INTRODUCTION
Document’s checklist is already shared with you and for reference we have mentioned all points and formats in this
manual. However, if the ULB is maintaining the formats/documents that carry the relevant information that are
mentioned in indicators, they can also upload them.
We sincerely hope that all the ULBs will upload documents with full enthusiasm to maximize their marks and make
Safaimitra Suraksha challenge a grand success.
• Need copy of agreement in place at ULB level for non-compliance in resolution time
• Copy of escalation matrix followed by the ULB
Indicator 2.1 Document 4
Evidence of mechanism in place to ensure customer is satisfied before closing the complaint.
1 Street Plays
Photos
Total Ward numbers where
S.no Public Awareness Campaign (Minimum 2
wards Campaign carried out
per activity)
Summary of Number of Machines to be Available with the ULB as per CPHEEO Norms
Photo of
Name of Desludging Registration ID
S.No. Contact Number Registration ID/
Operator
License
1.
2.
.
.
N
Indicator 2.3 Document 4
List of desludging and/or sewer cleaning vehicles
Holding of Core Sewer and Septic Maintenance Machine: Whether ULBs has number of
machines/equipment available, as per CPHEEO norms, to clean sewers/septic/stormwater drain
manholes tanks
1 ULB Code
2 ULB Name
3 Census Population
4 New Areas added to Municipal Limit (Yes/No)
(If Yes, Increase in population percentage and year of addition)
5 If Yes to above question, mention the increase in population percentage and year of addition
6 Last estimated population and year
7 Population connected to sewer network
8 Population connected to septic tank
9 Number of Households connected to septic tank
10 Length of Sewer: -
a) more than 900mm Dia
b) 601-900mm Dia
c) 301-600mm Dia
d) Up to 300mm Dia
e) Length of combined Sewer
11 Number of Sanitary Maintenance Hole
Indicator 2.4 Document 1
List of Permanent Workers
Name of Informal
S.No. Contact Number
Worker
1.
2.
.
.
N
Indicator 2.4 Document 3
List of Contractual Workers
Name of Contractual
S.No. Contact Number
Worker
1.
2.
.
.
N
Indicator 2.4 Document 4
List of Private Workers
Name of Private
S.No. Contact Number
Worker
1.
2.
.
.
N
Indicator 2.4 Document 5
List of SHG/NGO Workers
Name of SHG/NGO
S.No. Contact Number
Worker
1.
2.
.
.
N
Indicator 2.4 Document 6
List of Casual/Daily Workers
Name of Casual/Daily
S.No. Contact Number
Worker
1.
2.
.
.
N
Indicator 2.4 Document 7
List of Waterborne Sanitation Workforce/staff
Name of Waterborne
S.No. Sanitation Contact Number
Workforce/staff
1.
2.
.
.
N
Indicator 2.4 Document 8
List of Waterborne Sanitation Workforce/staff
Total Number of
Sewer men
Total Number of
Sanitary Beldar
Indicator 2.4 Document 9
List of Safaimitra/Staff getting hardship allowance
Name of Safaimitra/Staff
S.No. getting hardship Contact Number
allowance
1.
2.
.
.
N
Indicator 2.5 Document 1
No. of Safaimitras/workers provided with PPE Kit and Safety Gears as per CPHEEO norms
• ULBs need to attach a copy of translated toolkits and applied norms in vernacular languages for
assessment
• Toolkit and applied norms should be recent in date
Indicator 2.7 Document 2
No. of formal de-sludging and/or sewer cleaning staff (In-house/ Private Operators)
S.No. Name of Safaimitras linked with Name of the Scheme Contact Number
entrepreneurship/livelihood
opportunities/another scheme
1.
2.
.
.
N
Indicator 3.1A Document 1
Details regarding total number of septic tanks along with logbook (record) of desludging of septic tanks (1st
January 2021 to 30th April 2021)
Necessary Action
S.No. Location of Hotspots
Put in Place
1.
2.
.
.
Indicator 3.1C Document 1
Details regarding the total no. of households in the ULB
Commercial
S.No. Wards
Establishments
1.
2.
.
.
Total Number of Commercial
Establishments
Indicator 3.1C Document 3
Details regarding the total no. of CTs in the ULB
Households
S.No. Wards Households connected Closed
System
1.
2.
.
.
Total Number of Households
Total Number of Households Connected to Closed System
Indicator 3.1C Document 6
Details regarding the total no. of commercial establishments connected to a closed system such as sewerage
and/or septic tank + Soak pit
Commercial
Commercial Establishments
S.No. Wards
Establishments connected Closed
System
1.
2.
.
.
Total Number of Commercial Establishments
Total Number of Commercial Establishments Connected to
Closed System
Indicator 3.1C Document 7
Details regarding the total no. of CTs connected to a closed system such as sewerage and/or septic tank + Soak
pit
CTs connected
S.No. Wards CTs
Closed System
1.
2.
.
.
Total Number of CTs
Total Number of CTs Connected to Closed System
Indicator 3.1C Document 8
Details regarding the total no. of PTs connected to a closed system such as sewerage and/or septic tank + Soak
pit
PTs connected
S.No. Wards PTs
Closed System
1.
2.
.
.
Total Number of PTs
Total Number of PTs Connected to Closed System
Indicator 3.1C Document 9
Details regarding total Septic Tank
• Need clear details of total amount of operational cost of mechanized cleaning incurred
separately
Indicator 3.3 Document 1
Details regarding total capacity of FSTPs (KLD) in the ULB