GENERAL NOTES ON PLUMBING WORKS


2.50
CB CB
LC 1.50 1.00
ALL SANTARY WORKS INCLUDED HEREIN SHALL EXECUTED IN
ACCORDANCE TO THE PROVISIONS OF THE NATIONAL WATER CLOSET
DC PLUMBING CODE AND THE NATIONAL BUILDING CODE OF THE
PHILIPPINES AND ITS IMPLEMENTING RULES AND
CB CB
REGULATIONS. LAVATORY
CB
COORDINATE THE DRAWING WITH OTHER RELATED DRAWING

1.50
AND SPECIFICATIONS TO THE ARCHITECT AND ENGINEER SEPTIC TANK/
MH MH

0.50
CO
AND BE NOTIFIED IMMEDIATELY FOR DISCREPANCY FOUND
SEPTIC VAULT 10mmØ REBAR @ 4"Ø PVC STORM
THEREIN BEFORE HIS DECISIONS WILL BE FINAL.
.30m OC. BOTH FACE
DRAIN PIPE
ALL PIPES SHALL BE INSTALLED AS INDICATED OR PROPER FD FLOOR DRAIN CO
CO

CB
EXECUTION OF OTHER TRADE SHALL BE WITH PRIOR OUTLET
APPROVAL OF ARCHITECT OR ENGINEER.
CB CB PVC POLYVINYL
CHLORIDE
INLET

PROPOSED SANITARY UTILITIES SHALL CONFORM TO THE 2.50


ACTUAL LOCATION AND IN EVERY EVALUATION SHALL BE
1.50 1.00
VENT STACK
VERIFIED BY CONTRACTOR.
VSTR THRU ROOF
CO
0.50
MH MH
THE CONTRACTOR SHALL BE RESPONSIBLE FOR REQUIRED

0.30
AIR
FLOOR AND WALL OPENINGS. SPACE
CB CATCH BASIN
ALL SLOPES AND HORIZONTAL DRAINAGE SHALL MAINTAIN INLET OUTLET CONC. COVER
2% MINIMUM UNLESS OTHERWISE NOTED.
DOWNSPOUT CO
CB DS 4"Ø PVC STORM
THE SIZE OF WATER SUPPLY PIPES AND FIXTURE SHALL BE IN
ACCORDANCE W/ THE MANUFACTURER'S SPECIFICATIONS. DRAIN PIPE
CO CLEANOUT 3mmØ HOR. BAR @
EVERY 3 LAYER OF CHB 10MMØ

0.50
2.50
ALL FIXTURES SHALL BE VENTED UNLESS OTHERWISE REBARS
4" THK. CHB
NOTED. SP. @
CB
SLOPE 0.20M
THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES AT OC. BW
CB CB
THE SITE AND COORDINATES WITH THE SEWER DISPOSAL
SYSTEM.
MH MANHOLE
TO STREET 4" THK. CHB
SEWER THE WORKS SHALL BE EXECUTED IN THE BEST OF
TO STREET WORKMANSHIP MANNER KNOWN TO THE TRADE AND TO THE
SPECIFICATION OF THE ARCHITECT OR ENGINEER.
WATERLINE
SEWER
0.50
REFER TO THE ARCHITECT, SANITARY ENGINEER, OR
MASTER PLUMBER FOR PROPER VERIFICATIONS.

2 POWER LAYOUT LOCATION MAP 3 RISER DIAGRAM


E 1 NTS NTS
E 1 NTS

PREPARED FROM THE OFFICE OF: PREPARED BY: PROJECT OWNER: PROJECT TITLE: SHEET CONTENTS: REVISIONS: DISCIPLINE:
DRAWINGS AND SPECIFICATIONS DULY SIGNED,
STAMPED OR SEALED, AS INSTRUMENTS OF SERVICE, ARE SYMBOL DESCRIPTION DATE APPROVED
THE INTELLECTUAL PROPERTIES AND DOCUMENTS OF
ARCH. EDMUND ESPELOY RAFANAN ARCHITECTURAL
AR EDMUND ESPELOY RAFANAN, UAP WHETHER THE OBJECT FOR WHICH ARE MADE IS
EXECUTED OR NOT. IT SHALL BE UNLAWFUL
PROPOSED -2BEDROOM FLOOR PLANS
ELEVATIONS, SECTIONS, SCHEDULE OF
REGISTERED AND LICENSED ARCHITECT FOR ANY PERSON, SHEET NO.:
PRC REG. NO.: 0033876, UAP- IAPOA NO.: 30536-143143-073115
WITHOUT THE CONSENT OF THE AUTHOR, TO DUPLICATE
OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN ROGELIO BLANDO HILARIE THREE STOREY RESIDENCE DOORS & WINDOWS

THE REPETITION OF
BRGY. MACALONG, ASINGAN, PANGASINAN
PTR NO.:

TIN NO.:
00929346

404-172-567
DATE ISSUED:

PLACE ISSUED:
JANUARY 5, 2016
ASINGAN, PANGASINAN
AND FOR OTHER PROJECTS