Professional Documents
Culture Documents
Msu Boq
Msu Boq
BILL OF QUANTITES
CRDORM - Page 1 of 3
BID AMOUNT (PHP)
Item No. DESCRIPTION Quantity Unit Unit Cost
In Figures In Words
A. BOY'S DORM MAIN COMFORT ROOMS ( 4-UNITS)
Demolition and Disposal (Tiles, Fixtures,
1 120.00 sq.m 241.50 28,980.00 Twenty Eight Thousand Nine Hundred Eighty Pesos Only
Ceiling, Windows & Doors, etc)
2 Sewer Lines 4.00 rooms 19,271.70 77,086.80 Seventy Seven Thousand Eighty Six & 80/100 Pesos Only
3 Water Lines 4.00 rooms 12,177.31 48,709.24 Forty Eight Thousand Seven Hundred Nine & 24/100 Pesos Only
4 Tiles and C.R. Fixtures 4.00 rooms 115,841.52 463,366.08 Four Hundred Sixty Three Thousand Three Hundred Sixty Six & 8/100 Pesos Only
5 Doors & Windows 47.10 sq.m 5,414.53 255,024.37 Two Hundred Fifty Five Thousand Twenty Four & 37/100 Pesos Only
6 3.5mm Ficem Ceiling on LMF 120.00 sq.m 762.74 91,528.80 Ninety One Thousand Five Hundred Twenty Eight & 80/100 Pesos Only
7 PAINTING WORKS
7.a Masonry and Concrete Surface 115.10 sq.m 546.23 62,871.08 Sixty Two Thousand Eight Hundred Seventy One & 8/100 Pesos Only
7.b Wooden Surface 165.00 sq.m 371.17 61,243.05 Sixty One Thousand Two Hundred Forty Three & 5/100 Pesos Only
Sepric Tanks, Catch Basin, Lavatory &
8 4.00 sets 67,670.57 270,682.28 Two Hundred Seventy Thousand Six Hundred Eighty Two & 28/100 Pesos Only
Repair of Conc. Flooring
9 Electrical Works 4.00 rooms 23,749.70 94,998.80 Ninety Four Thousand Nine Hundred Ninety Eight & 80/100 Pesos Only
B. GIRL'S DORM MAIN COMFORT ROOMS ( 4-UNITS)
Demolition and Disposal (Tiles, Fixtures,
1 120.00 sq.m 241.50 28,980.00 Twenty Eight Thousand Nine Hundred Eighty Pesos Only
Ceiling, Windows & Doors, etc)
2 Sewer Lines 4.00 rooms 19,271.70 77,086.80 Seventy Seven Thousand Eighty Six & 80/100 Pesos Only
3 Water Lines 4.00 rooms 12,177.31 48,709.24 Forty Eight Thousand Seven Hundred Nine & 24/100 Pesos Only
TOTAL BID AMOUNT (IN FIGURE AND IN WORDS) 4,750,000.00 Four Million Seven Hundred Fifty Thousand Pesos Only