recycled urea = 90.4 TPH
M-01
1 LLCGO = 82.5 TPH
Feed
LLCGO = 82.5 TPH
Urea = 39.4 TPH
Methanol = 180 TPH
Water = 11 TPH
recycled urea = 90.4 TPH
At Re = 10580.15439
dimensionless blend time is given by
tbN(d/D)2.3 = 8.4 (See Fig 10.3 pasted here
Blend time, tb = 0.1727751643 min
kW required = 58.873567881 kW
1 US gallon = 0.003785 m3
1000 gallon 1 m3 = 264.1722 gallon
= 39459.5 gallon
This is dimension of liquid content h=D
This is dimension of liquid content h=D
40% of tank diameter
13
recycled urea = 90.4 TPH
M-01
1 LLCGO = 82.5 TPH
Feed
nPnO = 73.24 TPH
Urea = 90.4 TPH
Benzene = 109.86 TPH
At Re = 91874.98194
dimensionless blend time is given by
tbN(d/D)2.3 = 6 (See Fig 10.3 pasted here
Blend time, tb = 1.6454777554 min
kW required = 39.925417346 kW
cP or mPas
1 US gallon = 0.003785 m3
1000 gallon 1 m3 = 264.1722 gallon
= 26759.66 gallon
Chilling water in
jacketed vessel
Pressure drop
OD of reactor = 1.52 m
ID of jacket = 1.67 m
W/m deg C
kJ/kg deg C
W/m deg C (Table 12.6 RC 6)
W/m2 deg C
W/m2 deg C
W/m2 deg C
jacketed vessel
Pressure drop
OD of reactor = 1.52 m
ID of jacket = 1.67 m
W/m deg C
kJ/kg deg C
W/m deg C (Table 12.6 RC 6)
W/m2 deg C
W/m2 deg C