Rehabilitation/ Major Repair of Permanent Bridge, Diosdado Macapagal Bridge (B01669Mn) Along Mayor Democrito D. Plaza Ave., Butuan City
Rehabilitation/ Major Repair of Permanent Bridge, Diosdado Macapagal Bridge (B01669Mn) Along Mayor Democrito D. Plaza Ave., Butuan City
, BUTUAN CITY
TO BUTUAN DAN
NILO C. OBUS ANSARODIN M. CONDAR MA. THERESA M. DAGUIPA JOSE CAESAR A. RADAZA
Proprietor Manager Safety Engineer Project Engineer III District Engineer
TRAFFIC MANAGEMENT PLAN
T
O
C
A
PI 50 50 50 50
T Traffic Cones to be placed 3
to 5 meters apart m m m m
O
L
GO
ROADWORK
AHEAD
60
STOP
H
I
G
H
W
A
Y TO LIBERTAD PROPER TO BRGY. BONBON
ROADWORK
STOP
AHEAD
50 50 50 50
m m m m
Prepared by: Republic of the Philippines Project Title: Checked by: Reviewed by: Recommending Approval: Approved by:
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BUTUAN CITY
EQUI-PARCO DISTRICT ENGINEERING OFFICE 20ND0059: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO
NRJ BCIR-DEMOCRITO D. PLAZA II AVE. ROAD IN SUPPORT OF PROPOSE
CONSTRUCTION REGIONAL OFFICE XIII BUTUAN CITY IT PARK AND PUBLIC UTILITY TRANSPORT TERMINAL, BUTUAN GRACE T. CURAYAG ANSARODIN M. CONDAR ERVIN P. SALANG JOSE CAESAR A. RADAZA
CO. CITY, AGUSAN DEL NORTE
PROJECT ENGINEER III DISTRICT SAFETY ENGINEER ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
TO BUTUAN DAN
NILO C. OBUS ANSARODIN M. CONDAR MA. THERESA M. DAGUIPA JOSE CAESAR A. RADAZA
Proprietor Manager Safety Engineer Project Engineer III District Engineer
REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES USATAN BRIDGE (B00892MN) ALONG BUTUAN CITY MASAO PORT ROAD BU
TO BUTUAN
K 1246+050.00
60
60
ROADWORK
PREPARE
END
TO STOP
GROUTED RIPRAP
SLOPE = 1:1
PLAN
BEG. OF BRIDGE
LEGEND ABUTMENT 'A'
TO TRENTO (BACK
TO BISLIG
(BACK OF
OF BACKWALL)
BACKWALL)
STA. 1390+325.507
Ballard
EXISTING GROUND
Noted by:
H G F E D C B A
100.00% 100.00%
90.00% 99.55%
10.00% 0.45%
ROAD BUTUAN CITY
ROADWORK AHEAD
ROADWORK
END
PREPARE
TO STOP
60
60
TO MASAO
d of the Project
1246+050.00
Approved By:
ALIPIO B. GRANA
District Engineer
*NOT TO SCALE
STRAIGHTLINE DIAGRAM
WIDENING OF NGILAN BRIDGE (B00818MN) ALONG DAANG MAHARLIKA (SURIGAO - AGUSAN SECTION), BUTUAN CITY
ROAD WIDENING
K1225+020.85-K1225+045.65 ROAD WIDENING
K1225+074.35-K1225+180.00
WIDENED BRIDGE
3.10 M
2.40 M
3.0 M
1.50 M
EMBANKMENT BH NO.1 STA. 1390+322.507 BH NO.1 STA. 1390+350.207
SLOPE = 1:1.5
EDGE OF PAVEMENT
1.50 M 1.50 M
GROUTED RIPRAP
SLOPE = 1:1
PLAN
BEG. OF BRIDGE
ABUTMENT 'A'
TO TRENTO (BACK
TO BISLIG
(BACK OF
OF BACKWALL)
BACKWALL)
STA. 1390+325.507
9.420 L.M.
(TO TAL WIDTH OF BRIDGE) 1.06L.M.
3.650L.M. 3.650L.M.
EXISTING GROUND
Noted by:
Prepared by:
H G F E D C B A
100.00% 100.00%
90.00% 99.55%
10.00% 0.45%
3.40 M
1.50 M
TO BISLIG
TO BISLIG
*NOT TO SCALE