abo ut The Ex ecut i on
Of The W orks , W ho In The Opi ni on Of The Engi ne er
M i s conduct s Hi m s el f Or Is Incom pet ent Or Ne gl i gent In
The P roper P erform ance Of Hi s Dut i es And S uch P ers on
S hal l Not Be A gai n Em pl o yed Upon Th e W orks W i t hout
P erm i s s i on Of The Engi ne er.
21. C ont ract ors ’ The C ont ract or S ha l l Hi m s el f S upervi s e The Ex ecut i on
S upervi s i on Of W orks Or S hal l Appoi nt C om pet ent Agent Approved
B y The En gi nee r To Act In Hi s S t ead. If, In Th e Opi ni on
Of The Engi ne er The C ont ract or Hi m s el f Not Have
S uffi ci ent Knowl ed ge And Ex peri enc e To Be C apabl e Of
R ecei vi ng Ins t ru ct i ons Or C annot Gi ve Hi s Ful l
At t ent i on To The W orks , The C ont ra ct or S hal l At Hi s
Own Ex pens e, Em pl o y As Hi s Acc r edi t ed A gent An
Engi ne er Or A S ui t abl y Qu al i fi ed And Ex peri enced
P ers on Approv ed B y Th e En gi n eer. T he Nam e Of The
Agent S o Appoi nted, Al ong-W i t h The Qual i fi cat i ons ,
Ex peri ence And Addres s S hal l Be C omm uni cat ed To The
Engi ne er. Th e A ge nt S hal l Be A R e s pons i bl e P ers on
Adequat el y O r gani s at i on B y The C ont ract or To Tak e
Deci s i on On S i t e And To S pend M oney If R equi red Fo r
P rocuri ng M at eri al And Labou r Et c. To C arr y Out
Em er genc y W orks In Th e Int e res t Of The W ork, If S o
R equi red By Th e En gi neer. Ord ers Gi ven To
C ont ract or’s A gent S hal l Be C ons i der ed To H ave The
S am e Force As If Thes e Had Be en Gi ven To The
C ont ract or Hi m s el f.
If The C ont ract or F ai l s To Appoi nt A S ui t abl e A gent As
Di rect ed B y The En gi ne er, The En gi n ee r S hal l Have Ful l
P owers To S us pend The Ex ecut i on Of The W orks Unt i l
S uch Dat e As A S ui t abl e A gent Is Ap poi nt ed And The
C ont ract or S hal l Be Hel d R es pons i bl e For The Del a y S o
C aus ed To The W or ks .
22. Em pl o ym ent The Contractor Shall Employ The Labour In Sufficient Numbers To
Of Labour Maintain The Required Rate Of Progress And Of Quality To Ensure
Workmanship, Of The Degree Specified In The
Contract And To The Satisfaction Of The Engineer. The Contractor
Shall Not Employ In Connection With The Work Any Child Who Has
Not Completed His 15th Year Of Age. He Shall Also Not Employ An
Adolescent Who Has Not Completed His 18th Year Unless He Is
Certified Fit For Work As An Adult As Prescribed Under Clause (B)
Of Sub-Section (2) Of Section 69 Of The Factories Act, 1948.
The C ont ract or S hal l M ake Hi s Own Arran gem ent For
The En ga gem ent Of Al l Labou r Local O r Ot herwi s e.
The C ont ract or S hal l Indem ni f y The C orporat i on Or An y
Agent , S ervant Or Em pl o yee Of C or porat i on For An y
Laps es On The P a rt Of C ont ract o r On Account O f Non-
C om pl i ance Of Abo ve R efer red A ct s .
30
23. C om pl i ance The C ont ract or S hal l P a y Fai r And R eas onabl e W ages To
With Labour The W orkm en Em pl o yed B y Hi m , F or The C ont ract
R egul at i on. Undert aken B y Hi m . In The Ev ent Of An y Di s put e
Ari s i ng B et ween T he C ont ract o r And Hi s W orkm en On
The Grounds That The W ages P ai d A re Not F ai r And
R eas onabl e, The Di s put e S hal l Be R eferr ed W i t hout
Del a y To Th e En gi neer, W ho S hal l D eci de Th e S am e.
The Deci s i on Of The Engi ne er S hal l Be C oncl us i ve And
Bi ndi ng On Th e C ont ract or But S uch Deci s i on S hal l Not
In An y W a y A ffe c t The C ondi t i ons In Th e C ont ract
R ega rdi n g The P a ym ent To Be M ade B y C orpor at i on At
The S am e S anct i one d Tender R at es .
The Em pl o ye es O f The C ont ract or And The S ub-
C ont ract or In No C as e S hal l Be Treat ed As Th e
Em pl o yees Of The C orporat i on At An y P oi nt Of Ti m e.
31
R equi red To T ake A Li cen ce From The Des i gn at ed
Offi ce r. The Act Is Appl i cabl e To The Es t abl i s hm ent s Or
C ont ract or Of P ri nc i pl e Em pl o yer If Th e y Em pl o y 20 Or
M ore C ont ract Labo ur.
32
P rovi ded In Th e A ct And G et The S am e C ert i fi ed B y Th e
Des i gn at ed Aut hori t y.
The Contractor Shall In Any Case Pay All Taxes Which May Have To
Be Paid In Respect Of All Ground, Sheds Or Offices Used As Above,
And All The License Fees, Etc., That May Be Demanded For The
Storage Or Otherwise Of The Various Articles As Per Rules In Force.
The Contractor Shall Provide, If Necessary Or If Required On The Site
All Temporary Accesses Thereto And Shall Alter, Adopt And
Maintain The Same As Required From Time To Time And Shall Take
Up And Clear Them Away As And When No Longer Required And
Make Good All Damage Done To The Site.
The Contractor Has Also Be Allowed At The Sole Discretion Of The
Corporation To Stack Material Required For Execution Of Work In
Corporation Land Out Of The Project Area On Payment Of Necessary
Charges As Per Corporation Rules For Use Of Roads Public Utility
Places.
32. W at er S uppl y The W at er W i l l Not Be S uppl i ed B y The C orporat i on.
For The C ont ract or Has To M ake Hi s Own Arran gem ent s Fo r
C orporat i on S uppl y Of W at er. Howeve r On Av ai l a bi l i t y Of W at er It
W ork C an Be S uppl i ed A t The Or gani s at i on C orporat i on R at e
And Term s And C on di t i ons .
33. El ect ri c No P ower C onnect i on S hal l B e P rovi de d. The C ont ra ct or
S uppl y S hal l M ake At Hi s Own C os t Hi s Own Arran gem ent For
P ower C onnect i on, If R equi red.
34. C ont ract or To The C ont ract or S hal l M ake Hi s Own Arran gem ent s For
P rot ect The P rot ect i ng The W o rk / P rot ect i on Agei s t Obs t ruct i ons
W ork From An y Ant i -S o ci al El em ent s B y Taki ng At Hi s /
Thei r C os t P ol i ce P rot ect i on Or S uch Ot her Le gal
M et hods Throu gh Law Enfo rci n g Aut h ori t i es And That
The C orporat i on S h al l Not Be Li abl e T o C om pens at e The
C ont ract or On Thi s Account . The C orporat i on W oul d
Onl y Forw ard Th e Appl i cat i on Of The C ont ract or To The
P ol i ce Dept t . W i thout An y Li abi l i t y A gai ns t The
C orporat i on On Thi s Account .
36
Corporation Against All Losses And Claims For Injuries Or Damage
To Any Person Or Any Property Whatsoever Which May Arise Out Of
Or In Consequence Of The Construction And Maintenance Of The
Work And Against All Claims, Demands, Proceedings, Damages,
Costs, Charges And Expenses Whatsoever In Respect Of Or In
Relation Thereto.
PROVIDED Always That Nothing Herein Contained Shall Be Deemed
To Render The Contractor Liable For Or In Respect Of Or To The
Corporation Against Any Compensation Or Damage Caused By The
Excepted Risks.
The Contractor Shall At All Times Indemnify The Corporation Against
All Claims, Damages Or Compensation Under The Provisions Of
Payment Of Wages Act 1936, Minimum Wages Act 1948, Employers
Liability Act 1938, The Workmen’s Compensation Act 1923,
Industrial Dispute Act 1947, Indian Factories Act 1948 And Maternity
Benefit Act, 1961 Or Any Modifications Thereof And Rules Made
There Under From Time To Time Or As A Consequence Or Any
Accident Or Injury To Any Workman Or Other Persons In Or About
The Works, Whether In The Employment Of The Contractor Or Not,
Save And Except Where Such Accident Or Injury Have Resulted From
Any Act Of The Corporation, Their Agents Or Servants, And Also
Against All Cost, Charges And Expenses Of Any Suit, Action Or
Proceedings Arising Out Of Such Accident Or Injury And Against All
Sum Or Sums Which May With The Consent Of The Contractor Be
Paid To Compromise Or Compound Any Such Claim Without
Limiting His Obligations And Liabilities As Above Provided. The
Contractor Shall Insure Against All Claims Damages Or
Compensation Payable Under The Various Acts Mentioned Above Or
Any Modifications Thereof Or Any Other Law Relating Thereto.
The Aforesaid Insurance Policies Shall Provide That They Shall Not
Be Canceled Till The Commissioner Has Agreed To Their
Cancellations.
The Contractor Shall Prove To The Engineer From Time To Time That
He Has Taken Out All The Insurance Policies Referred To Above And
Has Paid The Necessary Premia For Keeping The Policies Alive Till
The Expiry Of The Defects Liability Period After Completion Of
Work For A Period Of Not Exceeding 12 Months As Per Directives Of
Directorate Of Insurance, Maharashtra State.
The Contractor Shall Ensure That Similar Insurance Policies Are
Taken Out By His Sub Contractors(If Any) And Shall Be Responsible
For Any Claims Or Losses To The Corporation Resulting From Their
Failure To Obtain Adequate Insurance Protection In Connection
Thereof. The Contractor Shall Produce Or Cause To Be Produced By
His Sub-Contractor (If Any) As The Case May Be, The Relevant
Policy Or Policies And Premium Receipts As And When Required By
The Engineer.
37
Behavi o r B y Or Am ongs t The W orkers And Ot her
Em pl o yed On Th e W orks And For Th e P res erv at i on Of
P eace And P rot ect i on Of The Inhabi t a nt s And S ecuri t y
Of P ropert y In Th e Nei ghbo rhood Of The W orks . He
S hal l Al s o P a y Th e C har ges O f S uch S peci al P ol i ce ( If
An y) As The En gi ne er M a y D eem Ne ces s ar y.
40
Ni ght On An y P ar t Of The W orks . In C as e Of An y
Offen ce C om m i t t ed B y An y Of The Labour O r
Em pl o yees O f The C ont ract or Agai n s t An y Of The
P rovi s i ons Of Thi s C ondi t i on The C ont ract or S hal l Be
Li abl e To A P enal t y Not Ex ceedi n g R upees Hunder ed
For Ever y S uch O ff ens e And The S am e S hal l Be C har ged
To The Ac count Of The C ont ract or.
48. Treas ur e Al l Fos s i l s , C oi ns , Art i cl es Of Val ue Or Ant i qui t y And
Trove Fos s i l s S t ruct ural And Ot her R em ai ns Thi ngs Of G eol ogi cal O r
Et c. Archa eol ogi cal Int e res t Di s cove red In Or Upon Th e S i t e
S hal l Be Abs ol ut e P ropert y Of Th e C orp orat i on And The
C ont ract or S hal l D ul y P res erve Them And S hal l Take
P recaut i ons To P re vent Hi s W orkm en Or An y Ot h er
P ers on From R em ov i ng Or D am a gi n g A n y S uch Art i cl es
Or Thi ng And S hal l Im m edi at el y Upon Di s cover y
Thereof And Befo r e R em oval Acquai nt The Engi neer
W i t h S uch Di s cove r y And S hal l F rom Ti m e To Ti m e
Del i ver Th e S am e To S uch P ers on Or P ers ons As The
Engi ne er M a y From Ti m e To Ti m e Ap poi nt To R ecei v e
The S am e At The E x pens e Of The C orp orat i on.
49. P at ent ’ R i ght The C ont ract or S ha l l S ave Harm l es s An d Ind em ni f y The
And C orporat i on From And Agai ns t Al l C l ai m s And
R o yal t i es P roceedi n gs For O r On Account O f In fr i ngem ent O f An y
P at ent R i ght s , Des i gn Trad em ark Or Nam e Of Ot her
P rot ect ed R i ght s In R es pect Of Any C ons t ru ct i onal
P l ant , M achi ne W ork, Or M at e ri al Us ed For Or In
C onnect i on W i t h The W orks Or An y O f Them And From
And Agai ns t Al l C lai m s , P roceedi n gs , Dam a ges , C os t s ,
C harges And Ex pens es W hat s oever In R es pect The reof
Or In R el at i on Theret o. Ex cept W here Ot herwi s e
S peci fi ed, The C on t ract or S hal l P a y Al l Tonna ge And
Ot her R o yal t i es , R ent And Ot h er P a ym ent s Or
C om pens at i on, If A n y, For Get t i n g S t one, S and, G ravel ,
C l a y Or Ot her M at e ri al s R equi red Fo r T he W orks Or An y
Of Them .
50. Quarr y I) Qua rr y Fo r Ex t ract i on Of M urum , S t one, R ubbl e Or
An y Ot her M at eri al S hal l Not Be M ade Avai l abl e B y Th e
C orporat i on The C ont ract or Has To M ake Hi s Own
Arran gem ent s For Q uarr y At Hi s C os t .
Ii )Th e S uc ces s ful T endere r S hal l S ubm i t Quarr y P e rm i t
From The C om pet ent Aut hori t y B ef ore S t art i ng The
W ork
.
51. P hot ographs No P hot ogr aphs Of The W ork Or An y P art There Of O r
Of The W orks Equi pm ent Em pl o yed Ther eon S hal l Be Taken Or
P erm i t t ed B y The C ont ract or To Be Taken B y An y Of
Hi s Em pl o ye es O r An y Em pl o ye es Of Hi s S ub-
C ont ract or W i t hout The P ri or Approval Of The En gi ne er
In W ri t i ng And No S uch P hot ographs S hal l Be P ubl i s hed
Or Ot her wi s e C i rcu l at ed W i t hout The Approval Of The
Engi ne er In W ri t i ng.
60. Di s crepan ci es The Dra wi ngs And S peci fi cat i ons Are To Be C ons i dered
In D rawi n gs As M ut ual l y Ex pl anat or y Of Ea ch Ot her, Det ai l ed
Or Drawi n gs B ei ng Fol l owed In P refe ren ce To S m al l S cal e
S peci fi cat i ons Drawi n gs And Fi gured Di m ens i ons In P refer enc e To
S cal e And S peci al C ondi t i ons In P refe rence To Gen eral
C ondi t i ons . S peci al C ondi t i ons Or Di mens i ons Gi ven In
The S peci fi c at i ons S hal l S upers ede Al l El s e. S houl d An y
Di s crepan ci es , Ho wever Appe ar, O r S houl d An y
M i s unders t andi ng A ri s e As To The M e a ni ng And Im port
Of The S ai d S pec i fi cat i ons Or Dr aw i ngs , Or As To
M eani ng And As T o The To The Di m ens i ons Or Th e
Qual i t y Of Th e M at eri al s O r Th e Due And P rope r
Ex ecut i on Of The W orks , Or As To The M eas ur em ent Or
Qual i t y And Val uat i on Of The W orks Ex ecut ed Under
Thi s C ont ract , Or As Ex t ra Thereupo n The S am e S hal l
Be Ex pl ai ned B y T he En gi ne er Be Bi ndi ng Upon The
C ont ract or And C o nt ract or S hal l B e E x ecut e The W ork
Accordi n g S uch Ex pl anat i on (S ubj ect As Afor es ai d) And
W i t hout Ex t ra C harge Or Deduct i on To Or From The
C ont ract And S hal l Al s o Do Al l S uch W ork And Thi ngs
As M a y Be © For The P roper C om pl et i on Of W orks As
Im pl i ed B y Th e Drawi n gs And S pe ci fi cat i ons , Even
Though S uch W ork s And Thi ngs Are Not S peci fi cal l y
S hown And Des c ri bed In Th e S ai d Drawi n gs And
S peci fi cat i ons . The Fi nal De ci s i on Of T he C om m i s s i oner
In C as e A R efe renc e Be M ad e To Hi m Under C l aus e No.
89 Be Bi ndi n g Up on The C ont ract or And C ont ract or
S hal l Ex ecut e The W orks Accor di ng To S uch
Ex pl anat i on ( S ubj ect To Afores ai d ) A nd S hal l Al s o Do
Al l S uch W orks And R equi red Thi ngs As M a y Be
Neces s ar y For Th e P roper C om pl et i on Of W orks As
Im pl i ed B y Th e Drawi n gs And S pe ci fi cat i ons , Even
Though S uch W ork s And Thi ngs Are Not S peci fi cal l y
S hown And Des cr i bed In Th e S ai d Drawi n gs And
S peci fi cat i ons .
61. Engi ne er To The En gi neer S hal l Have The P owe r An d Aut hori t y From
Have P ower Ti m e To Ti m e And At Al l Ti m es To M ake And Is s u e
To Is s ue S uch Furt her D ra wi ngs And To Gi ve S uch Furt he r
Furt her Ins t ru ct i ons And D i rect i ons As M a y Appear To Hi m
Drawi n gs Or Neces s ar y O r P ro per For Th e Gu i dance O f Th e
Ins t ru ct i ons C ont ract or And The Good And S uffi ci ent
Ex ecut i on Of The W orks Accordi ng T o Term s Of The
S peci fi cat i ons And C ont ract or S hal l Recei ve, Ex ecut e
Obe y And Be Boun d B y Th e S am e, A ccordi n g To Th e
True Int ent And M eani ng The reof, As Ful l y And
Effect u al l y As Tho ugh The S am e Had Accom pani ed Or
Had Be en M ent i oned Or R ef err e d To In The
S peci fi cat i on. The Engi ne er M a y Al s o Al t er Or Var y The
43
Lev el s Or P os i t i on Of An y W orks C ont em pl at ed B y The
S peci fi cat i ons , Or M a y Ord er An y Of Th e W orks
C ont em pl at ed Ther e b y To Be Om i t t ed, W i t h Or W i t hout
The S ubs t i t ut i on Of An y Ot her W orks In Li eu The reof,
Or M a y Ord er An y W o rk Or An y P ort i on Of W ork
Ex ecut ed Or P art i al l y Ex ecut ed, To Be R em oved,
C hanged O r Al t ere d, And If Ne edful , M a y Orde r That
Ot her W orks S hal l Be S ubs t i t ut ed Ins t ead The reof And
Di ffer ence Of Ex pens e Oc cas i oned B y An y S uch
Di m i nut i on Or Al t erat i on S o Ordered And Di rect ed S hal l
Be Added To O r Deduct ed From The Am ount Of Thi s
C ont ract As P rovi ded Under Th e C l aus e No. 101 And
102.
No W ork W hi ch R adi cal l y C han ges Th e Ori gi nal Nat u re
Of The C ont r act S hal l Be Orde red B y Th e En gi ne er
And In The Event Of An y Devi at i on Bei n g Orde red
W hi ch In The Opi ni on Of Th e C ont rac t or C han ges Th e
Ori gi nal Nat ure Of C ont ract He S hal l N evert hel es s C a rr y
It Out And Di s a gre e m ent As To Th e N at ure O f The W ork
And The R at e To B e P ai d Th ere fore S hal l B e R es ol ved
In Acco rdanc e W i t h C l aus e No.114.
The Ti m e For C om pl et i on Of The W orks , S hal l In The
Event Of An y Devi at i ons R es ul t i ng In Addi t i onal C os t
Over Th e C ont ract S um Bei n g Ord ered , Be Ex t ended Or
R educed R eas onabl y B y The En gi ne er . The Engi nee r’s
Deci s i on In Thi s C a s e S hal l Be Fi nal .
62. Lev el s Al l Lev el s R ef err ed To In C onne ct i on W i t h Thes e W orks
Are Bas ed On Gr eat Tri gonom et ri c S urve y (G.T.S .)
Lev el s . The C ont ra ct or S houl d Al s o Keep The Lev el i ng
Ins t rum e nt In Good W orki ng C ondi t i on Through Out The
P eri od Of C ons t ruct i on W ork On S i t e.
63. S et t i ng Out The Engi ne er S ha l l S uppl y Di m ens i oned Drawi n gs ,
The W ork. Lev el s And Ot her Inform at i on Ne ces s a r y To En abl e The
C ont ract or To S et Out The W orks . The C ont ract or S hal l
P rovi de Al l S et t i ng Out App arat us At Hi s Own C os t ,
S uch As Le vel i n g Ins t rum ent s In Good W orki n g
C ondi t i on And Appl i ances , Al l P egs , R angi n g R ods ,
Lon g M e as uri n g R ods , M arked M et r es And Or gani s at i on
And Ea ch M et r e An d Or gani s at i on Nu m bered, P ot s And
S i ght -R ai l s , Boni n g R ods , M oul ds , Tem pl at es , Et c.
Toget h er W i t h An y R eas onabl e Num b er Of La boure rs
That M a y B e R eui r ed And S et Out The W ork And Be
R es pons i bl e For T he Ac cura c y O f T he S am e. The
C ont ract or S hal l A m end At Hi s Own C os t And To The
S at i s fact i on Of Th e Engi ne er An y Erro r Found At An y
S t age W hi ch M a y A ri s e Throu gh Ina ccu rat e S et t i ng Out .
The C ont ract or S ha l l P rot ect And P re s erve Al l Ben ch
M arks Us ed In S et t i ng Out The W ork Ti l l The End Of
Defe ct s Li abi l i t y P e ri od Unl es s The En gi ne er Di rect s It s
Earl y R em oval . The C ont ra ct or S h oul d Al s o Ke ep
Lev el i ng Ins t rum e nt In Good W orki ng C ondi t i on
Throughout Th e P er i od Of C ons t ruct i on W ork On S i t e.
64. W orks C l os ed No W ork S hal l B e Done Bet we en S uns et And S unri s e Or
Bet we en On S unda y Or M uni ci pal Hol i da ys And Ex cept W it h The
S uns et And S peci al S anct i on Of The En gi nee r In W ri t i ng P revi ous l y
S unri s e Or On Obt ai ned And The W i t hhol di ng Of S uc h S anct i ons S hal l
S unda ys And Be No Ground Of C om pl ai nt On The P art Of C ont ract or
Hol i da ys Or C aus e Fo r C om pens at i on To Hi m , Or Ex cus e For Not
C om pl et i ng The W ork W i t hi n The C ont ract P e ri od. The
P eri od W i t hi n W hi ch The W ork H as To Be C arri ed Out
And C om pl et ed Has Be en Fi x ed In T er m s Of Thi s C l aus e
W i t h The P rovi s i on That The Tot al Num ber Of Hours O f
W ork P erm i s s i bl e S hal l Not Ex ceed 48 Hours In A W eek
And In No C as e M ore Than 8 Hours On An y W orki ng
44
Da y, The Act ual T i m e W i t hi n W hi ch The S ai d Hou rs
S hal l Be W orked Be i ng S ubj ect To M ut ual Arran gem ent s
W i t h The C ont ract or At The C om m encem ent Of The
W orks Or From Ti m e To Ti m e As M a y Be R equi red And
P rovi ded That Al l W orks S hal l Be S t opped For R es t And
M eal s For One Ho ur At About M i d- Da y Ex cl us i ve Of
The P erm i s s i bl e Hours Afores ai d For T he W orks .
Though S an ct i on M a y Be Acco rded To The C ont ract or
To W ork On Da ys And At Ti m es Ot herwi s e Norm al l y
Non-P erm i s s i bl e Under Thi s C ont ract , The C ont ract or
S hal l Be R equi re d To B ear The C os t For S uch
S upervi s i on As In T he Opi ni on Of The Engi ne er M a y Be
Neces s ar y At Thes e Ti m es .
66. Dut i es And The Duties Of The Representative Of The Engineer Are To Check,
P owers Of Watch And Supervise Work And To Test And Examine Any Material
The To Be Used Or Workmanship Employed In Connection With The
Engi ne er’s Works. He Shall Have No Authority To Relieve The Contractor Of
R epres ent at i ve Any Of His Duties Or Obligations Under The Contract Nor To Except
As Expressly Provided Here Under Or Elsewhere In The Contract To
Order Any Work Involving Delay Or Any Extra Payment By The
Corporation Or To Make Any Variation Of Or In The Works.
Fai l ure O f The R epres ent at i ve Of T he Engi ne er To
Di s approve An y W ork Or M at eri al S hal l Not P rej udi ce
The P ower Of The Engi n eer Ther ea ft er To Di s app rove
S uch W ork Or M at eri al And To Order T he P ul l i ng Down,
R em oval Or B reaki n g Up Th ereo f.
If The C ont ra ct or S hal l Be Di s s a t i s fi ed W i t h An y
Deci s i on Of The R epres ent at i ve Of The
Engi ne er H e S hal l Be Ent i t l e d To R efer Th e
M at t er To The En gi neer W ho S hal l Thereupon C onfi rm ,
R evers e O r Ve r y S uch Deci s i on.
67. Engi ne er’s The W hol e Of The W ork S hal l Be Under The Di r ect i on
Deci s i on Of The En gi ne er, W hos e De ci s i on S hal l B e Fi nal ,
C oncl us i ve And Bi ndi ng On Al l P art i es To The C ont ract ,
45
On Al l Ques t i ons R el at i ng To T he C ons t ruct i on
And M eani n g Of P l a ns , W orki ng Drawi ngs , S ect i ons And
S peci fi cat i ons C onnect ed W i t h The W ork.
68. Ins t ru ct i ons The C ont ract or O r Hi s Agent S hal l Be In At t endan ce At
To C ont ract or The S i t e(S ) Duri n g Al l W orki n g Hours And S hal l
S upervi s e The Ex ecut i on Of The W orks W i t h S uch
Addi t i onal As s i s t ance In Ea ch Trade As
The En gi neer M a y C ons i der Nec es s ar y. Orde rs Gi ven To
The C ont ract or’s Agent S hal l Be C o ns i dered To Hav e
The S am e For ce A s If The y Had Be e n Gi ven To The
C ont ract or Hi m s el f.
The Engineer Shall Communicate Or Confirm His Instruction To The
Contractor In Respect Of The Execution Of Work In A “Works Site
Order Book” Maintained In The Office Of The Engineer And The
Contractor Or His Authorised Representative Shall Confirm Receipt
Of Such Instructions By Signing The Relevant Entries In This Book. If
Required By The Contractor He Shall Be Furnished A Certified True
Copy Of Such Instruction(S). If The Contractor Fails To
Comply With The Instruction(S) Of The Engineer, The Engineer May
Impose The Daily Penalty Of .500 (Rupees Five Hundred) For Each
Of Such Defaults. This Penalty Will Not Prejudice The Right Of The
Municipal Commissioner Or The Engineer To Claim Compensation.
69. W ork Order A W ork Order Book S hal l Be M ai nt ai ned On S i t e And It
Book S hal l Be Th e P r opert y Of C orpo r at i on And The
C ont ract or S hal l P rom pt l y S i gn Orde rs Gi ven Therei n B y
Engi ne er O r Hi s R epres ent at i ves An d Hi s S uperi or
Offi ce rs And C om p l y W i t h Them . The C ont ract or S hal l
R eport The C om pl i ance In Good Ti m e S o That It C an Be
C hecked. Th e C ont r act or W i l l Be Al l owed To C op y Out
Ins t ru ct i on Therei n From Ti m e To Ti m e .
70. M ana gem ent Ei t her The En gi ne e r Or Th e C ont ract ors M a y R equi r e
M eet i ng The Ot her To At t en d M ana gem ent M eet i ng. The Bus i nes s
Of A M ana gem ent M eet i ng S hal l B e To R evi ew The
P l ans For R em ai ni n g W orks .
Engi ne ers S hal l R e cord The Bus i n es s Of M an a gem ent
M eet i ngs And Is T o P rovi de C opi es Of Hi s R e cord To
Thos e At t endi n g T he M e et i ngs . The R es pons i bi l i t y Of
The P art i es For Act i ons To B e Tak en Is To B e D eci ded
B y The En gi ne er Ei t her At The M an a ge m ent M eet i ngs O r
Aft er Th e M ana gem ent M eet i n gs And S t at ed In W ri t i ng
To Al l W ho At t end The M eet i n gs .
71. M at eri al s (A) Material To Be Provided By The Contractor:
The Contractor Shall, At His Own Expense, Provide All Materials
Required For The Works.
All Materials To Be Provided By The Contractor Shall Be In
Conformity With The Specifications Laid Down In The Contract And
The Contractor Shall, Furnish Proof To The Satisfaction Of The
Engineer That The Materials So Comply. Contractor Shall Produce
Proof Viz. Challans, Bills, Vouchers Etc. So As To Ensure That The
Material Was Brought On Site And Quantities Used As Per The
Norms, Specifications Etc.
Offi ce rs Of Th e C or porat i on C oncerned W i t h The W ork
S hal l Be Ent i t l ed At An y Ti m e To Ins p ect And Ex am i ne
An y M at eri al Int end ed To Be Us ed In O r On The W orks
Ei t her On The S i t e Or At Fact or y O r W orks hop Or Ot her
P l aces W here S uch M at eri al s Are As s e m bl ed, Fabri cat ed
Or M anuf act ur ed O r At An y P l a ce(S ) W here Thes e Ar e
La yi n g Or F rom Whi ch Thes e Are B ei ng Obt ai ned And
The C ont ract o r S ha l l Gi ve S uch Fa ci l i t i es As M a y B e
R equi red Fo r S uch Ins p ect i on And E x am i nat i on. The
M at eri al s B rou ght On S i t e Out s i de W orki ng Hou rs S hal l
Be S t ack ed S epar at el y Ti l l The y A re Ins pect ed B y The
Engi ne er Or Hi s R e pres ent at i ve.
Al l M at eri al s Bro ught To The S i t e S hal l Not Be
46
R em oved Off The S i t e W i t hout The P ri or W ri t t en
Approval Of Th e Engi ne er. But W henever Th e W orks
Are Fi nal l y C om pl e t ed The C ont ract or S hal l At Hi s Own
Ex pens e Fort hwi t h R em ove From The S i t e Al l S urpl us
M at eri al s Ori gi nal l y S uppl i ed B y Hi m .
The C ont ract or S hal l , At Hi s Own Ex pens e And W i t hout
Del a y, S uppl y To The En gi neer S am p l es Of M at eri al s
P ropos ed To Be Us ed In The W orks . T he En gi neer S hal l
W i t hi n S even Da ys Of S uppl y Of S a m pl es Or W it hin
S uch Furt her P e ri o d As He M a y R equ i re And Int i m at ed
To The C ont ract or In W ri t i ng, Infor m The C ont ract or
W het her The S am pl es Are Approv ed B y Hi m Or Not .
If The S am pl es A re Not Approved The C ont ract or S hal l
Fort hwi t h Arran ge To S uppl y To The Engi ne er For
Approval Fres h S am pl es C om pl yi n g With The
S peci fi cat i ons Lai d Down In The C ont ra ct .
The En gi ne er S ha l l Have Ful l P ow ers To R equi re
R em oval Of An y O r Al l Of The M at e ri al s Brou ght To
S i t e B y The C ont r a ct or W hi ch Are No t In Ac cordan ce
W i t h The C ont ract S peci fi cat i ons Or W hi ch Do Not
C onform In C hara ct er Or Qual i t y To The S am pl es
Approved B y Hi m . In C as e Of Def aul t On The P art Of
The C ont ract or In R em ovi ng The R ej ect ed M at e ri al s ,
The En gi ne er S hal l Be At Li b ert y To Hav e Th em
R em oved B y Ot her M eans . The En gi ne e r S hal l Hav e Ful l
P owers To P rocu re Ot her P rop er M at eri al s To B e
S ubs t i t ut ed For R eject ed M at e ri al s And In The Ev ent Of
The C ont ract or R e f us i ng To C om pl y, H e M a y C aus e Th e
S am e To B e S uppl i e d B y Ot h er M e ans . Al l C os t s , W hi ch
M a y At t end Upon S uch R em oval And/ Or S ubs t i t ut i on
S hal l Be Bo rne B y The C ont ract or.
47
M at eri al s And Furni s h Hi m s e l f W i t h S heds And Yards In S uch
R equi red S i t uat i ons And In S uch Num be rs As , In The Opi ni on Of
The En gi ne er Are R equi s i t e For C ar r yi n g Out The W orks
Under Thi s C ont r ac t , And The C ont ract or S hal l Keep At
Each Of S uch S heds And Yards A S uffi ci ent Quant i t y Of
M at eri al s In S t ock S o As Not To D el a y The C ar r yi n g Out
The W orks W i t h Due
Ex pedi t i on And The Engi ne er And Hi s S ub-Ordi nat es
S hal l Have Free A c ces s To The S ai d Sheds Or Yards At
An y Ti m e Fo r The P urpos e Of Ins pect i ng The S t ock Of
M at eri al s S o Kept In H and An y M a t eri al Or Art i cl e,
W hi ch The Engi ne er M a y Obj ect To , S hal l Not Be
Brou ght Upon O r Us ed In Th e W ork But S hal l Be
Fort hwi t h R em oved From The S heds Or Yards B y The
C ont ract or At Hi s Own C os t . The C ont ract or W i l l
Howeve r Be Al l owed To Us e For Th e Above P urpos e
The C om pl et ed P ort i on Of The Bui l di ngs If Avai l abl e.
(B) General :
C em ent Brou ght On S i t e B y The C on t ract ors S hal l Be
S t ored In W at erpro of Godown W i t h Two Locks On Ea ch
Door. The Ke y Of One Lock Of Each Door S hal l R em ai n
W i t h The Engi neer Or Hi s R epres ent at i ve And That Of
The Ot her Lock With The C ont ract or’s
Or gani s at i on A gent At S i t e Of W orks S o That C em ent
Is R em ov ed From T he Godown Onl y A c cordi ng To Dai l y
R equi rem ent s W i t h The Knowl ed ge Of Bot h The P art i es .
77. C ont ract or To The C ont ract or S ha l l , If R equi red B y The En gi nee r In
S earch W ri t i ng, S earch Un der The Di re ct i on Of The En gi neer
For Th e C aus e O f An y Def ect , Im p e rfect i on O r F aul t
Appeari n g Du ri ng T he P rogres s Of Th e W ork Or In Th e
P eri od Of M ai nt enance. Unl es s S uch Defect ,
Im pe rfe ct i on Or F aul t S hal l Be One For W hi ch The
C ont ract or Is Li abl e Under The C ont r act , The C os t Of
The W ork C arri ed Out B y Th e C ont ra ct or In S ear chi ng
As Afores ai d S hal l Be Born e B y T he C orporat i on.
If S uch De fect , Im p erfe ct i on Or Faul t S hal l Be One For
W hi ch C ont ract or Is Li abl e As Afor es ai d, The C os t Of
The W ork C arri ed Out In S ear chi n g A s Afores ai d S hal l
Be Born e B y Th e C ont ract or And He S hal l In S uch C as e
R epai r, R ect i f y And M ake Good S uch Defect ,
Im pe rfe ct i on Or Fau l t , At Hi s Own Ex pens e.
78. Defaul t Of In C as e O f Def aul t On The P art Of The C ont ract or In
C ont ract or In C arr yi n g Out S uch Ins t ru ct i on Wi t hi n The Ti m e
C om pl i ance S peci fi ed The rei n Or, If Non, W i t hin A R eas onabl e
Ti m e, The C orporat i on S hal l Be Ent i t l ed To Em pl o y An y
Ot her P ers ons To C arr y Out Th e S a m e And Al l C os t s
C ons equent Thereo n Or Inci d ent al Theret o S hal l , Aft er
Due C ons ul t at i on W i t h The C orp orat i on And Th e
C ont ract or, Be Det erm i ned B y Th e En gi ne er And S hal l
Be R e cover abl e From The C ont r act or B y The
C orporat i on F rom An y M oni es Du e O r To Be com e Du e
To The C ont ra ct or And The En gi ne er S hal l Not i f y Th e
C ont ract or Ac cordi n gl y.
79. Ur gent W orks If An y Ur gent W ork ( In R es pe ct W hereof The Deci s i on
Of The En gi ne er S hal l Be Fi nal And Bi ndi ng) B ecom es
Neces s ar y And The C ont ract or Is Una bl e Or Unwi l l i ng
At Once To C arr y It Out , The Engi nee r M a y B y Hi s Own
Or Ot her W ork P eopl e, C arr y It Out As He M a y C ons i der
Neces s ar y. If The Ur gent W ork S hal l Be S uch As Th e
49
C ont ract or Is Li abl e Unde r The C ont r act To C a rr y Out
At Hi s Ex pens e A l l Ex pens e In curr e d On It B y The
C orporat i on S hal l Be R e cover abl e Fro m The C ont ract or
And Be Adj us t ed O r S et Off A gai ns t An y S um P a yabl e
To Hi m .
PART – IV
TIME SCHEDULE AND DELAYS
80. C o m me n c e me n t The Ti m e Al l owed For Ex ecut i on For The W orks As
T i me S peci fi ed In The C ont ract Docum ent s S hal l Be The
Es s ence Of The C o nt ract . The Ex ecut i on Of The W orks
S hal l C om m ence From The D at e S peci fi ed B y The
Engi ne er In W ri t i ng. If The C ont ract o r Fai l s Or Ne gl ect s
To C om m ence The Ex ecut i on Of The W orks As
Afores ai d, The C or porat i on S hal l W i t hout P rej udi ce To
An y Ot he r R i ght Or R em ed y Be At Li bert y To Forf ei t
The S ecuri t y Depos i t Abs ol ut el y.
81. E x t e n si o n O f In An y C as e W her e The Ti m e P res c ri be d For C om pl et i on
T i me F o r Of An y W ork Is Ex cl us i ve Of M ons oon P eri od. No N ew
C o mp l e t i o n Trench W ork S hou l d Be S t art ed Aft e r 15 t h M a y And
Due T o Ex i s ti ng Trench es Are R equi red To Be R ei ns t at ed B y
M o n s o on .
31 s t M a y Eve r y Y e ar. Th e S i t e S hal l Be C l ear ed In Al l
R es pect In cl udi ng R em oval Of S urpl us M at eri al On Or
Befo re 10 t h J une Of Ever y Y ear. The M ons oon P eri od
S hal l Be De em ed T o B e From 10 t h J une To 30 t h S ept . O f
The C al endar Yea r.
Howeve r, If Th e C ont ract or Is P erm i t t ed B y The
Engi ne er To W ork Duri n g An y M ons oon. P eri od, Al l
S uch P eri od S hal l Be T aken Int o Account F or The
C al cul at i ng The C o nt ract P eri od On P ro-R at a B as i s As
Under.
C os t Of W ork Done
Effect i ve Duri n g M ons oon
Da ys = - ---- --- - ---- ---- X N o. Of Da ys O f
Tot al C os t Of C ont ract P eri od
C ont rac t W ork
50
C ons i derat i on S hal l Be M ade B y T he C ont ract or In
W ri t i ng W i t hi n 14 (Fourt een ) D a ys Of The Happ eni ng Of
The Event C aus i n g Del a y. The C ont rac t or M a y Al s o, If
P ract i cabl e Indi cat e In S uch A R equ es t The P e ri od Fo r
W hi ch Ex t ens i on Is Des i red. In An y S uch C as e, The
Engi ne er M a y Gi v e A Fai r R e as ona bl e Ex t ens i on Of
Ti m e For C om pl et i on Of Indi vi dual It e m s Or Groups Of
It em s O f W ork For W hi ch S epar at e P eri ods Of
C om pl et i on Are S peci fi ed In The C ont ract Or Th e
C ont act As W hol e. The De ci s i on Of The En gi nee r In
R ega rd To The Ex t ens i on Wi l l Be C omm uni cat ed To The
C ont ract or In W ri t i ng W i t hi n A R eas o nabl e Ti m e And
The C ont ract or S ha l l Al s o Be P ai d S uch C om pens at i on
That In The Opi ni on Of The En gi n eer Is F ai r And
R eas onabl e To C ov er The Del a ys R es ul t i ng From The
P rovi s i ons Under The S ub C l aus e (E) Ab ove.
.10,000/- For All Contracts Over .25 Lakhs And Upto The Value
Of ..100 Lakhs.
..20,000/- For All Contracts Over .1 Crore And Upto The Value Of
..5 Crores
..35,000/- For All Contracts Over .5 Crores And Upto The Value
Of .10 Crores.
..50,000/- For All Contracts Over .10 Crores.
If The Attainment Of The Milestones Is Delayed For Reason Not
Attributable To The Contractors No Moneys Will Be Held In
Abeyance.
84. Di s rupt i on Of The C ont ract or S hal l Gi ve W ri t t en Not i ce To Th e
P rogr es s For Engi ne er W henev er P l anni ng Or P ro gre s s Of The W orks
La ck Of Is Li kel y To B e Del a yed Or Di s rup t ed Unl es s An y
Drawi n gs . Furt her D rawi n g Or Order, Incl udi ng A Di re ct i on,
Ins t ru ct i on Or App roval , Is Is s ued B y T he En gi n eer
51
W i t hi n A R eas onabl e Ti m e. The Not i ce S hal l Incl ud e
Det ai l s Of The Dr a wi ng Or O rder R eq ui red And Of W h y
And B y W hen It Is R equi red And O f An y D el a y Or
Di s rupt i on Li kel y T o Be S uff ered If It Is Lat e.
85. Del a ys Of If B y R eas on O f An y Fai l ure O r In abi l i t y Of Th e
Drawi n gs Engi ne er To Is s ue W i t hi n A Ti m e R easonabl e In Al l The
C i rcum s t ances An y Drawi n g Or Ord er R eques t ed B y The
C ont ract or In Ac co rdance W i t h The C l aus e 84 Of Thi s
C ondi t i on The C ont ract or S uffe rs Del a y, Then The
Engi ne er S hal l Ta ke S uch Del a y Int o Account In
Det erm i ni ng An y Ex t ens i on Of Tim e To W hi ch The
C ont ract or Is Ent i t l ed Under S ub-C l aus e (G) O f C l aus e
No. 82 Hereof. No M oni t ar y C l ai m W i ll Be Ent ert ai ned
On Thi s Account .
86. M ont hl y The C ont ract ors W i l l Be R equi red To S ubm i t The
R eport M ont hl y P rogres s R eport s B y The 2 n d Da y Of The
Fol l owi ng M ont h T o The En gi n eer F ai l ure On The P a rt
Of The C ont ra ct or To S ubm i t M o nt hl y R eport In
Ti m e W i l l At t ract Act i on As P er C l aus e No.83.
87. R at e Of If For An y R eas on, W hi ch Does Not Ent i t l e The
P rogr es s . C ont ract or To An Ex t ens i on Of Tim e, The R at e Of
P rogr es s Of Th e W orks Or An y S ect i on Is At An y Ti m e,
In The Opi ni on Of The Engi ne er, Too S l ow To C om pl y
W i t h The Ti m e For C om pl et i on, The Engi ne er S hal l S o
Not i f y Th e C ont rac t or W ho S hal l Thereupon Take S uch
S t eps As Are N eces s ar y, S ubj ect To Th e C ons ent Of The
Engi ne er, To Ex pedi t e P rogr es s S o As To C om pl y W i t h
The Ti m e For C om pl et i on. The C ont ract or S hal l Not Be
Ent i t l ed To An y A ddi t i onal P a ym ent For Taki n g S uch
S t eps . If, As A R e s ul t Of An y Not i c e Gi ven B y The
Engi ne er Und er Thi s C l aus e, The C ont ract or C ons i de rs
That It Is Ne ces s a r y To Do An y W ork At Ni ght O r On
Loc al l y R eco gni z ed Da ys Of R es t , He S hal l Be Ent i t l ed
To S eek The C ons ent Of The Engi neer S o To Do.
P rovi ded That If An y S t eps , T aken B y The C ont ract or In
M eet i ng Hi s Obl i gat i ons Under Thi s C l aus e, Invol ve The
C orporat i on In Addi t i onal S upervi s i on C os t s , S uch C os ts
S hal l Be Det erm i n ed B y The En gi ne er And S hal l Be
R ecover abl e From The C ont ract or, And M a y Be
Deduct ed B y Th e C orporat i on From An y M oni es Due Or
To Be com e Due T o The C ont ract or And The En gi nee r
S hal l Not i f y The C o nt ract ors Ac cordi n gl y.
88. S us pens i on Of (A)The C ont r act or S hal l , On R ecei pt Of The O rder In
W ork W ri t i ng Of Th e En gi neer, S us pend The P rogr es s Of The
W orks Or An y P art Thereof For S uch T i m e And In S uch
M anner As The En gi ne er M a y C ons i d er N eces s ar y For
An y O f The Fol l owi ng R eas ons : -
53
P eri od Of S us pen s i on P rovi ded Al wa ys That Th e
C ont ract or S hal l N ot Be Ent i t l ed To An y C l ai m In
R es pect Of An y S uch W orki ng M ach i ner y, S al ar y O r
W ages For The Fi r s t 30 Da ys W het he r C ons ecut i ve O r
In The A ggr e gat e O r S uch S us pens i on Or In R es pe ct Or
An y S us pens i on W hat s oever Occas i oned By
Uns at i s fact or y W or k Or An y Ot her D ef aul t On Hi s P art.
The Deci s i on Of The Engi ne er In Thi s R ega rd S hal l Be
Fi nal And C oncl us i ve A gai ns t The C ont r act or.
4) In Th e Event O f –
i) An y Tot al S t oppage Of W ork On Not i ce
From En gi nee r Und er S ub C l aus e (1) In That Beh al f.
(B) C om pl et i on P er i od 7 ½ P ercent
(As Ori gi nal l y S t i pul at ed
Or As Ex t ended )
Ex ceedi ng 6 M ont h s And
Not Ex ceedi ng 2 Y ears
(C )C om pl et i on P eri od 5 P ercent
(As Ori gi nal l y S t i pul at ed
Or As Ex t ended )
Ex ceedi ng 2 Y ears
The Am ount Of Li qui dat ed Dam a ges M a y B e Adj us t ed
S et Off A gai ns t A n y S um P a yabl e T o The C ont ra ct or
Under Thi s Or An y Ot her C ont ract W i t h The C orporat i on
Or F rom The S e curi t y Depos i t Of The C ont ra ct or
Ent i rel y At Th e Di s cret i on Of Th e C orp orat i on.
PART – V
BILLS AND PAYMENTS
91. M et hod Of Ex cept W here An y Gener al Or Det ai l e d Des c ri pt i on Of
M eas urem ent The W ork In Bi l l s Of Qu ant i t i es Or S chedul e Of
W orks / It em s / Quant i t i es Ex pres s l y S hown To The
C ont rar y, Bi l l s Of Quant i t i es S hal l Be Deem ed To Hav e
Been P repa red And M eas ur em ent s S ha l l Be T aken In
Accord ance W i t h The P rocedur e S et Fort h In The
S chedul e Of R at es / S peci fi cat i ons Not wi t hs t andi ng An y
P rovi s i on In The R el evant S t andard M et hod Of
M eas urem ent O r A n y G ener al Or Loc a l C us t om . In Th e
C as e Of It em s , W hich Are Not C overed B y Th e S chedul e
Of R at es / S peci fi c a t i ons , M eas urem ent S hal l Be T aken
In A ccord ance With The R el evant S t andar d
S peci fi cat i ons P ubl i s hed B y P W D Govt . Of M aha ras t ra
And For The W orks Not C overed In Thi s P ubl i cat i on,
M eas urem ent s S hal l Be Taken As P e r The C odes B y
Bure au Of Indi an S t andards . .
92. R ecords And The C ont ract or S hal l S ubm i t To The Engi ne er The
M eas urem ent M ont hl y S t at em ent s Of Th e Es t i m at e d Val ue Of Th e
W ork C om pl et ed Les s Than The C u m ul at i ve Am ount
C ert i fi ed P revi ous l y. The M ont hl y S t a t em ent s S hal l B e
In The Bi l l Form S peci fi ed B y The En gi neer And It S hal l
55
Be S ubm i t t ed On Or Befo re The Dat e Ins t ruct ed B y The
Engi ne er. Thes e M o nt hl y Bi l l s S hal l Be S upport ed W i th
Det ai l ed M e as urem ent s For The Gros s Quant i t y Of The
W ork Done Dul y D educt i ng The Gros s Quant i t y P ai d In
The P revi ous Bi l l . The C ont ract or Is P erm i t t ed To C op y
Down The C orre ct i ons In Th e Bi l l s P ai d As P er The
Engi ne ers C e rt i fi cat i on. Upon R ec ei pt Of The Bi l l And
M eas urem ent s B y The C ont ract ors , T he Engi n eer S hal l
Ex cept As Ot herwi s e S t at ed As cert ai n And Det erm i ne B y
M eas urem ent The Val ue In A ccor dance W i t h The
C ont ract Of W ork D one In Ac cordan ce Therewi t h.
57
q) C l eani ng S i t e An d W orks : R em oval B y Th e
C ont ract or Off Th e S i t e, Of An y Tool s , P l at s &
M at eri al s And S w eepi n g Bui l di n g, W as hi ng Fl oors ,
C l eani ng J oi neri es & R em oval O f S pl as hes Of As phal t
Le avi n g The W hol e S i t e Neat And Ti d y.
r) C om pl et i on: C om pl et i ng The W ork To The
S at i s fact i on Of The Engi nee r On Or B efore S t i pul at ed
The Dat e O f C om pl et i on.
s ) Di ffi cul t P os i t i on: Acces s i bi l i t y Or Ot herwi s e To
S i t e, Eas y O r Di ffi c ul t P os i ti on In W ork s .
t ) Errors : R ect i fi c at i on Of Al l Defe ct s Duri ng
C ons t ruct i on & Defe ct Li abi l i t y P eri od To The
S at i s fact i on Of En gi neer.
u) C urved W orks Et c. W orks Of An y Qu ant i t y, S i z e
Or S hape W het her Level , Incl i ned, C urv ed, Bat t e red Et c.
v) M aker’s Ins t ruct i o n: C om pl i ance W i t h M ake’s
Ins t ru ct i ons In The C as e Of P ropri et ar y Art i cl es , F act or y
M ade Good Of P r ec as t It em s .
w) W as t e: Al l W as t e Laps , S e am s , J oi nt s (R ough Or
Fai r C ut t i ng) S t r ai ght / R aki n g, C i r cu l ar And M aki n g
Good.
x ) Art i fi ci al Li ght s : To Incl u de Al l
Li ght i ng/ K eros en e Or El ect ri c P ower As The C as e M a y
Be W hen Need A ri s es For Us e Of Li ght i ng W hi l e
C arr yi n g Out W orks .
C ons t ruct i on Of Approaches To Th e S i t e Of W ork.
M aki ng A rran gem e nt s For P roper Acc es s To W orks In
The Form O f S t ai rs , Ladd ers , Li ft s Et c . As Order ed B y
The Engi n eer – In – C harge For P ro per S upervi s i ons ,
Tes t i ng And Or Ins pect i on Of W orks Incl udi ng M at eri al
Duri ng C ons t ruct i on & De fect Li abi l i t y P eri od.
95. Int e ri m Int e ri m Bi l l s S hal l Be S ubm i t t ed B y The C ont ract or
P a ym ent From Ti m e To Ti m e (But At An Int e r val Of Not Les s
Than One M ont h) For Th e W orks Ex ecut ed. The
Engi ne er S hal l A rra nge To H ave Th e Bi l l s Veri fi ed B y
Taki ng O r C aus i ng To Be Tak en, W her e Nec es s ar y, Th e
R equi s i t e M eas urem ent Of W ork. The J oi nt M eas urem ent
S hal l Not Be An E x cus e For The C ont ract or To S ubm i t
Int e rm edi at e Bi l l s At M ont hl y Or Int erval s Not Les s
Than A M ont h. Al l Int e ri m Bi l l s S hal l Be Fi rs t
S ubm i t t ed By The C ont ract or With Det ai l ed
M eas urem ent s And There aft er Onl y The Engi nee r Or Hi s
Or gani s at i on R epr es ent at i ve S hal l C arr y Out J oi nt
Veri fi c at i ons Or Ot herwi s e On R ecord In The
M eas urem ent Book Befo re C ert i fi cat i on Of The Bi l l s .
(Iv) The Contractor Shall Submit To The Engineer His Detailed Rate
Analysis For Carrying Out Variation Duly Supported With Quotations
And Other Supporting Documents Within 7 Days Of Written
Instructions To Carry Out Variations. If The Contractor’s Quotation Is
Unreasonable, The Engineer Orders The Variation And Makes Change
To The Contract Price Which Is Based On His Own Forecast Of The
Variations On The Contractor’s Cost. In Case, The Rates Decided By
The Engineer Are Not Acceptable To The Contractor, He Shall
Continue With The Work And Maintain Contemporary Records Of
Actual Expenses On Day-To-Day Basis With Joint Assessment/
Verification. The Contractor Is Not Entitle For Payment Of Actual
Expenses As Per Joint Records Added With 10% For Profit And
Overheads. Disagreement With The Rate Fixed By The Engineer
Shall Be Informed By The Contractor Before Commencing The Work
Of Variations, Failing Which The Rate Fixed By The Engineer Shall
Be Final And Binding On The Parties To Contract.
103. Overpa ym ent W henever An y C l ai m For The P a ym ent Of A S um To The
And C orporat i on R i s es Out Of Or Under Thi s C ont ract
Underpa ym e nt Agai ns t The C ont ra ct or The
S am e M a y B e Dedu c t ed B y The C orpor a t i on From An y
S um Then Due Or W hi ch At An y Ti m e Ther eaft er M a y
Becom e Due To Th e C ont ract or Under Thi s C ont ract And
Fai l i ng That Under An y C ont r act W i t h The C orpor at i on
Or F rom An y Ot he r S um Due To Th e C ont ract or From
The C orporat i on (W hi ch M a y Be Av ai l abl e W i t h The
C orporat i on) Or F r om Hi s S ecuri t y Depos i t / R et ent i on
M one y, Or He S hal l P a y The C l ai m On Dem and.
B) C om m i t s Defaul t In C om pl yi n g W i t h An y O f The
Term s And C ondi t i ons Of C ont ract And Does Not
R em ed y It W i t hi n Fourt een Da ys A ft er A
Not i ce In W ri t i ng Is Gi ven To Hi m In That Beh al f B y
The En gi neer, Or
G) B ei n g A C om pa n y, S hal l P as s A R es ol ut i on Or The
C ourt S hal l M ake A n Orde r For Th e Li qui dat i on Of Hi s
Affai rs , Or A R ec ei ver Or A M ana ge r On Behal f O f The
Debent ure Hol d er s S hal l Be Appoi nt ed Or
C i rcum s t ances S ha l l Ari s e W hi ch Ent it l e The C ourt Or
Debent ure Hol ders To Appoi nt A R ecei ver O r A
M ana ger, Or
64
Ex ces s S hal l Be D educt ed From An y M one y Due To
The C ont ract or, B y C orporat i on Under The C ont ract or
Ot herwi s e Hows oev er Or From Hi s S ecuri t y Depos i t
Or The S al e P roce eds Ther e Of P rov i ded, Howev er,
That C ont ract or S hal l Have No C l ai m Agai ns t
C orporat i on Even If The C ert i fi ed V al ue Of W ork
Done D epart m ent al l y O r Th rou gh A N ew C ont ra ct or
Ex ceed The C e rt i fi ed C os t Of S uch W ork And Al l i ed
Ex pens es , P rovi ded Al wa ys Th at W hi ch Ever Of The
Three C ours es M ent i oned In C l aus es (A ), (B ) Or (C ) Is
Adopt ed B y The En gi ne er, Th e C ont rac t or S hal l Have
No C l ai m To C ompens at i on For An y Los s S us t ai ned
B y Hi m B y R eas on Hi s Havi ng P urchas ed Or P ro cured
An y M at eri al s , Or Ent ered Int o An y E nga gem ent s , O r
M ade An y Advanc e On Ac count Of Or W i t h A Vi ew
To The Ex ecut i on Of The W ork O r T he P erform ance
Of The C ont ra ct .
110. A c t i o n W he n If The P ro gr es s Of An y P art i cul ar P ort i on Of The W ork
The P r o gr es s Is Uns at i s fa ct or y T he C ondi t i ons M ent i oned In C l aus e
Of Any 108(B), Be Ent i t l ed To Lak e Act i on U nder C l aus e Aft er
P a r t i c ul ar Gi vi ng The C ont rac t or 14 Da ys Not i ce In W ri t i ng. The
Portion Of The C ont ract or W i l l Have No C l ai m For C om pens at i on, For
Work Is
An y Los s S us t ai ned B y Hi m Owi n g To S uch Act i on.
U n s a t i s f a ct o r y
111. C o n t r ac t or In An y C as e In W hi ch An y Of Th e P owers C onferr ed
R e ma i n s L i a bl e
Upon The En gi neer B y C l aus es 108 & 109 Hereo f S hal l
To Pa y
Have B ecom e Ex erc i s abl e And The S am e S hal l Not Have
C o mp e n s a t i o n
Been Ex erci s ed Th e Non Ex erci s e Th ere Of S hal l Not
If A c t i o n N o t
C ons t i t ut e A W al ver Of An y Of The C ondi t i ons Thereof
T a ke n U n d er
And S uch P owers Shal l Not Wi t hs t anding The Ex ci s abl e
Clause 108 And
109 In Th e Event Of A n y Fut ur e C as e Of Defaul t B y The
C ont ract or For W hi ch Under An y C l au s e Hereo f He Is
Decl ar ed Li abl e T o P a y C om pens at i on Am ount i ng To
The W hol e Of Thi s S ecuri t y D epos i t And The Li abi l i t y
Of The C ont ract or For P as t And Fut u re C om pens at i on
S hal l R em ai n Unaff ect ed.
112. P ower To In The Ev ent Of Engi ne er T aki ng A ct i on Under S ub
Take C l aus es (A) Or ( C ) C l aus e 108, He M a y If H e S o
P os s es s i on Of Des i res , T ake P os s es s i on Of Al l An y Tool s And P l ant ,
Or R equi re M at eri al s And S t ore In Or Upon The W ork Of The S i t e
R em oval Or Thereof O r Bel on gi ng To The C ont rac t or, Or P rocured
S el l B y Hi m And Int end ed To Be Us es Fo r The Ex ecut i on Of
C ont ract ors The W ork Or An y P art Thereof P a yi n g Or Al l owi ng For
P l ant . The S am e In Accou nt At The C ont ract R at es Or In Th e
C as e Of C ont ract R at es Not Bei n g Appl i cabl e At C urrent
M arket R at es To B e C ert i fi ed B y The Engi ne er W hos e
C ert i fi cat e Ther eof S hal l B e Fi nal . In The Al t ernat i ve
The En gi neer M a y Aft er Gi vi n g Not i c e In W ri t i ng To
The C ont ract or Or Hi s C l erk Of The W ork Forem an Or
Ot her Aut hori s es A gent R equi res Hi m To R em ove S uch
Tool s And P l ant , Mat eri al , Or S t ores Fr om The P rem i s es
W i t hi n A Ti m e To Be S peci fi ed In S u ch Not i ce And In
The Event Of The C ont ract or Fai l i n g To C om pl y W i t h
An y S uch R equi s i t i on, The Engi ne er M a y R em ove Th em
At The C ont ract or ’s Ex pens es Or S el l T hem B y Au ct i ons
Or P ri vat e S al e On Account Of The C ont ract or And At
Thi s R i s k In Al l R es pect And Th e C e rt i fi cat e O f The
Engi ne er As To T he Ex pens es Of A n y S uch R em oval
And The Am ount Of The P roc eeds And Ex pens ed On An y
S uch S al e S hal l Be Fi nal And C oncl us i ve Agai ns t The
C ont ract or.
113. No Int eres t It Is A greed That T he C orporat i on Of Or It s En gi ne er Or
For Del a yed Offi ce r S hal l Not Be Li abl e To P a y An y Int e res t Or
P a ym ent s Due Dam a ge W i t h R es pect To An y M one ys Or Bal an ce W hi ch
65
To Di s put es M a y Be In It s Or It s En gi ne er’s O r Offi ce r’s H ands
Et c. Owi ng To An y Di s p ut e Or Di ff er ence O r C l ai m Or M i s -
Unders t andi n g B et ween The C orpor a t i on Of Or It s
Engi ne er Or O ffi c er On The On e Hand And The
C ont ract or On The Ot her, O r W i t h R es pect To An y D el a y
On The P art Of The C orporat i on Of Navi M um abi Or It s
Engi ne er O r Offi c ers In M aki n g P e r i odi cal Or Fi n al
P a ym ent s Or In An y Ot her R es pe ct W hat ever.
P a ym ent To Th e C ont ract or O f The A m ount Due Under
Each Of Th e Int eri m P a ym ent C ert i fi c at e Is s u ed B y Th e
Engi ne er S hal l B e M ade B y The C orp orat i on W i t hi n 45
(Fort y Fi ve) D a ys If S uch C ert i fi cat e Bei n g Del i ve red.
If The C orporat i on M akes Lat e P a ym en t , The C ont ract or
Is T o B e P ai d Int e re s t On The Lat e P a ym ent In The Nex t
P a ym ent . Int eres t S hal l Be C al cul at e d From The Dat e
B y W hi ch The P a ym ent S houl d Have Been M ade Upt o
The Dat e W hen Th e Lat e P a ym ent Is M ade At 6% P er
Annum . It Is A Ter m Under Thi s C ont ract That P a ym ent
Of Int er es t In Ex ce s s Of 6% Is B arr ed On An y Am ount
P a yabl e To The C on t ract or On An y Acc ount .
It Is Di s t i nct l y Un ders t ood And A gre ed B et we en The
P art i es He ret o Th at P a ym ent For W ork Al read y Ex ecut ed
B y The C ont ract or Is Not A C ondi t i on P recedent Unde r
Thi s C ont ract For The Ex ecut i on Of The R em ai ni ng
W ork.
114. J uri s di ct i on In C as e Of An y C l a i m , Di s put e Or Di fferenc e Ari s i n g In
R es pect Of A C ont ract , Th e C aus e Of Act i on The reof
S hal l Be D eem ed T o Have Ari s en In N avi M um bai And
Al l Le gal P roceedi ngs In R es pe ct Of An y S uch C l ai m ,
Di s put e Or Di ff e rence S hal l Be Ins t i t ut ed In A
C om pet ent C ourt In The C i t y Of Navi M um bai Onl y.
115. Fi nal i t y Of S ETT LEM ENT Of D IS P UTES
Deci s i on And If A Di s put e/ Di s put es Of An y Ki nd W hat s oever Ari s es
Non- Bet we en Th e C ont r act or And En gi nee r s R epres ent at i ve
Arbi t rabi l i t y The S am e S hal l Be R eferred To The Engi ne er Fo r Hi s
Deci s i on W i t h Det ai l ed J us t i fi cat i on. S uch R ef eren ce
S hal l Be S t at ed Tha t It Is Inpe rs unce T o Thi s C l aus e For
R evi ew And Gi vi ng De ci s i ons B y Th e Engi ne ers . The
Engi ne er S hal l Gi v e Hi s Deci s i on W i t hi n 14 Da ys Of
R ecei pt Of Not i ce. If Ei t he r P art y Is N ot S at i s fi ed Wi th
The Deci s i on O f Th e Engi n eer Or The Engi ne er Fai l s To
Gi ve The De ci s i on W i t hi n The P eri od Of 14 Da ys F rom
The Dat e O f R ecei p t Of Not i ce Unde r Thi s C l aus e, S uch
A Di s put e M a y B e R ef err ed To Ar bi t rat i on As P er
C l aus e No. 115.
116. Arbi t rat i on Ex cept W here, Ot he rwi s e P rovi ded Fo r In Thi s C ont ra ct ,
Al l Ques t i ons And Di s put es R el at i ng To The M eani n g Of
Ins t ru ct i on Hear In Befo re M ent i oned Or As To An y
Ot her Ques t i on, C l ai m , R i ght , M at t er Of Handi ng
W hat s oever, If An y Ari s i ng Out O f O r R el at i ng To Thi s
C ont ract , S peci fi cat i on, Es t i m at es , Ins t ruct i ons , Orders
Or Thes e C ondi t i ons Or Ot her wi s e C oncerni n g The
W orks , Or The Ex ecut i on Or F ai l ure To Ex ecut e Th e
S am e W here Ari s i n g Duri n g Th e P ro gr es s Of The W ork
Or Aft e r C om pl et i on Or Abandonm ent Thereo f Of An y
M at t er Di r ect l y O r Indi r ect l y C onne ct ed W i t h Thi s
Agreem ent S hal l B e R eferr ed To The S o l e Arbi t rat i on Of
The M uni ci pal C om m i s s i oner Of Navi M um bai
C orporat i on, C .B.D. , Navi M um bai And If Th e M uni ci pal
C om m i s s i oner Is U nabl e Or Unwi l l i n g To Act As S uch,
Then The M at t er In Di s put e S hal l Be R eferr ed To S ol e
Arbi t rat i on Or S uc h Ot her P ers on A ppoi nt ed B y The
M uni ci pal C om m i s s ioner W ho Is W i l l i ng To Act As S uch
Arbi t rat or. In C as e, The Arbi t rat or S o Appoi nt ed Is
66
Unabl e To Act For An y R e as ons , The M uni ci pal
C om m i s s i oner In T he Event Of S uch Inabi l i t y, S hal l
Appoi nt Anot her P ers on To Act A s Arbi t rat or In
Accord ance W i t h The Te rm s Of Th e C ont ract . S uch
P ers on S hal l Be Ent i t l ed To P roceed W it h The R eferenc e
From Th e S t at e At W hi ch It W a s Left B y Hi s
P redeces s o rs . It Is Al s o A Term Of Thi s C ont ract That
No P ers on Ot her Than A P ers on Appoi nt ed B y Th e
M uni ci pal C om m i s sioner As Afores ai d S houl d Act As An
Arbi t rat or.
As Afores ai d The P rovi s i ons Of The Arbi t rat i on And
C onci l i at i on Act 1996 Or An y S t at ut ory M odi fi c at i on Or
R ei nact m ent Ther e Of And The R ul es M ade The re Und er
And For Th e Ti m e Bei n g In For ce S ha l l Appl y To The
Arbi t rat i on P roceedi ngs Und er Thi s C l au s e.
117. La ws Thi s C ont ract S hal l Be Gov erned B y The Indi an Laws
Governi n g For The Ti m e B ei ng In For ce.
The C ont ract –
PART –VII
WORK COMPLETION & DEFECT LIABILITY
118. C l earanc e Of Upon The Is s ue O f An y Taki n g Ov e r C ert i fi cat e The
Site On C ont ract or S hal l C l ear A wa y And R e m ove From Th at
C om pl et i on P art Of Th e S i t e To W hi ch S uch Taki n g-Over C ert i fi cat e
R el at es Al l C ont rac t or’s Equi pm ent , S urpl us M at eri al s ,
R ubbi s h And Tem porar y W orks O f Ever y Ki nd, And
Le ave S uch P a rt Of The S i t e And W orks C l ean And In A
W orkm an Li k e C on di t i on To The S at i s fact i on Of The
Engi ne er. If The C ont ract or Do es Not C l ear The S i t e
W i t hi n 15 Da ys Al l M at eri al W i l l Be C onfi s cat ed And
No C om pens at i on Shal l Be P ai d And The S i t e W i ll Be
C l eared At R i s k An d C os t Of The C ont ract or.
119. S ubm i s s i ons On C om pl et i on Of The W ork, The C ont ract ors S hal l
Of Fi nal Furni s h Fre e Of C os t 1 S et Of R .T.F. Of Fi nal
C om pl et i on C om pl et i on Drawi ngs And 6 Bound S et s Of C opi es Of
Drawi n gs . Drawi n gs , S howi n g Al l The Det ai l s C hecked And S i gned
B y The En gi ne er W i t hi n 2 M ont hs Of C om pl et i on Of
W orks . The P a ym en t Of Fi nal Bi l l S hal l Be M ade To The
C ont ract ors Aft e r R ecei pt Of Abov e S et s . In C as e The
C ont ract or Fai l s To S ubm i t The C om pl et i on Drawi ngs , A
C om pens at i on At The R at e Of .5000/ - P er Drawi n g
S hal l Be R ecov ered From The Fi nal Bi l l s
67
Hi s W orkers On The S i t e In C onn ect i on W i t h The
Ex ecut i on Of W orks As S hal l Have Bee n Erect ed B y Th e
C ont ract or Or Th e W orkm en And C l ea ned Al l Di rt From
Al l P art s Of Bui l di ng(S ) In, Upon O r About W hi ch The
W ork Has B een E x ecut ed Or Of W hi ch He M a y
Have H ad P os s es s i on For The P urp os e Of Ex ecut i on
Thereof And C l ean e d Fl oors , Gut t ers A nd Drai ns , Eas ed
Doors And S as hes , Oi l ed And Fas t eni ngs , Label ed The
Ke ys C l earl y And Handed Them Ov er To The Engi ne er
Or Hi s R epres ent at i ve And M ade The W hol e P rem i s es
Fi t For Im m edi at e Occupat i on Or Us e To The
S at i s fact i on Of Th e Engi n eer. If The C ont ract or S hal l
Fai l To C om pl y W i t h An y Of The R equi rem ent s Of
Thi s C ondi t i on As Afores ai d, On Or B efore Th e Dat e O f
C om pl et i on Of Works , The En gi ne e r M a y At Th e
Ex pens e Of The C ont ract or Ful fi l l S uch
R equi rem ent s And Di s pos e Of Al l The S urpl us M at eri al
And R ubbi s h Et c. As He Thi nks Fi t A nd The C ont ra ct or
S hal l Have No C l aim s In R es pect Of A n y S uch M at eri al
Ex cept For An y S um Act ual l y R eal i s ed B y The S al e
Thereof Les s The C os t Of Ful fi l l i ng The R equi rem ent s
And An y Ot her A m ount That M a y B e Due F rom The
C ont ract or. If T he Ex pens e Of Ful fi l l i ng S uch
R equi rem ent Is M ore Than Th e Am ount R eal i s es On
S uch Di s pos al As Afores ai d, The C ont ract or S hal l
Fort hwi t h On Dem a nd P a y S uch Ex ces s .
The Contractor`S Notice Of Completion As Aforesaid Shall Have To
Accompanied With One Set Of Tracings Of Final Completion
Drawings On RTF And Six Bound Sets Of Copies Of As Built
Drawings, Failing Which The Notice Shall Be Deemed To Have Not
Been Issued At All.
68
S ubs t ant i al l y C om pl et ed And S hal l Ha ve S at i s fact o ri l y
P as s ed An y Fi nal Tes t That M a y B e P res cri bed Unde r
The C ont ract , The Engi ne er M a y Is s ue A C ert i fi cat e Of
C om pl et i on In R es pect Of Th at P art Of The
W orks Befor e C om pl et i on Of The W hol e W orks And
Upon The Is s ue Of S uch C ert i fi cat es , The C ont ract ors
S hal l Be De em ed To Have Und ert ak en To C om pl et e
An y Out s t andi n g W orks In Th at P art Of The W orks
Duri ng Th e P eri od Of M ai nt enan ce.
121. Taki ng Ov er C orporat i on W i l l Take Ov er Th e W or k At An y S t a ge
Of W ork W henever R equi r ed In The Int er es t Of P ubl i c B y Gi vi n g
10 Da ys Not i ce To The C ont ract or.
122. Defe ct s The C ont ract or S hal l Be R es pons i bl e To M ake Good And
Li abi l i t y R em ed y At Hi s O wn Ex pens e W i t hi n S uch P eri od As
P eri od M a y Be S t i pul at ed B y The En gi nee r A n y D ef ect s W hi ch
M a y Dev el op Or B e Not i ced B efor e T he Ex pi r y O f The
P eri od M ent i oned In Th e S chedul e `A' H eret o From
C ert i fi ed Dat e Of C om pl et i on And Int i m at i on Of W hi ch
Has Be en S ent To The C ont ract or Wi t hi n 7 Da ys Of
Ex pi r y Of Th e S ai d P eri od B y Let t e r S ent B y Hand
Del i ver y Or B y R e gi s t ered P os t
123. Li abi l i t y For If It S hal l Appe ar To The En gi n eer O r To Hi s
Defe ct s Or R epres ent at i ve At An y Ti m e Duri ng C ons t ruct i on
Im pe rfe ct i ons Or R econs t ruct i on O r Duri n g The Defe ct s ‚ Li abi l i t y
And P eri od, That An y W ork Has Be en Ex ecut ed W i t h
R ect i fi cat i on Uns ound, Im p erf ect Or Uns ki l l ful W orkm ans hi p Or That
Thereof An y M at eri al Or Ar t i cl e P rovi ded B y T he C ont ract or Fo r
Ex ecut i on Of The r eof Th e W ork Is Uns ound Or Of A
Qual i t y Inf eri or To That C ont ract ed For, Or Ot herwi s e,
Not In Acco rdanc e W i t h The C ont ra ct , Or That An y
Defe ct , S hri nka ge O r Ot her F aul t s Have Appear ed In The
W ork Ari s i ng Out Of De fect i ve Or Im proper M at e ri al s
Or W orkm ans hi p, The C ont ract or S ha l l , Upon R ecei pt
Of Not i ce In W ri t i ng In Th at Beh al f Fr om The Engi neer
Fort hwi t h R ect i f y Or R em ove Or R ec ons t ruct The W ork
S o S peci fi ed In W hol e Or P art , A s The C as e M a y
R equi re Or, As The C as e M a y B e, And / Or R em ove The
M at eri al s Or Art i cl es S o S peci fi ed And P rovi de Ot her
P roper And S ui t able M at eri al s Or Art i cl es At Hi s Own
Ex pens e Not wi t hs t andi ng Th at The S am e M a y Have B een
In advert ent l y P as s e d, C ert i fi ed And P ai d For, And In
The Event Of Hi s Fai l i ng To Do S o W i t hi n The P eri od
To Be S pe ci fi ed B y The En gi n eer In Hi s Not i ce
Afores ai d The En gi neer M a y R e ct i f y Or R em ove And
R e-Ex ecut e The W o rk And/ Or R em ove And R epl ac e W i t h
Ot hers The M at eri al s Or Art i cl es C om plai ned Of, As The
C as e M a y Be, B y O t her M eans At The R i s k And C os t Of
The C ont ract or.
69
The Engineer Reserves The Right To Decide The Rates And Prices Of
The Works As Executed By Other Means At The Risk And Cost Of
The Contractor.
The C os t And Ex pens es Ther eb y Incu rre d On The W orks
And Al s o S uch P ena l t y As The En gi nee r M a y Im pos e For
S uch W rongful C onduct Of The C ont ract or (W hi ch
P enal t y, Th e En gi n eer S hal l Be C om p et ent To Im pos e
And A gai ns t The Im pos i t i on Of W hi ch Or The Am ount
Thereof B y The En gi ne er An Appe al S hal l Li e Onl y To
The C om m i s s i oner W i t hi n S even Da ys Of The Order In
That Behal f Of The Engi nee r And The Deci s i ons Of The
C om m i s s i oner S hall Be Fi n al And Bi ndi ng Upon The
C ont ract or) M a y Be Deduct ed From An y M one y Du e Or
To Becom e Du e To The C ont ract or, U nder Thi s Or An y
Ot her C ont ra ct B et ween The C ont r act or And The
C orporat i on.
124. M ai nt enance The C ont ract or S hal l M ai nt ai n The Fi ni s hed S urfa ce O f
The R oad For A P eri od As S peci fi ed In C ont ract
Docum ent , Aft e r Th e C om pl et i on Of W ork W i t hout An y
Ex t ra C os t To C orporat i on Irres p ect i ve Of The Des i gns ,
S t andards And S pe ci fi cat i ons And Ac t ual Tra ffi c Et c.
The C ont ract or S ha l l Get The P ot hol es Fi l l ed Up W i t h
As phal t M i x M at eri al s And Keep The R oad S urfac e In
Good C ondi t i on Throughout The Year. 5 P erc ent
Am ount Of The To t al W ork Done S hal l Be W i t h Hel d
From R unni ng Ac co unt Bi l l For The P e r i od S peci fi ed In
The C ont ract Docu m ent From The Dat e Of C om pl et i on
Of W ork As M ai nt enance C har ges Of M ai nt ai ni ng And
Keepi n g The R oad In Good C ondi t i on. Thi s 5 P ercent
Am ount W i t hhel d Towards M ai nt en an ce C har ges S hal l
Be Al l owed To B e R epl aced W i t h Bank Guarant e e Or
Ot her R e co gni s ed F orm s At Int e rm edi a t e S t age, If S o,
Des i red In W ri t i n g. Thi s M ai nt enance C harges S hal l B e
In Addi t i on To S ecuri t y Dep os i t .
On C om pl et i on Of The W ork In Al l R e s pect s , Ne ces s ar y
C ert i fi cat es W i l l B e Is s ued B y The E ngi ne er And The
Defe ct Li abi l i t y P er i od W i l l Be C ount ed From The D at e
Of Is s ue O f S uch C e rt i fi cat es
Al l Dam a ges Duri n g Ex ecut i on S hal l B e M ade Good B y
The C ont ract or At H i s C os t . He W i l l Be R es pons i bl e For
An y D am a ge To The R oad S urfac e In cl udi ng B.T.
S urface In R ai n y S eas on And Duri n g C ons t ruct i on And
Guarant e ed M ai nt e nance P eri od An d No S eparat e
P a ym ent W i l l Be M ade Fo r R es ort i n g S uch Dam a ges .
Defe ct i ve W ork Is Li abl e To B e R ej e ct ed At An y S t a ge.
The C ont ract or On No Account C an R e fus e To R ect i f y
Defe ct s M er el y On R eas ons That Fur t her W ork Has
Been C ar ri ed Out . No Ex t ra P a ym ent s S hal l Be M ade
For S uch R ect i fi c at i on.
125. Defe ct s The C ont ract S hal l Not Be C ons i der ed As C om pl et ed
Li abi l i t y Unt i l A Def ect s Li abi l i t y C ert i fi c at e S hal l Have Be en
C ert i fi cat e S i gned B y The Engi ne er And De l i vered To The
C ont ract or, S t at i ng The Dat e On W hi c h The C ont ract o r
S hal l Have C om pl eted Hi s Obl i gat i ons To Ex ecut e And
C om pl et e The W orks And R em ed y An y Defe ct s Therei n
To The Engi ne er’s S at i s fact i on. The Defe ct s Li abi l i t y
C ert i fi cat e S hal l B e Gi ven B y The En gi ne er W i t hi n 28
Da ys Aft er Th e Ex pi rat i on Of Th e La t es t S uch P eri od,
Or As S oon Ther eaft e r As An y W orks Ins t ru ct ed,
P urs uant To C l aus e s 121 And Hav e Be en C om pl et ed To
The S at i s fact i on Of The Engi n eer, P r ovi ded That The
Is s u e Of The D efe c t s Li abi l i t y C ert i fi c at e S hal l Not B e
A C ondi t i on P reced ent To P a ym ent To The C ont ract o r Of
The R et ent i on M one y.
70
126. Unful fi l l ed Not wi t hs t andi ng T he Is s ue Of The Defe ct s Li abi l i t y
Obl i gat i ons C ert i fi cat e Th e C on t ract or And The C o rporat i on S hal l
R em ai n Li abl e For The Ful fi l l m ent Of An y Obl i gat i on
In curr ed Under Th e P rovi s i ons Of The C ont ract P ri or
To The Is s ue Of T he D efe ct s Li abi l i t y C ert i fi cat e Is
Is s u ed And, For T he P urpos es O f D e t erm i ni ng Th e
Nat ure And Ex t ent Of An y S uch O bl i gat i on, The
C ont ract S hal l Be Deem ed To R e m ai n In For ce
Bet we en Th e P a rt i es To Th e C ont ra ct . N ot wi t hs t andi ng
The Is s u e Of The Defe ct s Li abi l i t y C ert i fi cat e The
C ont ract or And The C orporat i on S hal l R em ai n Li abl e
For The Ful fi l l m ent Of An y Obl i gat i on In curr ed Under
The P rovi s i ons Of The C ont ract P ri or To The Is s u e Of
The Def ect s Li abi l i t y C ert i fi cat e Is Is s ued And, For
The P urpos es O f D et erm i ni ng The N at ure And Ex t ent
Of An y S u ch Obl i gat i on, Th e C ont ract S hal l Be
Deem ed To R em ai n In Fo rc e Bet w een The P art i es To
The C ont ract .
127. R efund Of The Am ount Of S ecuri t y Depos i t Lod ged B y A
S ecuri t y C ont ract or S hal l Be R efunded Al on g W i t h The P a ym ent
Depos i t Of The Fi nal Bi l l , Or Aft er The Ex pi ry Of The D ef ect
Li abi l i t y P e ri od W hi ch Ever Is Lat er Unl es s The
Engi ne er Is Of Th e Opi ni on That In Ord er To S afe gu ard
Agai ns t Defe ct s A nd P endi ng C l ai m s Agai ns t The
C ont ract or It Is N eces s a r y To R et ai n M ore Am ount
R et ai ned As R et ent i on M one y.
71
ANNEXURE ‘A’
(See Condition 24)
Safety Provisions
1. Suitable Scaffolds Shall Be Provided For Workmen For All That Cannot Safely Be Done From
The Ground, Or From Solid Construction Except Such Short Period Work As Can Be Done
Safely From Ladders. When A Ladder Is Used An Extra Mazdoor Shall Be Engaged For
Holding The Ladder And If The Ladder Is Used For Carrying Materials As Well, Suitable
Footholds And Handholds Shall Be Provided On The Ladder And The Ladder Shall Be Given
An Inclination Not Steeper Than ¼ To 1 ( ¼ Horizontal And 1 Vertical).
2. Scaffolding Or Staging More Than 3.25 Meters Above The Ground Or Floor, Swung Or
Suspended From An Overhead Support Or Erected With Stationary Support, Shall Have A
Guard Rail Properly Attached, Belted Braced And Other Wise Secured At Least 1 Meter High
Above The Floor Or Platform Of Such Scaffolding Or Staging And Extending Along The Entire
Length Of The Outside And Ends Thereof With Only Such Openings As May Be Necessary For
The Delivery Of Materials. Such Scaffolding Or Staging Shall Be So Fastened As To Prevent It
From Swaying From The Building Or Structure.
3. Working Platform, Gangways, And Stairways Shall Be So Constructed That They Do Not Sag
Unduly Or Unequally, And If Height Of A Platform Or Gangway Or Stairway Is More Than
3.25 Meters Above Ground Level Or Floor Level, It Shall Be Closely Boarded, Have Adequate
Width And Be Suitably Fenced As Described In 2 Above.
4. Every Opening In Floor Of A Building Or In A Working Platform Shall Be Provided With
Suitable Means To Prevent Fall Or Persons Or Materials By Providing Suitable Fencing Or
Railing With A Minimum Height Of 1 Meter.
5. Safe Means Of Access Shall Be Provided To All Working Platforms And Other Working
Places. Every Ladder Shall Be Securely Fixed. No Portable Single Ladder Shall Be Over
9 Meters In Length. Width Between Side Rails In A Rung Ladder Shall In No Case Be Less
Than 30 Cm For Ladder Upto And Including 3 Meters In Length. For Longer Ladders This
Width Shall Be Increased By At Least 6 Mm For Each Additional 30 Cm Of Length. Uniform
Step Spacing Shall Not Exceed 30 Cm.
Excavation And Trenching :- All Trenches, 1.5 Metres Or More In Depth , Shall At All Times
Be Supplied With At Least One Ladder For Each 30 Metres In Length Or Fraction Thereof,
Ladder Shall Be Extended From Bottom Of Trench To At Least 1 Metre Above Surface Of The
Ground Sides Of A Trench Which Is 1.5 Meters Or More In Depth Shall Be Stepped Back To
Give Suitable Slope, Or Securely Held By Timber Bracing, So As To Avoid The Danger Of
Sides Collapsing. Excavated Material Shall Not Be Placed Within 1.5 Meters Of Edge Of Trench
Or Half Or Depth Of Trench, Whichever Is More. Cutting Shall Be Done From Top To Bottom.
Under No Circumstances Shall Undermining Or Under Cutting Be Done.
7. Demolition : Before Any Demolition Work Is Commenced And Also During The Process Of
The Work
(a) All Roads And Open Areas Adjacent To The Work Site Shall Either Be Closed Or Suitably
Protected.
(b) No Electric Cable Or Apparatus Which Is Liable To Be A Source Of Danger Over A Cable
Or Apparatus Used By Operator Shall Remain Electrically Charged,
(c) All Practical Steps Shall Be Taken To Prevent Danger To Persons Employed, From Risk Of
Fire Or Explosion, Or Flooding. No Floor, Roof Or Other Part Of A Building Shall Be So
Overloaded With Debris Or Materials As To Render It Unsafe.
8. All Necessary Personal Safety Equipment As Considered Adequate By The Engineer Shall Be
Available For Use Of Persons Employed On The Site And Maintained In A Condition Suitable
For Immediate Use, And The Contractor Shall Take Adequate Steps To Ensure Proper Use Of
Equipment By Those Concerned.
72
(a) Workers Employed On Mixing Asphaltic Materials, Cement And Lime Mortars/Concrete
Shall Be Provided With Protective Footwear, Handgloves And Goggles.
(b) Those Engaged In Handling Any Material Which Is Injurious To Eyes Shall Be Provided
With Protective Goggles.
(c) Those Engaged In Welding Works Shall Be Provided With Welder’s Protective Eye-Shields.
(d) Stone Breakers Shall Be Provided With Protective Goggles And Protective Clothing And
Seated At Sufficiently Safe Intervals.
(e) When Workers Are Employed In Sewers And Manholes, Which Are In Use, The Contractor
Shall Ensure That Manhole Covers Are Opened And Manholes Are Ventilated At Least For
An Hour Before Workers Are Allowed To Get Into Them. Manholes So Opened Shall Be
Cordoned Off With Suitable Railing And Proided With Warning Signals Or Boards To
Prevent Accident To Public.
(f) The Contractor Shall Not Employ Men Below The Age Of 18 And Women On The Work Of
Painting With Products Containing Lead In Any Form. Whenever Men Above The Age Of
18 Are Employed On The Work Of Lead Painting The Following Precautions Shall Be
Taken;
(g) No Paint Containing Lead Or Lead Products Shall Be Used Except In The Form Of Paste Or
Ready Made Paint.
(i) Suitable Face Masks Shall Be Supplied For Use By Workers When Paint Is Applied In
The Form Of Spray Or Surface Having Lead Paint Dry Rubbed And Scrapped.
(ii) Overalls Shall Be Supplied By The Contractor To Workmen And Adequate Facilities
Shall Be Provided To Enable Working Painters To Wash During And On Cessation Of
Work.
9. When Work Is Done Near Any Place Where There Is Risk Of Drowning, All Necessary
Equipment Shall Be Provided And Kept Ready For Use And All Necessary Steps Taken For
Prompt Rescue Of Any Person In Danger And Adequate Provision Made For Prompt First Aid
Treatment Of All Injuries Likely To Be Sustained During The Course Of The Work.
10 Use Of Hoisting Machines And Tackle Including Their Attachments, Anchorage And
Supports Shall Conform To The Following :
(A) (I) These Shall Be Of Good Mechanical Construction, Sound Material And Adequate
Strength And Free From Patent Defects And Shall Be Kept In Good Repair And In Good
Working Order.
(B) Every Crane Driver Or Hoisting Appliance Operator Shall Be Properly Qualified And No
Person Under The Age Of 21 Years Shall Be Incharge Of Any Hoisting Machine Including
Any Scaffold Winch Or Give Signals To Operator.
(C) In Case Of Every Hoisting Machine And Of Every Chain Ring Hook, Shackle, Swivel And
Pulley Block Used In Hoisting Or Lowering Or As Means Of Suspension, Safe Working
Load Shall Be Ascertained By Adequate Means. Every Hoisting Machine And All Gear
Referred To Above Shall Be Plainly Marked With Safe Working Load. In Case Of Hoisting
Machine Having A Variable Safe Working Load, Each Safe Working Load And The
Conditions Under Which It Is Applicable Shall Be Clearly Indicated. No Part Of Any
Machine Or Of Any Gear Referred To Above In This Paragraph Shall Be Loaded Beyond
Safe Working Load Except For The Purpose Of Testing.
(D) In Case Of Departmental Machine, Safe Working Load Shall Be Notified By The Engineer,
As Regards Contractor’s Machine The Contractor Shall Notify Safe Working Load Of Each
Machine To The Engineer Whenever He Brings It To Site Of Work And Get It Verified By
The Engineer.
11. Motors, Gearing, Transmission, Electric Wiring And Other Dangerous Parts Of Hoisting
Appliances Shall Be Provided With Efficient Safeguards, Hoisting Appliances Shall Be Provided
With Such Means As Will Reduce To The Minimum Risk Of Accidental Descent Of Load,
Adequate Precautions Shall Be Taken To Reduce To The Minimum Risk Of Any Part Of A
Suspended Load Becoming Accidentally Displaced. When Workers Are Employed On Electrical
Installations Which Are Already Energized, Insulating Mats, Wearing Apparel Such As Gloves,
Sleeves And Boots, As May Be Necessary, Shall Be Provided. Workers Shall Not Wear Any
Rings, Watches And Carry Keys Or Other Materials Which Are Good Conductors Of Electricity.
73
12. All Scaffolds, Ladders And Other Safety Devices Mentioned Or Described Herein Shall Be
Maintained In A Safe Condition And No Scaffold, Ladder Or Equipment Shall Be Altered Or
Removed While It Is In Use. Adequate Washing Facilities Shall Be Provided At Or Near Places
Of Work.
13. These Safety Provision Shall Be Brought To The Notice Of All Concerned By Display On A
Notice Board At A Prominent Place At The Work Spot. Persons Responsible For Ensuring
Compliance With The Safety Provisions Shall Be Named Therein By The Contractor.
14. To Ensure Effective Enforcement Of The Rules And Regulations Relating To Safety
Precautions, Arrangements Made By The Contractor Shall Be Open To Inspection By The
Engineer Or His Representative And The Inspecting Officers.
15. Notwithstanding The Above Provisions 1 To 14, The Contractor Is Not Exempted From The
Operation Of Any Other Act Or Rule In Force.
16. Complete Continuous Barricading Of G.I. Sheet Height 1.5 Mtr., With The Ground Clearance Of
0.60 Mtr. From The Ground Level And Completely Supported By M.S. Angles (As Per Design
& Instructions By The Engineer ) Must Be Provided. For Works Of Concrete And Asphalt Road,
This Should Be Maintained Till Completion Of Work.
74
ANNEXURE ‘B’
(See Condition No. 27)
DETAILS OF KEY PERSONNEL WITH TENDERER WHO ARE PROPOSED FOR THIS
CONTRACT
SIGNATURE OF TENDERER:
DATE:-
75
ANNEXURE ‘C’
")1 1 "
) N :- . ; . + ., ;<I 0M1, ( !;
9 H - 400 614.
!) :- / /20
76
: 1 )1 1 IहM <N 1
1. O( :1
!( : _______________________ O( :1 ()!2 1)
0j : _______________________ !( : ____________________
: ______________________ 0j : ______________________
: _______________________ : _______________________
2. O( :1 : _______________________
!( : ______________________ 1;1 "R)
0j : ______________________
: ______________________
: ______________________
0 O( :1 :-
0 :-
( !;
9 H ह &10 I)
S= k9
OP = [= II % O= ! : S= k
9 # (l= QI Qह< .
!( : ________________________ O( :1 : _______________________
!( : ________________________ O( :1 : _______________________
77
ANNEXURE ‘D’
INDEMNITY BOND
ON STAMP PAPER OF VALUE OF .100/-
In Consideration Of Navi Mumbai Muncipal Corporation Incorporated Under BPMC Act 1949 And
st
Having Its Office At Blapur Bhavan, 1 Floor, C.B.D. Belapur, Navi Mumbai-400614. (Hereinafter
Referred To As The Corporation, Which Expression, Shall Unless It Be Repugnant To The Context Or
Meaning Thereof Includes Its Successors Or Assigns) Having Awarded To M/S.
___________________________________________________________
______________________________________________ A Partnership/Proprietorship/Pvt. Ltd./Ltd.
Firm Carrying In Such Name And Style The Business Of Construction (Hereinafter Referred To As
The Contractor Which Expression Shall, Unless It Be Repugnant To The Context Or Meaning Thereof,
Includes Its Partners Or Partner/Proprietor For The Time Being Or Its Surviving Partner Or His Heirs
And Executors) For The Work Of
____________________________________________________________________________________
____________________________________________________________________________________
______At An ______ Percent Above / Below Estimated Cost Of . ________________________ And
In Compliance With One Of The Terms And Conditions Of The Said Contract.
We, M/S. _________________________________________________________________ Being The
Contractor Do Hereby Agree And Undertake And Indemnify And Save Harmless The Corporation In
Consequence Of The Manufacturing Defect, Patent Manufacturing Defect And Construction Defect
Found In The Constructed Work At Any Time In A Defect Liability Period Of _______ Years With The
Grant Of Completion Certificate By The Corporation To The Contractor In Accordance With And
Subject To The Provision Of The Said Contract.
It Is Hereby Agreed And Declared That The City Engineer Of The Corporation Or Any Officer Acting
As Such City Engineer Of The Corporation Shall Be The Competent Authority To Decide Upon The
Question As To The Defects In The Construction Of Works And The Remedy To Be Applied By The
Contractor For Their Rectification At His Cost And His Decision Shall Be Final, Conclusive And
Binding Upon Both The Corporation And The Contractor, Provided That The City Engineer Shall So
Decide After Giving An Opportunity To The Contractor To Represent His Case.
We Hereby Agree And Undertake Irrevocable And Unconditionally To Carry Out Duly Each And Very
Decision, Order, Direction Or Instruction As May Be Issued By The Said City Engineer Or As The Case
May Be, The Officer Of The Corporation In His Behalf And To Rectify Properly And Promptly The
Defect Found By Him.
FOR AND ON BEHALF OF M/S._____________________________________
__________________________________________________________________
Place :- __________________
Date :- __________________
SEAL
Notary, Maharashtra State BEFORE ME
Notary, Maharashtra State
Accepted By.
78
ANNEXURE – 9
AFFIDAVIT
ON STAMP PAPER OF VALUE OF .500/-
I/We Hereby State That We Are Aware Of The Provisions Of Section 10(1) 10(F) & (G) Of The BMPC
Act. 1949 Which Is Reproduced Below, And Solemnly State That We Have No Partnership Or Any
Share Of The Any Corporator Of Any Corporation In Our Company And Are Not Associated Presently
Or In The Past With Any Of The Office Bearers Of The Navi Mumbai Corporation Either Directly Of
Indirectly.
Extract Of Sec 10 Of BMPC Act:
10 (E) Subject To The Provision Of Section 13 And 404, A Person Shall Be Disqualified For Being
Elected And For Being A Counceller.
10 (F) Subject To The Provisions Sub-Section (2) Has Directly, By Himself Or His Partner Any
Share Or Interest In Any Contract Or Employment With By Or On Behalf Of The
Corporation.”
10(G) “Having Been Elected A Councilor Is Retained Or Employed In Any Professional Capacity
In Connection With Any Cause Of Proceeding In Which By Or On Behalf Of The
Corporation.”
We Are Aware That The Above Information If Found To Be Untrue Or False, We Are Liable To Be
Disqualified And The Earnest Money Accompanying The Tender Shall Stand Forfeited To The
Corporation. We Are Also Aware That If The Information Produced Above If Found To Be Untrue Or
False During The Currency Of The Contract. We Shall Be Held To Default And The Contract, If Any
Awarded To Us, Shall Be Liable To Be Terminated With All Its Concurrences.
Tenderer ………………………………………
Address ……………………………………….
………………………………………
Date The …………….. Day Of ……………… 20 Signature Of Tenderer
Witness ………………………………………
Address ………………………………………
………………………………………
Occupation ……………………………………… Signature Of Witness
79
ANNEXURE – 1
I ...................................................................................................age ...........................address
submit, vide this affidavit in truth, that I am the owner of the contracting firm........................................../
authorized signatory and I am submitting the documents in envelope no.1 for the purpose of scrutiny of
1. I am liable for action under Indian Penal Code for submission of any false / fraudulent Paper/
2. I am liable for action under Indian Penal Code if during contract period and defect liability period,
any false information, false bill of purchased supporting proof of purchase, proof of testing submitted by
my staff, subletting company or by myself, I will liable for action under Indian Penal Code.
3. In am liable for action Indian Penal Code if any paper are found false / fraudulent during contract
period and even after the completion of contract ( finalization of final bill).
(Signature of contractor)
( Seal of company)
80
01" -1
U= m 02 (Affidavit)
...................................................................................(=,(ar........................................
................................................................... = , KJ / )!0 J I) M
) & 02< 1 )<I Qह< 1 , ;1%;1 ( 0MNK Qह< , U= `=< )%NU= ह 29 , J9) ह ,=J
)!2 1J ह
)!2 1 J "R)
81
01" -2
)2 )MN
O( :1
( |
9 = *=! )
82
9 " : ;<1% & 1 *=!U= ! / H- ( < * & घ< U=<) ) %; 1 )1 (= J< ;!302
“ ”
1 ह I.
U= < e
9 < T 9": ;<1% & 1 v*=! VहNM ‚ N 1h )1l= Q = T
)%N ह ह1) N1 ह.
ह :-
:-
83