16. Once the bay is complete, check that the Cover Plate spacing
between the sketch panel and the Rim Channel at both ends of the
bay are within 25mm of each other, see Figure 20. If dimensions are
not within 25mm, adjust components to even out gap at both ends.
17. Match drill through the Main Girder and into the bottom flanges of
the Cross Brace and fasten Cross Braces to the Main Girder. See
Project Construction Drawings and Figure 21.
a. Cross Brace orientation and a tight fit against Main Girders
is critical for proper location of support legs or suspension
Figure 20 - Center Bay Assembly points, Reference construction drawings for roof support
locations. See Appendix A for suspended roof or Appendix
B for a fixed leg supported roof.
b. If the Cross Brace requires a leg housing, ensure that the
Cross Brace is oriented correctly (see Project Construction
Drawings).
18. If the bay requires any special framing of appurtenances, reference
Project Construction Drawings and see Appendix C for framing
installation.
Hold point
*Note: See Appendix A for a suspended roof or Appendix B for a fixed leg supported roof.
*Note: At this point some of the crew can continue to step 7 and installing the next bay while others complete
step 6.
Work Instructions
1
1. Bolt, ‘B’ Type
2. Panel Batten
3. Gasket (shop installed)
4. Panel Clip (installed in step 5c)
2
Gasket extends
Main Girder beyond Panel Batten
to the Main Girder
Work Instructions