Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

7 September 2021

Your Ref. No.: HK0201/Satker/AI/VIII/106 Our Ref. No.: 076/L-3455/2021


Ms. Asmelita, ST, Sp.1
Committing Officer (PPK)
Directorate of Irrigation and Lowlands
Directorate General of Water Resources
Ministry of Public Works and Housing
Jl. Pattimura No. 20, Kebayoran Baru
Jakarta 12110

Dear Ms. Asmelita:


Loan 3455-INO: Accelerating Infrastructure Delivery
through Better Engineering Services Project
Approval of Draft Addendum 4 of Project Preparation Consultant for Development
of Walimpong Irrigation System and Boya Irrigation System in South Sulawesi
The Asian Development Bank (ADB) has post-facto no objection for the draft addendum
no. 4 for the package. The addendum covers the following:
(i) the extension of the contract period from 31 August 2021 to 16 November 2021;
(ii) the additional time to complete the environmental impact assessment (AMDAL) and
the initial environment examination for the Walimpong and Boya irrigation systems
including specific environment evaluation documents for Boya; and
(iii) the adjustment of the deliverables, personnel and payment schedules due to the
extension.
The proposed addendum maintains the current contract amount.
You may proceed with contract addendum signing and submit the signed contract
addendum No. 4 to ADB for our record.
Please feel free to contact Ms. Olga Suyatmo, Senior Procurement Officer at
osuyatmo@adb.org for further clarification.
Sincerely,

Jiro Tominaga
Country Director
Indonesia Resident Mission
cc: Director General of Water Resources (DGWR), Ministry of Public Works and Housing
(MPWH)
Director of System and Strategy of Water Resources Management, DGWR, MPWH
Director for Budget Planning and International Cooperation/Head of Project Coordination
Office, Secretariat General, MPWH

You might also like