Skyjack policy is to fully support all service bulletins for 5 years from the original date of
issue. The attached service Bulletin was originally released to all owners of these units
more than 5 years ago.

We do continue to encourage our customer to complete any and all outstanding


bulletins, but Skyjack will no longer be responsible for any costs incurred.

The requisite components to complete this bulletin may be obsolete and need to be
sourced outside our standard supply chain. These parts may not be available at former
list pricing. Further, some components may no longer be available by any means. In the
case of safety related service bulletins, the absence of proper components could lead
to Skyjack recommending that the unit be permanently removed from service.

If you have any questions with respect to this policy, please call Skyjack at 1-800-275-
9522. You may e-mail any questions to service@skyjack.com.

Best Regards,

Brad Boehler, P.Eng, Vice President, Engineering


55 Campbell Road, Guelph, Ontario, Canada N1H 1B9
Tel: 519.837.0888 Toll Free: 1.800.265.2738 Fax: 519.837.3102

Skyjack Inc. 55 Campbell Road, Guelph, Ontario, Canada N1H 1B9 INDUSTRIAL GROUP
Tel: 519 837 0888 Fax: 519 837 3102 linamar.com skyjack.com A Division of Linamar Holdings Inc.
Service Bulletin #75
SJB-46TK and SJB-66TK
Solid State Relay Installation

March 28, 2000

Product Affected: SJB-46TK, SJB-66TK

SJB-46TK
94205 and below.

SJB-66TK
93433 and below.

Introduction:

To ensure the safety of our customers and yours, Skyjack requires the following retrofit
be performed on the above listed machines. Please follow the instructions below to complete this
service bulletin..

Tools Required:

• Blade Screwdriver
• Wire Cutter
• Wire Stripper
• Crimper
• 1 Kit (Hardware is in bottom of relay box.)

Procedure:

1. Turn battery disconnects switches to the off positions.


2. Open the platform control box.
3. Disconnect the four wires from relay 75CR. (39K on some older machines)
4. Remove relay 75CR. (39K)
5. Mount solid state relay to far left relay mounting hole using hardware removed from
75CR. (39K)
6. Cut terminals from wires.
7. Install ¼” fork terminals on wires 08 and 75A.(10 & 104 on older machines)
8. Install #6 fork terminals on wires 02 and 75.
9. Attach wires to solid state relay as follows:
a. Pin 1 Wire 08 (10)
b. Pin 2 Wire 75A (104)
c. Pin 3 Wire 75
d. Pin 4 Wire 02

Bulletin #75 3451 Swenson Ave. St. Charles, Illinois Page 1 of 2


Phone: 630.262.0005 Fax: 630.262.0006
10. Close platform control box.
11. Turn battery disconnects switches to the on positions.
12. Test functions.

Parts and Warranty Policy:

Upon completion, send in a warranty claim form, for each machine, stating Service Bulletin #75
has been completed.

Skyjack will pay ½ hour of labor plus travel time, up to 4 hours, for this bulletin.

Ownership of Machines:

If you have sold or transferred SJB-46TK or SJB-66TK machine(s) with the serial numbers listed
above, it is your responsibility to forward this service bulletin to the current owner and to notify
Skyjack Inc.

Contact Information:

We regret the inconvenience and appreciate your cooperation. If you have any questions please
call Skyjack Service at 800-275-9522 or 630-262-0005. You can e-mail any questions to
service@skyjackinc.com