S.

No Description Units Nos

1 Excavation for foundation m3 8


2 PCC in foundation m3 8
3 Footing in foundation m3 8
4 column upto plinth level m3 8
5 Back filling upto plinth level m3 1
6 Brick work upto slab level m3 4
7 Beams m3 4
8 slab m3 1
9 parapet wall m3 4
10 doors and windows 1
Width
L (m) thickness (m) Quantity Duration(in days)
(m)
1.52439 1.52439 1.763 32.8 7
1.524 1.524 0.1 1.9 4
1.25 1.25 0.25 3.1 5
0.75 0.5 2.4 7.2 6
13.5 1.5 0.8 16.2 3
3.05 0.23 2.74 7.7 5
3.05 0.23 0.3 0.8 4
3.5 3.96 0.1 1.4 4
3.05 0.23 0.75 2.1 4
1 Door and 2 windows 3