Subedarganj ( SFG ) :- Upgradation of passenger amenities 21600

LENGTH/
SN DESCRIPTION RATE PER CASH STORE TOTAL 2700
AREA
Development of circulating area and provision of
1 water booth,PF benches,toilets along with other misc. 18854831 0 18854831 3004
work for face lifting of Subedar ganj station station
2 Cost for HL Plat form from low level to HL platform 12000 2618 SQM 31416148 0 31416148 9004
3 Construction of washable apron 600 mtr long . 1800 33115 m 59607000 0 59607000
4 Provision of hydrant pipe line 5 Nos. 600m each 3000 7704 m 23112000 0 23112000 8318.255894
Provision of 6.1 mtr Wide FOB at Subedarganj
5 1200 35444 m 42532800 0 42532800
station.
6 Cost of Washing pit line 1200 30278 m 36333654 0 36333654
Cost of booking office , waiting hall, compressure
7 321 16359 Sqm 5251151 0 5251151 2194.56
room& TXR office
8 Cost of Plat form shelter 3388 3652 Sqm 12372296 0 12372296 1463.04 3388
Cost for 50000 Gall. Capacity OHT with 1 no. Tube
9 8654116 0 8654116 4327058.00
well & pump house
10 Cost of Rail 52 Kg ( S/H ) 124.8 38200 MT 0 4767360 4767360 300.00
Total 238133995 4767360 242901355 191711438 218636407
11 D & G charges 242901355 9.13 % 22176894 0 22176894 50030737 54033196 58355852 63024320
Total 260310889 4767360 265078249
12 Cost of Electrical/G 155414995 5 % 7770750 0 7770750
13 Cost of Electrical/TRD 84889457 10 % 8488946 0 8488946
14 Cost of S & T 155414995 8 % 12433200 0 12433200 2.78
Total 289003784 4767360 293771144

Sr. DEN / II / ALD 339227.6491


Sr. No. Phase Scope as per Master plan of SFG station Revised Phase Scope
( Plan No. NCR/ALD DRM plan no.44/05 )
A Phase -1
1 Development of 7.00 mtr wide approach road Raising of existing plat form (GM LS 2013-14 , ID no.
alongthe boundarywall of NCE HQ office complex 06.02.53.13.3.00.001)
2 Development of circulating area of north side 2.44 mtr wide FOB from PF No. 1 to island platform ( Out of
Turn in GM LS 2013-14 )
3 Renovation of existing station building
4 Extension of PF no. 1 to accommodate 24 coaches
length.
5 Extension of Island PF to accommodate 24 coaches
length.
6 Development & raising of existing platforms
7 Provision of a through FOB with landings on PF no.
1 , island PF & the approach road of south side
8 Provision of PF shelter

B Phase -2
1 Developmentof saloon siding with road approach&
shelter.
2 One full length washing line with aparallel stabling Proposed station building on south side.
line.
3 Extension of PF shelter on both platforms. Construction of OHT 50000 gall. Capacity with Pump house.
4 Proposed station building on south side. Station building façade
5 Approach road
6 Construction of new platform no. 4 , Extension &Raising of
existing plat form
7 Hydrant pipe line
8 Washable apron
9 6.1 Mtr full length FOB

C Phase -3
1 Additional washing line. Washing line with washing line complex..
2 Additional OC siding & platform. OC siding & platform.
3 Platform no. 4.
4 Station building on south side.
5 Development of circulating area of south side.
Subedarganj ( SFG ) :- Upgradation of passenger amenities ( Phase-II ) 21600
 SN  Description  QTY  Rate  Per  Cash  Store   Amount
1 Cost of Development of circulating area 4600 2639 Sqm 12139400 0 12139400

2 Provision of one nos RCC Tank 50000 gallons 1 5042602 Each 5042602 0 5042602
capacity
3 Construction of pump house with tubewell 1 1627710 Each 1627710 0 1627710

4 Cost of station building 1200 17301 Sqm 20761200 0 20761200 2194.56


5 Cost of station building façade lifting ( LS ) 2000000 0 2000000

6 Cost of approach road 10500 1536 Sqm 16128000 0 16128000 10500


7 Construction of new platform ,Extension & raising
of existing PF
a PF wall ( 600 m long each side ) 1546 9829 R/m 15195634 0 15195634

b Earth filling & CC base ( 10mx600) 14784 752 Sqm 11117568 0 11117568

c CC PF flooring 14784 1236 Sqm 18273024 0 18273024


 1232
8 Provision of RCC Benches 200 9646 Each 1929200 0 1736280
 14784
9 Construction of Platform shelter 7400 5168 sqm 38243200 0 38243200

10 Provision of ladies & gents toilets ( area 15 sqm 60 17301 sqm 1038060 0 1038060
Each)
11 Provision of water booth 24 167797 Each 4027128 0 4027128

12 Provision of Hydrant pipe line 2580 10299.95 r/m 21636052 4937807 26573859
 26573871  2580
13 Provision of washable apron 2580 38825.25 r/m 58727806 41441338 100169144
 100169145
14 Provision of 6.1 mtr Wide FOB. 854 47004 Sqm 40141416 0 40141416

15 Cost of track portion ( LS ) 20000000 0 20000000


140
Total 288028001 46379145 334214226
854
16 Miscellaneous 30513759 0 30513759
 207.097984
Total 318541760 46379145 364727985
 20.25
17 Estt of Sr DEE/G portion 38942538 0 38942538
30513758.85
18 Estt of S& T portion 30000000 0 30000000

19 Estt of TRD portion 40000000 0 40000000

G.Total 427484298 46379145 473670523

915

 Sr.DEN/II/ALD

Subedarganj ( SFG ) :- Upgradation of passenger amenities ( Phase-I ) 21600


1 Raising of Platform
2 Proposed FOB

Subedarganj ( SFG ) :- Upgradation of passenger amenities ( Phase-III ) 21600


1 Proposed OC siding
2 Proposed OC platform
3 Proposed Wasing line
4 Washing line complex
Annexure-
Subedarganj ( SFG ) :- Upgradation of passenger amenities 21600
 SN  Description  QTY  Rate  Per  Cash  Store   Amount
1 Cost of Development of circulating area 4600 2639 Sqm 12139400 0 12139400

Provision of one nos RCC Tank 50000 gallons


capacity
2 1 5042602 Each 5042602 0 5042602
3 Construction of pump house with tubewell 1 1627710 Each 1627710 0 1627710
4 Cost of Washing pit line 1200 31829 m 38194800 0 38194800
Cost of station building, compressure room & TXR
5 1300 17301 Sqm 22491300 0 22491300 2194.56
office
6 Extension & Raising of existing PF 0 0
a PF wall ( 600 m long each side ) 1200 9829 R/m 11794800 11794800
b Earth filling & CC base ( 10mx600) 6000 752 Sqm 4512000 4512000
c CC PF flooring 6000 1236 Sqm 7416000 7416000
7 Provision of RCC Benches 200 9646 Each 1929200 1736280
8 Construction of Platform shelter 3388 5168 sqm 17509184 17509184
Provision of ladies & gents toilets ( area 15 sqm
9 Each) 60 17301 sqm 1038060 1038060
10 Provision of water booth 8 167797 Each 1342376 1342376
11 Provision of Hydrant pipe line 3000 10299.95 r/m 25158201 5741636 30899836   0899850
3
12 Provision of washable apron 1800 38825.25 r/m 40379251 10934990 51314241  69885450
Provision of 6.1 mtr Wide FOB at
13 915 47004 Sqm 43008660 0 43008660
Subedarganj station. ( 150 Mtr. Long )
14 Cost of rail 124.8 38200 MT 4767360 4767360
Total 233583544 21443986 254834609
15 Miscellaneous 21719990 0 21719990  207.097984
Total 255303534 21443986 276554599  20.25
16 Estt of Sr DEE/G portion 38942538 0 38942538
17 Estt of S& T portion 7788508 0 7788508
18 Estt of TRD portion ( 20% of PF cost) 8246397 0 8246397
G.Total 310280977 0 331532042
915

 DEN/E/I/ALD

  696197.427
4  1071772  5767969
 25158200.5 5741635.714
 30899836.22
 Scope of work for improvement of  civil lines side station
1 building & circulating
 Construction of station building on GF  1525 s  qm
2   onstruction of station building on FF
C  1750  sqm
3  Construction of station building on SF  1150  sqm
4  Improvement to façade of existing building including poarch
5  Construction of new PRS complex  6000 s  qm
6  Development of circulating area from IIIrd avenue toVII avenue
 43450  sqm
7  Signage 
8  Construction of Type III quarters 72 no;s
9  Construction of Type II quarters 72 no;s
10  Dismantling of existing quarters  6480   um
C
11  Provision of multi level parking ( Two floor )  4000  sqm
12  Provision of basement parking under park   3250  sqm
13  Related electric & S&T work

 Scope of work for Development of  circulating area & provision
of multilevel parking at City side of ALD station
1   evelopment of circulating area 
D  21600  sqm
2  Construction of Type III quarters 8 no;s
3  Replacement of  three nos RCC Tanks in liue of  3  No;s
4 existing tanks including dismantling of existing RCC
 Dismantling of quarters, TTE rest house, union offices   000
7 c  um
5 etc)
 Provision of multi level parking  including toilet  4400  sqm
7 complex( Two floor )
 Signage 
8  Related electric & S&T work

 DEN/E/I/ALD
 Justification (1)

  llahabad junction is Zonal Headquarter for NCR & divisional Head
A
quarter of Allahabad division. Allahabad station is A­1 category station of
 Above  mentioned works are very necessary to improve the allahabad
station civil lines side as to make it world class station. Therefore proposal
 Justification (2)
  llahabad junction is Zonal Headquarter for NCR & divisional Head
A
quarter of Allahabad division. Allahabad station is A­1 category station of
 Above  mentioned works are very necessary to improve the allahabad
station city  side as to make it world class station. Therefore proposal has
Cost for Road
SN SOR DESCRIPTION QTY UNIT RATE CASH STORE TOTAL
1 231010 Preparation of subgrade by excavating earth upto 22.5cm depth, Sqm to38.91
1000 dressing camber and
38910
consolidating
0 with
38910
power road roller
231030 Providing and laying each layer of flat brick soling hand packed and joints filled with ordinary0sand 0 0
2 231031 With well burnt bricks. Class 7.5 designation 1000 Sqm 186.83 186830 0 186830
231040 Providing and laying water bound macadam with specified stone aggregate, stone screening0and binding 0 material0 including scr
3 231041 Sub-base with stone aggregate 90mm to 45mm including stone cum 13.2mm
170screening 1003.48size170592 0 170592
4 231042 Base course with 63mm to 45mm size including stone screening cum size
170 13.2mm 1459.59 248130 0 248130
233010 Providing and applying tack coat using bitumen emulsion (Rapid setting) complying with IS: 8887-0 1995,
0 spraying0 the bitumen e
5 233011 On W.B.M. @ 0.4kg/ sqm 1000 Sqm 19.99 19990 0 19990
234010 2.5 cm thick bitumastic sheet with hot bitumen of approved quality using stone chippings (60% 0 12.5 mm 0 nominal 0 size and 40%
6 234011 With paving bitumen 80/ 100 heated and then mixed with solvent Sqm
1000 at the rate 214.38
of 70grams
214380
per kg. of asphalt
0 214380
7 237070 Providing and laying Dry Brick (FPS bricks of class designation400 metrof full
7.5) edging 87.65
brick width
35060
and half brick
0 depth
35060including excav
e
Total 913892 0 913892
8 Add 20% above on Unified SOR 2010 913892 20.00 % 182778 0 182778
TOTAL 1096670 0 1096670
Add 4 % 1096670 4 % 43867 0 43867
TOTAL 1140537 0 1140537
 Cost of road area 1000 Sqm 1  140537
 Cost of road area 1 Sqm  1140.54

 Sr DEN/I/ALD
 DT  21/6/13  Annexure ­ 
 SQ m cost of FOB Based on smith road FOB ALD plan no 85/2006 for WP 2014 ­15

 S No  Discription  No   Length  Breadth  Area


1 Walkway of Smith Road FOB / ALD 1 133.76 6.45 862.752
2 stair case 4 16.6 2.74 45.484
908.236 35130635.93
3  Engineering Cost  for  WP 2011 ­12 37951626 40999142 35130635.93 7.83 2750728.794
Engineering Cost for WP 2014-15 42690417.83 0.2 70261.27187
Engineering Cost for WP 2014-15( Per Sqm
Cost of FOB ) For 1 SQM  47004 37951626
Work Charge establishment charges 7.83%  3680.39
Contingency 0.20%  94.01
Civil Engineering Per Sqm Cost of FOB For 1 SQM  50778
 Cost of Washing pit line  55 mtr long
SN SOR DESCRIPTION QTY. PER RATE CASH STORE TOTAL
1 011010 Earth work in excavation as per approved drawings and
dumping at embankment site or spoil heap, within
railway land, including 50m lead and 1.5m lift, the lead
to be measured from the centre of gravity of excavation
to centre of gravity of spoil heap: the lift to be measured
from natural ground level and paid for in layers of 1.5m
each, including incidental work, as per specifications-in
011011 All kinds of soils 300 cum 85.54 25662 0 25662 206.25
2 012010 Extra over item 011010 for excavation in foundations for cum 9.00 0 0 0
buildings and bridges to cover dressing to neat dimension
and plumbing sides etc. Note : Dressing under this item is
payable for the total quantity of excavation in
foundation and not partly
3 013140 Removal of excavated/slip earth/ debris/ malba from the 600 cum 114.99 68994 0 68994 30000
site of works to any other place outside Railway land/
premises, including all excavations, handling, re-handling,
loading, unloading and leading, etc. all labour and
material as a complete job. Removal of Earth (all kinds of
soils)/ROCKS, BOULDERS including mud/slush, slipped
earth in catch water drains, side drains, over berms in
cutting, water way of bridges, over coping of toe/breast/
retaining walls etc. including crossing of nallah, railway
tracks, making/repairing approach roads if required, all
lead, lift, ascent, descents, or any other obstruction.
Earth spoils to be dumped outside the cutting or railway
embankments as per direction of Engineer in charge
4 021090 Leading ballast, kankar, brickbats, stone-chips, shingle, 600 Cum 64.38 38627 0 38627 B-211
stone boulders, block kankar, pitching stones , rubble
stones, laterite, coal, surkhi, dry mortar, sand , moorum,
earth, manure or sludge, ashes, lime, debris, muck,
malba, etc.. for lead upto 25 km. Note : Lead under this
item is payable when the same exceeds 500 M.
5 031010 Providing and laying in position cement concrete of 0 0 0
specified proportion excluding cost of cement, centering
and shuttering - All works upto Plinth level :
031012 1:3:6 (1 cement : 3 sand : 6 graded stone aggregate 55 cum 1861.88 102403 0 102403 121 39.6 12.375
40mm nominal size)
6 031050 Providing and laying in position cement concrete of M 20 0 0 0
grade, excluding the cost of cement and of centering and
shuttering, as per direction of the Engineer in charge :
031051 All works upto Plinth level 15 cum 1847.51 27713 0 27713 60.6 6.6
7 033060 Supply and using cement at worksite : 0 0 0
033061 OPC 43 grade 48.76 Tonne 5980.00 291585 0 291585
8 041010 Providing and laying in position M 20 Grade concrete for 0 0 0
reinforced concrete structural elements but excluding
cost of centering, shuttering, reinforcement and
Admixtures in recommended proportion (as per IS:9103)
to accelerate, retard setting of concrete, improve
workability without impairing strength and durability as
per direction of Engineer in charge
041011 All work upto plinth level, including raft foundation of 55 cum 2100.13 115507 0 115507 189.2 19.8
washable aprons, HS tank, pile cap, footings of FOB, and
Platform shelter etc.
9 045010 Supplying Reinforcement for R.C.C. work including 0 0 0
straightening, cutting, bending, placing in position and binding all
complete.
045014 High yield strength deformed bars 7820 Kg 54.35 425017 0 425017
10 051010 Brick work with non-modular (FPS) bricks of class designation 0 0 0
7.5 in foundation and plinth in :
#REF! #REF! 85 cum #REF! #REF! 0 #REF!  80.75  60.72
11 092010 Cement concrete flooring 1:2:4 (1cement: 2coarse sand: 4graded stone aggregate) finished with 0 a floating
0 coat of0neat cement including cement slurry, but excluding the cost o
092013 50mm thick with 20mm nominal size stone aggregate 75 Sqm 132.48 9936 0 9936 15.15 44
12 111090 12 mm cement plaster 1:3 (1cement: 3coarse sand) 220 Sqm 75.38 16584 0 16584 20.9 132
finished with a floating coat of neat cement
13 222150 Providing/ fixing/ grouting various size HTS holding down bolt203.5 Kg column
in concrete 126.85
or in other
25814
structural steel
0 member
25814 incl. drilling holes
170 of required size, bolts threaded at both e
TOTAL #REF! 0 #REF!
14 Add % above on Unified SOR 2010 #REF! 20 % #REF! 0 #REF!
TOTAL #REF! 0 #REF!
Add 4 % #REF! 4 % #REF! 0 66941
TOTAL A #REF! 0 #REF!
Dismantling & removing of existing track of any classification
including hauling of materials, track crossing,loading ,
unloading, transporting the materials such as rails, metal/
15 NS-1 wooden sleepers & fittings etc. to railway store as per direction 55 Meter 55.27 3040 0 3040
of engineer incharge with contractor's labour, tools & plants etc
with proper accountal. ( LAR No.75W/59/Dy. CE/C/ALD dt.
31-03-2006
Laying of track on washing pit with contractor's labour, tools &
plants etc including handling of rails for all lead & lift & fixing of
16 NS-2 55 Meter 74.00 4070 0 4070
necessary fastenning as a complete job. ( LAR No.75W/59/Dy.
CE/C/ALD dt.31-03-2006
TOTAL B 7110 0 7110
Total with Add 4 % every year upto 2014-15 10120 0 10120
Total A+B #REF! 0 #REF!
#REF!
31829

660000
Annexure I
Cost for Ground Floor Building ( 6.76x4.06m ) =27.44 Sqm 27.4456

SN SOR DESCRIPTION QTY UNIT RATE CASH STORE TOTAL


 011010   arth work in excavation as per approved
E
drawings and dumping at embankment
site or spoil heap, within railway land,
including 50m lead and 1.5m lift, the lead
to be measured from the centre of gravity
of excavation to centre of gravity of spoil
heap: the lift to be measured from natural
ground level and paid for in layers of
1.5m each, including incidental work, as
per specifications­in
 
1  011011  All kinds of soils   7.61
4 c  um   5.54
8  4073  
0  4073
 2   12040
0  Filling, watering and ramming earth in 15  8.165  cum  19.20  157  0  157
cm layers in floors and foundations with
surplus earth from foundations including
50m lead and 1.5m lift
 3  012050  Supplying and filling sand in plinth and  2.268  cum  610.26  1384  0  1384
under floors including watering, ramming,
consolidating and dressing complete
 031010 Providing and laying in position cement  0  0  0
concrete of specified proportion
excluding cost of cement, centering and
shuttering ­ All works upto Plinth level :

 4  031012   :3:6 (1 cement : 3  sand : 6 graded
1  8.165  cum   1861.88  15202  0  15202
stone aggregate 40mm nominal size)
  33060
0  Supply and using cement at worksite :  0  
0  0
 5  033061  OPC 43 grade  9.18  Tonne  5980.00  54896  0  54896
 041010 Providing and laying in position M 20  0  0  0
Grade concrete for reinforced concrete
structural elements but excluding cost of
centering, shuttering, reinforcement and
Admixtures in recommended proportion
(as per IS:9103) to accelerate, retard
setting of concrete, improve workability
without impairing strength and durability
as per direction of Engineer in charge
 6  041011  All work upto plinth level, including raft  9.084  cum  2100.13  19078  0  19078
foundation of washable aprons, HS tank,
pile cap, footings of FOB, and Platform
shelter etc. 
 7  041012  All work in buildings above plinth level  6.259  cum  2309.58  14456  0  14456
upto floor two  level.
 045010  Supplying Reinforcement for R.C.C. work  0  0  0
including straightening, cutting, bending,
placing in position and binding all
complete.
 8  045011  Mild steel and medium tensile steel bars  1534  Kg  51.56  79093  
0  79093
  42010
0  Centering and shuttering including  0  0  0
strutting, propping etc. and removal of
form for :
 9  042011  Foundations, footings, bases of columns,  9.83  Sqm  127.8  1256  0  1256
raft foundation of washable aprons, Pile
caps, Footings of FOB  etc.
 10  042013  Suspended floors, roofs, landings,  27.09  Sqm  213.09  5773  0  5773
balconies, FOB slabs, walkway slabs
and access platform
 11  042014  Lintels, beams, plinth beams, bed  34.66  Sqm  184.72  6402  0  6402
blocks, girders, bressumers and
cantilevers
 12  042015  Columns, pillars, , posts and struts  16.56  Sqm  270.2  4475  
0  4475
 051010   rick work with non­modular (FPS) bricks of
B  0  0  0
class designation 7.5 in  foundation and plinth in :
 13   51015
0  Cement mortar 1:6 (1 cement : 6 fine sand)  4.5  cum  2837.41  12768  
0  12768
 051030  Brick work with machine moulded perforated  0  0  0
bricks of class designation 12.5 conforming to IS:
2222 ­1991 in superstructure from beyond plinth
level upto 6m above plinth level in cement mortar
1:6 (1 cement  : 6 coarse sand)
 4
1   51031
0  With non­modular (FPS) bricks  14   um
c  3525.78  49361  
0  49361
 15  051040  Extra over item 051010 & 051020 for brick work   .5
4  cum  141.73  638  0  638
in superstructure  beyond plinth level upto floor
two level :
 071010   roviding wood work in frames of doors,
P  0  0  0
windows, clerestory windows and other
frames and trusses, wrought, framed and
fixed in position :
 16   71012
0  Sal wood   31.875 c  udm
3  38.59  12807  
0  12807
 072010  Providing and fixing panelled/glazed or  0  0  0
panelled and glazed shutters for doors,
windows and clerestory windows
including ISI marked black enamelled
M.S. butt hinges with necessary screws
excluding, panelling/glazing which will be
paid for separately
 17  072011  Second class teak wood, 35mm thick   .05
4  Sqm  1688.49  6838  0  6838
 072020   roviding and fixing panelling/glazing or
P  0  0  0
panelling and glazing in panelled/ glazed
or panelled and glazed shutters for doors,
windows and clerestory windows (Area of
opening for panel inserts excluding
portion inside grooves or rebates to be
measured). Panelling/glazing for
panelled/ glazed or panelled and glazed
shutters 25mm to 40mm thick
 18   72021
0  Second class teak wood.15mm thick  3.09  Sqm  1335.10  4125  0  4125
 081030  Structural steel work welded in built up  0  0  0
sections, trusses and framed work,
girders, stagings, racks, etc including
cutting, bending, straightening,  hoisting,
fixing in position, including applying a
priming coat of approved steel primer,
complete ­ upto 6m height above GL
 19   81032
0  In flats, plates , round or square bars  225  Kg  68.00  15300  0  15300
 092010 Cement concrete flooring 1:2:4 (1cement: 2coarse sand: 4graded   stone aggregate) finished with a floating coat of neat cement including cement slurry, but excluding the cos
 0  0  0
 20  092012  40mm thick with 20mm nominal size stone aggregate  22.68  Sqm  113.50  2574  0  2574
 092020  Cement plaster skirting (upto 30cm height) with cement mortar 1:3 (1cement: 3coarse sand) finished with a floating coat of neat cement
 0  0  0
 21  092021  15mm thick  3.51  Sqm  102.63  360  0  360
 111020  15 mm cement plaster on the rough side  0  0  0
of single or half brick wall of mix ­
 2
2  111022  1:6 (1cement: 6 fine sand)  121.18  Sqm  71.82  8703  0  8703
 23   15060
1  Applying one coat of cement primer of  121.18  Sqm  23.72  2874  0  2874
approved brand and manufacture on wall
surface
 24  115080  Finishing walls with Deluxe Multi surface  143.86  Sqm  81.29  11694  0  11694
paint system for interiors and exteriors
using Primer as per manufacturers
specifications with two or more coats
applied @ 1.25ltr/10 sqm over and
including one coat of Special primer
applied @ 0.75 ltr/10sqm
 25  115110  Finishing walls with water proofing  121.18  Sqm  33.36  4043  0  4043
cement paint of required shade two or
more coats on new work applied @ 3.84
Kg/10 sqm
  21010
1  Applying Priming Coat :  0  0  0
 26  121011  With ready mixed pink or grey primer of  42.12  Sqm  21.40  901  0  901
approved brand and manufacture on
woodwork (hard and soft wood)
 27  121014  With ready mixed red oxide zinc  4.02  Sqm  9.87  40  0  40
chromate primer of approved brand and
manufacture on steel work (second coat)
 28  121020  Painting wood work with Deluxe Multi  42.12  Sqm  67.56  2846  0  2846
Surfaces Paint of required shade. Two or
more coat applied @ 0.90ltr/ 10sqm over
an under coat of primer, applied @
0.75ltr/ 10sqm of approved brand or
manufacture
 154010  Providing and fixing 110mm dia PVC soil,  11.40  metre  221.56  2526  0  2526
waste and vent pipes including jointing
and cost of spun yarn and sand etc.
 29 complete
 154020  Providing and fixing brackets comprising  9  Each  91.92  827  0  827
of aluminium painted standard steel clip
and cast iron base for 110mm A.C.
pipes, including cost of screws etc. and
drilling of holes and making good the
walls including cost of sand etc.
 30 complete
 154110  Providing and fixing 110 mm PVC bend  3  Each  118.77  356  0  356
of the required degree with access door
inclusive of 3mm thick bitumastic felt
washer, bolts and nuts, complete,
including jointing and cost of spun yarn
 31 and sand etc. complete
Total 345827 0 345827 352487
Add 20% above on Unified SOR 2010 for All
32 Chapters as per LAR 74-W/8727/Bills Dated 345827 20 % 69165 0 69165
28/12/2012
TOTAL 414992 0 414992
33 Add 4% above escalation for the year 2014-15 414992 4 % 16600 0 16600
TOTAL 431592 0 431592
Total cost of 27.44 sqm area 431592 0 431592
cost of 1 sqm area 15729 0 15729
Add 10% for sanitary , water supply & sewerage system 1573 0 1573 12203
Total cost of 1 sqm area ( Witout work charge & contegency ) 17301 0 17301 Elec. 10% 1220.3
Cost for 1 sqm 17301 0 17301

DEN/E/I/ALD

Detail of Cement
Per Cum
Cement in
SN SOR Description of Item Qty Unit Cement ( in
Qtl
Qtl)
 1  031012   :3:6 (1 cement : 3  sand : 6 graded
1  8.165  cum   2.20  17.96
stone aggregate 40mm nominal size)
 2  041011  All work upto plinth level, including raft  9.084  cum  3.44  31.25
foundation of washable aprons, HS tank,
pile cap, footings of FOB, and Platform
shelter etc. 
 3  041012  All work in buildings above plinth level  6.259  cum  3.44  21.53
upto floor two  level.
 
4   51015
0   ement mortar 1:6 (1 cement : 6 fine sand)
C   .5
4   um
c   .625
0   .81
2
 5  051031  With non­modular (FPS) bricks  14  cum  0.625  8.75
 6   92012
0  22.68  Sqm
  0mm thick with 20mm nominal size stone aggregate
4   .170
0  3.86
 7  092021  15mm thick  3.51  Sqm  0.110  0.39
 8  111022  1:6 (1cement: 6 fine sand)  121.18  Sqm  0.043  5.21
Total 91.76
In ( MT ) 9.18

DEN/E/I/ALD
Annexure II
Cost for First Floor Building ( 6.76x4.06m ) =27.44 Sqm 27.4456

SN SOR DESCRIPTION QTY UNIT RATE CASH STORE TOTAL


  33060 S
0   upply and using cement at worksite :  0  
0  0
 1  033061  OPC 43 grade  5.31  Tonne  5980.00  31754  0  31754
 041010 Providing and laying in position M 20 Grade concrete  0  0  0
for reinforced concrete structural elements but
excluding cost of centering, shuttering,
reinforcement and Admixtures in recommended
proportion (as per IS:9103) to accelerate, retard
setting of concrete, improve workability without
impairing strength and durability as per direction of
Engineer in charge
 2  041012  All work in buildings above plinth level upto floor two  6.759  cum  2309.58  15610  0  15610  6.259  0.5  6.759
level.
 045010  Supplying Reinforcement for R.C.C. work including  0  0  0
straightening, cutting, bending, placing in position
and binding all complete.
 3  045011  Mild steel and medium tensile steel bars  680  Kg  51.56  35061  
0  35061
 042010  Centering and shuttering including strutting, propping  0  0  0
etc. and removal of form for :
 4  042013  Suspended floors, roofs, landings, balconies, FOB  27.09  Sqm  213.09  5773  0  5773
slabs, walkway slabs and access platform
 5  042014  Lintels, beams, plinth beams, bed blocks, girders,  25.76  Sqm  184.72  4758  0  4758
bressumers and cantilevers
 6  042015  Columns, pillars, , posts and struts  16.56  Sqm  270.2  4475  
0  4475
 051030   rick work with machine moulded perforated bricks of class
B  0  0  0
designation 12.5 conforming to IS: 2222 ­1991 in
superstructure from beyond plinth level upto 6m above plinth
level in cement mortar 1:6 (1 cement  : 6 coarse sand)
 7  051031
 With non­modular (FPS) bricks  21  cum  3525.78  74041  0  74041  12  4.3  16.3
 071010 P   roviding wood work in frames of doors, windows,  0  0  0
clerestory windows and other frames and trusses,
wrought, framed and fixed in position :
 8  071012  Sal wood  331.875  cudm  38.59  12807  0  12807
 072010  Providing and fixing panelled/glazed or panelled and  0  0  0
glazed shutters for doors, windows and clerestory
windows including ISI marked black enamelled M.S.
butt hinges with necessary screws excluding,
panelling/glazing which will be paid for separately
 9  072011  Second class teak wood, 35mm thick  4.05  Sqm  1688.49  6838  0  6838
 072020  Providing and fixing panelling/glazing or panelling  0  0  0
and glazing in panelled/ glazed or panelled and
glazed shutters for doors, windows and clerestory
windows (Area of opening for panel inserts excluding
portion inside grooves or rebates to be measured).
Panelling/glazing for panelled/ glazed or panelled
and glazed shutters 25mm to 40mm thick
 10  072021  Second class teak wood.15mm thick  3.09  Sqm  1335.10  4125  0  4125
 081030  Structural steel work welded in built up sections,  0  0  0
trusses and framed work, girders, stagings, racks,
etc including cutting, bending, straightening,
hoisting, fixing in position, including applying a
priming coat of approved steel primer, complete ­
upto 6m height above GL
 11  081032  In flats, plates , round or square bars  225  Kg  68.00  15300  0  15300
 092010 Cement concrete flooring 1:2:4 (1cement: 2coarse sand: 4graded   stone aggregate) finished with a floating coat of neat cement including cement slurry, but excluding the cost of nosing of steps e
 0  0  0
 12  092012  40mm thick with 20mm nominal size stone aggregate  22.68  Sqm  113.50  2574  0  2574
 092020  Cement plaster skirting (upto 30cm height) with cement mortar 1:3 (1cement: 3coarse sand) finished with a floating coat of neat cement  0  0  0
 3
1  092021  15mm thick  3.51  Sqm  102.63  360  0  360
 14  105030  Painting top of roofs with residual type petroleum  27.44  Sqm  141.15  3873  0  3873
bitumen of penetration 80/100 of approved quality at
17kg per 10 sqm impregnated with a coat of coarse
sand at 60 cudm. Per 10sqm. including cleaning the
slab surface with brushes and finally with a piece of
cloth lightly soaked in kerosene oil complete
 105190  Grading roof for water proofing treatment with­    0  0  0
 15  105191  Cement concrete 1:2:4 (1 cement, 2 coarse sand  1.646  cum  1693.44  2787  0  2787
and 4 graded stone aggregate of 20mm nominal
size)
 111020  15 mm cement plaster on the rough side of single or  0  0  0
half brick wall of mix ­
 6
1  111022  1:6 (1cement: 6 fine sand)  167.38  Sqm  71.82  12021  0  12021  121.18  46.2  167.38
 17  115060  Applying one coat of cement primer of approved  121.18  Sqm  23.72  2874  0  2874
brand and manufacture on wall surface
 18  115080  Finishing walls with Deluxe Multi surface paint  199.71  Sqm  81.29  16234  0  16234  143.86  55.85  199.71
system for interiors and exteriors using Primer as
per manufacturers specifications with two or more
coats applied @ 1.25ltr/10 sqm over and including
one coat of Special primer applied @ 0.75 ltr/10sqm
 19  115110  Finishing walls with water proofing cement paint of  121.18  Sqm  33.36  4043  0  4043
required shade two or more coats on new work
applied @ 3.84 Kg/10 sqm
 121010  Applying Priming Coat :  0  0  0
 20  121011  With ready mixed pink or grey primer of approved  42.12  Sqm  21.40  901  0  901
brand and manufacture on woodwork (hard and soft
wood)
 21  121014  With ready mixed red oxide zinc chromate primer of  4.02  Sqm  9.87  40  0  40
approved brand and manufacture on steel work
(second coat)
 22  121020  Painting wood work with Deluxe Multi Surfaces Paint  42.12  Sqm  67.56  2846  0  2846
of required shade. Two or more coat applied @
0.90ltr/ 10sqm over an under coat of primer, applied
@ 0.75ltr/ 10sqm of approved brand or manufacture
 154010  Providing and fixing 110mm dia PVC soil, waste and  11.40  metre  221.56  2526  0  2526
vent pipes including jointing and cost of spun yarn
 23 and sand etc. complete
 154020 P   roviding and fixing brackets comprising of  9  Each  91.92  827  0  827
aluminium painted standard steel clip and cast iron
base for 110mm A.C. pipes, including cost of screws
etc. and drilling of holes and making good the walls
 24 including cost of sand etc. complete
 154110  Providing and fixing 110 mm PVC bend of the  3  Each  118.77  356  0  356
required degree with access door inclusive of 3mm
thick bitumastic felt washer, bolts and nuts,
complete, including jointing and cost of spun yarn
 25 and sand etc. complete
Total 262806 0 262806 269466
Add 20% above on Unified SOR 2010 for All Chapters as
32 262806 20 % 52561 0 52561
per LAR 74-W/8727/Bills Dated 28/12/2012
TOTAL 315368 0 315368
33 Add 4% above escalation for the year 2014-15 315368 4 % 12615 0 12615
TOTAL 327982 0 327982
Total cost of 27.44 sqm area 327982 0 327982
cost of 1 sqm area 11953 0 11953
Add 10% for sanitary , water supply & sewerage system 1195 0 1195 12203
Total cost of 1 sqm area ( Witout work charge & contegency ) 13148 0 13148 Elec. 10% 1220.3
Cost for 1 sqm 13148 0 13148
Cost for First floor for 1 sqm 13148 0 13148
Cost for second floor for 1 sqm 5 % 13805 0 13805
Cost for Third floor for 1 sqm 5 % 14496 0 14496

SR.DEN / III/ ALD

Detail of Cement

Per Cum
Cement in
SN SOR Description of Item Qty Unit Cement
Qtl
( in Qtl)
 1  041012 A
  ll work in buildings above plinth level upto floor two  6.759  cum  3.44  23.25
level.
 
2  051031  With non­modular (FPS) bricks  21  cum  0.625  13.13
 3   92012 4
0   0mm thick with 20mm nominal size stone aggregate  22.68   qm
S   .170
0  3.86
 4  092021  15mm thick  3.51  Sqm  0.110  0.39
 5  105191  Cement concrete 1:2:4 (1 cement, 2 coarse sand  1.646  cum  3.200  5.27
and 4 graded stone aggregate of 20mm nominal
size)
 6  111022  1:6 (1cement: 6 fine sand)   67.38
1  Sqm  0.043  7.20
Total 53.08
In ( MT ) 5.31

 Sr DEN/II/ALD

 434  12432  5395488


  935036.8
5
 6825292.32

  .76
6
 6.76
 4.06
 4.06
 Parapet Wall  21.64  4.9772  5

 Mumty  8' x 15'   .44


2   .57
4
 4.88  9.14  14.02

 14.02  0.23  2.44  7.87  1.97  2

 Total brick work  In building  14


I n Parapet  5
 In Mumty  2
 Total brick work  21.00

 RCC slab  11.1508  1.67  0.42  0.5


 White Washing   1.64
2  1   1.64
2
 14.02  2.44  34.21
 55.85
Annexure III
Cost for development of Circulating Area ( 7500 Sqm ) Area 7500

SN SOR DESCRIPTION QTY UNIT RATE CASH STORE TOTAL


 1  012040   illing, watering and ramming earth in 15 cm
F  2615  cum  19.20  50208  0  50208
layers in floors and foundations with surplus
earth from foundations including 50m lead and
1.5m lift
 2  021080  Leading ballast, kankar, surkhi, lime, sand,  2615  Cum  94.49  247086  0  247086
ashes, stone­chips, pitching, stone, boulders,
soling, stone, rubble stone, brickbats, shingle,
dry mortar, laterite or similar materials
including picking up and stacking, lead upto
50m
 3  021081  Additional lead  for every subsequent 50m or  2615  Cum  23.54  61567  0  61567
part thereof, over 50m and upto 500m over
item no. 021080
  33060
0  Supply and using cement at worksite :  0  
0  0
 4  033061  OPC 43 grade  13.50  Tonne  5980.00  80730  0  80730
 051010   rick work with non­modular (FPS) bricks of class
B  0  0  0
designation 7.5 in  foundation and plinth in :
 7   51017
0  Cement mortar 1:4 (1 cement : 4 coarse sand)  80  cum  2835.40  226832  
0  226832
 051030  Brick work with machine moulded perforated bricks of  0  0  0
class designation 12.5 conforming to IS: 2222 ­1991 in
superstructure from beyond plinth level upto 6m above
plinth level in cement mortar 1:6 (1 cement  : 6 coarse
sand)
 8  051031  With non­modular (FPS) bricks  40  cum  3525.78  141031  0  141031
  98020
0   upplying and laying interlocking pre­cast CC block pavers of approved design factory manufactured  of specified grade cement concrete on passenger p
S  0  0  0
 9  098022  80mm thick blocks of M35 grade for medium traffic 2000  Sqm  875.54  1751080  0  1751080
 111060  20 mm cement plaster of mix  0  0  0
 10  111061  1:4 (1cement: 4coarse sand)  400  Sqm  84.46  33784  0  33784
 238030  Providing and laying bitumen mastic wearing course (as per specifications) with industrial bitumen of grade 85/25 conforming to IS : 702 prepared by usin
 0  0  0
 11  238031  25 mm thick  5500  Sqm  711.45  3912975  0  3912975
TOTAL 6505293 0 6505293
Add % above on unified SOR 2010 . for All Chapters
35 6505293 20.00 % 1301059 0 1301059
as per LAR 74-W/8618/Bills Dated 15/06/2012
TOTAL 7806351 0 7806351
17 Add 4% above escalation for the year 2014-15 7806351 4 % 312254 0 312254
TOTAL 8118606 0 8118606
Cost for 7500sqm 8118606 0 8118606
Cost for 1 sqm 1082.481 0 1082.481

SR.DEN / III/ ALD

Detail of Cement

Per Cum
Cement in
SN SOR Description of Item Qty Unit Cement
Qtl
( in Qtl) 5410000
 
2   51017
0   ement mortar 1:4 (1 cement : 4 coarse sand)
C  0
8 c  um   .950
0   6.00
7
 3  051031  With non­modular (FPS) bricks  40  cum  0.625  25.00
 4  111061  1:4 (1cement: 4coarse sand)  400  Sqm  0.09  34.00
Total 135.00
In ( MT ) 13.50

 Sr DEN/II/ALD
 Proposal No 51/P/2010  Annexure IV
 Replacement of  one no . 50000 gallons capacity RCC tank in liew of old  tank at
ALD Station  with Assosiated pipe line.                               
SN SOR DESCRIPTION QTY RATE PER CASH Store Total
1 NS1 Construction of ''Intz'' type one nos.RCC
Over Head Tanks complete in all respects
(with contractor's own steel , cement and
all T&P items required for the construction)
of 50000 gallon capacity each with 20 m
high RCC staging as per Standard NR
HQ E Plan No. HQ/1/01-97 (sheet no.
I&II ,R-1 NR Type plan .W-40 ) with raft
foundations, bottom ring beam, floor
coloumns with bracings, top ring beam,
column bracings, top dome, bottom dome,
900 mm wide RCC stair case with two
rows of 15 mm dia "Ä" class G.I. pipe
railing over balcony etc on outer side ,M.
S. ladder from last landing to
balcony,balcony to top dome, Alluminium
ladder from top dome to inside tank body
complete,man hole with cover at top
dome, ventilator with covering of mosquito
proof netting fixed on wooden frame,
water level indicator (electrical/electronics)
having display arrangements in pump
house with suitable wiring from tank to
pump house building providing and fixing
of aluminium lightening conductor strip 20
mmx3 mm at center of top slab of
ventilator in accrdance with IS
specification, providing and fixing CI
double flange " LA" class verical pipes 1 3031472 Each 3031472 0 3031472
from tank body to 1.00 m below ground
level with proper duck foot bend resting
over the cement concrete block of proper
size along with materials required for
proper jointing,fixed in MS clamp with
coloumn etc. complete as per direction of
Railway's Engineer at site, C.I.inlet pipes
100 mm dia 03 nos., C.I. outlet pipes 150
mm dia 02 nos.with 01 no overflow pipe of
100 mm dia and one wash out pipe
(150mm dia),over flow pipe (100mm dia)
etc. including 19 mm thick plaster with
coarse sand 1:2 inside the tank body
except top dome and cement and sand
plaster 1:3:6 mm thick on all exposed
surface with all contractor's men and
materials,equipment,shuttering,temporary
arrangements etc. complete work with two
coats of water proofing cement of
approved shade and quality on exposed
concrete surface & two coats of enamel
paint of approved shade and quality over
all steel surfaces,including testing of
overhead tank and maintaining the same
for a period of six months. All RCC works
to be executed in M 30 design mix. The
rate to be quoted is for complete work, as
per plan no referred above.
2 NS 2 Soil investigation in connection with
provision of 01nos RCC overhead tanks
of capacity 50000 gallons each from HBTI/
Kanpur or any other approved Engineering
2 40689 Each 81378 0 81378
College including submission of the report
to ascertain the bearing capacity and its
suitability for foundation of tank. ( LAR 74-
W / 8475/Bills dt 02/08/2011 )
 Total (A)    3112850  3112850
 Pipe Line 550m ( Annexure IV )
 SOR  DESCRIPTION  Qty  unit  rate  CASH  STORE  TOTAL
 133270 P   roviding and fixing enclosed type water
meter (bulk type) conforming to IS : 2373
and tested by Municipal Board complete
with bolts, nuts, rubber insertions etc.  (The
tail pieces if required will be paid
separately)
 1  133273  150 mm dia nominal bore  1  Each   5938.09  5938  5938
 133220  Providing and fixing C.I. sluice valves (with
cap) complete with bolts, nuts, rubber
insertions etc. 150 mm dia (the tail pieces if
required will be paid separately)
 2  133222  Class II  8  Each   5405.31  43242  0  43242
 133360  Providing and laying Double Flanged Pipe
(screwed/welded) Centrifugally (Spun)
Cast Iron, Class B (IS : 1536)
 3  133362  150mm dia C.I. Double Flanged Pipe  550  metre   2181.36  1199748  1199748
 133170  Providing flanged joints to double flanged
C.I./ D.I. pipes and specials including
fittings, packings & testing of joints up to
400 mm dia
 4  133174  150 mm dia. pipe  190  Each   204.67  38887  38887
 133040  Providing and laying flanged C.I. standard
specials such as tees, bends, collars,
tapers, caps etc., suitable for flanged
jointing as per IS:1538 :
 
5  133041  Upto 300 mm dia   15  quintal    755.36
5   6330
8   6330
8
 6  181030  Dismantling RCC work for tanks etc   14
1  cum  634.73  72359  72359
 Total   1446504  1446504
Add % above on Unified SOR 2010 for All Chapters
7 1446504 20.00 % 289301 316721
as per LAR No:74-W/8714/Bills dt 09/11/2012
 Total    735805
1   763225
1
  Total ( A+b)   4848656  4876075
 Add 4% for 2014­15  193946  193946
 G. Total   5042602  5070021

 DEN/E/I/ ALD

 DEN / E/ I/ALD
Provision of T/well with pump house and assosiate pipe line in station
area of Allahabad Railway Station . (Annexure- V )
 SOR  DESCRIPTION  QTY  RATE  UNIT  CASH  STORE  TOTAL
  rilling & reaming of 675 dia bore in all type
D
of soil/ strata including sand stone , rock &
boulder formation with mechenical
 1  NS1  80  1059  metre  84720  0  84720
preumatic rig with contractors own materials
T & P ,labour consumable etc complete
from ground level to 75 m below
 Drilling & reaming of 550 dia bore  in all type
of soil/ strata including sand stone , rock &
boulder formation with mechenical
 2  NS2 preumatic rig with contractors own materials  40  1059  metre  42360  0  42360
T & P ,labour consumable etc complete
from 75 m below ground level to120 m
below  ground level
 From 120m below ground level to160 m
 3  NS3  40  1059  metre  42360  0  42360
below  ground level
 From 160m below ground level to 200 m
 4  NS4  30  1059  metre  31770  0  31770
below  ground level
 Application electric lodging including all
 5  NS5  1  24435  per job  24435  0  24435
incidental charges complete .
 Surrounding of tubewell by pre gravel 1.6
 6  NS6 mm to 4 mm including supplying of pre  45  1955  cum  87975  0  87975
gravel of approved quality at site .
 Supplying, Lowering & Painting of T.W.
assembly as approved by the site 350 mm
 7  NS7 dia M.S.E.R.W. housing pipe of mild steel  62.3  3291  Metre  205029  0  205029
of 8 mm thick plain / slotted as per
requirement
 
8   S8
N  S/F350mm dia reducer of mild steel  1  2198  Each  2198  
0  2198
 9  NS9  S/F200 mm dia MS Plain pipe 6mm thick  16  2036  metre   2576
3  0   2576
3
 S/lowering & fixing 200 mm dia MS Slotted
 10  NS10  40  2365  metre  94600  0  94600
pipe 6mm thick (threaded & socketed)
 1
1   S11
N  S/F 200 mm dia Bell plug 6mm thick   1  1303  Each   303
1  
0   303
1
 12  NS12  S/F350 mm dia MS Clamp  1  1955  Each  1955  0  1955
 13  NS13  S/F350 mm dia Well Cap  1  977  Each  977  0  977
 14  NS14  S/F350 mm dia MS Ring  11  1303  Each  14333  0  14333
 15  NS15  S/F200 mm dia MS Ring  10  401  Each  4010  0  4010
 S/F200 mm dia MS pipe girder for TW
 16  NS16  6  2036  metre  12216  0  12216
support
 Development of Tube Well by 600 PSI Air
 17  NS17 Compressure including all incidental  60  2304  Hour  138240  0  138240
charges 
 18  NS18  Supply of Sodium Hexameta Phosphate  80  130  Kg  10400  0  10400
 Development of Tube Well by over pumping
 19  NS19  85  896  Hour  76160  0  76160
unit including all incidental charges 
 20  NS20  Testing of Yield and verticality  1  1218  per job  1218  0  1218
 Chemical and Bacteriological testing of
 21  NS21  1  1543  per job  1543  0  1543
Water
 Supplying& using Bentonite powder during
 22  NS22  2500  5.25  Kg  13125  0  13125
boring of the well
 Conducting Geophysical survey by
electrical resistivity method to decided the
location of tube well site depending upon
the water bearing atrata taking into acount
the physiography, hydrology & submission
 23  NS23 of detailed report along with  2  3488  each  6976  0  6976
recommendation of best suitable site
( minimum three lacation each to be tested
for tube well )(  LAR No: 74­W/8463/Bills/dt
04/07/2011 of Rajapur pump for all items
mentioned above from NS ­1 ­NS 23)
 Tatal A  930479  930479
 PUMP HOUSE
  OR
S  DESCRIPTION  Qty  unit  rate  CASH  STORE  TOTAL
 011010  Earth work in excavation as per approved
drawings and dumping at embankment site
or spoil heap, within railway land, including
50m lead and 1.5m lift, the lead to be
measured from the centre of gravity of
excavation to centre of gravity of spoil
heap: the lift to be measured from natural
ground level and paid for in layers of 1.5m
each, including incidental work, as per
specifications­in
 
1  011011  All kinds of soils  28  cum  85.54   395
2  
0   395
2
 2   12010
0  Extra over item 011010 for excavation in  28  cum  9.00  252  0  252
foundations for buildings and bridges to
cover dressing to neat dimension and
plumbing sides etc. Note : Dressing under
this item is payable for the total quantity of
excavation in foundation and not partly   
 031010  Providing and laying in position cement
concrete of specified proportion excluding
cost of cement, centering and shuttering ­
All works upto Plinth level :                                                            
 3  031012  1:3:6 (1 cement : 3  sand : 6 graded stone  11.1  cum   1861.88  20667  20667  79.2
aggregate 40mm nominal size)
  33060
0  Supply and using cement at worksite :
 4  033063  PPC   10.52  Tonne  5520.00  58070  58070
 041010  Providing and laying in position M 20 Grade  0
concrete for reinforced concrete structural
elements but excluding cost of centering,
shuttering, reinforcement and Admixtures in
recommended proportion (as per IS:9103) to
accelerate, retard setting of concrete,
improve workability without impairing
strength and durability as per direction of
Engineer in charge
 5  041012  All work in buildings above plinth level upto  6.4  cum  2309.58  14781  14781  27.52
floor two  level.
 045010  Supplying Reinforcement for R.C.C. work  0
including straightening, cutting, bending,
placing in position and binding all complete.
 6  045014  High yield strength deformed bars  496  Kg  54.35  26958  26958
 051010   rick work with non­modular (FPS) bricks of class
B  0
designation 7.5 in  foundation and plinth in :
 7  051018  Cement mortar 1:6 (1 cement : 6 coarse sand)  53.25  cum  2835.40  150985  150985  32.5
 8  051040   xtra over item 051010 & 051020 for brick
E  39  cum  141.73  5527  5527
work in superstructure  beyond plinth level
upto floor two level :
 111010  12 mm cement plaster of mix ­
 9  111011  1:4 (1cement: 4 fine sand)  363  Sqm  62.37  22640  22640  16.5
  92010
0  Cement concrete flooring 1:2:4 (1cement: 2coarse sand: 4graded   stone aggregate) finished with a floating coat of neat cement including cement slurry, but excluding the cost of nosing of steps etc. complete
 0
1  092014  75mm thick with 20mm nominal size stone aggregate  55  Sqm  178.35  9809  9809  9.835
 11  121013  With ready mixed red oxide zinc chromate  19.55  Sqm  17.31  338  338
primer of approved brand and manufacture
on steel galvanized iron/steel works
 12  121051  Two or more coats on new work  19.55  Sqm  45.30  886  886
 3
1   17051
1   ld work (two or more coats)
O  32   qm
S  6.80  218  218
 14  117071  Old work (two or more coats) with lime  137.25  Sqm  6.91  948  948
 15  117081  Two or more coat, to give an even shade  120  Sqm   8.40
4   808
5   808
5
 081010  Structural steel work in single section
including cutting, bending, straightening,
drilling, rivetting, bolting, hoisting, fixing in
position, including applying a priming coat
of approved steel primer, complete ­ upto
6m height above GL
 6
1  081011  In RSJ, tees, angles and channels  112  g
K   2.67
5   899
5   899
5
 17   81012
0  In flats, plates, round or square bars  20.75  Kg  52.48  1089  1089
 081250  Providing and fixing ISI standard steel
glazed doors, windows and ventilators of
standard rolled steel sections (shutters &
frame), joints mitered and welded with
15x3mm lugs, 10cm long, embedded in
cement concrete blocks 15x10x10cm of
1:3:6 (1cement: 3coarse sand: 6graded
stone aggregate 20mm nominal size) or with
wooden plugs and screws or rawl plugs and
screws or with fixing clips or with bolts and
nuts as required, including providing and
fixing glass panes with glazing clips and
special metal sash putty of approved make,
necessary fittings such as brass handles,
brass peg stays, brass spring catch, bolts,
hinges, locks etc as required, applying a
priming coat of approved steel primer but
excluding the cost of metal beading
 18   81252
0  Windows fixed  4.5  Sqm  2309.68  10394  10394  0.1
 081200  Providing and fixing 1mm thick M.S. sheet
door shutter with frame of 40x40x6mm
angle iron and 3mm M.S. gusset plates at
the junctions and corners, all necessary
fittings complete, including applying a
priming coat of approved steel primer
 19  081202  Using flats 30x6mm for diagonal braces and  4.25  Sqm  1843.95  7837  7837
central cross piece
 20  154010  Providing and fixing 110mm dia PVC soil,  21  metre  221.56  4653  4653
waste and vent pipes including jointing and
cost of spun yarn and sand etc. complete
 21  154110  Providing and fixing 110 mm PVC bend of  4  Each  118.77  475  475
the required degree with access door
inclusive of 3mm thick bitumastic felt
washer, bolts and nuts, complete, including
jointing and cost of spun yarn and sand etc.
complete
 042010  Centering and shuttering including strutting,
propping etc. and removal of form for :
 22  042013  Suspended floors, roofs, landings,  34.5  Sqm  213.09  7352  7352
balconies, FOB slabs, walkway slabs and
access platform
 23  042014  Lintels, beams, plinth beams, bed blocks,  10.2  Sqm  184.72  1884  1884
girders, bressumers and cantilevers
 Total ( B )  359865  359865 deduct pipe line 
Add % above on Unified SOR 2010 for All
359865 20.00 % 71973 71973
Chapters
 G. Total   431838  431838
 Pipe line  (Annexure­ VI )
  OR
S  DESCRIPTION  Qty  unit  rate  CASH  STORE  TOTAL
 133270 P   roviding and fixing enclosed type water
meter (bulk type) conforming to IS : 2373
and tested by Municipal Board complete
with bolts, nuts, rubber insertions etc.  (The
tail pieces if required will be paid separately)
 24  133273  150 mm dia nominal bore  1  Each   5938.09  5938  5938
 133220  Providing and fixing C.I. sluice valves (with
cap) complete with bolts, nuts, rubber
insertions etc. 150 mm dia (the tail pieces if
required will be paid separately)
 25  133222  Class II  2  Each   5405.31  10811  0  10811
 133360  Providing and laying Double Flanged Pipe
(screwed/welded) Centrifugally (Spun) Cast
Iron, Class B (IS : 1536)
 26  133362  150mm dia C.I. Double Flanged Pipe  60  metre   2181.36  130882  130882
 133170  Providing flanged joints to double flanged
C.I./ D.I. pipes and specials including
fittings, packings & testing of joints up to
400 mm dia
 27  133174  150 mm dia. pipe  20  Each   204.67  4093  4093
 133040  Providing and laying flanged C.I. standard
specials such as tees, bends, collars,
tapers, caps etc., suitable for flanged
jointing as per IS:1538 :
 28  133041  Upto 300 mm dia   3  quintal   5755.36  17266  17266
 Total    68990
1   68990
1
Add % above on Unified SOR 2010 for All
76 168990 20.00 % 33798 33798
Chapters
2  G. Total 
  02788   02788
2
 Cost for  t/well ,pumphouse & pipe line  for one pump  1565105  1565105
 Add 4% for 2014­15  62604  62604
 G. Total   1627710

 DEN / E / I/ ALD
Annexure IV
Cost for basement parking (framed structure) ( 6.76x4.06m ) =27.44 Sqm as on June 2014 27.4456

SN SOR DESCRIPTION QTY UNIT RATE CASH STORE TOTAL


 011010   arth work in excavation as per approved drawings and
E
dumping at embankment site or spoil heap, within
railway land, including 50m lead and 1.5m lift, the lead to
be measured from the centre of gravity of excavation to
centre of gravity of spoil heap: the lift to be measured
from natural ground level and paid for in layers of 1.5m
each, including incidental work, as per specifications­in
 
1  011011  All kinds of soils  82.32   um
c   5.54
8  7042  
0  7042
 2   12040
0  Filling, watering and ramming earth in 15 cm layers in   4.696
2  cum  19.20  474  0  474
floors and foundations with surplus earth from
foundations including 50m lead and 1.5m lift
 3  012050  Supplying and filling sand in plinth and under floors  12.348  cum  610.26  7535  0  7535
including watering, ramming, consolidating and dressing
complete
 031010 Providing and laying in position cement concrete of  0  0  0
specified proportion excluding cost of cement, centering
and shuttering ­ All works upto Plinth level :

 4  031012   :3:6 (1 cement : 3  sand : 6 graded stone aggregate
1  4.116  cum   1861.88  7663  0  7663
40mm nominal size)
  33060
0  Supply and using cement at worksite :  0  
0  0
 5  033061  OPC 43 grade  10.93  Tonne  5980.00  65357  0  65357
 041010 Providing and laying in position M 20 Grade concrete for  0  0  0
reinforced concrete structural elements but excluding
cost of centering, shuttering, reinforcement and
Admixtures in recommended proportion (as per IS:9103)
to accelerate, retard setting of concrete, improve
workability without impairing strength and durability as
per direction of Engineer in charge
 6  041011  All work upto plinth level, including raft foundation of  17.316  cum  2100.13  36366  0  36366
washable aprons, HS tank, pile cap, footings of FOB,
and Platform shelter etc. 
 7  041012  All work in buildings above plinth level upto floor two  6.259  cum  2309.58  14456  0  14456
level.
 045010  Supplying Reinforcement for R.C.C. work including  0  0  0
straightening, cutting, bending, placing in position and
binding all complete.
 8  045011  Mild steel and medium tensile steel bars  3300  Kg  51.56  170148  
0  170148
  42010
0  Centering and shuttering including strutting, propping  0  0  0
etc. and removal of form for :
 9  042011  Foundations, footings, bases of columns, raft foundation  30  Sqm  127.8  3834  0  3834
of washable aprons, Pile caps, Footings of FOB  etc.
 10  042013  Suspended floors, roofs, landings, balconies, FOB  30  Sqm  213.09  6393  0  6393
slabs, walkway slabs and access platform
 11  042014  Lintels, beams, plinth beams, bed blocks, girders,  8  Sqm  184.72  1478  0  1478
bressumers and cantilevers
 12  042015  Columns, pillars, , posts and struts  15  Sqm  270.2  4053  
0  4053
 051010   rick work with non­modular (FPS) bricks of class designation 7.5
B  0  0  0
in  foundation and plinth in :
 13   51015
0  Cement mortar 1:6 (1 cement : 6 fine sand)  4.5  cum  2837.41  12768  
0  12768
 051030  Brick work with machine moulded perforated bricks of class  0  0  0
designation 12.5 conforming to IS: 2222 ­1991 in superstructure
from beyond plinth level upto 6m above plinth level in cement mortar
1:6 (1 cement  : 6 coarse sand)
 4
1   51031
0  With non­modular (FPS) bricks  11   um
c  3525.78  38784  
0  38784
 15  051040  Extra over item 051010 & 051020 for brick work in superstructure   .5
4  cum  141.73  638  0  638
beyond plinth level upto floor two level :
 071010   roviding wood work in frames of doors, windows,
P  0  0  0
clerestory windows and other frames and trusses,
wrought, framed and fixed in position :
 16   71012
0  Sal wood  100  cudm  38.59  3859  0  3859
 072010  Providing and fixing panelled/glazed or panelled and  0  0  0
glazed shutters for doors, windows and clerestory
windows including ISI marked black enamelled M.S. butt
hinges with necessary screws excluding, panelling/
glazing which will be paid for separately
 17  072011  Second class teak wood, 35mm thick  2  Sqm  1688.49  3377  0  3377
  72020
0  Providing and fixing panelling/glazing or panelling and  0  0  0
glazing in panelled/ glazed or panelled and glazed
shutters for doors, windows and clerestory windows
(Area of opening for panel inserts excluding portion
inside grooves or rebates to be measured). Panelling/
glazing for panelled/ glazed or panelled and glazed
shutters 25mm to 40mm thick
 18   72021
0  Second class teak wood.15mm thick  2  Sqm  1335.10  2670  0  2670
 092010 Cement concrete flooring 1:2:4 (1cement: 2coarse sand: 4graded   stone aggregate) finished with a floating coat of neat cement including cement slurry, but excluding the 
 0  0  0
 20  092012  40mm thick with 20mm nominal size stone aggregate  22.68  Sqm  113.50  2574  0  2574
 092020  Cement plaster skirting (upto 30cm height) with cement mortar 1:3 (1cement: 3coarse sand) finished with a floating coat of neat cement
 0  0  0
 21  092021  15mm thick  3.51  Sqm  102.63  360  0  360
 111020  15 mm cement plaster on the rough side of single or half  0  0  0
brick wall of mix ­
 2
2  111022  1:6 (1cement: 6 fine sand)  121.18  Sqm  71.82  8703  0  8703
 23   15060
1  Applying one coat of cement primer of approved brand  121.18  Sqm  23.72  2874  0  2874
and manufacture on wall surface
 25  115110  Finishing walls with water proofing cement paint of  121.18  Sqm  33.36  4043  0  4043
required shade two or more coats on new work applied
@ 3.84 Kg/10 sqm
 121010  Applying Priming Coat :  0  0  0
 26  121011   ith ready mixed pink or grey primer of approved brand
W  3  Sqm  21.40  64  0  64
and manufacture on woodwork (hard and soft wood)
 27  121014  With ready mixed red oxide zinc chromate primer of  3  Sqm  9.87  30  0  30
approved brand and manufacture on steel work (second
coat)
 28  121020  Painting wood work with Deluxe Multi Surfaces Paint of  3  Sqm  67.56  203  0  203
required shade. Two or more coat applied @ 0.90ltr/
10sqm over an under coat of primer, applied @ 0.75ltr/
10sqm of approved brand or manufacture
 154010  Providing and fixing 110mm dia PVC soil, waste and  3.00  metre  221.56  665  0  665
vent pipes including jointing and cost of spun yarn and
 29 sand etc. complete
 154020  Providing and fixing brackets comprising of aluminium  3  Each  91.92  276  0  276
painted standard steel clip and cast iron base for 110mm
A.C. pipes, including cost of screws etc. and drilling of
holes and making good the walls including cost of sand
 30 etc. complete
 154110  Providing and fixing 110 mm PVC bend of the required  3  Each  118.77  356  0  356
degree with access door inclusive of 3mm thick
bitumastic felt washer, bolts and nuts, complete,
including jointing and cost of spun yarn and sand etc.
 31 complete
Total 407043 0 407043 413703
Add 18% above on Unified SOR 2010 for All Chapters 407043 20.00 % 81409 0 81409
TOTAL 488451 0 488451
Total cost of 27.44 sqm area 488451 0 488451
cost of 1 sqm area( Witout work charge & contegency ) 17801 0 17801
Add 4 % for 2014-15 18513

DEN / E/I/ ALD

Detail of Cement

Per Cum
Cement in
SN SOR Description of Item Qty Unit Cement
Qtl
( in Qtl)
 1  031012   :3:6 (1 cement : 3  sand : 6 graded stone aggregate
1  4.116  cum   2.20  9.06
40mm nominal size)
 2  041011  All work upto plinth level, including raft foundation of  17.316  cum  3.44  59.57
washable aprons, HS tank, pile cap, footings of FOB,
and Platform shelter etc. 
 3  041012  All work in buildings above plinth level upto floor two  6.259  cum  3.44  21.53
level.
 
4   51015
0   ement mortar 1:6 (1 cement : 6 fine sand)
C   .5
4   um
c   .625
0   .81
2
 5  051031  With non­modular (FPS) bricks  11  cum  0.625  6.88
 6   92012
0   0mm thick with 20mm nominal size stone aggregate
4   2.68
2   qm
S   .170
0  3.86
 7  092021  15mm thick  3.51  Sqm  0.110  0.39
 8  111022  1:6 (1cement: 6 fine sand)  121.18  Sqm  0.043  5.21
Total 109.29
In ( MT ) 10.93

DEN / E/I/ ALD


Dt 20/6/13 Annexure VII
Cost for Platform Shelter ( 875.00 Sqm ) 875Sqm
SN SOR DESCRIPTION QTY RATE PER CASH STORE TOTAL Cement
1 011010 Earth work in excavation as per approved
drawings and dumping at embankment site or
spoil heap, within railway land, including 50m
lead and 1.5m lift, the lead to be measured from
the centre of gravity of excavation to centre of
gravity of spoil heap: the lift to be measured from
natural ground level and paid for in layers of 1.5m
each, including incidental work, as per
specifications-in
011011 All kinds of soils 85 cum 85.54 7271 0 7271 8 3.6 1.6 1.8 82.944
2  031020   roviding and laying cement concrete, up
P 0 0 0
to plinth  in retaining walls, walls (any
thickness) including attached plasters,
columns, pillars, posts, struts, buttresses,
string or lacing courses, parapets, coping,
bed blocks, anchor blocks, plain window
sills, fillets etc, excluding the cost of
cement and of shuttering, centering.
 031023  1:2:4 (1 cement : 2 sand : 4 graded stone  5  cum   1883.40 9417 9417  16  8  3.6  1.6  0.8 36.864
aggregate 20mm nominal size)
3 033060 Supply and using cement at worksite : 0 0 0 8 2  1.6 0.5 12.8
033063 PPC 23 Tonne 5520.00 126960 126960 8 1  1.6 0.5 6.4
 4  041010   roviding and laying in position M 20
P 0 0
Grade concrete for reinforced concrete
structural elements but excluding cost of
centering, shuttering, reinforcement and
Admixtures in recommended proportion
(as per IS:9103) to accelerate, retard
setting of concrete, improve workability
without impairing strength and durability as
per direction of Engineer in charge
 041011  All work upto plinth level, including raft  60  cum  2100.13 126008 126008
foundation of washable aprons, HS tank,
pile cap, footings of FOB, and Platform
shelter etc. 
 5  045010  Supplying Reinforcement for R.C.C. work 0 0
including straightening, cutting, bending,
placing in position and binding all
complete.
 045014  High yield strength deformed bars  3600  Kg  54.35 195660 195660
6 081140 Supplying and fixing lewis/ holding down bolts of 384 Kg 61.13 23474 0 23474 384
approved design with nuts and washers complete
7 081020 Structural steel work riveted or bolted in built up 0 0 0
sections, trusses and framed work, girders,
staging, racks etc including cutting, bending,
straightening, drilling, rivetting, bolting, hoisting,
fixing in position including applying a priming
coat of a approved steel primer complete - upto
6m height above GL
081021 In RSJ, tees, angles and channels 18760 Kg 57.04 1070070 0 1070070 0
081022 In flats, plates, round or square bars 8000 Kg 57.51 460080 0 460080 0
8 081030 Structural steel work welded in built up sections, 0 0 0 0
trusses and framed work, girders, stagings,
racks, etc including cutting, bending,
straightening, hoisting, fixing in position,
including applying a priming coat of approved
steel primer, complete - upto 6m height above GL
081031 In RSJ, tees, angles and channels 6000 Kg 69.24 415440 0 415440 0
081032 In flats, plates , round or square bars 5500 Kg 68.00 374000 0 374000 0
 9  108020   roviding and fixing M.S. holder bat
P 0 0
clamps of approved design to C.I. or
S.C.I. rain water pipes embedded in and
including cement concrete blocks
10x10x10cm  of 1:2:4 mix (1cement:
2coarse sand: 4graded stone aggregate
20mm nominal size) and cost of cutting
holes and making good the walls etc.
 108023  150mm dia.  24  Each  134.68 3232 3232  0.12
 10  108030   roviding, erecting and fixing on wall face
P 0 0  a
S.C.I rain water pipes including filling of
joints with spun yarn soaked in neat
cement slurry and cement mortar 1:2
(1cement: 2fine sand)
 108033  150mm dia.  30  metre   1185.66 35570 35570  0.15
 11  108080  CI Plain Shoes 0 0
 108083  150mm dia.  8  Each  742.61 5941 5941  0.024
 12  108090  CI Branches (Plain) 0 0  0
 108096  150mm dia. double branch  8  Each  879.66 7037 7037  0.072  0  144
 13  101080   upply & installation of precoated
S  1006  Sqm  550.35  553652 553652
galvanized iron profile sheets (size, shape
and pitch of corrugation as approved by
Engineer­in­charge) 0.50mm +/­ 5% total
coated thickness (TCT) thick Zinc coating
120gsm as per IS:277 in 240mpa steel
grade, 5­7microns epoxy primer on both
side of the sheet and polyester top coat
15­18 microns.  Sheet should have
protective guard film of 25 microns
minimum to avoid scratches while
transportation and should be supplied in
single length upto 12 metre or as desired
by Engineer­in­charge.  The sheet shall be
fixed using self drilling / self tapping
screws of size (5.5 x 55mm) with EPDM
seal or with polymer coated J or L hooks,
bolts and nuts 8mm diameter with bitumen
and G.I. limpet washers or with G.I. limpet
washers filled with white lead complete
upto any pitch in horizontal/vertical or
curved surfaces excluding the cost of
purlins, rafters and trusses and including
cutting to size and shape wherever
required
 14  101090  Providing and fixing precoated galvanised
steel sheet roofing accessories 0.50mm
+/­ 5% total coated thickness (TCT) thick
Zinc coating 120 gsm as per IS:277 in
240mpa steel grade, 5­7 microns epoxy
primer on both side of the sheet and
polyester top coat 15­18 microns using
self drilling/self tapping screws or with
polymer coated J or L hooks, bolts and
nuts and or G.I. seam bolts and nuts, G.I.
plain and bitumen washers complete :
 101091  Ridges plain (500­600mm)  80  metre  568.36  45468.80 45469
 101092  Flashings/Aprons.(Upto 600mm)  160  metre  556.64  89062.40 89062
 101096  Gutter (600mm over all girth)  80  metre  671.95  53756.00 53756
 15  121090   ainting with aluminium paint of approved
P
brand and manufacture to give an even
shade
 121091  Two or more coats on new work  500  Sqm  42.26  21130.00 21130
TOTAL 3623230 0 3623230
Add 20% above on Unified SOR 2010 for All
16 Chapters as per LAR 74-W/8727/Bills Dated 3623230 20.00 % 724646 0 724646
28/12/2012
TOTAL 4347876 0 4347876
17 Add 4% above escalation for the year 2014-15 4347876 4 % 173915 0 173915
TOTAL 4521791 0 4521791

Cos for Platform Shelter ( 875.00 Sqm ) 4521791 874.7826087


Cos for Platform Shelter ( 1.00 Sqm ) 5168

Detail of Cement

SN Per Cum
Cement in
SOR Description of Item Qty Unit Cement
Qtl
( in Qtl)
031023 1:2:4 (1 cement : 2 sand : 4 graded stone 5 cum 3.200 16.00
aggregate 20mm nominal size)
041011 All work upto plinth level, including raft 60 cum 3.44 206.40
foundation of washable aprons, HS tank, pile
cap, footings of FOB, and Platform shelter
etc.
108033 150mm dia. 30 metre 0.005 0.15
Total 222.55
In ( MT ) 22.26

 DEN/E/I/ALD
DT 21/6/13 Annexure VIII
Cost of 1 no. RCC Bench
SN SOR DESCRIPTION QTY. RATE PER CASH STORE TOTAL
1 172020 Supplying, erecting and fixing precast 1 Each 7729.55 7730 0 7730
concrete reinforced bench with back rest.
Bench shall consist of 2 nos. L shaped base
support in natural cement colour of thickness
100 mm, back height 1000 mm, front height
450 mm, base width 620 mm and 5 nos.
reinforced concrete planks in red colour and
size of 1500 x 100 x 50mm and 1 no.
reinforced concrete plank of 150 x 200 x
50mm; manufactured by using M-30 grade
concrete & reinforced suitably; all parts to be
joined with galvanised nuts and bolts of
suitable size. All bolts to be sealed after
assembly. Complete job to be done as per
directions of Engineer Incharge
Total 7730 0 7730
2 Add % above on Unified SOR 2010 for All
Chapters as per LAR 74-W/8727/Bills Dated 7730 20 % 1546 0 1546
28/12/2012
 Total 9275 0 9275
3 Add 4% above escalation for the year 2014-15 9275 4 % 371 0 371
TOTAL 9646 0 9646
Cost for 1 no. RCC Bench 9646 Each

DEN/E/I/ALD
 Dt  20/6/13
 Platform WALL 100M LONG  AS PER N.R. Type P­ 34 sheet no. 1/R1.  ( H L )
 As per New SOR 2010
 SN  SOR  DESCRIPTION  QTY  RATE  PER  CASH  STORE  TOTAL
 011010   arth work in excavation as per approved
E
drawings and dumping at embankment
site or spoil heap, within railway land,
including 50m lead and 1.5m lift, the lead
to be measured from the centre of gravity
of excavation to centre of gravity of spoil
heap: the lift to be measured from natural
ground level and paid for in layers of 1.5m
each, including incidental work, as per
specifications­in
 1  011011  All kinds of soils  69.54  cum  85.54  5948  
0  5948
  31010
0  Providing and laying in position cement  0  0  0
concrete of specified proportion excluding
cost of cement, centering and shuttering ­
All works upto Plinth level :                                                            
 2  031012  1:3:6 (1 cement : 3  sand : 6 graded stone  17.48  cum   1861.88  32546  0  32546
aggregate 40mm nominal size)
  33060
0  Supply and using cement at worksite :  
0  
0  0
 3  033063  PPC   19.37  Tonne  5520.00  106898  0  106898
 042010  Centering and shuttering including  0  0  0
strutting, propping etc. and removal of
form for :
 4  042011  Foundations, footings, bases of columns,  100  Sqm  127.8  12780  0  12780
raft foundation of washable aprons, Pile
caps, Footings of FOB  etc.
 041010  Providing and laying in position M 20  0  0  0
Grade concrete for reinforced concrete
structural elements but excluding cost of
centering, shuttering, reinforcement and
Admixtures in recommended proportion
(as per IS:9103) to accelerate, retard
setting of concrete, improve workability
without impairing strength and durability
as per direction of Engineer in charge
 5  041011  All work upto plinth level, including raft  15.53  cum  2100.13  32615  0  32615
foundation of washable aprons, HS tank,
pile cap, footings of FOB, and Platform
shelter etc. 
 045010  Supplying Reinforcement for R.C.C. work  0  0  0
including straightening, cutting, bending,
placing in position and binding all
complete.
 6  045014  High yield strength deformed bars  1200  Kg  54.35  65220  
0  65220
 051010   rick work with non­modular (FPS) bricks of class
B  0  0  0
designation 7.5 in  foundation and plinth in :
 7  051017  Cement mortar 1:4 (1 cement : 4 coarse sand)  105.05  cum  2835.40  297859  
0  297859
 114020   ointing on brick/tile flooring with cement
P  0  0  0
mortar 1:3 (1cement: 3fine sand)
 8  114022  Ruled pointing  132  Sqm  47.64  6288  
0  6288
 131070  Providing and fixing 3 layer PP­R (Poly  0  0  0
Propylene Random copolymer)
designated as PN­10 pipes, approved by
CBRI and conforming to IS:15801; U V
stabilized & anti­microbial fusion welded,
having thermal stability for hot & cold
water supply including all PP­R plain &
brass threaded polypropylene random
fittings including trenching, refilling &
testing of joints complete as per direction
of Engineer­in­Charge. External work
(higher dia)
 9   31072  PN­10 Pipe, 160mm OD (SDR­11)
1  60  metre  3790.79  227447  0  227447
 Total 787602 0 787602
10 Add % above on Unified SOR 2010 for All
Chapters as per LAR 74-W/8727/Bills Dated 787602 32 % 252033 0 252033
28/12/2012
 Total 1039635 0 1039635
11 Add 4% above escalation for the year 2014-15 1039635 4 % 41585 0 41585
TOTAL 1081220 0 1081220
 COST OF 1 METRE Platform WALL high level  10812
 say  10812/ metre

 DEN/E/I/ALD
Detail of Cement

SN Per Cum
SOR Description of Item Qty Unit Cement Cement in Qtl
( in Qtl)
 2  031012   :3:6 (1 cement : 3  sand : 6 graded stone
1  17.48  cum   2.200  38
aggregate 40mm nominal size)
 23  041011  All work upto plinth level, including raft  15.53  cum  3.44  53
foundation of washable aprons, HS tank,
pile cap, footings of FOB, and Platform
shelter etc. 
 49  051017  Cement mortar 1:4 (1 cement : 4 coarse sand)  105.05  cum  0.950  100
 397  114022  Ruled pointing  132  Sqm  0.015  2
  94
1
 19.37

 Annexure B

 For Island P.F. ( H L ) ( 1362.00 Sqm )
 Earth filling & CC with SOR 2010 

1 012050 Supplying and filling sand in plinth and 204 cum 610.26  124493  204.3
under floors including watering, ramming,
consolidating and dressing complete  For Island P.F.
 1  013120   arthwork in filling in embankment, guide
E  1634.4  cum  208.30  340446
bunds, around buried type abutments,
bridge gaps, trolley refuges, rain bunds if
provided, platforms etc. with earth
excavated from outside railway boundary
entirely arranged by the contractor at his
own cost as per RDSO's latest guidelines
and specifications and special condition
of contract including all leads, royalty,
lifts, ascents, descents, crossing of
nallahs or any other obstructions. The
rates shall include all dressing of bank to
final profile, demarcation and setting out
of profile, site clearance, removing of
shrubs, roots of vegetations growth,
heavy grass, benching of existing slope
of old bank, all handling/re­handling.
taxes, octroi and royalty etc. as a
complete job. Cut trees shall be property
of railways and to be deposited in the
railway godown unless specified
otherwise in the Special conditions of
contract  15
 2  013130  Extra for mechanical compaction of earth/  1634.4  cum  14.21  23225
blanketing material filled in embankment
with contractor’s rollers of suitable
capacity, type and size to achieve
specified density as per specification,
testing as per IS codes incl. cost of
water, T&P consumable material and all
labour as a complete job. The work is to
be executed as per Latest edition of
"Guidelines for Earthwork in Railway
Projects" issued by RDSO, Lucknow  0.69  13.62  0.69
  33060
0  Supply and using cement at worksite :  0  C C 
 3  033063  PPC   45.10  Tonne  5520.00  248952  Earth Filling  LEAN CC
 031010  Providing and laying in position cement
concrete of specified proportion excluding
cost of cement, centering and shuttering ­
All works upto Plinth level :                                                            
 3  031012  1:3:6 (1 cement : 3  sand : 6 graded stone  205  cum   1861.88  381685  451  20667  204.3
aggregate 40mm nominal size)
 Total 1118801
5 Add % above on Unified SOR 2010 for All
Chapters as per LAR 74-W/8727/Bills Dated 1118801 32 % 358016
28/12/2012  RL
  otal 1476817
T  GL  Earth
Cost of earth work & cc floor 1362 S qm  1476817  914
Cost of earth work & cc floor 1 S qm  1084  BED L
8 8674.402554

Detail of Cement

SN Per Cum
SOR Description of Item Qty Unit Cement Cement in Qtl
( in Qtl)
 157  092013  50mm thick with 20mm nominal size stone aggregate
 205  Sqm  0.202  41.41

  1.41
4
 4.14

 For Island P.F. ( H L ) ( 1362.00 Sqm )
 Earth filling & CC with SOR 2010 

1 012050 Supplying and filling sand in plinth and 204 cum 610.26  124493
under floors including watering, ramming,
consolidating and dressing complete
 1  013120   arthwork in filling in embankment, guide
E  815  cum  208.30  169765
bunds, around buried type abutments,
bridge gaps, trolley refuges, rain bunds if
provided, platforms etc. with earth
excavated from outside railway boundary
entirely arranged by the contractor at his
own cost as per RDSO's latest guidelines
and specifications and special condition
of contract including all leads, royalty,
lifts, ascents, descents, crossing of
nallahs or any other obstructions. The
rates shall include all dressing of bank to
final profile, demarcation and setting out
of profile, site clearance, removing of
shrubs, roots of vegetations growth,
heavy grass, benching of existing slope
of old bank, all handling/re­handling.
taxes, octroi and royalty etc. as a
complete job. Cut trees shall be property
of railways and to be deposited in the
railway godown unless specified
otherwise in the Special conditions of
contract
 2  013130  Extra for mechanical compaction of earth/  815  cum  14.21  11581
blanketing material filled in embankment
with contractor’s rollers of suitable
capacity, type and size to achieve
specified density as per specification,
testing as per IS codes incl. cost of
water, T&P consumable material and all
labour as a complete job. The work is to
be executed as per Latest edition of
"Guidelines for Earthwork in Railway
Projects" issued by RDSO, Lucknow
  33060
0  Supply and using cement at worksite :  0
 3  033063  PPC   45.10  Tonne  5520.00  248952
 031010  Providing and laying in position cement
concrete of specified proportion excluding
cost of cement, centering and shuttering ­
All works upto Plinth level :                                                            
 3  031012  1:3:6 (1 cement : 3  sand : 6 graded stone  205  cum   1861.88  381685  451
aggregate 40mm nominal size)
 Total 936476
5 Add % above on Unified SOR 2010 for All
Chapters as per LAR 74-W/8727/Bills Dated 936476 32 % 299672
28/12/2012
 Total 1236148
Cost of earth work & cc floor 1362 S qm  1236148
Cost of earth work & cc floor 1 S qm  908
7264
Annexure
Cost for CC flooring ( 100 Sqm )

SN SOR DESCRIPTION QTY UNIT RATE CASH STORE TOTAL


 033060  Supply and using cement at worksite :
1 033063 PPC 7.98 Tonne 5520.00 44050 0 44050
092060 Providing and laying plain cement concrete flooring of specified thickness with mix design concrete
0 over
0 firm, well0prepared and well compacted bed including provision of designed expansion joi
092062 M-25 20 cum 2714.63 54293 0 54293 20 7.98
048070 Vacuum dewatering of all types & grade 100 Sqm 6.93 693 0 693
concrete by mechanical means including
draining out the sucked excess water from
concrete & then finishing the surface smooth
with mechanical trowelling with suitable
equipment etc. complete. The methodology
to be adopted will be as per user manual of
dewatering & trawling machine and as
directed by Engineer.
Total 99035 0 99035
Add 20% above on Unified SOR 2010 for All
4 Chapters as per LAR 74-W/8727/Bills Dated 99035 32 % 31691 0 31691
28/12/2012
TOTAL 130726 0 130726
Total cost of 1 sqm area 1307 0 1307
Total cost of 8 sqm area ( Witout work charge & contegency ) 10458 0 10458 Elec. 10% #REF!

SR.DEN / II/ ALD


 Cost of Platform Rail level to High level
 SN  SOR  DESCRIPTION  QTY  RATE  PER  AMOUNT
 1   arth filling & CC 
E  1  8974  Mtr  8974
 Platform WALL 1M LONG  AS PER N.R. Type P­ 34 sheet no. 1/
 
2 R1.  ( H L )  
1   0812 M
1   tr   0812
1
 3  Cost for CC flooring   1  10458  Mtr  10458
 Cost per mtr  30244

 Cost of Platform Low level to High level
 SN  SOR  DESCRIPTION  QTY  RATE  PER  AMOUNT
 1   arth filling & CC 
E  1  7264  Mtr  7264
 Platform WALL 1M LONG  AS PER N.R. Type P­ 34 sheet no. 1/
 
2 R1.  ( H L )  
1   0812 M
1   tr   0812
1
 3  Cost for CC flooring   1  10458  Mtr  10458
 Cost per mtr  28534

 Cost of  Island Platform Rail level to High level
 SN  SOR  DESCRIPTION  QTY  RATE  PER  AMOUNT
 1   arth filling & CC 
E  1  8974  Mtr  8974
 Platform WALL 1M LONG  AS PER N.R. Type P­ 34 sheet no. 1/
 
2 R1.  ( H L )  
2   0812 M
1   tr   1624
2
 3  Cost for CC flooring   1  10458  Mtr  10458
 Cost per mtr  41056

 Cost of Island Platform Low level to High level
 SN  SOR  DESCRIPTION  QTY  RATE  PER  AMOUNT
 1   arth filling & CC 
E  1  7264  Mtr  7264
 Platform WALL 1M LONG  AS PER N.R. Type P­ 34 sheet no. 1/
 
2 R1.  ( H L )  
2   0812 M
1   tr   1624
2
 3  Cost for CC flooring   1  10458  Mtr  10458
 Cost per mtr  39346
Annexure D
Cost of Water Booth - One No. ( 2x4 ) Taps
SN SOR DESCRIPTION QTY. RATE PER CASH STORE TOTAL
 1  011010   arth work in excavation as per
E
approved drawings and dumping at
embankment site or spoil heap,
within railway land, including 50m
lead and 1.5m lift, the lead to be
measured from the centre of gravity
of excavation to centre of gravity of
spoil heap: the lift to be measured
from natural ground level and paid
for in layers of 1.5m each, including
incidental work, as per
specifications­in
 011011  All kinds of soils  1.3  cum  85.54  111  
0  111
 2   31020
0  Providing and laying cement  0  0  0
concrete, up to plinth  in retaining
walls, walls (any thickness)
including attached plasters,
columns, pillars, posts, struts,
buttresses, string or lacing courses,
parapets, coping, bed blocks,
anchor blocks, plain window sills,
fillets etc, excluding the cost of
cement and of shuttering, centering.
 031023  1:2:4 (1 cement : 2 sand : 4 graded  1.07  cum   1883.40  2015  0  2015
stone aggregate 20mm nominal
size)
 3  033060  Supply and using cement at  0  0  0
worksite :
  33063
0  PPC   1.16  Tonne  5520.00  6420  
0  6420
 4  043010  Providing, hoisting and fixing in  0  0  0
position upto floor two level M20
Grade precast RCC work including
setting in cement mortar 1:3 (1
cement : 3 coarse sand) and
finishing smooth with 6mm thick
cement plaster 1:3 (1 cement : 3
fine sand) on exposed surfaces
complete including cost of centering,
shuttering, finishing, Admixtures in
recommended proportion (as per IS:
9103) to accelerate, retard setting of
concrete, improve workability
without impairing strength and
durability, excluding cost of cement
and steel reinforcement, as per
approved plan & direction of
Engineer incharge.
 043014  In Shelves, cantilevers, chajjas,  0.25  cum  3447.7  862  0  862
sunshades etc.
 5  045010  Supplying Reinforcement for R.C.C.  0  0  0
work including straightening, cutting,
bending, placing in position and
binding all complete.
 045014  High yield strength deformed bars  25  Kg  54.35  1359  
0  1359
 6  051010   rick work with non­modular (FPS) bricks
B  0  0  0
of class designation 7.5 in  foundation and
plinth in :
 051018  Cement mortar 1:6 (1 cement : 6 coarse  3  cum  2835.40  8506  0  8506
sand)
 7  051040  Extra over item 051010 & 051020 for brick  1.5  cum  141.73  213  0  213
work in superstructure  beyond plinth level
upto floor two level :
 081410   teel work welded in built up
S  0  0  0
sections/ framed work including
cutting, hoisting, fixing in position
and applying a priming coat of
approved steel primer using
structural steel etc. as required
 081412  In gratings, frames, guard bar,  20  Kg  72.53  1451  0  1451
ladders, railings, brackets, gates
and similar works
 9   92010
0  Cement concrete flooring 1:2:4 (1cement: 2coarse sand: 4graded   stone aggregate) finished with a floating coat of neat cem
 0  0  0
 092014  75mm thick with 20mm nominal size stone aggregate  2  Sqm  178.35  357  0  357
 10  094060  Providing & fixing Precast Chequered tiles conforming to IS:13801:1993, manufactured under mechanical vibration & hydrau
 0  0  0
 094063  400mm x 400mm x 35mm thick  15  Sqm  803.24  12049  0  12049
 11  099080  Polished stone tile work for wall lining (dado) over 12mm thick bed of cement mortar 1:3, including pointing in white cement 
 0  0  0
 099081  8 mm thick pink/grey granite tiles  50  Sqm  1358.36  67918  0  67918
 12  131130  Providing and fixing G.I. pipes  0  0  0
complete with G.I. fittings and
clamps, including cutting and
making good the walls etc. Internal
work – Exposed on wall
  31131
1  15 mm dia. nominal bore  4  metre  136.59  546  0  546
 3
1  131132  20 mm dia. nominal bore  60  metre  168.20  10092  0  10092
 14  131136  50 mm dia. nominal bore  50  metre  431.38  21569  0  21569
 15  134010  Providing and fixing PTMT bib cock  0  0  0
of approved quality and colour
 134011  15mm nominal bore, 86mm long.  8  Each   123.19  986  0  986
Weighing not less than 88 gms
Total 134453 0 134453
16 Add % above on Unified SOR 2010 for All
Chapters as per LAR 74-W/8727/Bills 134453 20 % 26891 0 26891
Dated 28/12/2012
 Total 161344 0 161344
Add 4% above escalation for the year
17 161344 4 % 6454 0 6454
2014-15
TOTAL 167797 0 167797
Cost for 1 no. Water Booth 167797

DEN/E/I/ALD

Detail of Cement

SN Per Cum
Cement in
SOR Description of Item Qty Unit Cement
Qtl
( in Qtl)
1 031023 1:2:4 (1 cement : 2 sand : 4 graded 1.07 cum 3.200 3.42
stone aggregate 20mm nominal size)
2 043014 In Shelves, cantilevers, chajjas, 0.25 cum 4.04 1.01
sunshades etc.
3  051018   ement mortar 1:6 (1 cement : 6 coarse
C  3  cum  0.625 1.88
sand)
4 092014 75mm thick with 20mm nominal size stone aggregate
2 Sqm 0.281 0.56
5 094063 400mm x 400mm x 35mm thick 15 Sqm 0.094 1.41
 099081  8 mm thick pink/grey granite tiles  50  Sqm  0.07  3.35
  1.63
1
 1.16
 Annexure 
COST OF HYDRANT PIPE LINE 560M LONG
SN SOR DESCRIPTION QTY. RATE PER CASH STORE TOTAL
 011010   arth work in excavation as per
E
approved drawings and dumping at
embankment site or spoil heap, within
railway land, including 50m lead and
1.5m lift, the lead to be measured
from the centre of gravity of
excavation to centre of gravity of
spoil heap: the lift to be measured
from natural ground level and paid for
in layers of 1.5m each, including
incidental work, as per specifications­
in
 1  011011  All kinds of soils  60  cum  85.54  5132  
0  5132
  31010
0  Providing and laying in position  0  0  0
cement concrete of specified
proportion excluding cost of cement,
centering and shuttering ­ All works
upto Plinth level :                                                            
 2  031012  1:3:6 (1 cement : 3  sand : 6 graded  45  cum   1861.88  83785  0  83785
stone aggregate 40mm nominal size)
 3  032020  Providing and fixing precast M 15  18  cum  2064.53  37162  0  37162
grade  cement concrete  in string or
lacing courses, coping, bed plates,
anchor blocks, plain window sills,
shelves, louvers, steps, etc. upto
floor two level, including hoisting and
setting in position with cement mortar
1:3 (1 cement : 3 coarse sand), cost
of required shuttering, centering
complete ­ excluding the cost of
cement. (cast at site)
 033060  Supply and using cement at  0  0  0
worksite :
 4   33063
0  PPC   17  Tonne  5520.00   3840
9  
0   3840
9
 5  081070  Erecting rails in posts, platform wall  520  quintal   68.59  35667  0  35667
copings etc. including necessary
cutting and drilling
 131130  Providing and fixing G.I. pipes  0  0  0
complete with G.I. fittings and
clamps, including cutting and making
good the walls etc. Internal work –
Exposed on wall
 
6  131132  20 mm dia. nominal bore  120  metre   68.20
1  20184  
0  20184
 7  131136  50 mm dia. nominal bore  675  metre  431.38  291182  0  291182
  32030
1  Providing and fixing gun metal gate  0  0  0
valve with C.I. wheel of approved
quality (screwed end)
 8   32034
1  50 mm nominal bore  280  Each   1418.48  397174  
0  397174
 133120  Providing and laying Double Flanged  0  0  0
(Screwed/Welded) Centrifugally
(Spun) Ductile Iron Pipes of Class K ­
9 conforming to IS : 8329 up to 500
mm dia
 9  133122  150mm dia Ductile Iron Double  560  metre  3424.34  1917630  0  1917630
Flanged
 133140  Providing lead caulked joints to spun  0  0  0
iron or C.I./ DI pipes and specials
including testing of joints but
excluding the cost of pig  lead up to
400 mm dia
 10   33144
1  150 mm dia. pipe   280  Each   186.07  52100  
0  52100
 133170  Providing flanged joints to double  0  0  0
flanged C.I./ D.I. pipes and specials
including  fittings, packings & testing
of joints up to 400 mm dia
 11   33174
1  150 mm dia. pipe  280  Each   204.67  57308  
0  57308
 133220  Providing and fixing C.I. sluice valves  0  0  0
(with cap) complete with bolts, nuts,
rubber insertions etc. 150 mm dia (the
tail pieces if required will be paid
separately)
 12   33221
1  Class  I  3  Each   5821.80  17465  
0  17465
 133300  Providing and laying S&S C.I.  0  0  0
Standard specials such as tees,
bends, collars tapers and caps etc,
suitable for flanged jointing as per IS :
1538
 3
1   33301
1  Upto   300 mm dia  8  Quintal    943.52
5  47548  
0  47548  8
 14  137010  Supplying, fabricating and fixing M.S.  2000  Kg  109.68  219360  0  219360
flat angle iron pipe clamps, stays,
etc. including drilling holes, welding (if
any) including nuts and bolts etc.
including all lifts
Total 3275536 0 3275536
15 Add % above on Unified SOR 2010 for All
Chapters as per LAR 74-W/8727/Bills 3275536 20 % 655107 0 655107
Dated 28/12/2012
 Total 3930644 0 3930644
Add 4% above escalation for the year
16 3930644 4 % 157226 0 157226
2014-15
TOTAL 4087869 0 4087869
17 Cost of U/S 60/52 KG Rail 52 MT 20611   071772
1   071772
1
TOTAL  4087869  1071772  5159641
 P/F Zoloto forged brass valve  4.50  2270.37
bulb with detachable handle 50
 #VALU
 17  N.S 1 mm dia with all labour & material  280  Each   2172.6  608328  0  608328  0  6.4  39  8.90  0  800  6.4  100  12.80  10240  566  2172.6  1285028 #VALUE!  #VALUE!
complete ( LAR 74­ W /8361/Bills E!
dated 09/11/2011
TOTAL for 560 mlong hydrant   696197
4   071772
1  5767969
TOTAL for 1120 mlong hydrant  9392395  2143544   1535939
1

COST OF HYDRANT PIPE LINE 560m


560 5767969
long
COST OF HYDRANT PIPE LINE 1 m
 10299.95
long

DEN/E/I/ALD
Detail of Cement

SN Per Cum
SOR Description of Item Qty Unit Cement Cement in Qtl
( in Qtl)
 2  031012   :3:6 (1 cement : 3  sand : 6 graded
1  45  cum   2.200  99.00
stone aggregate 40mm nominal size)
 15  032020  Providing and fixing precast M 15  18  cum  3.800  68.40
grade  cement concrete  in string or
lacing courses, coping, bed plates,
anchor blocks, plain window sills,
shelves, louvers, steps, etc. upto
floor two level, including hoisting and
setting in position with cement mortar
1:3 (1 cement : 3 coarse sand), cost
of required shuttering, centering
complete ­ excluding the cost of
cement. (cast at site)
 167.40
 16.74

  60
5
 224  225  450  500  m

 52kg  104mt/km
Construction of washable apron 560 mtr long .
SN SOR DESCRIPTION QTY. RATE PER CASH STORE TOTAL
1 011010 Earth work in excavation as per approved drawings and dumping at
embankment site or spoil heap, within railway land, including 50m
lead and 1.5m lift, the lead to be measured from the centre of gravity
of excavation to centre of gravity of spoil heap: the lift to be measured
from natural ground level and paid for in layers of 1.5m each, including
incidental work, as per specifications-in
011011 All kinds of soils 840 cum 85.54 71854 0 71854
2 021070 Loading/Unloading ballast, kankar, brickbats, stone-chips, shingle, 840 Cum 40.07 33660 0 33660
stone boulders, block kankar, pitching stones , rubble stones, laterite,
coal, surkhi, dry mortar, sand , moorum, earth, manure or sludge,
ashes, lime etc., including lead up to 50m and stacking into/from
trucks, trailors or wagons
3 021090 Leading ballast, kankar, brickbats, stone-chips, shingle, stone boulders, 840 Cum 64.38 54078 0 54078
block kankar, pitching stones , rubble stones, laterite, coal, surkhi, dry
mortar, sand , moorum, earth, manure or sludge, ashes, lime, debris,
muck, malba, etc.. for lead upto 25 km. Note : Lead under this item is
payable when the same exceeds 500 M.
4 031010 Providing and laying in position cement concrete of specified 0 0 0
proportion excluding cost of cement, centering and shuttering - All
works upto Plinth level :
031011 1:3:6 (1 cement : 3 sand : 6 graded stone aggregate 20mm nominal 95 cum 1695.79 161100 0 161100 209
size)
5 031060 Centering and shuttering including strutting, propping etc. and 0 0 0
removal of form work for :
031061 Foundations, footings, bases of columns 100 Sqm 128.24 12824 0 12824
6 043010 Providing, hoisting and fixing in position upto floor two level M20 0 0 0
Grade precast RCC work including setting in cement mortar 1:3 (1
cement : 3 coarse sand) and finishing smooth with 6mm thick cement
plaster 1:3 (1 cement : 3 fine sand) on exposed surfaces complete
including cost of centering, shuttering, finishing, Admixtures in
recommended proportion (as per IS:9103) to accelerate, retard
setting of concrete, improve workability without impairing strength
and durability, excluding cost of cement and steel reinforcement, as
per approved plan & direction of Engineer incharge.
043013 In lintels, beams, bressumers 1 cum 4197.07 4197 0 4197 4.04
043015 In slabs for drain covers, manhole covers, flue tops etc. 0.5 cum 2695.23 1348 0 1348 2.02
 7  051010   rick work with non­modular (FPS) bricks of class designation 7.5 in  foundation
B 0 0 0
and plinth in :
 051014  Cement mortar 1:4 (1 cement : 4 fine sand)  12  cum  2903.10 34837 0 34837  11.4

8 111070 12 mm cement plaster finished with a floating coat of neat cement of 0 0 0


mix -
111072 1:4 (1cement: 4fine sand) 200 Sqm 75.38 15076 0 15076 15.4
9 111180 Neat cement punning 200 Sqm 13.01 2602 0 2602 4.4
10 142010 Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes 0 0 0
including bends etc with collars jointed with stiff mixture of cement
mortar in the proportion of 1:2 (1cement: 2fine sand) including testing
of joints etc. complete upto 800mm dia.
142014 300mm dia. R.C.C. pipe 200 metre 495.19 99038 0 99038 2.2
11 182010 Demolishing brick work including stacking of serviceable material and 0 0 0
disposal of unserviceable material within 50m lead
182013 In cement mortar 105 cum 367.12 38548 0 38548
12 188070 Taking out earthenware or stoneware/concrete pipes and stacking 0 0 0
within 50m lead including excavation of trench and refilling and
ramming complete. (Demolishing of concrete/masonry if required to
be done will be paid extra)
188072 Above 15 cm dia upto 30cm dia. 1100 metre 8.73 9603 0 9603
13 033060 Supply and using cement at worksite : 0
033062 OPC 53 grade 24.85 Tonne 6325.00 157176 0 157176
Total 695940 0 695940
14 Add % above SOR- 2010 for all chapters . 695940 20 % 139188 0 139188
Total 835128 0 835128
Total with 4 % escallation 868533 0 868533
Dism. Cement concrete, lime concrete, RCC work etc. incl. leading,
15 NS-1 loading and unloading with own tools, plants up to 5Km. Debries as per 2 354.93 CUM. 710 0 710 118 354
instructions by site Engineer.LAR No.74-W/8242/bills dated 13/01/2010
Prov. C.C. 1:4:8 (M-7.5) in foundation and floor with stone ballast 40mm in
layer not exceeding 5cm thick as required with contractors own materials incl.
16 NS-2 205.00 2194.09 CUM. 449788 0 449788 265.00 795
cost of cement, shuttering, tools and plants as required labours and crossing of
track with all lead, lift etc. complete. LAR No.74-W/8242/bills dated 13/01/2010  196
Prov. C.C. 1:2:4 with stone chips 20mm and down gauge in foundation and
floors incl. with contractors own materials, labours cost of ement and centering,
17 NS-3 shuttering, tools and plants as required vibrator, mechanical mixer, crossing of 205.00 2961.83 CUM. 607175 0 607175 171.00 513
track with all lead lift etc. complete job. LAR No.74-W/8242/bills dated
13/01/2010  3305.367
Prov. C.C./RCC work M-20 (1:1.5:3) with stone aggregate 20mm crushed
stone, cement and coarse sand in foundation and sub structure and flooring
incl. bailing out of water and laying concrete under water as required with
18 NS-4 410.00 3305.37 CUM. 1355202 0 1355202 383.00 1149
contractor's own materials incl. cost of cement, cost of all centering /
shuttering, tools and plants, labour, vibrator, crossing of track with all lead, lift
etc. complete. LAR No.74-W/8242/bills dated 13/01/2010
Supplying, making & fixing in position of reinforcement steel incl. all cutting,
19 NS-5 bending, binding welding etc. with contractors own labour and material 600.00 3377.49 qtl 2026494 0 2026494 265.00 795
complete. LAR No.74-W/8242/bills dated 13/01/2010
Dismantling of existing rails 90R / 52Kg. And 90R on PRC sleeper at washable
apron incl. jamming and painting, cutting, drilling of holes for fish plate etc. incl.
20 NS-6 560.00 252.5 Track mtr 141400 0 141400 560.00 1680
leading and stacking of rails, sleeper to be store of PWI at nominated place and
linking of rails on PRC up to 1Km.-
Laying of PRC on newly constructed washable apron with M+7 density
including spreading of PRC sleeper upto 1Km. Fitting tobe collected from PWI
21 NS-7 560.00 162.28 mtr 90877 0 90877 560.00 1680
store & linking of Rails on PRC upto 1Km.-LAR No.74-W/8242/bills dated
13/01/2010
  routing below the sleeper with shrinkage compensating chloride
G
22 NS-8 free fast setting and high early strength gaining cementicious grout 862.00 2132.4 Each 1838129 0 1838129 130.00 390
having flowing properties :LAR No.74­W/8242/bills dated 13/01/2010  861.5384615
A : For gap up to 15mm or less below the sleeper : The
grout material having maximum grain size 0.2mm and minimum
compressive strength of 200 ­220 kg / Sq Cm. in 4 hours and 300
23 0 0 0
kg. / Sq Cm. in 24 hours and 500 kg. / Sq CM. in 21 days with
flowable consistency suitable for intricate damp and water logged
areas.
B : For gap more than 15mm or less below the sleeper :
A mixure of grout material , course sand and graded aggregate of
1mm to 6mm down size IS seive to be used in mixed design to be
designed by contractor to achieve a strength of 220 to 230 Kg / cm
in 4 hours, 300 kg / cm in 24 hours and 500 kg / cm in 24 days. The
24 work will be carriedout including breaking damaged concrete in 0 0 0
between sleeper s to the top of base concrete and removal of all
damaged concrete up to a distance of 50 metres from the site of
work and cleaning below the sleeper by high pressure compressed
air water jet with all contractor's labour, materials & equipments
tools & plants complete.
Pouring of carbonious polymer sealant : As per IS : 1834 - 1984 grade -
B pouring of carbonious polymer sealant uneffected by spillage of fuel
oil, grease, mobile, & insensitive to heat from locomotive exhaust in the
25 NS-9 formed 10mm grove in between sleeper & concrete maintaining a depth 862.00 479.28 Each 413139 0 413139 569.00 1707
of 25mm from top level of the special concrete with contractor's labour,
materials & equipments tools & plants complete-LAR No.74-W/8242/bills
dated 13/01/2010  72
Grouting below the sleeper : Grouting in track bed concrete or any other
location with pumpable cementicious grout material i.e. Tech. Grout p.g.
or equivalent having shrinkage compensating chloride free and rpid
hardening properties with maximum graint size up to 0.2 mm . The
material should attain compressive strength of 200 -220 kg / Sq Cm. in 4
hours and 300 kg. / Sq Cm. in 24 hours and 500 kg. / Sq CM. in 21 days
26 NS-10 480 85.30 Kg 40944 0 40944
with flowable consistency by suitable for intricate damp and water
logged areas, the grouting to be carriedout by direct displacement
reciprocetting pump including drilling of 22 mm to 33mm nominal dia
holes by rotary cum percussion, drilling & fixing of exondable,
mechanical paker with all contractor's labour, materials, T/P and
equipements etc. LAR No.74-W/8019/bills dated 14/10/2010
Providing laying special concrete M 50 in between sleeper from P.F. wall
to the drain with special cement material and stone aggregate . The
special cement material will be rapid hardening, high early strength
gaining non shrinkaable chloride free type having grain size of less then
0.2mm. The concrete will be made mixed with stone aggregate of 15mm
to 12mm down size IS sieve and course sand with a gradient of 1 in 40
27 NS-11 with mix design given by the contractor to give a minimum compressive 238 11880.53 Cum 2827566 0 2827566
strength of 170kg to 200 kg. / Sq CM in 4 hours, 300 kg / Sq CM in 24
hours and 400 kg / Sq CM in 21 days. The work will be carriedout
including base preparation, cleaning of all loose materials by high
pressure compressed air water jet with all contractor's labour, materials
& equipments tools & plants complete. except cement which will be paid
seperately.LAR No.74-W/8242/bills dated 13/01/2010 235.2
Pouring of carbonious polymer sealant As per IS : 1834 - 1984 grade - A
Display good adhesion has the ability to withsatand extension without
28 NS-12 862 274.17 Each 236335 0 236335
cracking. B. Low susceptibility to flow during hot weather conditions.LAR
No.74-W/8019/bills dated 14/10/2010
29 NS-13 Cost of sleeper with fittings 1820.00 1715.00 each 0 3121300 3121300  1846.153846 862.00 2586
30 NS-14 Rubber Pad 3640.00 600.00 each 0 2184000 2184000 1724.00 5172
31 NS-15 Cost of Rail 520Kg ( S/H ) 62.4 38200 MT 0 2383680 2383680
Total 10896292 7688980 18585272
Add 4 % upto 2014-15 12747121 8995019.071 21742140
Cost for 1 mtr 38825.25
31.2

1820
Annexure I
Cost for New Road ( 200 m x 5 m )= 1000 Sqm (With Earth Work 1.00m Ht )
SN SOR DESCRIPTION QTY UNIT RATE CASH STORE TOTAL
 1  013120   arthwork in filling in embankment, guide
E  1000  cum  208.30  208300  0  208300
bunds, around buried type abutments,
bridge gaps, trolley refuges, rain bunds if
provided, platforms etc. with earth
excavated from outside railway boundary
entirely arranged by the contractor at his
own cost as per RDSO's latest guidelines
and specifications and special condition of
contract including all leads, royalty, lifts,
ascents, descents, crossing of nallahs or
any other obstructions. The rates shall
include all dressing of bank to final profile,
demarcation and setting out of profile, site
clearance, removing of shrubs, roots of
vegetations growth, heavy grass, benching
of existing slope of old bank, all handling/re­
handling. taxes, octroi and royalty etc. as a
complete job. Cut trees shall be property of
railways and to be deposited in the railway
godown unless specified otherwise in the
Special conditions of contract
 2  013130  Extra for mechanical compaction of earth/  1000  cum  14.21  14210  0  14210
blanketing material filled in embankment
with contractor’s rollers of suitable capacity,
type and size to achieve specified density
as per specification, testing as per IS codes
incl. cost of water, T&P consumable
material and all labour as a complete job.
The work is to be executed as per Latest
edition of "Guidelines for Earthwork in
Railway Projects" issued by RDSO,
Lucknow
 1   31010
2  1000  Sqm
 Preparation of subgrade by excavating earth upto  22.5cm depth, dressing to camber and consolidating with power road roller of 8 to 12 tonne cap
 38.91  38910  0  38910
 231030  Providing and laying each layer of flat brick soling hand packed and joints filled with ordinary sand  0  0  0
 2  231031  With well burnt bricks. Class 7.5 designation  1000  Sqm  186.83  186830  0  186830
 231040                                      
 Providing and laying water bound macadam with specified stone aggregate, stone screening and binding material including screening, sorting, spr
 0  0  0
 
3  231041  170  cum 
 Sub­base with stone aggregate 90mm to 45mm including stone screening 13.2mm size  1003.48  170592  0  170592  300
 4  231042  Base course with 63mm to 45mm size including stone screening 13.2mm size
 170  cum   1459.59  248130  0  248130
 233010  Providing and applying tack coat using bitumen emulsion (Rapid setting) complying with IS: 8887­ 1995, spraying the bitumen emulsion with mech
 0  0  0
 5  233011  On W.B.M. @ 0.4kg/ sqm  1000  Sqm  19.99  19990  0  19990
 234010  2.5 cm thick bitumastic sheet with hot bitumen of approved quality using stone chippings (60% 12.5 mm nominal size and 40% 10 mm nominal s
 0  0  0
 
6  234011  1000  Sqm
 With paving bitumen 80/ 100 heated and then mixed with solvent at the rate of 70grams per kg. of asphalt
 214.38  214380  0  214380
 7  237070  400  metre
 Providing and laying Dry Brick (FPS bricks of class designation 7.5) edging of full brick width and half brick depth including excavation, refilling / 
 87.65  35060  0  35060
Total 1136402 0 1136402
Add 30 % above on Unified SOR 2010 for All
8 1136402 30.00 % 340921 0 340921
Chapters as per 74-W/8725/Bills dated 21/12/2012
TOTAL 1477322 0 1477322
 add 45 for 2014­15  1536415.369
 Cost of road area 1000 Sqm  1536415
 Cost of road area 1 Sqm  1536

DEN/E/I/ALD