Rohan Builders (i) Pvt.Ltd.

Job Safety Analysis


DSM Engineering - MIDC Ranjangaon

TASK : - Backfilling, Levelling, Compaction, Column erection ,


CONTRACTOR: Rohan Builders JOB No.:
Shuttering , Casting & De-shuttering

SUPERVISOR : Mr. Manoj Lakhode, Mr. Parmod LOCATION : Raw Material Ware House Date- 11-10-2007

JOB STEP HAZARDS Control Measure ACTION


Break the job into steps. List the hazard or type of harm List the necessary control measures to be followed to Person who will ensure
Listing work which may be hazardous. identified with each step eliminate the identified hazards this happens

Backfilling, Levelling & Vehicle Movement (Hit Hazard) Documents of the vehicle to be checked and
Compaction Work certified.

Valid licence for driver/operator. Ganesh Kulkarni

Head light, Tail light, Reverse horn, rear mirror,


horn to be checked and daily checklist to be
fulfilled and recorded.

Proper access to be provided by clearing all


unwanted materials or traffic to enter the work
space.

Helper to be provided for controlling the traffic


by signal.

Continuous supervision to be provided.

This document is current at -2007/10


Rohan Builders (i) Pvt.Ltd.

Job Safety Analysis

Inspected Tools & Tackles to be provided.


Backfilling & Levelling By Cut Hazard/Hit Hazard
Manually
Tool box talk to be given before start the work
and recorded

Safety Goggles and Nose Mask to be provided.


Eye/Dust Hazard

All the moving parts to be guarded.


Moving parts/Trip hazard
Compaction using Compactor Before start the compactor machine tool box to
be given those who are engaged in this work.

Ear Plug to be provided.

Daily checklist to be fulfilled and recorded.

Shifting of reinforcement steel Vehicle rules to be followed.


to the work area using tractor. Vehicle Movement (Hit Hazard)
Do not allow overload.

Access to be cleared out from all unwanted


Shifting of reinforcement steel Person Fall Hazard materials from steel yard to the work area.
to the work area my manually.

This document is current at -2007/10


Rohan Builders (i) Pvt.Ltd.

Job Safety Analysis

PPE’s (Helmet, Shoes, Reflective Vest, Hand


gloves, goggles) to be provided for all those
who are engaged on the work.

Working at height Scaffolding to be provided with bracing, mid


rail, Guard rail, Top rail & Jali to be provided as
Fall hazard per the procedure on a firm base.

Platform with proper access.

Scaffolding to be done by a trained persons


under strict supervision.

Underneath area to be isolated and cleared


from all unwanted materials.

Full body harness with double lanyard to be


provided for those who are working more than
2 mtrs and to be hooked properly at the top.

The ramp or step staging with railing to be


permanently clamped with the structure to
avoid trip hazard and no overlapping on work
platforms.

Ladder will used as an access to the


scaffolding work platform wherever required.

This document is current at -2007/10


Rohan Builders (i) Pvt.Ltd.

Job Safety Analysis

Necessary quantity of people to be deployed to


laping the rod as per the length & weight.
Laping & Binding of
Reinforcement At work area
Trip Hazard If the length of the rod is more than 5 to 6 mtrs
approx two people to be deployed for reach the rod
for laping to avoid hit hazard.

Hit Hazard Hook to be provided for binding of steel.

Hand gloves to be provided for avoiding cut


hazard.

Site First aid centre provided in case of any first


Cut Hazard aid.

Tool box talks to be given to all to be careful


about binding wire to avoid cut hazard

Skilled Carpenter & Fitter to be deployed for


Shuttering work shuttering work.

PPE’s to be provided for all.(Safety Helmet with


Nail Bite/Cut Hazard
Chin Strip, Safety goggles, Safety shoes,
Reflective vest, cotton hand gloves.)

Continuous supervision to be provided.

This document is current at -2007/10


Rohan Builders (i) Pvt.Ltd.

Job Safety Analysis

Shuttering material to be secured properly


before pouring concrete inside.

Entry to be restricted inside the Batching Plant


operator room other than the operator and the
Mini Batching Plant electrician.

Only authorised operator is allowed to operate.


Electrocution Proper earthing to be given and all the
connections to be provided through ELCB only.

Electrician have to use rubber hand gloves


(tested & trade mark) while working/testing on
charged equipments.

Identification boards to be displayed.

All the moving parts to be guarded and no


loose clothing allowed near the
machinery/conveyors.

Un authorised entry to be restricted.

This document is current at -2007/10


Rohan Builders (i) Pvt.Ltd.

Job Safety Analysis

Moving parts/Trip hazard

CO2 fire extinguisher to be provided.

Safety Goggles and Nose Mask provided for those


who engaged on cement work.
Fire Hazard

Concrete Work Vehicle rules to be followed.

Transit Mixer Eye /Dust Hazard Daily checklist to be fulfilled and recorded.

Placing of Transit Mixer for


loading Concrete.
Mobile Plants/Hit Hazard

Proper access to be provided by clearing all


Placing of Transit mixer at work unwanted materials or traffic to enter the work
area for unloading concrete. space.

Helper to be provided for controlling the traffic


by signal.
Vehicle movement/Cut hazard

For Shifting of concrete to the Column proper


access to be given to avoid trip hazard

Concrete work by manually

This document is current at -2007/10


Rohan Builders (i) Pvt.Ltd.

Job Safety Analysis

Trip hazard

Concrete to be poured on concrete tray and


those who are doing the filling work & those
who are standing on the concrete will be
provided with gumboots and rubber hand
gloves other than mandatory PPE’s.

Person Injury

Skilled and trained carpenters & Fitters will be


deployed for de shuttering work.

PPE’s to be provided for all.(Safety Helmet with


De-shuttering work
Chin Strip, Safety goggles, Safety shoes,
Reflective vest, cotton hand gloves.)

Cut injury/nail bite


Scrap will be shifted to the scrap yard after the
completion of work.

Proper House keeping will be provided for


wood scrap, nails etc. to avoid cut injury/ nail
bite.

Daily tool box talks to be followed & recorded.

This document is current at -2007/10


Rohan Builders (i) Pvt.Ltd.

Job Safety Analysis

Work area should kept neat & clean after the


completion of work.

All the scraps to be to shifted to the specified


scrap area.
House keeping

Trip hazard Remove all the materials used for shuttering


from the work area and shifted to the yard as
soon as the de-shuttering work ends or
properly stacked at the work place for reuse.

Proper illumination to be provided at the work


area as per required or depends on the work.

Working at night

Inadequate illumination

This document is current at -2007/10


Rohan Builders (i) Pvt.Ltd.

Job Safety Analysis

Job Safety analysis attendees Mr.Ganesh Kulkarni, Mr. Manoj Lakhode, Mr. Parmod Signature Date
11-10-07
Written by M.T.HAQUE

This document is current at -2007/10