Professional Documents
Culture Documents
Raising PF
Raising PF
LENGTH/
SN DESCRIPTION RATE PER CASH STORE TOTAL 2700
AREA
Development of circulating area and provision of
1 water booth,PF benches,toilets along with other misc. 18854831 0 18854831 3004
work for face lifting of Subedar ganj station station
2 Cost for HL Plat form from low level to HL platform 12000 2618 SQM 31416148 0 31416148 9004
3 Construction of washable apron 600 mtr long . 1800 33115 m 59607000 0 59607000
4 Provision of hydrant pipe line 5 Nos. 600m each 3000 7704 m 23112000 0 23112000 8318.255894
Provision of 6.1 mtr Wide FOB at Subedarganj
5 1200 35444 m 42532800 0 42532800
station.
6 Cost of Washing pit line 1200 30278 m 36333654 0 36333654
Cost of booking office , waiting hall, compressure
7 321 16359 Sqm 5251151 0 5251151 2194.56
room& TXR office
8 Cost of Plat form shelter 3388 3652 Sqm 12372296 0 12372296 1463.04 3388
Cost for 50000 Gall. Capacity OHT with 1 no. Tube
9 8654116 0 8654116 4327058.00
well & pump house
10 Cost of Rail 52 Kg ( S/H ) 124.8 38200 MT 0 4767360 4767360 300.00
Total 238133995 4767360 242901355 191711438 218636407
11 D & G charges 242901355 9.13 % 22176894 0 22176894 50030737 54033196 58355852 63024320
Total 260310889 4767360 265078249
12 Cost of Electrical/G 155414995 5 % 7770750 0 7770750
13 Cost of Electrical/TRD 84889457 10 % 8488946 0 8488946
14 Cost of S & T 155414995 8 % 12433200 0 12433200 2.78
Total 289003784 4767360 293771144
B Phase -2
1 Developmentof saloon siding with road approach&
shelter.
2 One full length washing line with aparallel stabling Proposed station building on south side.
line.
3 Extension of PF shelter on both platforms. Construction of OHT 50000 gall. Capacity with Pump house.
4 Proposed station building on south side. Station building façade
5 Approach road
6 Construction of new platform no. 4 , Extension &Raising of
existing plat form
7 Hydrant pipe line
8 Washable apron
9 6.1 Mtr full length FOB
C Phase -3
1 Additional washing line. Washing line with washing line complex..
2 Additional OC siding & platform. OC siding & platform.
3 Platform no. 4.
4 Station building on south side.
5 Development of circulating area of south side.
Subedarganj ( SFG ) :- Upgradation of passenger amenities ( Phase-II ) 21600
SN Description QTY Rate Per Cash Store Amount
1 Cost of Development of circulating area 4600 2639 Sqm 12139400 0 12139400
2 Provision of one nos RCC Tank 50000 gallons 1 5042602 Each 5042602 0 5042602
capacity
3 Construction of pump house with tubewell 1 1627710 Each 1627710 0 1627710
b Earth filling & CC base ( 10mx600) 14784 752 Sqm 11117568 0 11117568
10 Provision of ladies & gents toilets ( area 15 sqm 60 17301 sqm 1038060 0 1038060
Each)
11 Provision of water booth 24 167797 Each 4027128 0 4027128
12 Provision of Hydrant pipe line 2580 10299.95 r/m 21636052 4937807 26573859
26573871 2580
13 Provision of washable apron 2580 38825.25 r/m 58727806 41441338 100169144
100169145
14 Provision of 6.1 mtr Wide FOB. 854 47004 Sqm 40141416 0 40141416
915
Sr.DEN/II/ALD
DEN/E/I/ALD
696197.427
4 1071772 5767969
25158200.5 5741635.714
30899836.22
Scope of work for improvement of civil lines side station
1 building & circulating
Construction of station building on GF 1525 s qm
2 onstruction of station building on FF
C 1750 sqm
3 Construction of station building on SF 1150 sqm
4 Improvement to façade of existing building including poarch
5 Construction of new PRS complex 6000 s qm
6 Development of circulating area from IIIrd avenue toVII avenue
43450 sqm
7 Signage
8 Construction of Type III quarters 72 no;s
9 Construction of Type II quarters 72 no;s
10 Dismantling of existing quarters 6480 um
C
11 Provision of multi level parking ( Two floor ) 4000 sqm
12 Provision of basement parking under park 3250 sqm
13 Related electric & S&T work
Scope of work for Development of circulating area & provision
of multilevel parking at City side of ALD station
1 evelopment of circulating area
D 21600 sqm
2 Construction of Type III quarters 8 no;s
3 Replacement of three nos RCC Tanks in liue of 3 No;s
4 existing tanks including dismantling of existing RCC
Dismantling of quarters, TTE rest house, union offices 000
7 c um
5 etc)
Provision of multi level parking including toilet 4400 sqm
7 complex( Two floor )
Signage
8 Related electric & S&T work
DEN/E/I/ALD
Justification (1)
llahabad junction is Zonal Headquarter for NCR & divisional Head
A
quarter of Allahabad division. Allahabad station is A1 category station of
Above mentioned works are very necessary to improve the allahabad
station civil lines side as to make it world class station. Therefore proposal
Justification (2)
llahabad junction is Zonal Headquarter for NCR & divisional Head
A
quarter of Allahabad division. Allahabad station is A1 category station of
Above mentioned works are very necessary to improve the allahabad
station city side as to make it world class station. Therefore proposal has
Cost for Road
SN SOR DESCRIPTION QTY UNIT RATE CASH STORE TOTAL
1 231010 Preparation of subgrade by excavating earth upto 22.5cm depth, Sqm to38.91
1000 dressing camber and
38910
consolidating
0 with
38910
power road roller
231030 Providing and laying each layer of flat brick soling hand packed and joints filled with ordinary0sand 0 0
2 231031 With well burnt bricks. Class 7.5 designation 1000 Sqm 186.83 186830 0 186830
231040 Providing and laying water bound macadam with specified stone aggregate, stone screening0and binding 0 material0 including scr
3 231041 Sub-base with stone aggregate 90mm to 45mm including stone cum 13.2mm
170screening 1003.48size170592 0 170592
4 231042 Base course with 63mm to 45mm size including stone screening cum size
170 13.2mm 1459.59 248130 0 248130
233010 Providing and applying tack coat using bitumen emulsion (Rapid setting) complying with IS: 8887-0 1995,
0 spraying0 the bitumen e
5 233011 On W.B.M. @ 0.4kg/ sqm 1000 Sqm 19.99 19990 0 19990
234010 2.5 cm thick bitumastic sheet with hot bitumen of approved quality using stone chippings (60% 0 12.5 mm 0 nominal 0 size and 40%
6 234011 With paving bitumen 80/ 100 heated and then mixed with solvent Sqm
1000 at the rate 214.38
of 70grams
214380
per kg. of asphalt
0 214380
7 237070 Providing and laying Dry Brick (FPS bricks of class designation400 metrof full
7.5) edging 87.65
brick width
35060
and half brick
0 depth
35060including excav
e
Total 913892 0 913892
8 Add 20% above on Unified SOR 2010 913892 20.00 % 182778 0 182778
TOTAL 1096670 0 1096670
Add 4 % 1096670 4 % 43867 0 43867
TOTAL 1140537 0 1140537
Cost of road area 1000 Sqm 1 140537
Cost of road area 1 Sqm 1140.54
Sr DEN/I/ALD
DT 21/6/13 Annexure
SQ m cost of FOB Based on smith road FOB ALD plan no 85/2006 for WP 2014 15
660000
Annexure I
Cost for Ground Floor Building ( 6.76x4.06m ) =27.44 Sqm 27.4456
4 031012 :3:6 (1 cement : 3 sand : 6 graded
1 8.165 cum 1861.88 15202 0 15202
stone aggregate 40mm nominal size)
33060
0 Supply and using cement at worksite : 0
0 0
5 033061 OPC 43 grade 9.18 Tonne 5980.00 54896 0 54896
041010 Providing and laying in position M 20 0 0 0
Grade concrete for reinforced concrete
structural elements but excluding cost of
centering, shuttering, reinforcement and
Admixtures in recommended proportion
(as per IS:9103) to accelerate, retard
setting of concrete, improve workability
without impairing strength and durability
as per direction of Engineer in charge
6 041011 All work upto plinth level, including raft 9.084 cum 2100.13 19078 0 19078
foundation of washable aprons, HS tank,
pile cap, footings of FOB, and Platform
shelter etc.
7 041012 All work in buildings above plinth level 6.259 cum 2309.58 14456 0 14456
upto floor two level.
045010 Supplying Reinforcement for R.C.C. work 0 0 0
including straightening, cutting, bending,
placing in position and binding all
complete.
8 045011 Mild steel and medium tensile steel bars 1534 Kg 51.56 79093
0 79093
42010
0 Centering and shuttering including 0 0 0
strutting, propping etc. and removal of
form for :
9 042011 Foundations, footings, bases of columns, 9.83 Sqm 127.8 1256 0 1256
raft foundation of washable aprons, Pile
caps, Footings of FOB etc.
10 042013 Suspended floors, roofs, landings, 27.09 Sqm 213.09 5773 0 5773
balconies, FOB slabs, walkway slabs
and access platform
11 042014 Lintels, beams, plinth beams, bed 34.66 Sqm 184.72 6402 0 6402
blocks, girders, bressumers and
cantilevers
12 042015 Columns, pillars, , posts and struts 16.56 Sqm 270.2 4475
0 4475
051010 rick work with nonmodular (FPS) bricks of
B 0 0 0
class designation 7.5 in foundation and plinth in :
13 51015
0 Cement mortar 1:6 (1 cement : 6 fine sand) 4.5 cum 2837.41 12768
0 12768
051030 Brick work with machine moulded perforated 0 0 0
bricks of class designation 12.5 conforming to IS:
2222 1991 in superstructure from beyond plinth
level upto 6m above plinth level in cement mortar
1:6 (1 cement : 6 coarse sand)
4
1 51031
0 With nonmodular (FPS) bricks 14 um
c 3525.78 49361
0 49361
15 051040 Extra over item 051010 & 051020 for brick work .5
4 cum 141.73 638 0 638
in superstructure beyond plinth level upto floor
two level :
071010 roviding wood work in frames of doors,
P 0 0 0
windows, clerestory windows and other
frames and trusses, wrought, framed and
fixed in position :
16 71012
0 Sal wood 31.875 c udm
3 38.59 12807
0 12807
072010 Providing and fixing panelled/glazed or 0 0 0
panelled and glazed shutters for doors,
windows and clerestory windows
including ISI marked black enamelled
M.S. butt hinges with necessary screws
excluding, panelling/glazing which will be
paid for separately
17 072011 Second class teak wood, 35mm thick .05
4 Sqm 1688.49 6838 0 6838
072020 roviding and fixing panelling/glazing or
P 0 0 0
panelling and glazing in panelled/ glazed
or panelled and glazed shutters for doors,
windows and clerestory windows (Area of
opening for panel inserts excluding
portion inside grooves or rebates to be
measured). Panelling/glazing for
panelled/ glazed or panelled and glazed
shutters 25mm to 40mm thick
18 72021
0 Second class teak wood.15mm thick 3.09 Sqm 1335.10 4125 0 4125
081030 Structural steel work welded in built up 0 0 0
sections, trusses and framed work,
girders, stagings, racks, etc including
cutting, bending, straightening, hoisting,
fixing in position, including applying a
priming coat of approved steel primer,
complete upto 6m height above GL
19 81032
0 In flats, plates , round or square bars 225 Kg 68.00 15300 0 15300
092010 Cement concrete flooring 1:2:4 (1cement: 2coarse sand: 4graded stone aggregate) finished with a floating coat of neat cement including cement slurry, but excluding the cos
0 0 0
20 092012 40mm thick with 20mm nominal size stone aggregate 22.68 Sqm 113.50 2574 0 2574
092020 Cement plaster skirting (upto 30cm height) with cement mortar 1:3 (1cement: 3coarse sand) finished with a floating coat of neat cement
0 0 0
21 092021 15mm thick 3.51 Sqm 102.63 360 0 360
111020 15 mm cement plaster on the rough side 0 0 0
of single or half brick wall of mix
2
2 111022 1:6 (1cement: 6 fine sand) 121.18 Sqm 71.82 8703 0 8703
23 15060
1 Applying one coat of cement primer of 121.18 Sqm 23.72 2874 0 2874
approved brand and manufacture on wall
surface
24 115080 Finishing walls with Deluxe Multi surface 143.86 Sqm 81.29 11694 0 11694
paint system for interiors and exteriors
using Primer as per manufacturers
specifications with two or more coats
applied @ 1.25ltr/10 sqm over and
including one coat of Special primer
applied @ 0.75 ltr/10sqm
25 115110 Finishing walls with water proofing 121.18 Sqm 33.36 4043 0 4043
cement paint of required shade two or
more coats on new work applied @ 3.84
Kg/10 sqm
21010
1 Applying Priming Coat : 0 0 0
26 121011 With ready mixed pink or grey primer of 42.12 Sqm 21.40 901 0 901
approved brand and manufacture on
woodwork (hard and soft wood)
27 121014 With ready mixed red oxide zinc 4.02 Sqm 9.87 40 0 40
chromate primer of approved brand and
manufacture on steel work (second coat)
28 121020 Painting wood work with Deluxe Multi 42.12 Sqm 67.56 2846 0 2846
Surfaces Paint of required shade. Two or
more coat applied @ 0.90ltr/ 10sqm over
an under coat of primer, applied @
0.75ltr/ 10sqm of approved brand or
manufacture
154010 Providing and fixing 110mm dia PVC soil, 11.40 metre 221.56 2526 0 2526
waste and vent pipes including jointing
and cost of spun yarn and sand etc.
29 complete
154020 Providing and fixing brackets comprising 9 Each 91.92 827 0 827
of aluminium painted standard steel clip
and cast iron base for 110mm A.C.
pipes, including cost of screws etc. and
drilling of holes and making good the
walls including cost of sand etc.
30 complete
154110 Providing and fixing 110 mm PVC bend 3 Each 118.77 356 0 356
of the required degree with access door
inclusive of 3mm thick bitumastic felt
washer, bolts and nuts, complete,
including jointing and cost of spun yarn
31 and sand etc. complete
Total 345827 0 345827 352487
Add 20% above on Unified SOR 2010 for All
32 Chapters as per LAR 74-W/8727/Bills Dated 345827 20 % 69165 0 69165
28/12/2012
TOTAL 414992 0 414992
33 Add 4% above escalation for the year 2014-15 414992 4 % 16600 0 16600
TOTAL 431592 0 431592
Total cost of 27.44 sqm area 431592 0 431592
cost of 1 sqm area 15729 0 15729
Add 10% for sanitary , water supply & sewerage system 1573 0 1573 12203
Total cost of 1 sqm area ( Witout work charge & contegency ) 17301 0 17301 Elec. 10% 1220.3
Cost for 1 sqm 17301 0 17301
DEN/E/I/ALD
Detail of Cement
Per Cum
Cement in
SN SOR Description of Item Qty Unit Cement ( in
Qtl
Qtl)
1 031012 :3:6 (1 cement : 3 sand : 6 graded
1 8.165 cum 2.20 17.96
stone aggregate 40mm nominal size)
2 041011 All work upto plinth level, including raft 9.084 cum 3.44 31.25
foundation of washable aprons, HS tank,
pile cap, footings of FOB, and Platform
shelter etc.
3 041012 All work in buildings above plinth level 6.259 cum 3.44 21.53
upto floor two level.
4 51015
0 ement mortar 1:6 (1 cement : 6 fine sand)
C .5
4 um
c .625
0 .81
2
5 051031 With nonmodular (FPS) bricks 14 cum 0.625 8.75
6 92012
0 22.68 Sqm
0mm thick with 20mm nominal size stone aggregate
4 .170
0 3.86
7 092021 15mm thick 3.51 Sqm 0.110 0.39
8 111022 1:6 (1cement: 6 fine sand) 121.18 Sqm 0.043 5.21
Total 91.76
In ( MT ) 9.18
DEN/E/I/ALD
Annexure II
Cost for First Floor Building ( 6.76x4.06m ) =27.44 Sqm 27.4456
Detail of Cement
Per Cum
Cement in
SN SOR Description of Item Qty Unit Cement
Qtl
( in Qtl)
1 041012 A
ll work in buildings above plinth level upto floor two 6.759 cum 3.44 23.25
level.
2 051031 With nonmodular (FPS) bricks 21 cum 0.625 13.13
3 92012 4
0 0mm thick with 20mm nominal size stone aggregate 22.68 qm
S .170
0 3.86
4 092021 15mm thick 3.51 Sqm 0.110 0.39
5 105191 Cement concrete 1:2:4 (1 cement, 2 coarse sand 1.646 cum 3.200 5.27
and 4 graded stone aggregate of 20mm nominal
size)
6 111022 1:6 (1cement: 6 fine sand) 67.38
1 Sqm 0.043 7.20
Total 53.08
In ( MT ) 5.31
Sr DEN/II/ALD
.76
6
6.76
4.06
4.06
Parapet Wall 21.64 4.9772 5
Detail of Cement
Per Cum
Cement in
SN SOR Description of Item Qty Unit Cement
Qtl
( in Qtl) 5410000
2 51017
0 ement mortar 1:4 (1 cement : 4 coarse sand)
C 0
8 c um .950
0 6.00
7
3 051031 With nonmodular (FPS) bricks 40 cum 0.625 25.00
4 111061 1:4 (1cement: 4coarse sand) 400 Sqm 0.09 34.00
Total 135.00
In ( MT ) 13.50
Sr DEN/II/ALD
Proposal No 51/P/2010 Annexure IV
Replacement of one no . 50000 gallons capacity RCC tank in liew of old tank at
ALD Station with Assosiated pipe line.
SN SOR DESCRIPTION QTY RATE PER CASH Store Total
1 NS1 Construction of ''Intz'' type one nos.RCC
Over Head Tanks complete in all respects
(with contractor's own steel , cement and
all T&P items required for the construction)
of 50000 gallon capacity each with 20 m
high RCC staging as per Standard NR
HQ E Plan No. HQ/1/01-97 (sheet no.
I&II ,R-1 NR Type plan .W-40 ) with raft
foundations, bottom ring beam, floor
coloumns with bracings, top ring beam,
column bracings, top dome, bottom dome,
900 mm wide RCC stair case with two
rows of 15 mm dia "Ä" class G.I. pipe
railing over balcony etc on outer side ,M.
S. ladder from last landing to
balcony,balcony to top dome, Alluminium
ladder from top dome to inside tank body
complete,man hole with cover at top
dome, ventilator with covering of mosquito
proof netting fixed on wooden frame,
water level indicator (electrical/electronics)
having display arrangements in pump
house with suitable wiring from tank to
pump house building providing and fixing
of aluminium lightening conductor strip 20
mmx3 mm at center of top slab of
ventilator in accrdance with IS
specification, providing and fixing CI
double flange " LA" class verical pipes 1 3031472 Each 3031472 0 3031472
from tank body to 1.00 m below ground
level with proper duck foot bend resting
over the cement concrete block of proper
size along with materials required for
proper jointing,fixed in MS clamp with
coloumn etc. complete as per direction of
Railway's Engineer at site, C.I.inlet pipes
100 mm dia 03 nos., C.I. outlet pipes 150
mm dia 02 nos.with 01 no overflow pipe of
100 mm dia and one wash out pipe
(150mm dia),over flow pipe (100mm dia)
etc. including 19 mm thick plaster with
coarse sand 1:2 inside the tank body
except top dome and cement and sand
plaster 1:3:6 mm thick on all exposed
surface with all contractor's men and
materials,equipment,shuttering,temporary
arrangements etc. complete work with two
coats of water proofing cement of
approved shade and quality on exposed
concrete surface & two coats of enamel
paint of approved shade and quality over
all steel surfaces,including testing of
overhead tank and maintaining the same
for a period of six months. All RCC works
to be executed in M 30 design mix. The
rate to be quoted is for complete work, as
per plan no referred above.
2 NS 2 Soil investigation in connection with
provision of 01nos RCC overhead tanks
of capacity 50000 gallons each from HBTI/
Kanpur or any other approved Engineering
2 40689 Each 81378 0 81378
College including submission of the report
to ascertain the bearing capacity and its
suitability for foundation of tank. ( LAR 74-
W / 8475/Bills dt 02/08/2011 )
Total (A) 3112850 3112850
Pipe Line 550m ( Annexure IV )
SOR DESCRIPTION Qty unit rate CASH STORE TOTAL
133270 P roviding and fixing enclosed type water
meter (bulk type) conforming to IS : 2373
and tested by Municipal Board complete
with bolts, nuts, rubber insertions etc. (The
tail pieces if required will be paid
separately)
1 133273 150 mm dia nominal bore 1 Each 5938.09 5938 5938
133220 Providing and fixing C.I. sluice valves (with
cap) complete with bolts, nuts, rubber
insertions etc. 150 mm dia (the tail pieces if
required will be paid separately)
2 133222 Class II 8 Each 5405.31 43242 0 43242
133360 Providing and laying Double Flanged Pipe
(screwed/welded) Centrifugally (Spun)
Cast Iron, Class B (IS : 1536)
3 133362 150mm dia C.I. Double Flanged Pipe 550 metre 2181.36 1199748 1199748
133170 Providing flanged joints to double flanged
C.I./ D.I. pipes and specials including
fittings, packings & testing of joints up to
400 mm dia
4 133174 150 mm dia. pipe 190 Each 204.67 38887 38887
133040 Providing and laying flanged C.I. standard
specials such as tees, bends, collars,
tapers, caps etc., suitable for flanged
jointing as per IS:1538 :
5 133041 Upto 300 mm dia 15 quintal 755.36
5 6330
8 6330
8
6 181030 Dismantling RCC work for tanks etc 14
1 cum 634.73 72359 72359
Total 1446504 1446504
Add % above on Unified SOR 2010 for All Chapters
7 1446504 20.00 % 289301 316721
as per LAR No:74-W/8714/Bills dt 09/11/2012
Total 735805
1 763225
1
Total ( A+b) 4848656 4876075
Add 4% for 201415 193946 193946
G. Total 5042602 5070021
DEN/E/I/ ALD
DEN / E/ I/ALD
Provision of T/well with pump house and assosiate pipe line in station
area of Allahabad Railway Station . (Annexure- V )
SOR DESCRIPTION QTY RATE UNIT CASH STORE TOTAL
rilling & reaming of 675 dia bore in all type
D
of soil/ strata including sand stone , rock &
boulder formation with mechenical
1 NS1 80 1059 metre 84720 0 84720
preumatic rig with contractors own materials
T & P ,labour consumable etc complete
from ground level to 75 m below
Drilling & reaming of 550 dia bore in all type
of soil/ strata including sand stone , rock &
boulder formation with mechenical
2 NS2 preumatic rig with contractors own materials 40 1059 metre 42360 0 42360
T & P ,labour consumable etc complete
from 75 m below ground level to120 m
below ground level
From 120m below ground level to160 m
3 NS3 40 1059 metre 42360 0 42360
below ground level
From 160m below ground level to 200 m
4 NS4 30 1059 metre 31770 0 31770
below ground level
Application electric lodging including all
5 NS5 1 24435 per job 24435 0 24435
incidental charges complete .
Surrounding of tubewell by pre gravel 1.6
6 NS6 mm to 4 mm including supplying of pre 45 1955 cum 87975 0 87975
gravel of approved quality at site .
Supplying, Lowering & Painting of T.W.
assembly as approved by the site 350 mm
7 NS7 dia M.S.E.R.W. housing pipe of mild steel 62.3 3291 Metre 205029 0 205029
of 8 mm thick plain / slotted as per
requirement
8 S8
N S/F350mm dia reducer of mild steel 1 2198 Each 2198
0 2198
9 NS9 S/F200 mm dia MS Plain pipe 6mm thick 16 2036 metre 2576
3 0 2576
3
S/lowering & fixing 200 mm dia MS Slotted
10 NS10 40 2365 metre 94600 0 94600
pipe 6mm thick (threaded & socketed)
1
1 S11
N S/F 200 mm dia Bell plug 6mm thick 1 1303 Each 303
1
0 303
1
12 NS12 S/F350 mm dia MS Clamp 1 1955 Each 1955 0 1955
13 NS13 S/F350 mm dia Well Cap 1 977 Each 977 0 977
14 NS14 S/F350 mm dia MS Ring 11 1303 Each 14333 0 14333
15 NS15 S/F200 mm dia MS Ring 10 401 Each 4010 0 4010
S/F200 mm dia MS pipe girder for TW
16 NS16 6 2036 metre 12216 0 12216
support
Development of Tube Well by 600 PSI Air
17 NS17 Compressure including all incidental 60 2304 Hour 138240 0 138240
charges
18 NS18 Supply of Sodium Hexameta Phosphate 80 130 Kg 10400 0 10400
Development of Tube Well by over pumping
19 NS19 85 896 Hour 76160 0 76160
unit including all incidental charges
20 NS20 Testing of Yield and verticality 1 1218 per job 1218 0 1218
Chemical and Bacteriological testing of
21 NS21 1 1543 per job 1543 0 1543
Water
Supplying& using Bentonite powder during
22 NS22 2500 5.25 Kg 13125 0 13125
boring of the well
Conducting Geophysical survey by
electrical resistivity method to decided the
location of tube well site depending upon
the water bearing atrata taking into acount
the physiography, hydrology & submission
23 NS23 of detailed report along with 2 3488 each 6976 0 6976
recommendation of best suitable site
( minimum three lacation each to be tested
for tube well )( LAR No: 74W/8463/Bills/dt
04/07/2011 of Rajapur pump for all items
mentioned above from NS 1 NS 23)
Tatal A 930479 930479
PUMP HOUSE
OR
S DESCRIPTION Qty unit rate CASH STORE TOTAL
011010 Earth work in excavation as per approved
drawings and dumping at embankment site
or spoil heap, within railway land, including
50m lead and 1.5m lift, the lead to be
measured from the centre of gravity of
excavation to centre of gravity of spoil
heap: the lift to be measured from natural
ground level and paid for in layers of 1.5m
each, including incidental work, as per
specificationsin
1 011011 All kinds of soils 28 cum 85.54 395
2
0 395
2
2 12010
0 Extra over item 011010 for excavation in 28 cum 9.00 252 0 252
foundations for buildings and bridges to
cover dressing to neat dimension and
plumbing sides etc. Note : Dressing under
this item is payable for the total quantity of
excavation in foundation and not partly
031010 Providing and laying in position cement
concrete of specified proportion excluding
cost of cement, centering and shuttering
All works upto Plinth level :
3 031012 1:3:6 (1 cement : 3 sand : 6 graded stone 11.1 cum 1861.88 20667 20667 79.2
aggregate 40mm nominal size)
33060
0 Supply and using cement at worksite :
4 033063 PPC 10.52 Tonne 5520.00 58070 58070
041010 Providing and laying in position M 20 Grade 0
concrete for reinforced concrete structural
elements but excluding cost of centering,
shuttering, reinforcement and Admixtures in
recommended proportion (as per IS:9103) to
accelerate, retard setting of concrete,
improve workability without impairing
strength and durability as per direction of
Engineer in charge
5 041012 All work in buildings above plinth level upto 6.4 cum 2309.58 14781 14781 27.52
floor two level.
045010 Supplying Reinforcement for R.C.C. work 0
including straightening, cutting, bending,
placing in position and binding all complete.
6 045014 High yield strength deformed bars 496 Kg 54.35 26958 26958
051010 rick work with nonmodular (FPS) bricks of class
B 0
designation 7.5 in foundation and plinth in :
7 051018 Cement mortar 1:6 (1 cement : 6 coarse sand) 53.25 cum 2835.40 150985 150985 32.5
8 051040 xtra over item 051010 & 051020 for brick
E 39 cum 141.73 5527 5527
work in superstructure beyond plinth level
upto floor two level :
111010 12 mm cement plaster of mix
9 111011 1:4 (1cement: 4 fine sand) 363 Sqm 62.37 22640 22640 16.5
92010
0 Cement concrete flooring 1:2:4 (1cement: 2coarse sand: 4graded stone aggregate) finished with a floating coat of neat cement including cement slurry, but excluding the cost of nosing of steps etc. complete
0
1 092014 75mm thick with 20mm nominal size stone aggregate 55 Sqm 178.35 9809 9809 9.835
11 121013 With ready mixed red oxide zinc chromate 19.55 Sqm 17.31 338 338
primer of approved brand and manufacture
on steel galvanized iron/steel works
12 121051 Two or more coats on new work 19.55 Sqm 45.30 886 886
3
1 17051
1 ld work (two or more coats)
O 32 qm
S 6.80 218 218
14 117071 Old work (two or more coats) with lime 137.25 Sqm 6.91 948 948
15 117081 Two or more coat, to give an even shade 120 Sqm 8.40
4 808
5 808
5
081010 Structural steel work in single section
including cutting, bending, straightening,
drilling, rivetting, bolting, hoisting, fixing in
position, including applying a priming coat
of approved steel primer, complete upto
6m height above GL
6
1 081011 In RSJ, tees, angles and channels 112 g
K 2.67
5 899
5 899
5
17 81012
0 In flats, plates, round or square bars 20.75 Kg 52.48 1089 1089
081250 Providing and fixing ISI standard steel
glazed doors, windows and ventilators of
standard rolled steel sections (shutters &
frame), joints mitered and welded with
15x3mm lugs, 10cm long, embedded in
cement concrete blocks 15x10x10cm of
1:3:6 (1cement: 3coarse sand: 6graded
stone aggregate 20mm nominal size) or with
wooden plugs and screws or rawl plugs and
screws or with fixing clips or with bolts and
nuts as required, including providing and
fixing glass panes with glazing clips and
special metal sash putty of approved make,
necessary fittings such as brass handles,
brass peg stays, brass spring catch, bolts,
hinges, locks etc as required, applying a
priming coat of approved steel primer but
excluding the cost of metal beading
18 81252
0 Windows fixed 4.5 Sqm 2309.68 10394 10394 0.1
081200 Providing and fixing 1mm thick M.S. sheet
door shutter with frame of 40x40x6mm
angle iron and 3mm M.S. gusset plates at
the junctions and corners, all necessary
fittings complete, including applying a
priming coat of approved steel primer
19 081202 Using flats 30x6mm for diagonal braces and 4.25 Sqm 1843.95 7837 7837
central cross piece
20 154010 Providing and fixing 110mm dia PVC soil, 21 metre 221.56 4653 4653
waste and vent pipes including jointing and
cost of spun yarn and sand etc. complete
21 154110 Providing and fixing 110 mm PVC bend of 4 Each 118.77 475 475
the required degree with access door
inclusive of 3mm thick bitumastic felt
washer, bolts and nuts, complete, including
jointing and cost of spun yarn and sand etc.
complete
042010 Centering and shuttering including strutting,
propping etc. and removal of form for :
22 042013 Suspended floors, roofs, landings, 34.5 Sqm 213.09 7352 7352
balconies, FOB slabs, walkway slabs and
access platform
23 042014 Lintels, beams, plinth beams, bed blocks, 10.2 Sqm 184.72 1884 1884
girders, bressumers and cantilevers
Total ( B ) 359865 359865 deduct pipe line
Add % above on Unified SOR 2010 for All
359865 20.00 % 71973 71973
Chapters
G. Total 431838 431838
Pipe line (Annexure VI )
OR
S DESCRIPTION Qty unit rate CASH STORE TOTAL
133270 P roviding and fixing enclosed type water
meter (bulk type) conforming to IS : 2373
and tested by Municipal Board complete
with bolts, nuts, rubber insertions etc. (The
tail pieces if required will be paid separately)
24 133273 150 mm dia nominal bore 1 Each 5938.09 5938 5938
133220 Providing and fixing C.I. sluice valves (with
cap) complete with bolts, nuts, rubber
insertions etc. 150 mm dia (the tail pieces if
required will be paid separately)
25 133222 Class II 2 Each 5405.31 10811 0 10811
133360 Providing and laying Double Flanged Pipe
(screwed/welded) Centrifugally (Spun) Cast
Iron, Class B (IS : 1536)
26 133362 150mm dia C.I. Double Flanged Pipe 60 metre 2181.36 130882 130882
133170 Providing flanged joints to double flanged
C.I./ D.I. pipes and specials including
fittings, packings & testing of joints up to
400 mm dia
27 133174 150 mm dia. pipe 20 Each 204.67 4093 4093
133040 Providing and laying flanged C.I. standard
specials such as tees, bends, collars,
tapers, caps etc., suitable for flanged
jointing as per IS:1538 :
28 133041 Upto 300 mm dia 3 quintal 5755.36 17266 17266
Total 68990
1 68990
1
Add % above on Unified SOR 2010 for All
76 168990 20.00 % 33798 33798
Chapters
2 G. Total
02788 02788
2
Cost for t/well ,pumphouse & pipe line for one pump 1565105 1565105
Add 4% for 201415 62604 62604
G. Total 1627710
DEN / E / I/ ALD
Annexure IV
Cost for basement parking (framed structure) ( 6.76x4.06m ) =27.44 Sqm as on June 2014 27.4456
4 031012 :3:6 (1 cement : 3 sand : 6 graded stone aggregate
1 4.116 cum 1861.88 7663 0 7663
40mm nominal size)
33060
0 Supply and using cement at worksite : 0
0 0
5 033061 OPC 43 grade 10.93 Tonne 5980.00 65357 0 65357
041010 Providing and laying in position M 20 Grade concrete for 0 0 0
reinforced concrete structural elements but excluding
cost of centering, shuttering, reinforcement and
Admixtures in recommended proportion (as per IS:9103)
to accelerate, retard setting of concrete, improve
workability without impairing strength and durability as
per direction of Engineer in charge
6 041011 All work upto plinth level, including raft foundation of 17.316 cum 2100.13 36366 0 36366
washable aprons, HS tank, pile cap, footings of FOB,
and Platform shelter etc.
7 041012 All work in buildings above plinth level upto floor two 6.259 cum 2309.58 14456 0 14456
level.
045010 Supplying Reinforcement for R.C.C. work including 0 0 0
straightening, cutting, bending, placing in position and
binding all complete.
8 045011 Mild steel and medium tensile steel bars 3300 Kg 51.56 170148
0 170148
42010
0 Centering and shuttering including strutting, propping 0 0 0
etc. and removal of form for :
9 042011 Foundations, footings, bases of columns, raft foundation 30 Sqm 127.8 3834 0 3834
of washable aprons, Pile caps, Footings of FOB etc.
10 042013 Suspended floors, roofs, landings, balconies, FOB 30 Sqm 213.09 6393 0 6393
slabs, walkway slabs and access platform
11 042014 Lintels, beams, plinth beams, bed blocks, girders, 8 Sqm 184.72 1478 0 1478
bressumers and cantilevers
12 042015 Columns, pillars, , posts and struts 15 Sqm 270.2 4053
0 4053
051010 rick work with nonmodular (FPS) bricks of class designation 7.5
B 0 0 0
in foundation and plinth in :
13 51015
0 Cement mortar 1:6 (1 cement : 6 fine sand) 4.5 cum 2837.41 12768
0 12768
051030 Brick work with machine moulded perforated bricks of class 0 0 0
designation 12.5 conforming to IS: 2222 1991 in superstructure
from beyond plinth level upto 6m above plinth level in cement mortar
1:6 (1 cement : 6 coarse sand)
4
1 51031
0 With nonmodular (FPS) bricks 11 um
c 3525.78 38784
0 38784
15 051040 Extra over item 051010 & 051020 for brick work in superstructure .5
4 cum 141.73 638 0 638
beyond plinth level upto floor two level :
071010 roviding wood work in frames of doors, windows,
P 0 0 0
clerestory windows and other frames and trusses,
wrought, framed and fixed in position :
16 71012
0 Sal wood 100 cudm 38.59 3859 0 3859
072010 Providing and fixing panelled/glazed or panelled and 0 0 0
glazed shutters for doors, windows and clerestory
windows including ISI marked black enamelled M.S. butt
hinges with necessary screws excluding, panelling/
glazing which will be paid for separately
17 072011 Second class teak wood, 35mm thick 2 Sqm 1688.49 3377 0 3377
72020
0 Providing and fixing panelling/glazing or panelling and 0 0 0
glazing in panelled/ glazed or panelled and glazed
shutters for doors, windows and clerestory windows
(Area of opening for panel inserts excluding portion
inside grooves or rebates to be measured). Panelling/
glazing for panelled/ glazed or panelled and glazed
shutters 25mm to 40mm thick
18 72021
0 Second class teak wood.15mm thick 2 Sqm 1335.10 2670 0 2670
092010 Cement concrete flooring 1:2:4 (1cement: 2coarse sand: 4graded stone aggregate) finished with a floating coat of neat cement including cement slurry, but excluding the
0 0 0
20 092012 40mm thick with 20mm nominal size stone aggregate 22.68 Sqm 113.50 2574 0 2574
092020 Cement plaster skirting (upto 30cm height) with cement mortar 1:3 (1cement: 3coarse sand) finished with a floating coat of neat cement
0 0 0
21 092021 15mm thick 3.51 Sqm 102.63 360 0 360
111020 15 mm cement plaster on the rough side of single or half 0 0 0
brick wall of mix
2
2 111022 1:6 (1cement: 6 fine sand) 121.18 Sqm 71.82 8703 0 8703
23 15060
1 Applying one coat of cement primer of approved brand 121.18 Sqm 23.72 2874 0 2874
and manufacture on wall surface
25 115110 Finishing walls with water proofing cement paint of 121.18 Sqm 33.36 4043 0 4043
required shade two or more coats on new work applied
@ 3.84 Kg/10 sqm
121010 Applying Priming Coat : 0 0 0
26 121011 ith ready mixed pink or grey primer of approved brand
W 3 Sqm 21.40 64 0 64
and manufacture on woodwork (hard and soft wood)
27 121014 With ready mixed red oxide zinc chromate primer of 3 Sqm 9.87 30 0 30
approved brand and manufacture on steel work (second
coat)
28 121020 Painting wood work with Deluxe Multi Surfaces Paint of 3 Sqm 67.56 203 0 203
required shade. Two or more coat applied @ 0.90ltr/
10sqm over an under coat of primer, applied @ 0.75ltr/
10sqm of approved brand or manufacture
154010 Providing and fixing 110mm dia PVC soil, waste and 3.00 metre 221.56 665 0 665
vent pipes including jointing and cost of spun yarn and
29 sand etc. complete
154020 Providing and fixing brackets comprising of aluminium 3 Each 91.92 276 0 276
painted standard steel clip and cast iron base for 110mm
A.C. pipes, including cost of screws etc. and drilling of
holes and making good the walls including cost of sand
30 etc. complete
154110 Providing and fixing 110 mm PVC bend of the required 3 Each 118.77 356 0 356
degree with access door inclusive of 3mm thick
bitumastic felt washer, bolts and nuts, complete,
including jointing and cost of spun yarn and sand etc.
31 complete
Total 407043 0 407043 413703
Add 18% above on Unified SOR 2010 for All Chapters 407043 20.00 % 81409 0 81409
TOTAL 488451 0 488451
Total cost of 27.44 sqm area 488451 0 488451
cost of 1 sqm area( Witout work charge & contegency ) 17801 0 17801
Add 4 % for 2014-15 18513
Detail of Cement
Per Cum
Cement in
SN SOR Description of Item Qty Unit Cement
Qtl
( in Qtl)
1 031012 :3:6 (1 cement : 3 sand : 6 graded stone aggregate
1 4.116 cum 2.20 9.06
40mm nominal size)
2 041011 All work upto plinth level, including raft foundation of 17.316 cum 3.44 59.57
washable aprons, HS tank, pile cap, footings of FOB,
and Platform shelter etc.
3 041012 All work in buildings above plinth level upto floor two 6.259 cum 3.44 21.53
level.
4 51015
0 ement mortar 1:6 (1 cement : 6 fine sand)
C .5
4 um
c .625
0 .81
2
5 051031 With nonmodular (FPS) bricks 11 cum 0.625 6.88
6 92012
0 0mm thick with 20mm nominal size stone aggregate
4 2.68
2 qm
S .170
0 3.86
7 092021 15mm thick 3.51 Sqm 0.110 0.39
8 111022 1:6 (1cement: 6 fine sand) 121.18 Sqm 0.043 5.21
Total 109.29
In ( MT ) 10.93
Detail of Cement
SN Per Cum
Cement in
SOR Description of Item Qty Unit Cement
Qtl
( in Qtl)
031023 1:2:4 (1 cement : 2 sand : 4 graded stone 5 cum 3.200 16.00
aggregate 20mm nominal size)
041011 All work upto plinth level, including raft 60 cum 3.44 206.40
foundation of washable aprons, HS tank, pile
cap, footings of FOB, and Platform shelter
etc.
108033 150mm dia. 30 metre 0.005 0.15
Total 222.55
In ( MT ) 22.26
DEN/E/I/ALD
DT 21/6/13 Annexure VIII
Cost of 1 no. RCC Bench
SN SOR DESCRIPTION QTY. RATE PER CASH STORE TOTAL
1 172020 Supplying, erecting and fixing precast 1 Each 7729.55 7730 0 7730
concrete reinforced bench with back rest.
Bench shall consist of 2 nos. L shaped base
support in natural cement colour of thickness
100 mm, back height 1000 mm, front height
450 mm, base width 620 mm and 5 nos.
reinforced concrete planks in red colour and
size of 1500 x 100 x 50mm and 1 no.
reinforced concrete plank of 150 x 200 x
50mm; manufactured by using M-30 grade
concrete & reinforced suitably; all parts to be
joined with galvanised nuts and bolts of
suitable size. All bolts to be sealed after
assembly. Complete job to be done as per
directions of Engineer Incharge
Total 7730 0 7730
2 Add % above on Unified SOR 2010 for All
Chapters as per LAR 74-W/8727/Bills Dated 7730 20 % 1546 0 1546
28/12/2012
Total 9275 0 9275
3 Add 4% above escalation for the year 2014-15 9275 4 % 371 0 371
TOTAL 9646 0 9646
Cost for 1 no. RCC Bench 9646 Each
DEN/E/I/ALD
Dt 20/6/13
Platform WALL 100M LONG AS PER N.R. Type P 34 sheet no. 1/R1. ( H L )
As per New SOR 2010
SN SOR DESCRIPTION QTY RATE PER CASH STORE TOTAL
011010 arth work in excavation as per approved
E
drawings and dumping at embankment
site or spoil heap, within railway land,
including 50m lead and 1.5m lift, the lead
to be measured from the centre of gravity
of excavation to centre of gravity of spoil
heap: the lift to be measured from natural
ground level and paid for in layers of 1.5m
each, including incidental work, as per
specificationsin
1 011011 All kinds of soils 69.54 cum 85.54 5948
0 5948
31010
0 Providing and laying in position cement 0 0 0
concrete of specified proportion excluding
cost of cement, centering and shuttering
All works upto Plinth level :
2 031012 1:3:6 (1 cement : 3 sand : 6 graded stone 17.48 cum 1861.88 32546 0 32546
aggregate 40mm nominal size)
33060
0 Supply and using cement at worksite :
0
0 0
3 033063 PPC 19.37 Tonne 5520.00 106898 0 106898
042010 Centering and shuttering including 0 0 0
strutting, propping etc. and removal of
form for :
4 042011 Foundations, footings, bases of columns, 100 Sqm 127.8 12780 0 12780
raft foundation of washable aprons, Pile
caps, Footings of FOB etc.
041010 Providing and laying in position M 20 0 0 0
Grade concrete for reinforced concrete
structural elements but excluding cost of
centering, shuttering, reinforcement and
Admixtures in recommended proportion
(as per IS:9103) to accelerate, retard
setting of concrete, improve workability
without impairing strength and durability
as per direction of Engineer in charge
5 041011 All work upto plinth level, including raft 15.53 cum 2100.13 32615 0 32615
foundation of washable aprons, HS tank,
pile cap, footings of FOB, and Platform
shelter etc.
045010 Supplying Reinforcement for R.C.C. work 0 0 0
including straightening, cutting, bending,
placing in position and binding all
complete.
6 045014 High yield strength deformed bars 1200 Kg 54.35 65220
0 65220
051010 rick work with nonmodular (FPS) bricks of class
B 0 0 0
designation 7.5 in foundation and plinth in :
7 051017 Cement mortar 1:4 (1 cement : 4 coarse sand) 105.05 cum 2835.40 297859
0 297859
114020 ointing on brick/tile flooring with cement
P 0 0 0
mortar 1:3 (1cement: 3fine sand)
8 114022 Ruled pointing 132 Sqm 47.64 6288
0 6288
131070 Providing and fixing 3 layer PPR (Poly 0 0 0
Propylene Random copolymer)
designated as PN10 pipes, approved by
CBRI and conforming to IS:15801; U V
stabilized & antimicrobial fusion welded,
having thermal stability for hot & cold
water supply including all PPR plain &
brass threaded polypropylene random
fittings including trenching, refilling &
testing of joints complete as per direction
of EngineerinCharge. External work
(higher dia)
9 31072 PN10 Pipe, 160mm OD (SDR11)
1 60 metre 3790.79 227447 0 227447
Total 787602 0 787602
10 Add % above on Unified SOR 2010 for All
Chapters as per LAR 74-W/8727/Bills Dated 787602 32 % 252033 0 252033
28/12/2012
Total 1039635 0 1039635
11 Add 4% above escalation for the year 2014-15 1039635 4 % 41585 0 41585
TOTAL 1081220 0 1081220
COST OF 1 METRE Platform WALL high level 10812
say 10812/ metre
DEN/E/I/ALD
Detail of Cement
SN Per Cum
SOR Description of Item Qty Unit Cement Cement in Qtl
( in Qtl)
2 031012 :3:6 (1 cement : 3 sand : 6 graded stone
1 17.48 cum 2.200 38
aggregate 40mm nominal size)
23 041011 All work upto plinth level, including raft 15.53 cum 3.44 53
foundation of washable aprons, HS tank,
pile cap, footings of FOB, and Platform
shelter etc.
49 051017 Cement mortar 1:4 (1 cement : 4 coarse sand) 105.05 cum 0.950 100
397 114022 Ruled pointing 132 Sqm 0.015 2
94
1
19.37
Annexure B
For Island P.F. ( H L ) ( 1362.00 Sqm )
Earth filling & CC with SOR 2010
1 012050 Supplying and filling sand in plinth and 204 cum 610.26 124493 204.3
under floors including watering, ramming,
consolidating and dressing complete For Island P.F.
1 013120 arthwork in filling in embankment, guide
E 1634.4 cum 208.30 340446
bunds, around buried type abutments,
bridge gaps, trolley refuges, rain bunds if
provided, platforms etc. with earth
excavated from outside railway boundary
entirely arranged by the contractor at his
own cost as per RDSO's latest guidelines
and specifications and special condition
of contract including all leads, royalty,
lifts, ascents, descents, crossing of
nallahs or any other obstructions. The
rates shall include all dressing of bank to
final profile, demarcation and setting out
of profile, site clearance, removing of
shrubs, roots of vegetations growth,
heavy grass, benching of existing slope
of old bank, all handling/rehandling.
taxes, octroi and royalty etc. as a
complete job. Cut trees shall be property
of railways and to be deposited in the
railway godown unless specified
otherwise in the Special conditions of
contract 15
2 013130 Extra for mechanical compaction of earth/ 1634.4 cum 14.21 23225
blanketing material filled in embankment
with contractor’s rollers of suitable
capacity, type and size to achieve
specified density as per specification,
testing as per IS codes incl. cost of
water, T&P consumable material and all
labour as a complete job. The work is to
be executed as per Latest edition of
"Guidelines for Earthwork in Railway
Projects" issued by RDSO, Lucknow 0.69 13.62 0.69
33060
0 Supply and using cement at worksite : 0 C C
3 033063 PPC 45.10 Tonne 5520.00 248952 Earth Filling LEAN CC
031010 Providing and laying in position cement
concrete of specified proportion excluding
cost of cement, centering and shuttering
All works upto Plinth level :
3 031012 1:3:6 (1 cement : 3 sand : 6 graded stone 205 cum 1861.88 381685 451 20667 204.3
aggregate 40mm nominal size)
Total 1118801
5 Add % above on Unified SOR 2010 for All
Chapters as per LAR 74-W/8727/Bills Dated 1118801 32 % 358016
28/12/2012 RL
otal 1476817
T GL Earth
Cost of earth work & cc floor 1362 S qm 1476817 914
Cost of earth work & cc floor 1 S qm 1084 BED L
8 8674.402554
Detail of Cement
SN Per Cum
SOR Description of Item Qty Unit Cement Cement in Qtl
( in Qtl)
157 092013 50mm thick with 20mm nominal size stone aggregate
205 Sqm 0.202 41.41
1.41
4
4.14
For Island P.F. ( H L ) ( 1362.00 Sqm )
Earth filling & CC with SOR 2010
1 012050 Supplying and filling sand in plinth and 204 cum 610.26 124493
under floors including watering, ramming,
consolidating and dressing complete
1 013120 arthwork in filling in embankment, guide
E 815 cum 208.30 169765
bunds, around buried type abutments,
bridge gaps, trolley refuges, rain bunds if
provided, platforms etc. with earth
excavated from outside railway boundary
entirely arranged by the contractor at his
own cost as per RDSO's latest guidelines
and specifications and special condition
of contract including all leads, royalty,
lifts, ascents, descents, crossing of
nallahs or any other obstructions. The
rates shall include all dressing of bank to
final profile, demarcation and setting out
of profile, site clearance, removing of
shrubs, roots of vegetations growth,
heavy grass, benching of existing slope
of old bank, all handling/rehandling.
taxes, octroi and royalty etc. as a
complete job. Cut trees shall be property
of railways and to be deposited in the
railway godown unless specified
otherwise in the Special conditions of
contract
2 013130 Extra for mechanical compaction of earth/ 815 cum 14.21 11581
blanketing material filled in embankment
with contractor’s rollers of suitable
capacity, type and size to achieve
specified density as per specification,
testing as per IS codes incl. cost of
water, T&P consumable material and all
labour as a complete job. The work is to
be executed as per Latest edition of
"Guidelines for Earthwork in Railway
Projects" issued by RDSO, Lucknow
33060
0 Supply and using cement at worksite : 0
3 033063 PPC 45.10 Tonne 5520.00 248952
031010 Providing and laying in position cement
concrete of specified proportion excluding
cost of cement, centering and shuttering
All works upto Plinth level :
3 031012 1:3:6 (1 cement : 3 sand : 6 graded stone 205 cum 1861.88 381685 451
aggregate 40mm nominal size)
Total 936476
5 Add % above on Unified SOR 2010 for All
Chapters as per LAR 74-W/8727/Bills Dated 936476 32 % 299672
28/12/2012
Total 1236148
Cost of earth work & cc floor 1362 S qm 1236148
Cost of earth work & cc floor 1 S qm 908
7264
Annexure
Cost for CC flooring ( 100 Sqm )
Cost of Platform Low level to High level
SN SOR DESCRIPTION QTY RATE PER AMOUNT
1 arth filling & CC
E 1 7264 Mtr 7264
Platform WALL 1M LONG AS PER N.R. Type P 34 sheet no. 1/
2 R1. ( H L )
1 0812 M
1 tr 0812
1
3 Cost for CC flooring 1 10458 Mtr 10458
Cost per mtr 28534
Cost of Island Platform Rail level to High level
SN SOR DESCRIPTION QTY RATE PER AMOUNT
1 arth filling & CC
E 1 8974 Mtr 8974
Platform WALL 1M LONG AS PER N.R. Type P 34 sheet no. 1/
2 R1. ( H L )
2 0812 M
1 tr 1624
2
3 Cost for CC flooring 1 10458 Mtr 10458
Cost per mtr 41056
Cost of Island Platform Low level to High level
SN SOR DESCRIPTION QTY RATE PER AMOUNT
1 arth filling & CC
E 1 7264 Mtr 7264
Platform WALL 1M LONG AS PER N.R. Type P 34 sheet no. 1/
2 R1. ( H L )
2 0812 M
1 tr 1624
2
3 Cost for CC flooring 1 10458 Mtr 10458
Cost per mtr 39346
Annexure D
Cost of Water Booth - One No. ( 2x4 ) Taps
SN SOR DESCRIPTION QTY. RATE PER CASH STORE TOTAL
1 011010 arth work in excavation as per
E
approved drawings and dumping at
embankment site or spoil heap,
within railway land, including 50m
lead and 1.5m lift, the lead to be
measured from the centre of gravity
of excavation to centre of gravity of
spoil heap: the lift to be measured
from natural ground level and paid
for in layers of 1.5m each, including
incidental work, as per
specificationsin
011011 All kinds of soils 1.3 cum 85.54 111
0 111
2 31020
0 Providing and laying cement 0 0 0
concrete, up to plinth in retaining
walls, walls (any thickness)
including attached plasters,
columns, pillars, posts, struts,
buttresses, string or lacing courses,
parapets, coping, bed blocks,
anchor blocks, plain window sills,
fillets etc, excluding the cost of
cement and of shuttering, centering.
031023 1:2:4 (1 cement : 2 sand : 4 graded 1.07 cum 1883.40 2015 0 2015
stone aggregate 20mm nominal
size)
3 033060 Supply and using cement at 0 0 0
worksite :
33063
0 PPC 1.16 Tonne 5520.00 6420
0 6420
4 043010 Providing, hoisting and fixing in 0 0 0
position upto floor two level M20
Grade precast RCC work including
setting in cement mortar 1:3 (1
cement : 3 coarse sand) and
finishing smooth with 6mm thick
cement plaster 1:3 (1 cement : 3
fine sand) on exposed surfaces
complete including cost of centering,
shuttering, finishing, Admixtures in
recommended proportion (as per IS:
9103) to accelerate, retard setting of
concrete, improve workability
without impairing strength and
durability, excluding cost of cement
and steel reinforcement, as per
approved plan & direction of
Engineer incharge.
043014 In Shelves, cantilevers, chajjas, 0.25 cum 3447.7 862 0 862
sunshades etc.
5 045010 Supplying Reinforcement for R.C.C. 0 0 0
work including straightening, cutting,
bending, placing in position and
binding all complete.
045014 High yield strength deformed bars 25 Kg 54.35 1359
0 1359
6 051010 rick work with nonmodular (FPS) bricks
B 0 0 0
of class designation 7.5 in foundation and
plinth in :
051018 Cement mortar 1:6 (1 cement : 6 coarse 3 cum 2835.40 8506 0 8506
sand)
7 051040 Extra over item 051010 & 051020 for brick 1.5 cum 141.73 213 0 213
work in superstructure beyond plinth level
upto floor two level :
081410 teel work welded in built up
S 0 0 0
sections/ framed work including
cutting, hoisting, fixing in position
and applying a priming coat of
approved steel primer using
structural steel etc. as required
081412 In gratings, frames, guard bar, 20 Kg 72.53 1451 0 1451
ladders, railings, brackets, gates
and similar works
9 92010
0 Cement concrete flooring 1:2:4 (1cement: 2coarse sand: 4graded stone aggregate) finished with a floating coat of neat cem
0 0 0
092014 75mm thick with 20mm nominal size stone aggregate 2 Sqm 178.35 357 0 357
10 094060 Providing & fixing Precast Chequered tiles conforming to IS:13801:1993, manufactured under mechanical vibration & hydrau
0 0 0
094063 400mm x 400mm x 35mm thick 15 Sqm 803.24 12049 0 12049
11 099080 Polished stone tile work for wall lining (dado) over 12mm thick bed of cement mortar 1:3, including pointing in white cement
0 0 0
099081 8 mm thick pink/grey granite tiles 50 Sqm 1358.36 67918 0 67918
12 131130 Providing and fixing G.I. pipes 0 0 0
complete with G.I. fittings and
clamps, including cutting and
making good the walls etc. Internal
work – Exposed on wall
31131
1 15 mm dia. nominal bore 4 metre 136.59 546 0 546
3
1 131132 20 mm dia. nominal bore 60 metre 168.20 10092 0 10092
14 131136 50 mm dia. nominal bore 50 metre 431.38 21569 0 21569
15 134010 Providing and fixing PTMT bib cock 0 0 0
of approved quality and colour
134011 15mm nominal bore, 86mm long. 8 Each 123.19 986 0 986
Weighing not less than 88 gms
Total 134453 0 134453
16 Add % above on Unified SOR 2010 for All
Chapters as per LAR 74-W/8727/Bills 134453 20 % 26891 0 26891
Dated 28/12/2012
Total 161344 0 161344
Add 4% above escalation for the year
17 161344 4 % 6454 0 6454
2014-15
TOTAL 167797 0 167797
Cost for 1 no. Water Booth 167797
DEN/E/I/ALD
Detail of Cement
SN Per Cum
Cement in
SOR Description of Item Qty Unit Cement
Qtl
( in Qtl)
1 031023 1:2:4 (1 cement : 2 sand : 4 graded 1.07 cum 3.200 3.42
stone aggregate 20mm nominal size)
2 043014 In Shelves, cantilevers, chajjas, 0.25 cum 4.04 1.01
sunshades etc.
3 051018 ement mortar 1:6 (1 cement : 6 coarse
C 3 cum 0.625 1.88
sand)
4 092014 75mm thick with 20mm nominal size stone aggregate
2 Sqm 0.281 0.56
5 094063 400mm x 400mm x 35mm thick 15 Sqm 0.094 1.41
099081 8 mm thick pink/grey granite tiles 50 Sqm 0.07 3.35
1.63
1
1.16
Annexure
COST OF HYDRANT PIPE LINE 560M LONG
SN SOR DESCRIPTION QTY. RATE PER CASH STORE TOTAL
011010 arth work in excavation as per
E
approved drawings and dumping at
embankment site or spoil heap, within
railway land, including 50m lead and
1.5m lift, the lead to be measured
from the centre of gravity of
excavation to centre of gravity of
spoil heap: the lift to be measured
from natural ground level and paid for
in layers of 1.5m each, including
incidental work, as per specifications
in
1 011011 All kinds of soils 60 cum 85.54 5132
0 5132
31010
0 Providing and laying in position 0 0 0
cement concrete of specified
proportion excluding cost of cement,
centering and shuttering All works
upto Plinth level :
2 031012 1:3:6 (1 cement : 3 sand : 6 graded 45 cum 1861.88 83785 0 83785
stone aggregate 40mm nominal size)
3 032020 Providing and fixing precast M 15 18 cum 2064.53 37162 0 37162
grade cement concrete in string or
lacing courses, coping, bed plates,
anchor blocks, plain window sills,
shelves, louvers, steps, etc. upto
floor two level, including hoisting and
setting in position with cement mortar
1:3 (1 cement : 3 coarse sand), cost
of required shuttering, centering
complete excluding the cost of
cement. (cast at site)
033060 Supply and using cement at 0 0 0
worksite :
4 33063
0 PPC 17 Tonne 5520.00 3840
9
0 3840
9
5 081070 Erecting rails in posts, platform wall 520 quintal 68.59 35667 0 35667
copings etc. including necessary
cutting and drilling
131130 Providing and fixing G.I. pipes 0 0 0
complete with G.I. fittings and
clamps, including cutting and making
good the walls etc. Internal work –
Exposed on wall
6 131132 20 mm dia. nominal bore 120 metre 68.20
1 20184
0 20184
7 131136 50 mm dia. nominal bore 675 metre 431.38 291182 0 291182
32030
1 Providing and fixing gun metal gate 0 0 0
valve with C.I. wheel of approved
quality (screwed end)
8 32034
1 50 mm nominal bore 280 Each 1418.48 397174
0 397174
133120 Providing and laying Double Flanged 0 0 0
(Screwed/Welded) Centrifugally
(Spun) Ductile Iron Pipes of Class K
9 conforming to IS : 8329 up to 500
mm dia
9 133122 150mm dia Ductile Iron Double 560 metre 3424.34 1917630 0 1917630
Flanged
133140 Providing lead caulked joints to spun 0 0 0
iron or C.I./ DI pipes and specials
including testing of joints but
excluding the cost of pig lead up to
400 mm dia
10 33144
1 150 mm dia. pipe 280 Each 186.07 52100
0 52100
133170 Providing flanged joints to double 0 0 0
flanged C.I./ D.I. pipes and specials
including fittings, packings & testing
of joints up to 400 mm dia
11 33174
1 150 mm dia. pipe 280 Each 204.67 57308
0 57308
133220 Providing and fixing C.I. sluice valves 0 0 0
(with cap) complete with bolts, nuts,
rubber insertions etc. 150 mm dia (the
tail pieces if required will be paid
separately)
12 33221
1 Class I 3 Each 5821.80 17465
0 17465
133300 Providing and laying S&S C.I. 0 0 0
Standard specials such as tees,
bends, collars tapers and caps etc,
suitable for flanged jointing as per IS :
1538
3
1 33301
1 Upto 300 mm dia 8 Quintal 943.52
5 47548
0 47548 8
14 137010 Supplying, fabricating and fixing M.S. 2000 Kg 109.68 219360 0 219360
flat angle iron pipe clamps, stays,
etc. including drilling holes, welding (if
any) including nuts and bolts etc.
including all lifts
Total 3275536 0 3275536
15 Add % above on Unified SOR 2010 for All
Chapters as per LAR 74-W/8727/Bills 3275536 20 % 655107 0 655107
Dated 28/12/2012
Total 3930644 0 3930644
Add 4% above escalation for the year
16 3930644 4 % 157226 0 157226
2014-15
TOTAL 4087869 0 4087869
17 Cost of U/S 60/52 KG Rail 52 MT 20611 071772
1 071772
1
TOTAL 4087869 1071772 5159641
P/F Zoloto forged brass valve 4.50 2270.37
bulb with detachable handle 50
#VALU
17 N.S 1 mm dia with all labour & material 280 Each 2172.6 608328 0 608328 0 6.4 39 8.90 0 800 6.4 100 12.80 10240 566 2172.6 1285028 #VALUE! #VALUE!
complete ( LAR 74 W /8361/Bills E!
dated 09/11/2011
TOTAL for 560 mlong hydrant 696197
4 071772
1 5767969
TOTAL for 1120 mlong hydrant 9392395 2143544 1535939
1
DEN/E/I/ALD
Detail of Cement
SN Per Cum
SOR Description of Item Qty Unit Cement Cement in Qtl
( in Qtl)
2 031012 :3:6 (1 cement : 3 sand : 6 graded
1 45 cum 2.200 99.00
stone aggregate 40mm nominal size)
15 032020 Providing and fixing precast M 15 18 cum 3.800 68.40
grade cement concrete in string or
lacing courses, coping, bed plates,
anchor blocks, plain window sills,
shelves, louvers, steps, etc. upto
floor two level, including hoisting and
setting in position with cement mortar
1:3 (1 cement : 3 coarse sand), cost
of required shuttering, centering
complete excluding the cost of
cement. (cast at site)
167.40
16.74
60
5
224 225 450 500 m
52kg 104mt/km
Construction of washable apron 560 mtr long .
SN SOR DESCRIPTION QTY. RATE PER CASH STORE TOTAL
1 011010 Earth work in excavation as per approved drawings and dumping at
embankment site or spoil heap, within railway land, including 50m
lead and 1.5m lift, the lead to be measured from the centre of gravity
of excavation to centre of gravity of spoil heap: the lift to be measured
from natural ground level and paid for in layers of 1.5m each, including
incidental work, as per specifications-in
011011 All kinds of soils 840 cum 85.54 71854 0 71854
2 021070 Loading/Unloading ballast, kankar, brickbats, stone-chips, shingle, 840 Cum 40.07 33660 0 33660
stone boulders, block kankar, pitching stones , rubble stones, laterite,
coal, surkhi, dry mortar, sand , moorum, earth, manure or sludge,
ashes, lime etc., including lead up to 50m and stacking into/from
trucks, trailors or wagons
3 021090 Leading ballast, kankar, brickbats, stone-chips, shingle, stone boulders, 840 Cum 64.38 54078 0 54078
block kankar, pitching stones , rubble stones, laterite, coal, surkhi, dry
mortar, sand , moorum, earth, manure or sludge, ashes, lime, debris,
muck, malba, etc.. for lead upto 25 km. Note : Lead under this item is
payable when the same exceeds 500 M.
4 031010 Providing and laying in position cement concrete of specified 0 0 0
proportion excluding cost of cement, centering and shuttering - All
works upto Plinth level :
031011 1:3:6 (1 cement : 3 sand : 6 graded stone aggregate 20mm nominal 95 cum 1695.79 161100 0 161100 209
size)
5 031060 Centering and shuttering including strutting, propping etc. and 0 0 0
removal of form work for :
031061 Foundations, footings, bases of columns 100 Sqm 128.24 12824 0 12824
6 043010 Providing, hoisting and fixing in position upto floor two level M20 0 0 0
Grade precast RCC work including setting in cement mortar 1:3 (1
cement : 3 coarse sand) and finishing smooth with 6mm thick cement
plaster 1:3 (1 cement : 3 fine sand) on exposed surfaces complete
including cost of centering, shuttering, finishing, Admixtures in
recommended proportion (as per IS:9103) to accelerate, retard
setting of concrete, improve workability without impairing strength
and durability, excluding cost of cement and steel reinforcement, as
per approved plan & direction of Engineer incharge.
043013 In lintels, beams, bressumers 1 cum 4197.07 4197 0 4197 4.04
043015 In slabs for drain covers, manhole covers, flue tops etc. 0.5 cum 2695.23 1348 0 1348 2.02
7 051010 rick work with nonmodular (FPS) bricks of class designation 7.5 in foundation
B 0 0 0
and plinth in :
051014 Cement mortar 1:4 (1 cement : 4 fine sand) 12 cum 2903.10 34837 0 34837 11.4
1820
Annexure I
Cost for New Road ( 200 m x 5 m )= 1000 Sqm (With Earth Work 1.00m Ht )
SN SOR DESCRIPTION QTY UNIT RATE CASH STORE TOTAL
1 013120 arthwork in filling in embankment, guide
E 1000 cum 208.30 208300 0 208300
bunds, around buried type abutments,
bridge gaps, trolley refuges, rain bunds if
provided, platforms etc. with earth
excavated from outside railway boundary
entirely arranged by the contractor at his
own cost as per RDSO's latest guidelines
and specifications and special condition of
contract including all leads, royalty, lifts,
ascents, descents, crossing of nallahs or
any other obstructions. The rates shall
include all dressing of bank to final profile,
demarcation and setting out of profile, site
clearance, removing of shrubs, roots of
vegetations growth, heavy grass, benching
of existing slope of old bank, all handling/re
handling. taxes, octroi and royalty etc. as a
complete job. Cut trees shall be property of
railways and to be deposited in the railway
godown unless specified otherwise in the
Special conditions of contract
2 013130 Extra for mechanical compaction of earth/ 1000 cum 14.21 14210 0 14210
blanketing material filled in embankment
with contractor’s rollers of suitable capacity,
type and size to achieve specified density
as per specification, testing as per IS codes
incl. cost of water, T&P consumable
material and all labour as a complete job.
The work is to be executed as per Latest
edition of "Guidelines for Earthwork in
Railway Projects" issued by RDSO,
Lucknow
1 31010
2 1000 Sqm
Preparation of subgrade by excavating earth upto 22.5cm depth, dressing to camber and consolidating with power road roller of 8 to 12 tonne cap
38.91 38910 0 38910
231030 Providing and laying each layer of flat brick soling hand packed and joints filled with ordinary sand 0 0 0
2 231031 With well burnt bricks. Class 7.5 designation 1000 Sqm 186.83 186830 0 186830
231040
Providing and laying water bound macadam with specified stone aggregate, stone screening and binding material including screening, sorting, spr
0 0 0
3 231041 170 cum
Subbase with stone aggregate 90mm to 45mm including stone screening 13.2mm size 1003.48 170592 0 170592 300
4 231042 Base course with 63mm to 45mm size including stone screening 13.2mm size
170 cum 1459.59 248130 0 248130
233010 Providing and applying tack coat using bitumen emulsion (Rapid setting) complying with IS: 8887 1995, spraying the bitumen emulsion with mech
0 0 0
5 233011 On W.B.M. @ 0.4kg/ sqm 1000 Sqm 19.99 19990 0 19990
234010 2.5 cm thick bitumastic sheet with hot bitumen of approved quality using stone chippings (60% 12.5 mm nominal size and 40% 10 mm nominal s
0 0 0
6 234011 1000 Sqm
With paving bitumen 80/ 100 heated and then mixed with solvent at the rate of 70grams per kg. of asphalt
214.38 214380 0 214380
7 237070 400 metre
Providing and laying Dry Brick (FPS bricks of class designation 7.5) edging of full brick width and half brick depth including excavation, refilling /
87.65 35060 0 35060
Total 1136402 0 1136402
Add 30 % above on Unified SOR 2010 for All
8 1136402 30.00 % 340921 0 340921
Chapters as per 74-W/8725/Bills dated 21/12/2012
TOTAL 1477322 0 1477322
add 45 for 201415 1536415.369
Cost of road area 1000 Sqm 1536415
Cost of road area 1 Sqm 1536
DEN/E/I/ALD