Procedure
Laid out all junction and switch boxes on the project board.
Used 3.5mm2 wires for the power circuit and 1.5mm2 for the remote circuit.
Connected all wires according to schematic diagram (Diag. 1) to JS21 standards.
Checked all connections before connecting to supply.
Carried out system checks for proper operation of stop/start station and starter.
Carried out all installation test of motor.
Setup
Carrying out Motor Winding Continuity Test
Conclusion
1. Megohmmeter readings were all 1 mega ohm when testing insulation so there were no
leaks in the curcuit.
2. The motor will run single-phase as winding T3/T6 was damaged.