Notes:: 0 04.06.17 WA Issued For Client's Approval

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

NOTES :

1. ALL DIMENSIONS ARE IN METERS UNLESS


CL STATED OTHERWISE NOTED.
18.30 2. CROSS SECTION DRAWINGS SHOULD BE
READ IN CONJUNCTION WITH ROADWAY

R.O.W / BUILDING LINE

R.O.W / BUILDING LINE


CORRIDOR
9.15 9.15 LAYOUT,UTILITIES LAYOUT AND
LANDSCAPING DRAWINGS.
3.15 2.50 7.00 2.50 3.15
SIDEWALK PARALLEL CARRIAGEWAY PARALLEL SIDEWALK 3. FOR CROSS SECTION MARKER, REFER
PARKING 3.50 3.50 PARKING TO DRAWING NO. 301-TD-500-01
LANE LANE 4. FOR PRECAST CONCRETE INTERLOCKING
TILES BLOCK PATTERN, REFER TO
4.90 LANDSCAPING DRAWINGS.
4.70 4.10 5. FOR CROSS SECTION SLOPE, REFER
3.50 3.40 TO ROADS PROFILE DRAWING.
2.30 2.30
1.80 1.80
0.90 1.55 0.90
0.50 0.50

2%
2% 2%

0.80
0.90

1.00

0.40 0.80

0.90
0.50

0.90

1.00
1.50

0.80
1.50
PGL

1.20

1.50
1.50
0.40
FUTURE CURB SURROUND FOR
0.60 0.70 1.00 1.30 1.00 ROAD LIGHTING PROTECTION 1.00 0.60 0.40 1.00 0.70 0.60
1.20 0.80 1.20
LEGEND

ETIC-Du
DEWA(HV)

S.W.D.
DEWA(LV)

DEWA(WD)
DEWA(LV)
MANHOLE

SEWERAGE (H.C)
ETISALAT
ETISALAT

STREET LIGHTING
SEWERAGE M.H.
DEWA(WD)

SEWERAGE (H.C)
ELECTRICAL

WATER

ETISALAT & Du

FIRE FIGHTING

DRAINAGE
TYPICAL SERVICES RESERVATION CROSS SECTION
SEWERAGE
FOR CORRIDOR WIDTH OF 18.30m
IRRIGATION

STREET LIGHTING
CL
18.30 PROPOSED GROUND
PGL
LEVEL

R.O.W / BUILDING LINE

R.O.W / BUILDING LINE


CORRIDOR
5.50 7.30 5.50 EXISTING PAVEMENT
EX. GRADED AREA EX. CARRIAGEWAY EX. GRADED AREA ( NOT INCLUDING THE TOP
AC WEARING COURSE )

PROPOSED AC WEARING
6.00 6.00 COURSE
3.90 3.25 PROPOSED INTERLOCK TILES
1.60 1.60 ( PARKING & SIDEWALK )

Status:
TENDER DRAWINGS
ISSUE BOX

FOUNDATION

FIRE FIGHTING
EX. SEWERAGE

EX. DRAINAGE

EX. IRRIGATION &


EX. STREET LIGHTING
EX. SEWERAGE (H.C)

EX. SEWERAGE (H.C)


X:\Projects\232-001 FCW Eastern Residences-North\4. Drawings\4.4 Tender Drawings\Rev. 2\4.4.2 South\4.4.2.4 Roads\4.4.2.4.2 Section301-FD-500-02 Section 1-1 (18.30m).dwg SIROSH

0 04.06.17 WA Issued for Client's Approval


REVISIONS

EXISTING CONDITION FOR CORRIDOR WIDTH OF 18.30m


SECTION 1-1 0 04.06.17 WA Tender Drawings Submission

Client :

CL
18.30
R.O.W / BUILDING LINE

R.O.W / BUILDING LINE


CORRIDOR
9.15 9.15

0.50 2.50 2.50 7.30 2.50 2.50 0.50


SIDEWALK PARALLEL CARRIAGEWAY PARALLEL SIDEWALK
PARKING 3.65 3.65 PARKING
LANDSCAPE LANE LANE LANDSCAPE

6.00 6.00
4.50 4.50
3.90 4.00
3.25 3.25
2.30 2.30 Consultant :
1.60 1.60
0.90 0.90
0.50 0.50

2%
* PROTECTION BARRIER BETWEEN STREET LIGHTING S* 2% * REFER TO NOTE NO. 5
POLE AND 11kV CORRIDOR TO BE PROVIDED
0.80

0.80
0.90

0.90
1.00

0.80

0.90
1.00
0.90
0.40

Project :
0.40

0.50 0.80 1.00 0.80 0.60 1.20 1.00 1.00 1.20 0.60 0.80 1.00 0.80 0.50
1.20 1.20 FALCON CITY OF WONDERS
EASTERN RESIDENCE SOUTH
DEWA(LV)
DEWA(WD)

DEWA(WD)
DEWA(LV)
ETISALAT & Du

IRRIGATION

DEWA(11 kV)

DEWA(11 kV)

ETISALAT & Du
CCTV / IT
STREET LIGHTING

EX. FIRE FIGHTING


EX. SEWERAGE

EX. DRAINAGE
EX. SEWERAGE (H.C)

EX. SEWERAGE (H.C)

Drawing Title :

TYPICAL, EXISTING & PROPOSED


*

ROAD & UTILITIES SECTION


AT SECTION 1-1
6/04/2017 9:42 AM

PROPOSED CONDITION FOR CORRIDOR WIDTH OF 18.30m


AEC HN
SECTION 1-1 301 2
0 5m 10m
WA JUNE 2017

1 : 200
301-TD--500-02 0