Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

Price format:

Lump sum Rate


Sr. 2 year
Work Area quantity ( Rs. / Value
No. quantity
per day Unit).
1 Housekeeping of plant area
1.1 RWPH 1 700 2500 1750000
1.2 FWPH 1 700 2500 1750000
1.3 DWPH 1 700 2500 1750000
1.4 RWTP 1 700 2500 1750000
1.5 IAPA 1 700 2500 1750000
1.6 DM 1 700 2500 1750000
1.7 COOLING TOWERS 1 700 2500 1750000
1.8 ECTS 1 700 2500 1750000
1.9 TANK FARMS / HGU 1 700 2500 1750000
1.10 GANTRY /FLARE AREA 1 700 2500 1750000
1.11 SWITCH YARD 1 48 2500 120000
Total 7048 1,76,20,000

2 Housekeeping of building area


2.1 SWITCH YARD 1 731 700 511700
OPERATOR ROOM IN DM/CPU AND
2.2 1 700 700 490000
CHEMICAL AREA
2.3 UCR 1 731 700 511700
CT1/2/3/FWPH Operator room and
2.4 1 700 700 490000
chlorination building and chemical area
RWTP Control Room and chemical houses
2.5 1 700 700 490000
and area
2.6 ECTS CONTROL ROOM 1 731 700 511700
2.7 ECTS CHEMICAL HOUSE 1 731 700 511700
2.8 OCR 1 731 700 511700
2.9 PLCR 1 731 700 511700
2.10 SUB STATION BULDING-11 1 540 700 378000
2.11 SUB STATION BULDING-12 1 540 700 378000
2.12 SUB STATION BULDING-13 1 540 700 378000
2.13 SUB STATION BULDING-14 1 540 700 378000
2.14 SUB STATION BULDING-15 1 540 700 378000
2.15 SUB STATION BULDING-16 1 540 700 378000
2.16 SUB STATION BULDING-17 1 540 700 378000
2.17 SUB STATION BULDING-18 1 540 700 378000
2.18 SUB STATION BULDING-19 1 540 700 378000
2.19 SUB STATION BULDING-20 1 540 700 378000
2.20 SUB STATION BULDING-21 1 540 700 378000
2.21 220 KV switchyard 1 540 700 378000
TOTAL 12966 90,76,200
3 No. of Toilet cleaning
Rate
Sr. Number 2 year
Work ( Rs. / Value
No. per day quantity
Unit).
3.1 Daily Toilet cleaning 34 24820 125 3102500
3.2 Opal working day toilet cleaning 23 12420 125 1552500
Total 37240 46,55,000
Total From 1+2+3 = Rs 3,13,51,200/-