This document outlines the bill of materials and scope of works for a 2-storey residential project located in Bacoor City, Cavite, Philippines. It includes 8 items for structural works (concrete and reinforcement) such as column footings, columns, tie beams, wall footings, beams, slabs and concrete stairs, CHB walls, and construction management. The total cost for structural works is estimated at PHP 677,156.92. Temporary facilities are budgeted at PHP 18,000. Mobilization costs PHP 19,800.
This document outlines the bill of materials and scope of works for a 2-storey residential project located in Bacoor City, Cavite, Philippines. It includes 8 items for structural works (concrete and reinforcement) such as column footings, columns, tie beams, wall footings, beams, slabs and concrete stairs, CHB walls, and construction management. The total cost for structural works is estimated at PHP 677,156.92. Temporary facilities are budgeted at PHP 18,000. Mobilization costs PHP 19,800.
This document outlines the bill of materials and scope of works for a 2-storey residential project located in Bacoor City, Cavite, Philippines. It includes 8 items for structural works (concrete and reinforcement) such as column footings, columns, tie beams, wall footings, beams, slabs and concrete stairs, CHB walls, and construction management. The total cost for structural works is estimated at PHP 677,156.92. Temporary facilities are budgeted at PHP 18,000. Mobilization costs PHP 19,800.