Footprint in Bangladesh

2010 2013 2017 2018


Project: 100MW Thermal Power Plant Project: 52.2 MW Thermal Power Plant Project: 100 MW Thermal Power Plant Project: 162 MW Thermal Power Plant
Client: IEL Consortium and Associates Limited Client: Raj Lanka Power Company Ltd Client: Acorn Infrastructure Services (Unit 3) Limited Client: Manikganj Power Generations Limited
Location: Megnaghat, Bangladesh Location: Natore, Bangladesh Location: Chittagong, Bangladesh Location: Manikganj, Bangladesh
Installed Capacity: 100MW Installed Capacity: 52.2 MW Installed Capacity: 100 MW Installed Capacity: 162 MW
Configuration: 12x Wärtsilä 20V32 Configuration: 6x Wärtsilä 20V32 Configuration: 8x CAT 16CM43 Configuration: 9x MAN 18V48/60TS
Scope: EPC of Balance of Plant Scope: Full EPC on Turnkey basis Scope: Full EPC on Turnkey basis Scope: EPC of Balance of Plant
COD: May, 2011 COD: Jan, 2014 COD: Nov, 2018 COD: Nov, 2020

2010 2014 2018 2020


Project: 100MW Thermal Power Plant Project: 52.2 MW Thermal Power Plant Project: 54.5 MW Thermal Power Plant Project: 115 MW Thermal Power Plant
Client: Dutch Bangla Limited Client: Lakdhanavi Bangla Power Limited Client: Bhairob Power Limited Client: Chandpur Power Generations Limited
Location: Shiddirganj, Bangladesh Location: Comilla, Bangladesh Location: Bhairob, Bangladesh Location: Chandpur, Bangladesh
Installed Capacity: 100MW Installed Capacity: 52.2 MW Installed Capacity: 54.5 MW Installed Capacity: 115 MW
Configuration: 12x Wärtsilä 20V32 Configuration: 6x Wärtsilä 20V32 Configuration: 3x MAN 18V48/60TS Configuration: 4xMAN18V51/60TS & 2xMAN20V45/60TS
Scope: EPC of Balance of Plant Scope: Full EPC on Turnkey basis Scope: EPC of Balance of Plant Scope: EPC of Balance of Plant
COD: June, 2011 COD: Dec, 2014 COD: Mar, 2021 COD: Dec, 2021(Planned)

LTL Global Engineering (Pte) Ltd, a fully owned subsidiary and the business arm for international EPC (power plant) projects of Ceylex Engineering (PVT) Ltd,
entered the Bangladesh market in 2010. To date, we have installed a total capacity in excess of 730 MW in Bangladesh.