Print Date: Sat Dec 01 09:15:38 GMT-04:00 MODEL 500 MAINTENANCE MANUAL (Rev 39)

2018 5-12-03(Rev 35)

INSPECTION PHASE 3

Date: _______________
Registration Number: _______________

Serial Number: _______________


Total Time: _______________

1. Description
A. Phase 3 consists of selected items to be inspected every 150-hours and 300-hours or 24 calendar
months, whichever occurs first. NOTE: 150 hour items are also listed in Phase B. When performing
Phases 1 through 4 as one operation, duplicated items do not need to be performed twice.
B. Inspection items are given in the sequence of the zone in which the inspection is completed. A
description of the inspection, as well as the Item Code Number are supplied for cross-reference to
section 5-10-01. Frequently, tasks give more information about each inspection. These tasks are
found in the individual chapters of this manual.
C. The right portion of each page gives space for the mechanic's and inspector's initials and remarks.
You can use copies of these pages as a checklist while you complete the tasks in this Inspection
Phase.
2. General Inspection Criteria
A. As you complete each of the inspection tasks in this Inspection Phase, examine the adjacent area
while access is available to find conditions that need more maintenance.
B. If it is necessary to replace a component or to make a change to a system while you complete a
task, do the task again before the system or component is returned to service.
C. (Phase) Inspection Kits are available for some Inspection Phase Documents. They supply
consumable materials used to complete the inspection item(s) given for the interval. Refer to the
Model 500 Illustrated Parts Catalog, Introduction, Phase Inspection Kit List to find applicable part
numbers.

ITEM CODE TASK ZONE MECH IN- REMARKS


NUMBER SP

A215001 Air Cycle Machine Oil Level - Check. Task 21-50-00-610 312

A291002 Hydraulic Sub-panel - Inspect. Task 29-10-06-210 311

A510001 Exterior Moisture Drain Holes - Inspect. Task 51-00-00- 131, 132,
160 141, 151,
161, 411,
412, 511,
512, 611,
612

D217001 Humidity Regulator (Water Separator) - Inspect. Task 312


21-70-00-160

© 2018 Cessna Aircraft Company


Retain printed data for historical reference only. For future maintenance, use only current data. Page 1
Print Date: Sat Dec 01 09:15:38 GMT-04:00 MODEL 500 MAINTENANCE MANUAL (Rev 39)
2018 5-12-03(Rev 35)

ITEM CODE TASK ZONE MECH IN- REMARKS


NUMBER SP

*** End of Phase 3 Inspection Items ***