PLUMBING ABBREVIATIONS GENERAL PLUMBING SYMBOLS PLUMBING PIPING SYMBOLS GENERAL NOTES
A/E ARCHITECT / ENGINEE
AFF ABOVE FINISH FLOOR 1. ENTIRE INSTALLATION SHALL CONFORM TO THE REQUIREMENTS OF THE
AFG ABOVE FINISH GRADE NC NORMALLY CLOSED DIRECTION OF PIPE PITCH (DOWN) DOMESTIC COLD WATER, COLD WATER
INTERNATIONAL PLUMBING CODE (IPC), INTERNATIONAL BUILDING CODE (IBC),
NG NATURAL GAS NATIONAL FIRE PROTECTION CODES, AND ALL OTHER APPLICABLE CODES AND
AP ACCESS PANEL DIRECTION OF FLOW DOMESTIC HOT WATER, HOT WATER
NIC NOT IN CONTRACT REGULATIONS.
AS AUTOMATIC SPRINKLER NO NORMALLY OPEN
ASD AUTOMATIC SPRINKLER DRAIN NOM. NOMINAL ANCHOR DOMESTIC HOW WATER RETURN, HOT WATER RETURN
2. COORDINATE PLUMBING SYSTEMS WITH WORK OF OTHER TRADES PRIOR TO ANY
ASHRAE AMERICAN SOCIETY HEATING,
three inches = one foot

NPW NON POTABLE WATER D D D DRAIN FABRICATION OR INSTALLATION. PROVIDE ALL FITTINGS, OFFSETS AND
REFRIGERATION, AIR CONDITIONING NTC NOT TO SCALE REDUCER OR INCREASER
6"

TRANSITIONS AS REQUIRED FOR A COMPLETE WORKABLE INSTALLATION.


ENGINEERS SAN SAN SAN SANITARY SEWER
ASME AMERICAN SOCIETY MECHANICAL ECCENTRIC REDUCER
SS SS SS SANITARY SEWER (OPTIONAL) 3. COORDINATE LOCATIONS OF ALL FLOOR OPENINGS WITH STRUCTURAL,
ENGINEERS OC ON CENTER
A ASPE AMERICAN SOCIETY PLUMBING OD OUTSIDE DIAMETER TOP CONNECTION, 45° OR 90° MECHANICAL AND ARCHITECTURAL PLANS PRIOR TO ANY INSTALLATION.
A
SAN SAN SAN SANITARY SEWER, BELOW GRADE
ENGINEERS OFD OVERFLOW DRAIN
BOTTOM CONNECTION, 45° OR 90° 4. PLATFORMS, CURBS AND FLASHINGS FOR PLUMBING EQUIPMENT SHALL BE AS
ASR AUTOMATIC SPRINKLER RISER OVFL OVERFLOW
SD SD SD STORM WATER INDICATED ON THE STRUCTURAL AND ARCHITECTURAL PLANS, UNLESS NOTED
SIDE CONNECTION OTHERWISE. COORDINATE EXACT SIZES OF REQUIRED OPENINGS AND SUPPORTS
SD SD SD STORM WATER, BELOW GRADE FOR FURNISHED EQUIPMENT.
BFP REDUCED PRESSURE BACKFLOW PA PASCAL CAPPED OUTLET
PREVENTER PD PRESSURE DROP OR DIFFERENCE 5. ALL EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE
BHP BREAK HORSEPOWER PDI PLUMBING AND DRAINAGE RISE OR DROP IN PIPE EQUIPMENT MANUFACTURER'S RECOMMENDATIONS AND APPLICABLE CODES.
PROVIDE ALL FITTINGS, TRANSITIONS, VALVES AND OTHER DEVICES REQUIRED
1

BSP BLACK STEEL PIPE INSTITUTE


UNION FOR A COMPLETE WORKABLE INSTALLATION.
BT BATHTUB PG PRESSURE GAGE
one and one half inches = one foot

BTU BRITISH THERMAL UNIT PSI POUNDS PER SQUARE INCH


BTUH BRITISH THERMAL UNIT PER HOUR PIPE UP 6. MAINTENANCE LABEL SHALL BE AFFIXED TO ALL PLUMBING EQUIPMENT AND A
PSIA POUNDS PER SQUARE INCH
ATMOSPHERE MAINTENANCE MANUAL SHALL BE PROVIDED TO VA AUTHORITIES.
PIPE DOWN
PSIG POUNDS PER SQUARE INCH
C CELSIUS GAUGE 7. HOUSEKEEPING PADS SHALL BE 4 INCHES HIGH WITH A MINIMUM OF 6 INCHES
CI CAST IRON PTRV PRESSURE TEMPERATURE RELIEF POINT OF CONNECTION BETWEEN NEW BEYOND EQUIPMENT (INTERIOR ONLY).
CO CLEANOUT AND EXISTING WORK WHERE REQUIRED, BEAM PENETRATIONS SHALL BE ALLOWED FOLLOWING COORDINATION
VALVE
WITH VA AUTHORITIES.
0

DCW DOMESTIC COLD WATER RD ROOF DRAIN LIMIT OF DEMOLITION


DHW DOMESTIC HOT WATER RWL RAIN WATER LEADER 8. SELECT CIRCUIT SETTINGS, AUTOMATIC FLOW CONTROL VALVES AND CONTROL VALVES
DHWR DOMESTIC HOT WATER RETURN INVERTED BUCKET TRAP SET INCLUDING BASED ON ACTUAL WATER FLOW AND PRESSURE DROP. PROVIDE STRAIGHT INLET AND
DN DOWN SAN SANITARY SEWER PIPING ACCESSORIES 9. OUTLET PIPING PER MANUFACTURER'S INSTRUCTIONS.
6"

DOE DEPARTMENT OF ENERGY SMACNA SHEET METAL AND AIR


DS DOWNSPOUT CONDITIONING CONTRACTORS 10. INSTALL ONLY APPROVED BACKFLOW PREVENTION ASSEMBLIES LISTED IN THE CALIFORNIA
FLOAT & THERMOSTATIC TRAP SET INCLUDING
DWG DRAWING NATIONAL ASSOCIATION CODE OF REGULATIONS LATEST EDITION. INSTALL BACKFLOW PREVENTION ASSEMBLIES
B DWH DOMESTIC WATER HEATER
PIPING ACCESSORIES
NOT MORE THAN 5 FEET ABOVE FINISHED FLOOR AND SHALL BE ACCESSIBLE. B
SCFM STANDARD CUBIC FOOT/MINUTE
DWV DRAIN WASTE VENT SPR SPRINKLER LINE STRAINER 11. PROVIDE AND INSTALL WATER HAMMER ARRESTORS ON WATER BRANCH PIPING SERVING
SQFT SQUARE FEET ~ FIXTURES WITH FLUSH VALVES OR PRIOR TO ANY QUICK CLOSING DEVICE. PLACEMENT
EL ELEVATION THERMOMETER
AND SIZING OF ARRESTORS SHALL BE IN ACCORDANCE WITH PDI STANDARD WH-201.
EMCS ENERGY MONOSERRAT ~ ~
TD TEMPERATURE DIFFERENCE
2

AND CENTRAL SYSTEM PRESSURE GAGE 12. INSTALL SWING CHECK VALVES IN THE HORIZONTAL POSITION.
TD TRENCH DRAIN ~
EPA ENVIROMENTAL PROTECTION TEMP TEMPERATURE FLOW ELEMENT
AGENCY TMV THERMOSTATIC MIXING VALVE FE 13. PROVIDE UNIONS OR FLANGES ON EACH SIDE OF CONTROL VALVES AND PUMPS. EVERY
EPACT ENERGY POLICY ACT TP TRAP PRIMER PIPING ASSEMBY SHALL BE MADE SO AS TO MAKE EVERY VALVE AND PIECE OF
ESC ESCUTCHEON TSTAT THERMOSTAT CO CLEAN OUT EQUIPMENT EASILY REMOVABLE.
ET EXPANSION TANK TYP TYPICAL
EWC ELECTRIC WATER COOLER HOSE BIB 14. ALL DRAIN CONNECTIONS FROM MECHANICAL EQUIPMENT SHALL BE PIPED TO SPILL
DIRECTILY INTO NEAREST FLOOR DRAIN OR FLOOR SINK OR ROOF RECEPTOR UNLESS
F FAHRENHEIT UPC UNIFORM PLUMBING CODE
OTHERWISE INDICATED.
one inch = one foot

FCO FLOOR CLEANOUT


FD FLOOR DRAIN V VENT 15. PROVIDE 1" AIR GAP AT ALL DRAIN CONNECTIONS.
FDC FIRE DEPARTMENT VB VACUUM BREAKER
(HOSE) CONNECTION
0

VTR VENT THROUGH ROOF 16. PROVIDE DRAIN VALVES WITH HOSE CONNECTIONS AT ALL LOW POINTS. ACCESSIBLE IN
FM FLOW METER PIPING WHERE PIPING SECTIONS ARE ISOLATED.
FS FLOOR SINK
W WASTE PLUMBING VALVE SYMBOLS
6"

FS FLOW SWITCH 17. SEE ARCHITECTURAL DOCUMENTS FOR PAINTING OF ALL EXPOSED PIPING.
WC WATER CLOSET
FU FIXTURE UNITS
WCO
WG
WALL CLEANOUT
WATER GAGE
FIXTURE UNIT VALUE (2012 IPC) 18. INSTALL SHUT-OFF VALVES AT EACH BRANCH PIPE LINE TO CORE RESTROOMS. PROVIDE
GAL GALLON ACCESS PANELS.
WH WALL HYDRANT
GCO GRADE CLEANOUTS GATE VALVE FIXTURE W/V TOTAL CW CW HW
C GPD GALLONS PER DAY
WH WATER HEATER 19. ALL PIPING NOTED TO BE CAPPED FOR FUTURE EXTENSION SHALL BE PROVIDED WITH
C
WHA WATER HAMMER ARRESTER TABLE 709.1 TABLE E103.3(2) (3/4 OF (3/4 OF VALVE NEAR CAP TO PERMIT FUTURE CONNECTION OF THE SYSTEM IF SHOWN ON PLANS
GPH GALLONS PER HOUR GLOBE VALVE TOTAL TOTAL
WL WATER LINE OR NOT.
GPM GALLONS PER MINUTE WM WATER METER CW) CW)
GPR GAS PRESSURE REGULATOR 20. ACOUSTICAL SEALING THRU WALL PENETRATIONS SHALL BE PROVIDED IN ACCORDANCE
WPD WATER PRESSURE DROP GATE VALVE WITH 3/4 " HOSE ADAPTER WITH ARCHITECTURAL SPECIFICATIONS.
GWH GAS FIRED WATER HEATER
WS WASTE STACK HOSE BIBB/ WALL HYDRANT - - - -
three quarters inch = one foot
2

CHECK VALVE 21. PROVIDE CLEANOUTS PER IPC 708.


H&CW HOT AND COLD WATER YCO YARD CLEANOUT
YH YARD HYDRANT KITCHEN SINK/ SINK 2 1.4 1.0 1.0 22. HANG AND BRACE ALL PIPES PER SPEC 13541. HANGING AND BRACING FROM THE ROOF DECK
HB HOSE BIBB ANGLE GLOBE VALVE
HD HUB DRAIN IS PROHIBITED. PROVIDE SUPPLEMENTAL FRAMING AS NEEDED TO SUPPORT UTILITIES.
HP HORSEPOWER ELECTRIC WATER COOLER/ 0.5 0.25 - - 23. THE HOT WATER TEMPERATURE AND TIME TO REACH EACH FIXTURE SHALL BE 100 DEGREE F IN
BUTTERFLY VALVE 30 SECONDS NOT TO EXCEED 110 DEGREES F.
HST HOT WATER STORAGE TANK DRINKING FOUNTAIN
(DOMESTIC) BALL VALVE
HWCP HOT WATER CIRCULATING PUMP
HYD HYDRANT
FIRE PROTECTION GENERAL NOTES
0

MODULATING CONTROL VALVE


INV INVERT
6"

IPC INTERNATIONAL PLUMBING CODE TWO POSITION CONTROL VALVE


IW INDIRECT WASTE 1. THE AUTOMATIC SPRINKLER SYSTEM IS A DEFERRED-APPROVAL ITEM. AS THE
BUILDING IS CONSTRUCTED PROVIDE FIRE PROTECTION DURING CONSTRUCTION.
THREE-WAY MODULATING CONTROL VALVE
KW KILOWATT APPROVAL OF DEFERRED ITEMS SHALL BE OBTAINED BEFORE BUILDING
KWHR KILOWATT-HOUR CONSTRUCTION BEGINS.

LAV LAVATORY THREE-WAY TWO POSITION CONTROL VALVE 2. THE AUTOMATIC SPRINKLER SYSTEM SHALL CONFORM TO THE REQUIREMENTS
D OF THE 2013 EDITION OF THE NFPA 13, AND FIRE SUPPRESSION SPECIFICATIONS
D
4

M METER SECTIONS 21 05 11 & 21 13 13. PENETRATIONS OF RATED ASSEMBLIES SHALL BE


MBH 1000 BTUH FIRE-STOPPING. FIRE-STOPPING SHALL BE AN APPROVED MATERIAL.
MER MECHANICAL EQUIPMENT PRESSURE REGULATING VALVE INSTALLATION OF FIRE PROTECTION SYSTEM SHALL NOT BE STARTED UNTIL
ROOM COMPLETE PLANS AND SPECIFICATIONS (INCLUDING WATER SUPPLY
one half inch = one foot

MH MANHOLE INFORMATION) HAVE BEEN APPROVED BY THE AUTHORITY HAVING JURISDICTION.


MOU MEMORANDUM OF AUTOMATIC FLOW CONTROL VALVE AT VARIOUS STAGES AND UPON COMPLETION, THE SYSTEM MUST BE TESTED IN
UNDERSTADING THE PRESENCE OF THE ENFORCING AGENCY.
MSB MOP SERVICE BASIN PRESSURE RELIEF VALVE
COORDINATE LOCATIONS OF ALL SPRINKLER HEADS WITH THE ARCHITECTURAL
3. REFLECTED CEILING PLANS AND ELECTRICAL LIGHTING LAYOUT. PRIOR TO
FABRICATION, SUBMIT LAYOUT DRAWINGS FOR ARCHITECTURAL ACCEPTANCE.
MANUAL AIR VENT
COORDINATE LOCATIONS OF ALL SPRINKLER MAINS, BRANCH PIPING, ETC. WITH
0

OTHER TRADES.

TEST PLUG (PRESSURE/TEMPERATURE) 4. PLUMBING DRAWINGS ARE DIAGRAMMATIC SHOWING APPROXIMATE COMPONENT
AND MAIN PIPE LOCATIONS ONLY. DRAWINGS DO NOT SHOW ALL OFFSETS OR
FITTINGS REQUIRED. THE FIRE SPRINKLER CONTRACTOR IS TO COORDINATE
AV AUTOMATIC AIR VENT WITH ALL OTHER TRADES TO AVOID CONFLICTS WITH DUCTS, LIGHTS, FIXTURES,
PIPING, ETC.

5. THE SPACING AND DETAILS OF THE SUPPORT AND BRACING OF THE FIRE
SPRINKLER PIPING SHALL COMPLY WITH THE 2013 EDITION OF NFPA 13. PROVIDE
DRAWING SYMBOLS ANCHORAGE DETAILS AND CALCULATIONS FOR THE CONNECTION OF SWAY
three eighths inch = one foot

BRACING TO THE STRUCTURE. DESIGN LOADS FOR THE ANCHORAGE MAY BE


E COMPUTED PER NFPA 13, 2013 EDITION. ALL SHOP DRAWINGS OF THE SPRINKLER
E
4

SYSTEM SHALL BE SUBMITTED TO THE AUTHORITY HAVING JURISDICTION FOR


REVIEW AND APPROVAL, PRIOR TO INSTALLATION. SPRINKLER HEADS SHALL BE
DETAIL NUMBER QUICK RESPONSE TYPE.
2
PL105 DRAWING NUMBER WHERE DRAWN

SECTION LETTER
A
PL105 DRAWING NUMBER WHERE SHOWN
0

BUILDING NO. WHERE EQUIPMENT IS LOCATED.


EQUIPMENT ABBREVIATION (PUMP)

26-P 3
PUMP NO.3 IN BUILDING NO.26 PLUMBING SHEET INDEX - PHARMACY
Sheet
8

TYPICAL UNIT NO.


Number Sheet Name Scale
one quarter inch = one foot

360-J PL001 GENERAL NOTES, ABBREVIATIONS, SYMBOLS AND SHEET INDEX - PHARMACY NTS
360-J PL201 PLUMBING SUPPLY DISTRIBUTION PLAN - PHARMACY 1/4" = 1' - 0"
F 360-J PL202 PLUMBING WASTE, DRAIN AND VENT PIPING PLAN - PHARMACY 1/4" = 1' - 0"
F
4

360-J PL203 PLUMBING ROOF PLAN - PHARMACY 1/4" = 1' - 0"


360-J PL301 PLUMBING STANDARD SCHEDULE AND RISER DIAGRAMS NTS
360-J PL401 PLUMBING DETAILS NTS
0

100% CD/BID SUBMISSION


FEBRUARY 2, 2016
C
O
N
S
U
L
T
A
N
T
S
:

A
R
C
H
I
T
E
C
T

Oo
f
f
i
c
er
o
fi
D
r
a
w
i
n
g
T
i
t
l
e

P
r
o
j
e
c
t
N
u
m
b
e
r
P
r
o
j
e
c
t
T
i
t
l
e
65% CD SUBMISSION 03/16/15

Ca
n
s
t
u
c
t
o
ns n
100% CD/BID SUBMISSION 02/02/16
16

GENERAL NOTES, ABBREVIATIONS, SYMBOLS AND SHEET INDEX - POST TRAUMATIC STRESS DIAGNOSIS (PTSD) 612-125

B
u
i
l
d
i
n
g
N
u
m
b
e
r
one eighth inch = one foot

n
da
F
a
c
i
l
i
t
i
e
PHARMACY EXPANSION AND RENOVATION
E SS I ON POLYTECH ASSOCIATES INC.
PROF AL

M
n
a
g
e
m
e
t
ED N M. PA P Building 360
OH
ER

EN

235 Pine Street, 17th Floor


A
p
p
r
o
v
e
d
:
P
r
o
j
e
c
t
D
i
r
e
c
t
o
r

L
o
c
a
t
i
o
n

D
r
a
w
i
n
g
N
u
m
b
e
r
PA

GIN
RE G I S T

San Francisco, CA 94104


E ER
8

220 Montgomery Street, Suite 650 No. M22336 TEL (415) 397-3117 795 WILLOW ROAD, MENLO PARK, CA
San Francisco, CA 94104 EXP. 12/31/15
FAX (415) 397-1517

D
a
t
e

C
h
e
c
k
e
d

D
r
a
w
n
TEL: 415.632.3266
www.mazzetti.com ME
4

CHANI CAL
TA
NI 360-J PL001
S

TE
A
R
e
v
i
s
i
o
n
s
:

D
a
t
e

PROJECT NUMBER: 130-085


OF CA L I FOR 01/13/15 RV GL
0

1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9

SHEET NOTES
(E) 1"CW (E) 1" MIXED HW 1. ALL PIPING SHALL BE ABOVE CEILING, WITHIN WALLS OR
(E) 3/4"HWR (E) 1-1/4"NG BELOW SLAB/FLOOR UNLESS NOTED OTHERWISE.

1-1/4" NG POD & POC

NEW BALANCING
(E) 2"CW
VALVE (TYP. 2)
F.F. = 24.5'
three inches = one foot

(E) BLDG 360 - H WING


6"

NEW 1-1/4"NG

A 18 PIPE EXPANSION NEW 2"CW 2" CW POC A


RELOCATED
NATURAL GAS NEW 2" CW & 1-1/4" JOINT (TYP. 3).
METER ASSEMBLY. NG RISERS IN WALL

1.
FILL
TALL STORAGE
LINE
1
one and one half inches = one foot

VAULT
KEY NOTES
PHMP2
OUTPATIENT (E) 1" MIXED HW
102
PROCESSING/
(E) 1-1/4"NG (E) 2"CW
0

DISPENSING 1 SEE CIVIL DRAWING 360-J CS501 FOR CONTINUATION. SIZE AS


PHOD2 NOTED.
(E) 1"CW
101B 2 1/2" CW DN TO ELECTRONIC TRAP PRIMER (115V/1PH/60HV)
(E) 3/4"HWR
FOR DRAIN TRAP SEAL PROTECTION.
1-1/2" CW, 3/4" HW & 3 1/2" CW & HW PIPING IN WALL BELOW WINDOW.
6"

1/2" HWR TO AND 4 1/2" CW & HW PIPING DOWN IN WALL.


FROM PLUMBING 5 CONNECT TO HUB DRAIN TAIL PIECE.
B 1 NEW 2" NG FIXTURES. B
6 CONNECT FOR FLOOR SINK.
NEW 2" CW 1 SHIPPING/ 7 3/4" COMPRESSED AIR DROP.
RECEIVING 16 8 FURNISH AND INSTALL 3/4" VALVE FOR CONNECTION AB 180
PHOD2
PACKAGER. PROVIDE PRESSURE GAGE AND 1/2" NPT AND
101A 7 8 MOVE CONNECTOR. FINAL CONNECTION BY EQUIPMENT
2

(E) 2" CW HALLWAY INSTALLER. MOUNT VALVE 36" ABOVE FINISH FLOOR.
9 AIR COMPRESSOR, OWNER FURNISHED, CONTRACTOR
(E) 1-1/4"NG H213 INSTALLED. 2x 5 HP, 208V/3PH/60HZ.
10 AIR DRYER OWNER FURNISHED, CONTRACTOR INSTALLED.
16 115V/1PH/60HZ, 2.63 RLA, 17.5 LRA.
REMOVE EXISTING 11 PROVIDE DRAIN PIPE CONNECTION TO FLOOR SINK. SEE 360-I
NATURAL GAS METER PL3.
ASSEMBLY
12 ALL FILTER, OWNER FURNISHED CONTRACTOR INSTALLED.
13 NEMA 4X ENCLOSURE FOR PRESSURE SWITCH. OWNER
one inch = one foot

FURNISHED CONTRACTOR INSTALLED. SEE NOTE #14.


14 LOCATE OWNER FURNISHED CONTRACTOR INSTALLED
PRESSURE SWITCH ON 3/4" RISER.
0

TALL STORAGE
15 REFER TO DETAILS 1 & 2 / 360-J PL401
16 DEMO ALL PIPING BEYOND THIS POINT.
6"

SHIPPING/ 17 SEE CIVIL DRAWING 360-J CS102 FOR EXISTING CONDITIONS.


RECEIVING SIZE AS NOTED.
2. PHOD2 18 PROVIDE EXPANSION JOINT TO ALLOW 4" MOVEMENT APART
101A AND 4" MOVEMENT TOGETHER FOR A TOTAL OF 8" MOVEMENT.
WORK VAULT SUBMIT CALCULATIONS AND SHOP DRAWING SIGNED BY A
C INPATIENT SURFACE
REMOVE
PHMP2 CALIFORNIA STATE REGISTERED STRUCTURAL ENGINEER FOR C
PROCESSING (E) 2" CW 17
102 APPROVAL.
PHOD2
101C REMOVE 19 3/4" CA - PROVIDE PRV, PRESSURE GAUGE, SOV AND QUICK

(N)1/2"HWR
(E) 2" NG 17 DISCONNECT COUPLER. MAKE FINAL CONNECTION TO EQUIP.
WITH OWNER PROVIDED FLEX HOSE. SET AT 80 PSI.
19
20 ROUTE CA PIPING IN WALL.
three quarters inch = one foot
2

(N)3/4"HW
21 ROUTE CA PIPING BELOW COUNTER, MOUNTED ON WALL OR
IN CABINET SPACE.
20
A. 22 3/4" CA DROP IN WALL.

(N)1 1/2"CW
23 3/4" CA - ROUTE ABOVE CEILING.

PLUMBING PHARMACY PARTIAL FIRST


FLOOR SUPPLY DIST. - DEMO
2
0

1/4" = 1'-0"
6"

21

D PACKAGING
D
4

PHOD2 7 8
101D

FEC
IV BULK STORAGE
one half inch = one foot

P-518
STORAGE

PROCUREMENT
3
ALCOVE
PHBS2
3/4" HW
4 104
3.
22 PHARMACEUTICAL WASTE
0

1/2" HWR

23 1" CW
SUPERVISOR
3/4" CW OFFICE
3/4" HW BREAK ROOM OFA01 EYE WASH: GUARDIAN G1779LH-L

DRUG SHELVING
SL001 105 P-518 WITH THERMOSTATIC MIXING VALVE.
P-528 103

1 1/2" CW 1 1/2" CW
ANTE ROOM
3/4" CW 3/4" HW 3/4" HW PHIV2
three eighths inch = one foot

3 106A
E E
4

3/4" HW
3/4" CW

4 3/4" HW

14 2 6 3/4" CA

12 P-707
ELECTRICAL
IV ROOM
107 PHIV2
0

106B THERMOSTATIC MIXING


VALVE. PROVIDE
11 10 MECHANICAL 9 11 W/INTEGRAL W/P-707
13 2 CONNECT TO
108 FUTURE
TO FIRE SPRINKLER PIPE ISOLATOR FLOOR DRAIN
3/4" CW
DISTRIBUTION SYSTEM HOOD
5 2
4.
8

3/4"CW MAKE-UP
one quarter inch = one foot

TO CHILLED WATER P-801


EXPANSION TANK
HUB DRAIN 1 4" FIRE WATER
15 FIRE RISER
F B. 1/2" CW TO TRAP
I.E. = 21.5'
A. F
4

PRIMER

PLUMBING PHARMACY FIRST FLOOR


N
SUPPLY DIST.
1 TRUE
1/4" = 1'-0" NORTH
0

100% CD/BID SUBMISSION


FEBRUARY 2, 2016
C
O
N
S
U
L
T
A
N
T
S
:

A
R
C
H
I
T
E
C
T

Oo
f
f
i
c
er
o
fi
D
r
a
w
i
n
g
T
i
t
l
e

P
r
o
j
e
c
t
N
u
m
b
e
r
P
r
o
j
e
c
t
T
i
t
l
e
65% CD SUBMISSION 03/16/15

Ca
n
s
t
u
c
t
o
ns n
100% CD/BID SUBMISSION 02/02/16
16

PLUMBING SUPPLY DISTRIBUTION PLAN - PHARMACY POST TRAUMATIC STRESS DIAGNOSIS (PTSD) 612-125

B
u
i
l
d
i
n
g
N
u
m
b
e
r
one eighth inch = one foot

n
da
F
a
c
i
l
i
t
i
e
EXPANSION AND RENOVATION
ESS I ON POLYTECH ASSOCIATES INC.
PROF AL

M
n
a
g
e
m
e
t
ED N M. PA P Building 360
OH
ER

EN

235 Pine Street, 17th Floor


A
p
p
r
o
v
e
d
:
P
r
o
j
e
c
t
D
i
r
e
c
t
o
r

L
o
c
a
t
i
o
n

D
r
a
w
i
n
g
N
u
m
b
e
r
PA

GIN
RE G I S T

San Francisco, CA 94104


E ER
8

220 Montgomery Street, Suite 650 No. M22336 TEL (415) 397-3117 795 WILLOW ROAD, MENLO PARK, CA
San Francisco, CA 94104 EXP. 12/31/15
FAX (415) 397-1517

D
a
t
e

C
h
e
c
k
e
d

D
r
a
w
n
TEL: 415.632.3266
www.mazzetti.com ME
4

L
CHANI CA
TA
NI 360-J PL201
S

TE
A
R
e
v
i
s
i
o
n
s
:

D
a
t
e

PROJECT NUMBER: 130-085


OF CA L I FOR 10/20/14 RV GL
0

1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9

SHEET NOTES

1. PROVIDE CONDENSATE DRAINAGE PIPING FROM FAN COIL


UNITS (SEE MECHANICAL PLAN MH6) TO TERMINATE FLOOR
SINK IN MECHANICAL 108.
2. ALL DASHED LINES ARE TO BE REMOVED.
3. ALL PIPING SHALL BE ABOVE CEILING, WITHIN WALLS OR
BELOW SLAB/FLOOR UNLESS NOTED OTHERWISE.
F.F. = 24.54'

TO (E) 3"OD UP
(E) 3" SD UP (E) 3" OD UP
HALLWAY TO (E) 3"SD UP
(E) 3" OD UP (E) 3" SD UP
three inches = one foot

H213 3"SD POD & POC


6"

(E) 4"SS
3"SD 3"OD POD &POC
REMOVE (E) 4"SD
RISER DOWN.
A A
NEW 4"OD
NEW 4" OVERFLOW DRAIN OUTLET NEW 4"SD
1 RECEPTION AREA
WRC01
1
(E) 3" OFD OUTLET NEW 4" SD RISER DOWN
100
NEW 4" GCO REMOVE (E) 3"OFD
OUTLET.
REMOVE (E) 4" GCO
1

POD & POC 4"SS 1 REMOVE (E) 4"SD


4"SD REMOVE (E) 4" GCO
one and one half inches = one foot

I.E. = 21.5'
4"SS NEW 4" FCO VAULT
I.E. = 20.5' PHMP2 2
1 REMOVE (E) 4"SS
NEW 4" GCO 3" OD UP 102

1
2
3" OD UP 3"SD KEY NOTES
3"SD I.E. =21.5' 1
I.E. =21.5'
3" SD UP 1 SEE CIVIL DRAWING 2CS101 FOR CONTINUATION. SIZE AS
0

3" SD UP NOTED.
2 3" OD, TERMINATE ABOVE SPLASH BLOCK.
SHIPPING/ RECEIVING
PHOD2
6"

101A
OUTPATIENT
B PROCESSING/
B
DISPENSING
PHOD2
101B
2

3/4"CD UP TO
AHU ON ROOF
one inch = one foot
0

2 2
6"

C C

INPATIENT PROCESSING
PHOD2
three quarters inch = one foot

101C
2

3/4"CD UP TO
FCU-1 ON ROOF 3/4"CD UP TO
FCU-2 ON ROOF
6" 0

PACKAGING
PHOD2
101D
3/4"CD
D 4"FCO D
4

P-518
one half inch = one foot

STORAGE ALCOVE
PHBS2
2" V 104
3 UP TO VTR 3
2"V. UP TO VTR
0

SUPERVISOR OFFICE
1 1/2" V OFA01
BELOW P-528 105
WINDOW BREAK ROOM
SL001 P-517
103
ANTE ROOM
PHIV2
106A

2" V
three eighths inch = one foot

E 4" W
E
4

4" FS
3" OD UP
2
2
3" OD UP
1 3"SD 3" SD UP 3"SD
1
I.E. =21.5' 3" SD UP I.E. =21.5'
ELECTRICAL
IV ROOM
107 PHIV2
2"V. UP TO VTR 106B
0

MECHANICAL

108

4 4
4" HUB DRAIN FOR
FIRE SPRINKLER
8

DRAIN 2" W
one quarter inch = one foot

2" GCO

1
F F
4

4"W
I.E. =20.5'

PLUMBING PHARMACY FIRST FLOOR B. A. N


0

WASTE & VENT


1 TRUE
1/4" = 1'-0" NORTH
100% CD/BID SUBMISSION
FEBRUARY 2, 2016
C
O
N
S
U
L
T
A
N
T
S
:

A
R
C
H
I
T
E
C
T

Oo
f
f
i
c
er
o
fi
D
r
a
w
i
n
g
T
i
t
l
e

P
r
o
j
e
c
t
N
u
m
b
e
r
P
r
o
j
e
c
t
T
i
t
l
e
65% CD SUBMISSION 03/16/15

Ca
n
s
t
u
c
t
o
ns n
100% CD/BID SUBMISSION 02/02/16
16

PLUMBING WASTE, DRAIN AND VENT PIPING PLAN - PHARMACY POST TRAUMATIC STRESS DIAGNOSIS (PTSD) 612-125

B
u
i
l
d
i
n
g
N
u
m
b
e
r
one eighth inch = one foot

n
da
F
a
c
i
l
i
t
i
e
EXPANSION AND RENOVATION
E SS I ON POLYTECH ASSOCIATES INC.
PROF AL

M
n
a
g
e
m
e
t
ED N M. PA P Building 360
OH
ER

EN

235 Pine Street, 17th Floor


A
p
p
r
o
v
e
d
:
P
r
o
j
e
c
t
D
i
r
e
c
t
o
r

L
o
c
a
t
i
o
n

D
r
a
w
i
n
g
N
u
m
b
e
r
PA

GIN
RE G I S T

San Francisco, CA 94104


E ER
8

220 Montgomery Street, Suite 650 No. M22336 TEL (415) 397-3117 795 WILLOW ROAD, MENLO PARK, CA
San Francisco, CA 94104 EXP. 12/31/15
FAX (415) 397-1517

D
a
t
e

C
h
e
c
k
e
d

D
r
a
w
n
TEL: 415.632.3266
www.mazzetti.com ME
4

CHANI CAL
TA
NI 360-J PL202
S

TE
A
R
e
v
i
s
i
o
n
s
:

D
a
t
e

PROJECT NUMBER: 130-085


OF CA L I FOR 10/20/14 RV GL
0

1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9

SHEET NOTES
H3
three inches = one foot
6"

A A

B. A.

HK HK
1

1 1
H6 H9
one and one half inches = one foot

KEY NOTES
0

AHU
3" RD-1
1 3" OD-1
6"

3" RD-1 (760SF)


3" OD-1
B (760SF)
B
2

3/4" CONDENSATE DRAIN


one inch = one foot

PIPING
6" 0

C C
2 2
three quarters inch = one foot
2

FCU
3/4" CONDENSATE DRAIN
1 PIPING

FCU
3/4" CONDENSATE DRAIN 2
PIPING
6" 0

D D
4
one half inch = one foot
0

3 3

2" V
three eighths inch = one foot

E E
4

3" RD-1
3" OD-1
(760SF)
3" RD-1
3" OD-1
(760SF)
0

2" V
8
one quarter inch = one foot

4 4
F F
4

CH
1
0

N
PLUMBING PHARMACY ROOF PLUMBING B. A.
1
PLAN TRUE
NORTH
100% CD/BID SUBMISSION
1/4" = 1'-0"
FEBRUARY 2, 2016
C
O
N
S
U
L
T
A
N
T
S
:

A
R
C
H
I
T
E
C
T

Oo
f
f
i
c
er
o
fi
D
r
a
w
i
n
g
T
i
t
l
e

P
r
o
j
e
c
t
N
u
m
b
e
r
P
r
o
j
e
c
t
T
i
t
l
e
65% CD SUBMISSION 03/16/15

Ca
n
s
t
u
c
t
o
ns n
100% CD/BID SUBMISSION 02/02/16
16

PLUMBING ROOF PLAN - PHARMACY POST TRAUMATIC STRESS DIAGNOSIS (PTSD) 612-125

B
u
i
l
d
i
n
g
N
u
m
b
e
r
one eighth inch = one foot

n
da
F
a
c
i
l
i
t
i
e
EXPANSION AND RENOVATION
E SS I ON POLYTECH ASSOCIATES INC.
PROF AL

M
n
a
g
e
m
e
t
ED N M. PA P Building 360
OH
ER

EN

235 Pine Street, 17th Floor


A
p
p
r
o
v
e
d
:
P
r
o
j
e
c
t
D
i
r
e
c
t
o
r

L
o
c
a
t
i
o
n

D
r
a
w
i
n
g
N
u
m
b
e
r
PA

GIN
RE G I S T

San Francisco, CA 94104


E ER
8

220 Montgomery Street, Suite 650 No. M22336 TEL (415) 397-3117 795 WILLOW ROAD, MENLO PARK, CA
San Francisco, CA 94104 EXP. 12/31/15
FAX (415) 397-1517

D
a
t
e

C
h
e
c
k
e
d

D
r
a
w
n
TEL: 415.632.3266
www.mazzetti.com ME
4

CHANI CAL
TA
NI 360-J PL203
S

TE
A
R
e
v
i
s
i
o
n
s
:

D
a
t
e

PROJECT NUMBER: 130-085


OF CA L I FOR 10/22/14 RV GL
0

1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9

2"VTR 2"VTR 2"VTR


(4 DFU) (4 DFU) (4 DFU) ROOF

PLUMBING FIXTURE SCHEDULE


2"
WASTE WATER WRIST
WASTE COLD HOT ELECTRIC
MARK DESCRIPTION VENT PIPE FIXTURE FIXTURE BLADE
PIPE WATER WATER SENSOR REMARKS, REFER TO NOTES BELOW
UNITS UNITS HANDLES
2"
(4 DFU)
three inches = one foot

IN. [mm] IN. [mm] IN. [mm] IN. [mm]


6"

P-518 SINK, CRS, ADA 2 [50] 1.5 [36] 0.5 [13] 0.5 [13] 2 2 NO YES SINGLE COMPARTMENT, COUNTER TOP, ACCESSIBLE.
A A
P-528 SINK, CRS, ADA 2 [50] 1.5 [36] 0.75 [19] 0.75 [19] 2 2 YES NO SINGLE COMPARTMENT, COUNTER TOP, ACCESSIBLE. 2" 2" 2" 2"
(2 DFU) (2 DFU) (2 DFU) (2 DFU)
P-609 ELECTRIC WATER COOLER, ADA 2 [50] 1.5 [36] 0.5 [13] - - 1 1 N/A NO (2 DFU) (2 DFU)
HI/LO - DUAL HEIGHT, ACCESSIBLE, 120V/1PH/60HZ.
1-1/2" 1-1/2"

P-801 WALL HYDRANT - - - - 0.75 [19] - - - - N/A NO MECHANICAL P-518 P-518


P-528
1

EMERGENCY SHOWER (2 DFU) 108 PACKAGING ANTE ROOM IV ROOM


P-707 - - - - 1.5 [40] 0.75 [19] - - N/A NO WITH INTEGRAL THERMOSTATIC MIXING VALVE SET AT 80 DEGREE F BREAKROOM PHOD2 PH1V2 P-707 PH1V2
EYE & FACE WASH SL001
one and one half inches = one foot

(2 DFU) (2 DFU) (2 DFU)


1/2"TP 101D 106A 106B
NOTES:
(2 DFU) 103
2"FS WCO WCO 4"FCO 2"GCO WCO 2"FD GROUND FLOOR
1. PROVIDE ALL REQUIRED FITTINGS AND ACCESSORIES FOR COMPLETE INSTALLATION, INCLUDING SHUT OFFS/STOPS, ESCUTCHEON PLATES, CHROME PLATED BRASS P-TRAPS AND
FIXTURE CARRIERS (AND FOR LAVATORIES, GRID STRAINERS, UNLESS NOTED OTHERWISE). FOR MORE INFORMATION, SEE SPECIFICATION SECTION # 22 4000. HUB DRAIN, (2 DFU) (2 DFU)
4" 2" 2" 2"
2. ALL EXPOSED WASTE AND HOT WATER PIPE AT ADA LAV. OR SINK FIXTURES SHALL BE COVERED WITH PROTECTIVE WRAP, TRUE BRO "LAVSHIELD" OR EQUAL. SEE 2/360-J PL401 2" 2"

3. PLUMBING FIXTURES MUST COMPLY WITH AB1953 - CALIFORNIA LEAD PLUMBING LAW.
4. THE FORCE REQUIRED TO ACTIVATE ACCESSIBLE FAUCET CONTROLS SHALL BE NO GREATER THAN 5 POUNDS.
0

1/2"TP 1/2"TP
4"
(12 DFU)
6"

SEE 2CS101 FOR CONT'N.

B B

PLUMBING SANITARY RISER DIAGRAM - PHARMACY


2

360-J PL301 SCALE: NOT TO SCALE


one inch = one foot
6" 0

(E)2"CW
C (E)1"MIXED HW C
(E)3/4"HWR
POC
POC
ROOF POC
three quarters inch = one foot
2

POC 1" 3/4"


1/2" BALANCING VALVE 1/2" (5.5 FU) (4 FU)

WATER HAMMER
ARRESTOR
3/4" 3/4"
3/4" 3/4"
0

EXPANSION 1-1/2" (3 FU) 1-1/2"


LOOP, TYPICAL (1.5 FU) 3/4" (1.5 FU)
(7 FU) (1.5 FU)
6"

3/4"
(4.5 FU) 1/2" 1/2" 1-1/2" 1/2" 1/2"
(1.5 FU) (1.5 FU) THERMOSTATIC
1/2" MIXING VALVE
(1.5 FU) INTEGRAL
1/2" WITH P-707

D D
4

MECHANICAL 3/4"
ELECTRONIC
(2.5 FU)
P-518 P-528 P-707 P-518 TRAP PRIMER
108
PACKAGING BREAKROOM P-801 IV ROOM ANTE ROOM
one half inch = one foot

PHOD2 SL001 PH1V2 PH1V2


101D 103 TP 106B 106A
TP TP
GROUND FLOOR
HUB DRAIN FOR
ELECTRONIC TRAP PRIMER FIRE SPRINKLER DRAIN
FLOOR SINK FLOOR DRAIN
0

1 PLUMBING WATER RISER DIAGRAM - PHARMACY


360-J PL301 SCALE: NOT TO SCALE
three eighths inch = one foot

E E
0 4 8
one quarter inch = one foot

F F
0 4

100% CD/BID SUBMISSION


FEBRUARY 2, 2016
C
O
N
S
U
L
T
A
N
T
S
:

A
R
C
H
I
T
E
C
T

Oo
f
f
i
c
er
o
fi
D
r
a
w
i
n
g
T
i
t
l
e

P
r
o
j
e
c
t
N
u
m
b
e
r
P
r
o
j
e
c
t
T
i
t
l
e
65% CD SUBMISSION 03/16/15

Ca
n
s
t
u
c
t
o
ns n
100% CD/BID SUBMISSION 02/02/16
16

PLUMBING STANDARD SCHEDULE AND RISER DIAGRAMS POST TRAUMATIC STRESS DIAGNOSIS (PTSD) 612-125

B
u
i
l
d
i
n
g
N
u
m
b
e
r
one eighth inch = one foot

n
da
F
a
c
i
l
i
t
i
e
EXPANSION AND RENOVATION
POLYTECH ASSOCIATES INC.

M
n
a
g
e
m
e
t
FESSION
PRO A Building 360
ED SE A V E L
235 Pine Street, 17th Floor
A
p
p
r
o
v
e
d
:
P
r
o
j
e
c
t
D
i
r
e
c
t
o
r

L
o
c
a
t
i
o
n

D
r
a
w
i
n
g
N
u
m
b
e
r
R
R

S
EN

E
TE

GIN
J

San Francisco, CA 94104


REGIS

EER
8

E18956
220 Montgomery Street, Suite 650 TEL (415) 397-3117 795 WILLOW ROAD, MENLO PARK, CA
San Francisco, CA 94104 EXP. 12/31/15
FAX (415) 397-1517

D
a
t
e

C
h
e
c
k
e
d

D
r
a
w
n
TEL: 415.632.3266
EL
www.mazzetti.com ECT RICA L
4

TA I
360-J PL301
A
S

TE RN
OF CA L IFO
R
e
v
i
s
i
o
n
s
:

D
a
t
e

PROJECT NUMBER: 130-085


01/13/15 RV GL
0

1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9

ITEM DESCRIPTION
FROM 4" FIRE DEPARTMENT CONNECTION.
1
SEE CIVIL DWG. CS501 FOR CONTINUATION.

2 4" OS&Y VALVE WITH SUPERVISORY SWITCH


5"
3 NOT USED. [125mm]

4 TO 4" FIRE SPRINKLER SYSTEM

FROM 4" FIRE WATER SERVICE.


three inches = one foot

5
SEE CIVIL DWG. CS501 FOR CONTINUATION.
6"

6 NOT USED.
7 SYSTEM WATER GAUGE AND VALVE
A A
8 ALARM CHECK VALVE
EXTERIOR BLDG. WALL

[900mm]
3'-0"
9 MAIN DRAIN VALVE
10 RISER FROM MAIN WATER SUPPLY
DRAIN STANDPIPE
11 FLOW TEST LINE
4
1
one and one half inches = one foot

1/2" HILTI-KWIK
4" EXPANSION BOLT 3
4-WAY BRACE ANCHOR WITH MIN. 3 HUB ADAPTER
1/2" EMBEDMENT TOLCO #909 SWAY BRACE (X4)
ER# 1385 (TYPICAL)
CONCRETE MASONRY WALL
7
0

BUILDING
INTERIOR

VERIFY
6"

9
1" SCH 40
B 8 GALVANIZED B
STEEL PIPE
11
TO FIRE
CAST IRON P-TRAP
SPRINKLER DRAIN,
SEE DETAIL 1/2"1 BOLT 1/2"1 BOLT
2
2

6/PP400
10 FINISH SLAB 4" [100mm]
(2" SPACING ALL AROUND) 1/2"1 BOLT

PIPE
1/2"1 BOLT
1 EXTERIOR GRADE
TOLCO #4A (4"-8") PIPE CLAMP
THRUST BLOCK
one inch = one foot

5
4-WAY BRACE
0

NOTE: DEFERRED APPROVAL. DIAGRAMS AND PIPE SIZE ARE FOR INFORMATION ONLY. REFER TO SPECIFICATION SECTIONS 21 05 11 & 21 13 13.
6"

C 1 FIRE SPRINKLER RISER DETAIL 2 HUB DRAIN DETAIL (FOR SPRINKLER MAIN DRAIN) C
360-J P401 SCALE: NOT TO SCALE 360-J P401 SCALE: NOT TO SCALE
three quarters inch = one foot
6" 0 2

HANGER ROD

INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR LOW
TEMPERATURE PIPE)

D D
4

PROVIDE HIGH COMPRESSIVE


STRENGTH INSULATION (9 PSF
MIN. DENSITY) UNDER
INSULATION SHIELD
one half inch = one foot

WELD
INSULATION SHIELD
AT HANGER
SADDLE
ADJUSTABLE CLEVIS HANGER TYPE 1 ADJUSTABLE CLEVIS HANGER TYPE 43
- SEE SPECIFICATIONS - SEE SPECIFICATIONS
0

PROVIDE INSULATION SHIELD 1/2" [15mm] DIA.


& INSERT FOR ALL PIPING HANGER RODS WITH
(8" [200mm] MIN.) 36" [900mm] MAX.
SPACING ON EACH
CHANNEL

BAND
1-5/8" [43mm] 12 GAUGE
CHANNEL OR 2"x2"x1/4"
NOTES:
three eighths inch = one foot

[50x50x6.4mm] ANGLE
SEE SPECIFER FOR DETAILED
E

[25mm]
1" MAX.
E
4

HANGER REQUIREMENTS

SIDE VIEW TRAPEZE HANGER FOR UP TO 1000 LB.


[453KG] UNIFORM LOAD

MAXIMUM PIPE/TUBING SUPPORT SPACING


IN. THRU 3/4 1 1 1/4 1 1/2 2 2 1/2 3 4 5 6 8 10 12 14 16 18 20 24
NOM. SIZE [mm] THRU [20] [25] [32] [40] [50] [65] [75] [100] [125] [150] [200] [250] [300] [350] [400] [450] [500] [600]
7 7 7 9 10 11 12 14 16 17 19 22 23 25 27 28 30 32
0

FT.
PIPE [mm] [2100] [2100] [2100] [2700] [3000] [3400] [3700] [4100] [4900] [5200] [5800] [6700] [7000] [7600] [8200] [8500] [9100] [9600]
FT. 5 FT 6 7 8 8 9 10 12 13 14 16 - - - - - - -
TUBING
[mm] [1500] [1800] [2100] [2400] [2400] [2700] [3000] [3700] [4000] [4100] [4900] - - - - - - -

NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.


8
one quarter inch = one foot

3 PIPE HANGERS
360-J P401 SCALE: NOT TO SCALE
F F
0 4

100% CD/BID SUBMISSION


FEBRUARY 2, 2016
C
O
N
S
U
L
T
A
N
T
S
:

A
R
C
H
I
T
E
C
T

Oo
f
f
i
c
er
o
fi
D
r
a
w
i
n
g
T
i
t
l
e

P
r
o
j
e
c
t
N
u
m
b
e
r
P
r
o
j
e
c
t
T
i
t
l
e
65% CD SUBMISSION 03/16/15

Ca
n
s
t
u
c
t
o
ns n
100% CD/BID SUBMISSION 02/02/16
16

PLUMBING DETAILS POST TRAUMATIC STRESS DIAGNOSIS (PTSD) 612-125

B
u
i
l
d
i
n
g
N
u
m
b
e
r
one eighth inch = one foot

n
da
F
a
c
i
l
i
t
i
e
EXPANSION AND RENOVATION
E SS I ON POLYTECH ASSOCIATES INC.
PROF AL

M
n
a
g
e
m
e
t
ED N M. PA P Building 360
OH
ER

EN

235 Pine Street, 17th Floor


A
p
p
r
o
v
e
d
:
P
r
o
j
e
c
t
D
i
r
e
c
t
o
r

L
o
c
a
t
i
o
n

D
r
a
w
i
n
g
N
u
m
b
e
r
PA

GIN
RE G I S T

San Francisco, CA 94104


E ER
8

220 Montgomery Street, Suite 650 No. M22336 TEL (415) 397-3117 795 WILLOW ROAD, MENLO PARK, CA
San Francisco, CA 94104 EXP. 12/31/15
FAX (415) 397-1517

D
a
t
e

C
h
e
c
k
e
d

D
r
a
w
n
TEL: 415.632.3266
www.mazzetti.com ME
4

CHANI CAL
TA
NI 360-J PL401
S

TE
A
R
e
v
i
s
i
o
n
s
:

D
a
t
e

PROJECT NUMBER: 130-085


OF CA L I FOR 06/04/15 RV GL
0

1 2 3 4 5 6 7 8 9

You might also like