Download as pdf or txt
Download as pdf or txt
You are on page 1of 25

Summary:

The objective of this document is to explain Integration steps between SAP ECC &
Decentralized SCM EWM.

Authors: Faraz Faridi

Author Bio:

Faraz is SAP EWM Lead consultant with 9.5 years of relevant experience in EWM of
Implementation, Roll Out & Support experience and has worked in Food Industry,
Pharmaceutical, Manufacturing & 3PL Warehousing.

Page 1
ERP & EWM Integration

Faraz Faridi

Page 2
Objective: -

The objective of this document is to demonstrate steps necessary to establish a


connection between the SAP ERP system and the SAP Decentralized SCM Extended
Warehouse Management.

After completing the below steps, you will be able to transfer Master data/Transactional
data between ECC & EWM.

Page 3
ECC Configuration Steps Includes: -

Activity Steps
(Include T-Code if
available)
1.Create the Company
Code

SPRO→ Enterprise
Structure→ Definition→
Financial
Accounting→Edit, Copy,
Delete, Check Company
Code→ Copy, delete,
check company code or
Edit Company Code Data

2. Create Plant

SPRO→ Enterprise
Structure→ Definition→
Logistics - General→
Define, copy, delete,
check plant→ Define
Plant or Copy, delete,
check plant

3. Create Division

SPRO→ Enterprise
Structure→ Definition→
Logistics - General→
Define, copy, delete,
check division → Define
Division or Copy, delete,
check division.

Page 4
4.Define, copy, delete,
check sales organization

SPRO→ Enterprise
Structure→ Definition→
Sales and Distribution→
Define, copy, delete,
check sales organization
→ Define Sales
Organization or Copy,
delete, check sales
organization.

5. Define, copy, delete,


check distribution
channel

SPRO→ Enterprise
Structure→ Definition→
Sales and Distribution→
Define, copy, delete,
check distribution
channel→ Define
distribution channel or
Copy, delete, check
distribution channel

6. Maintain storage
location

SPRO→ Enterprise
Structure→ Definition→
Materials
Management→ Maintain
storage location.

Page 5
7. Maintain purchasing
organization

SPRO→ Enterprise
Structure→ Definition→
Materials
Management→ Maintain
purchasing org

8.Define, copy, delete,


check warehouse
number

SPRO→Enterprise
Structure→Definition→L
ogistics
Execution→Define, copy,
delete, check warehouse
number

9.Define, copy, delete,


check shipping point

SPRO→Enterprise
Structure→Definition→L
ogistics Execution→
Define, copy, delete,
check shipping point

10. Assign Company


code to Company
SPRO→Enterprise
Structure→Assignment
→Financial accounting
→Assign company code
to company

Page 6
11.Assign plant to
company code

SPRO→Enterprise
Structure→Assignment
→Logistics –
General→Assign plant to
company code

12. Assign sales


organization to company
code

SPRO→Enterprise
Structure→Assignment
→ Sales and
Distribution→ Assign
sales organization to
company code

13. Assign distribution


channel to sales
organization

SPRO→Enterprise
Structure→Assignment
→ Sales and
Distribution→ Assign
distribution channel to
sales organization

14.Assign division to
sales organization

SPRO→Enterprise
Structure→Assignment
→ Sales and
Distribution→ Assign
division to sales
organization

Page 7
15.Assign sales
organization -
distribution channel –
plant

SPRO→Enterprise
Structure→Assignment
→ Sales and
Distribution→

16.Assign purchasing
organization to company
code

SPRO→Enterprise
Structure→Assignment
→ Materials
Management→ Assign
purchasing organization
to company code

17. Assign purchasing


organization to plant

SPRO→Enterprise
Structure→Assignment
→ Materials
Management→ Assign
purchasing organization
to plant

18. Assign warehouse


number to plant/storage
location

SPRO→Enterprise
Structure→Assignment
→ Logistics Execution→
Assign warehouse
number to plant/storage
location

Page 8
19. Assign shipping point
to plant

SPRO→Enterprise
Structure→Assignment
→ Logistics Execution→
Assign shipping point to
plant

20. Assign Shipping


Points

SPRO→ Logistics
Execution→ Shipping→
Basic Shipping
Functions→ Shipping
Point and Goods
Receiving Point
Determination→ Assign
Shipping Points

21.Assign Goods
Receiving Points for
Inbound Deliveries

SPRO→ Logistics
Execution→ Shipping→
Basic Shipping
Functions→ Shipping
Point and Goods
Receiving Point
Determination→ Assign
Goods Receiving Points
for Inbound Deliveries

Page 9
22. Maintain Extended
WM-Specific Parameters

SPRO→ Integration with


Other SAP Components
→ Extended Warehouse
Management → Basic
Settings for EWM Linkage
→Maintain EWM-
Specific Parameters

23. Generate
Distribution Model ERP
=> EWM

SPRO→ Integration with


Other mySAP.com
Components → Extended
Warehouse Management
→ Basic Settings for
EWM Linkage →
Generate Distribution
Model ERP => EWM

24. Defining the Queue


for Extended Warehouse
Management

25.Logging Sent and


Received Messages

Page 10
26.Registering the
Navigation from the
Queue

27. Assign Warehouse


Number to Warehouse
Number of Decentralized
SCM System

SPRO→ Integration with


Other mySAP.com
Components → Extended
Warehouse Management
→ Assign Warehouse
Number to Warehouse
Number of Decentralized
SCM System

28.Defining Delivery
Split by Warehouse
Number

SPRO→ Logistics
Execution→ Shipping→
Deliveries→ Define split
criteria for deliveries→
Delivery split by
warehouse number.

Page 11
RFC Connection settings ECC
Activity Steps
(Include T-Code if
available)
1.Name logical
system

SPRO→Integratio
n with Other SAP
Components→
Extended
Warehouse
Management→
Basic Settings for
Setting Up the
System Landscape

2.Assign Logical
Systems to a
Client

SPRO→Integratio
n with Other SAP
Components→
Extended
Warehouse
Management→
Basic Settings for
Setting Up the
System Landscape

Page 12
3.Specify SAP APO
Release

SPRO→Integratio
n with Other SAP
Components→
Extended
Warehouse
Management→
Basic Settings for
Setting Up the
System Landscape

Page 13
4.Set Up RFC
Destination

SPRO→Integratio
n with Other SAP
Components→
Extended
Warehouse
Management→
Basic Settings for
Setting Up the
System Landscape

Page 14
5.Set Target
System and Queue
Type

SPRO→Integratio
n with Other SAP
Components→
Extended
Warehouse
Management→
Basic Settings for
Setting Up the
System Landscape

6.Determining RFC
Destinations for
Method Calls in
ERP ((((BD97)))

7.Maintaining
qRFC Monitor
(QIN Scheduler)
Settings in
ERP((((SMQR))))))

Page 15
8.Maintaining
qRFC Monitor
(QOUT Scheduler)
Settings in
ERP(((((SMQS))))))

9.Registering
Display Programs
for Application Log
in ERP (SMQE)

Page 16
EWM Configuration Steps Includes

Activity Steps
(Include T-Code
if available)
1.Define
Warehouse
Number
Customizing

Path: SPRO→
Extended
Warehouse
Management→
Cross Process
Settings

2.Define
Warehouse
Number

Path: SPRO→
Extended
Warehouse
Management→
Master Data

Page 17
3.Define
Warehouse
Number Control

Path: SPRO→
Extended
Warehouse
Management→
Master Data→

Page 18
4.Define Number
Ranges

Path: SPRO→
Extended
Warehouse
Management→
Master Data→

5.Maintain
Supply Chain Note: CIF plant from ECC to EWM in order to create SCU in EWM.
Unit

Path:
/SCMB/SCUMAIN
- Maintain Supply
Chain Unit

Page 19
6. Create BP Note: CIF Vendor Or Customer to EWM in order to create a BP and add plant to
it under Identification Tab.
T-code: BP

7.Assign
Warehouse
Numbers

Path: SPRO→
Extended
Warehouse
Management→
Master Data→
Assign
Warehouse
Numbers

8.Map
Warehouse
Numbers from
ERP System to
EWM SPRO→
Extended
Warehouse
Management→
Interfaces → ERP
Integration→
General Settings

Page 20
09.Map Storage
Locations from
ERP System to
EWM

Path:
SPRO→Extended
Warehouse
Management→
Interfaces→ ERP
Integration→
Goods
Movements
10. Define
Availability
Group

Path:
SPRO→Extended
Warehouse
Management→
Goods Receipt
Process

11. Define Non-


Location-
Dependent Stock
Type

Path:
SPRO→Extended
Warehouse
Management→
Goods Receipt
Process

12. Configure
Stock Type

Path:
SPRO→Extended
Warehouse
Management→
Goods Receipt
Process

Page 21
RFC Connection settings EWM
Activity Steps
(Include T-Code if
available)
1.Name logical
system

2.Assign Logical
Systems to a Client

Page 22
3.Set Up RFC
Destination

Page 23
4.Determining RFC
Destinations for
Method Calls in
EWM ((((BD97)))))

5.Maintain Business
System Group

6.Assign Logical
System and Queue
Type

7.Maintaining qRFC
Monitor (QIN
Scheduler) Settings
in EWM
((((SMQR))))))

Page 24
8.Maintaining qRFC
Monitor (QOUT
Scheduler) Settings
in
EWM (((((SMQS)))))
)

9.Define Own
Business System

10.Define Business
System

11. Control for RFC


Queue

Reference:
http://help.sap.com

Page 25

You might also like