Professional Documents
Culture Documents
Hazard Identification Risk Assessment and Control Worksheet
Hazard Identification Risk Assessment and Control Worksheet
Project 2x20MW Lithium Ion Battery Energy Storage System Location Alaminos, Laguna
3
Nobody allowed to take rest on the surface of
Major Unlikely LOW
excavated areas.
Fall of Loosed Rocks / Debris, Workers /
f
Soil Erosion Supervisor Green Net shall be provided on the surface of
excavation to prevent loosed rocks and soil from Major Unlikely LOW
falling down below.
Access Ladder, Scaffold, etc shall be provided Effort should be made to
with a travel distance of 8.0 meters from each reduce this risk. Daily
Severe Unlikely MEDIUM Toolbox Talks shall be given
Workers Fall into the Excavation Supervisors / other and suitably maintained and secured to
g prevent any sudden movement. prior to work.
due to Poor Access / Egress Workers
Hard and secured barriers shall be provided to all Effort should be made to
Severe Unlikely MEDIUM reduce this risk.
deep excavations.
Banksman or a Flagman shall be assigned to
guide Equipment in the area with Whistle.
Movement of Heavy Equipment
Equipment / All Construction Equipment shall be provided with
h and Collision Major Unlikely LOW
Operator / Workers Beacon Lights and proper Reverse Alarm.
4
Oxygen Deficiency and Toxic Gas Testing should be done by Authorized Gas
Gases present in Deep Tester.
Excavation 1.22 meters deep x. Supervisor /
m Severe Remote LOW
4.67 meters width, which is Workers Confined Space Permit will be used as deemed
considered as Confined Space necessary. Full Body Harness will be used for
easy retrieval of the injured worker.
Fall of Hard Barriers into Workers / Hard Barriers shall be filled Up with water to
p Major Unlikely LOW
Excavation due to Strong Winds Operators stabilize them.
5
Oxygen Deficiency and Toxic Gas Testing should be done by Authorized Gas
Gases present in Deep Tester.
Excavation 1.22 meters deep x. Supervisor /
s Severe Remote LOW
4.67 meters width, which is Workers Confined Space Permit will be used as deemed
considered as Confined Space necessary. Full Body Harness will be used for
easy retrieval of the injured worker.
CC: Client
Operations
EHS Department
File
6
As new geotech report is yet to be approved adding
below note -
㻌㻌㻌㻌㻌㻌㻌㻌㻌㻌
䘠㻌
NE No Exceptions Noted
EN Exceptions Noted
RC Required Correction
FI For Information
Approval does not relive the contractor for his liabilities and responsibilities concerning
compliance with the contractual requirements and system completion.
As new geotech report is yet to be approved adding
below note -