DESIGN CALCULATION FOR PILECAP 2RC250 1 of 2

Project : T0516-ECO SANCTUARY Designed by : CPL Date : 23-Feb-16


Title : Pilecap Design for 2RC250 Checked by : LYJ Page :

Pile Type = RC (SP for Spun Pile and RC for RC Square Pile)
Number of Piles = 2
Pile Size = 250 mm
Pile Working Load = 850 kN
Column Load = 1500 kN
Column Load + Pilecap Weight = 1514 kN
Reaction per Pile = 757 kN, < Pile Working Load, OK.
Column Type = SC (SC for Square Column and CC for Circular Column)
Column Length, B = 900 mm
y
Column Width, D = 450 mm
Column Perimeter = 2700 mm My-y
Concrete Grade, fcu = 35 N/mm2
Steel Strength, fy = 460 N/mm2 x
Concrete Cover, c = 75 mm Mx-x
Distance from Pile Center to Pilecap Edge = 327 mm
Pile Spacing = 2.5 x Pile Size = 625 mm
Factor of Safety, FoS = 1.50

Pilecap Width, b = 654 mm


Pilecap Length, l = 1279 mm
Pilecap Thickness, h = 700 mm
Lever arm, Lx = 75 mm (Including 75mm deviation)
Lever arm, Ly = 75 mm (Including 75mm deviation)

Steel Reinforcement Bars Design


(A) My-y (Bars Lay Parallel with X-axis)
Effective Depth, d = 619 mm
Design Moment = 96 kNm
K = 0.011 =====> z = 588 mm
As required, As req = 372 mm 2

As minimum = 595 mm2 > As required


As maximum = 18312 mm2 > As required
Design As = 595 mm2
To Provide Bottom Reinforcement 6 T 12 mm diameter, Bar c/c spacing = 101 mm

(B) Mx-x (Bars Lay Parallel with Y-axis)


Effective Depth, d = 607 mm
Design Moment = 191 kNm
K = 0.012 =====> z = 577 mm
As required, As req = 759 mm 2

As minimum = 1164 mm2 > As required


As maximum = 35812 mm2 > As required
Design As = 1164 mm2
To Provide Bottom Reinforcement 11 T 12 mm diameter, Bar c/c spacing = 113 mm

541629852.xls
DESIGN CALCULATION FOR PILECAP 2RC250 2 of 2

Project : T0516-ECO SANCTUARY Designed by : CPL Date : 23-Feb-16


Title : Pilecap Design for 2RC250 Checked by : LYJ Page :

Shear Check

Shear at column face = 1.36 N/mm2 < 4.73 N/mm2

(A) X-axis
Shear force = 1275 kN
Shear stress = 3.15 N/mm2
100 x As, prov / bd = 0.17 < 3, = 0.17
400 / d = 0.65 < 1, = 1
fcu / 25 = 1.40
av = 0 mm
vc = 0.39 N/mm2
Shear resistance = 4.73 N/mm2 > 3.15 N/mm2 OK

(B) Y-axis
Shear force = 2550 kN
Shear stress = 3.28 N/mm2
100 x As, prov / bd = 0.16 < 3, = 0.16
400 / d = 0.66 < 1, = 1
fcu / 25 = 1.40
av = 0 mm
vc = 0.38 N/mm2
Shear resistance = 4.73 N/mm2 > 3.28 N/mm2 OK

Provide T16 - 200mm c/c as binder;


Provide Binder 3 T 16