MATERIAL TAKE-OFF LIST

Saudi Aramco 6228-ENG (11/2010)


SAMS DWG.
REV CODE DESCRIPTION SAP# QTY I/U PER REQ STATUS REMARKS
STOCK NUMBER CODE
CONCRETE : READY MIXED; 4000 PSI @ 28 DAYS WITH CONTRACTOR
4 CM
TYPE-5 CEMENT AS PER SAES-Q-001 & 09-SAMSS-097 SUPPLY

CONCRETE : READY MIXED; 2000 PSI @ 28 DAYS WITH CONTRACTOR


0.25 CM
TYPE-5 CEMENT AS PER SAES-Q-001 & 09-SAMSS-097 SUPPLY

BAR, REINF: CONCRETE , 12 MM DIA, STEEL DEFORMED, CONTRACTOR


35 M
FUSION BONDED EPOXY COATED, MIN. 60 KSI YLD. STR. SUPPLY

BAR, REINF: CONCRETE , 20 MM DIA, STEEL DEFORMED, CONTRACTOR


250 M
FUSION BONDED EPOXY COATED, MIN. 60 KSI YLD. STR. SUPPLY

TIE: WIRE, #16 GA X 3 LB, CS, ASTM A82, COATED, FOR CONTRACTOR
3 RO
TIEING FBE COATED REBARS SUPPLY

COATING; ANTI CORROSIVE, COAL TAR EPOXY BLACK , CONTRACTOR


1 KT
APCS-3 ; 20L/ KIT SUPPLY

CONTRACTOR
THINNER, PAINT: FOR APCS-3, 20 L CAN 0.5 CN
SUPPLY

ON
TI
UC
9
01
TR

-2
ct
-O
NS
09
CO
R
FO
ED
SU
 

IS  

NOTES:

1. CONTRACTOR SHALL VERIFY ALL QUANTITIES OF CONTRACTOR SUPPLIED MATERIALS REQUIRED TO PERFORM THE WORK, AS DETAILED ON THE PROJECT DOCUMENTS.

APPROVAL REFERENCE DRAWING


COMPILED BY REV.
RA-663828 SHT. 001
CHECKED DATE PROJECT ENGR DATE
KBR-AMCDE 00 AES 25-Aug-2019 25-Aug-2019

B.I. E.W.O. PHASE ENG. ITEM AREA START-UP DATE PRELIMINARY REV.
10-01861 10-01861-0001 200 CIVIL RAS TANURA FINAL X REV. 00
INDEX: Materials For: SHEET: 1 OF 1
FOUNDATION PLAN AND SECTION
Q ANCHOR BLOCK FOR JRT-SW PIPELINE
PLANT: PIPELINES REFINERY TO TERMINAL
TO-663828-001
053
RAS TANURA SAUDI ARABIA