1.

In test plan tree, u want to define a filter for associated test sets as “Open” and this is to ensure
that only tests that belong to an open test set are displayed

Multiple

Triple

Cross

Double

2. In test plan module when a called test has parameters, then when can you assign values to the
parameters?

Values are assigned from within the calling test

Values must be assigned when the test is executed

Values are assigned during test design or execution

Values must be assigned when the test is called during test design

3. From which tabs in the test lab module can you add tests to test set

Test Plan Tree tab

Release Tree tab

Requirements Tree tab

Testing Tree tab

4. Deleting the requirement doesn’t delete its child requirement, requirement traceability, defects
linkage and hence requests him not worry

True
False
5. Project is in critical phase and due to application instantly, plenty of defects were raised which
need to be fixed. But the challenge is lack of developers to fix the defects and turn around time
is also less. Hence mark gets the suggestion from the PM to generate the report

Pull all the showstopper and critical defects with open status by graph wizard with graph types
as Entity and Entity as Defect
Pull all critical defects with open status from business view reports
Pull all open defects from business view reports
Pull all showstopper and critical defects with open status from business view report
6. Susan working on test design related activity in Test Plan module and she is expected to
leverage test configuration to cover multiple requirement and avoid unnecessary duplications

Give the scenario how could, she has to achieves in HPALM

By associating different test configuration in the same test with each requirement

By associating different test configuration in multiple test with each requirement

By associating same test configuration in the same test with each requirement

By associating same test configuration in the multiple test with each requirement

7. Jamie is the QA lead for a banking based project. during system testing phase he and his team
member are expected to perform test execution and post test result as per the schedule. Test
execution was completed by Jamie’s team and they raised defect against discrepancies
Francise want to witness the test execution log and results along with testers contribution in
test execution.she logs into HPALM and for some requirements , she notice the status of not
completed as requirement coverage status.
Give the scenario what should francise infer for the requirement coverage status of not
completed
a) None of the test can have execution status of no run
b) None of the test can have execution status of blocked
c) None of the test can have execution status of passed
d) Almost one test has on execution status of Failed
8. You are expected to design test for both functional and non functional requirements for a
project in test plan module

1. LOAD-TEST
2. CAPACITY-TEST
3. BLACK-BOX-TEST
4. LR-SCENARIO
5. QUICK TEST
6. MANUAL

a. Option 4 5 6
b. Option 1 2 3
c. Option 3 4 5
d. Option 2 3 4

9. Susane is QA tester working for stock market based application where the direct business
impact is huge and hence testing is very crucial for the success of the project. Hence the
business had laid down the enough focus in ensuring 100% end-to-end test .Traceability across
SDLC phase
Give the scenario and guidliness mentioned by the business .what level of traceability susane
maintain in HPALM. To ensure no gap?
a. Link all requirements to reports and graphs
b. Link requirement to releases
c. Link all defects to requirement or test
d. Link all tests to requirement or vise versa

10.

11. In requirements module by defining traceability relationships , u cannot add a requirement


traceability link by dragging a requirement from the requirement tree to the appropriate grid

True

False

12. What does each test set folder to a cycle enable you to do in test lab module?

A. Group together test sets that will be run during the same cycle and analyze the progress of
the cycle as you run your tests
 
B. Separate test sets that will be run during the same cycle and analyze the progress of the cycle as
you run your tests
 
C. Group together test sets that will be run during different cycles and check the global requirements
 
D. Separate test sets that will be run during the same cycle and check the global requirements

13. Which of the given statement are true, regarding progress and summary graph for defect by status

a. Summary graph provides defect count by status

b. Progress graph provide accumulation of defects in a project

c. Progress graph provide defect count by status

b. Summary graph provides data captured over specific time


14. There are two methods you can use to conduct a search for similar/related defects:

A. Find parallel Defects & Find parallel Text.


B. Find related Defects & Find related Text.
C. Find Similar Defects & Find Similar Text.
D. Find all Defects & Find all Text

15.

16. To increase the flexibility and power of a test, you can add ________ to the called test and
to the tests that call it.

 
A. Input Values 
B. Output Values          
C. Parameters  
D. None of above

17. You can add a new defect to a Quality Center project from any module at any stage of the testing process.

A. True                         
B. False

18. Requirement topics are recorded in the Requirements module by creating a requirements
_________

A. Requirement Graph                      
B. Requirement Tree                         
C. Requirement Path            
D. Requirement Plan
E. Requirement Cycle
19.

a) You can only remove direct links from the Linked Defects grid.

b) Indirect links are removed automatically when the direct links are removed.

A. Both 1 & 2 are correct


B. Both 1 & 2 are incorrect
C. option 1 is correct
D Option 2 is correct

20. While reviewing and deciding which new defects need to be fixed, the QAmanager
assigns them to the appropriate __________

A. Release and cycle                            


B. Cycle and release
C. Defect and cycle                              
D. Cycle and defect

In the Test Plan module, which graph enables you to correlate the number of tests and the
elapsed time interval?
 
A. Tests Summary graph
B. Tests Results graph
C. Tests Trend graph
D. Tests Progress graph

There are two methods you can use to create tests from requirements:
 
A. Convert Requirements to Tests & Generate a Test from Requirements
B. Convert Requirements to Tests & Convert a Test from Requirements
C. Convert Requirements to Tests & Generate a Requirement from Tests
D. Convert a Test from Requirements & Generate Requirements to Tests

When a requirement changes, Quality Center alerts the affected requirements. The alerts can
be seen by______
A. Author of the requirement     
B. Users authorized by the Author of the requirement
C. All users                                          
D. Administrator

Which module enables you to define graphs and reports?

A. Test Plan
B. Test Resources
C. Dashboard
D. Requirements

If the QA manager would like to see an overview of status of the tests within folder in the Test
Plan Tree, which graph would you generate?

A. Live Analysis
B. Defect Age Graph 
C. Coverage Analysis 
D. Test Plan Summary
Which module enables you to define graphs and reports?

Test Plan
B. Test Resources
C. Dashboard
D. Requirements