Download as pdf or txt
Download as pdf or txt
You are on page 1of 7

DESIGN, BUILD AND OPTIMISE

YOUR
METRO NETWORKS
FROM VISION TO COMMISSIONING
MORE THAN 50 YEARS SPENT SUPPORTING YOU IN
ALL YOUR METRO PROJECTS

EGIS OUR OTHER


OUR SKILLS OUR POSITIONING AREAS OF EXPERTISE
INFRASTRUCTURE BIM, ASSET MANAGEMENT,
EPCM,
AND SYSTEMS SECURITY STUDIES,
DESIGN AND BUILD, PPP,
DIAGNOSTICS
TURNKEY

L O N G T E R M PA R T N E R S H I P LRT
Together, we are committed to
meeting the challenges of the planet, 800
1
accompanying transitions, and acting in
the general interest to shape tomorrow’s RAILWAY AN INTEGRATED ENGINEERING CULTURE

12,000
world. Engineers, town planners, architects,
economists ... all the skills within the same team.

EGIS CONTRIBUTES METRO


TO DESIGNING AND
750
2
MODERNISING YOUR
TRANSPORT NETWORKS
CABLE CAR
A CLOSE RELATIONSHIP WITH

100 EGIS’ ASSETS


Urban: LRT, metro, cable car
CLIENTS AND SUPPORT THROUGHOUT
Railway: passenger railway, high
THE ENTIRE PROJECT

KM
speed line, freight

ON A METRO
Our teams adapt to each organisation and are used
to working with partners.
WE OFFER

PROJECT
3
A global offer and an ability to
manage complex projects
OF LINE EXPERIENCE AND EXPERTISE
Support for decision-makers, from
idea to commissioning Ranging from the management of major projects
A long-term commitment close to to all the technical disciplines concerned (systems
our customers integration, underground works, tracks, power,
signalling, etc.).
Solutions tailored to each context, TURNOVER
€267M
4
for sustainable mobility

2000
EMPLOYEES
IN RAIL ACTIVITIES
IN 2020 INCLUDING
ABILITY TO ADAPT TO CONSTRAINTS
Cost control, planning, site management, etc.

54 %
IN THE RAIL BUSINESS LINE
IN 2020
OUTSIDE OF FRANCE

2 | 3
underground works
and viaducts
Today we use mostly Earth Pressure Balance or Slurry Shield
Tunnel Boring Machines (TBMs) for our tunnelling work.
TBMs limit disturbance to the urban environment and utility
networks while producing smooth tunnel walls, and are thus the
most efficient and cost-effective solution

U
 nderground
works
techniques Egis JMI expertise
Egis designed and built the The superb engineering structures

FOCUS ON the lyon (france) metro, Slurry shield tunnel


1 designed by Jean Muller (engineer
complete metro network which is
highly automated (including one boring machine and architect, 1925-2005) are of

proven expertise
international renown and led to
driverless line) and very popular 2 Cut-and-cover retaining the creation of the firm Jean Muller
with its users. structure International (which has since become
3 Excavation by sections Egis JMI).
The four lines have enabled the
INTERVIEW* GRAND PARIS EXPRESS PROJECT: people of Lyon to reconnect with 4 Drill-and-blast

GPE
their city, due in part to
The largest
urban project in
Europe
200 km
of lines
high-quality urban developments:
pedestrian areas, redesign of Tunnel Boring Machine Egis brings proven
optimisations to your viaducts
Marianne SÉNÉCHAL
metro station surroundings,
This continuously improving method
In charge of leading and 68 37 teams of architects
and engineers mobilised
restructuring of the street
is one of the safest and quickest
coordinating project stations network and provision of
management operations for the techniques.
park-and-ride facilities. China
infrastructure of line 16 of the
2 million daily travellers Egis has used TBMs on projects in

‘‘
future Grand Paris Express. India, Riyadh and several French cities Macao, viaduct on a polder
Rennes Cut-and-cover
• A complex viaduct project partly on a polder

automatic
• Designed to withstand typhoons
Inoyour opinion, what are Egis’ major What specific means do you implement to • Commissioning of a first automatic line running 20 km (21 stations)

metro
strengths on this type of project? support a project of this scale? This technique limits difficulties caused
I would say that it is above all our experience and We are accustomed to coordinating and federating by a shallow water table (4-6m).
the cross-functionality of our business lines, which multidisciplinary forms of expertise on
EPCM of second automatic metro
The public utility networks are diverted India Thailand
today enables us to respond perfectly to a transport high-stakes and international projects. This project and the tunnel is excavated in a trench.
line, infrastructure and buildings Kolkata (Calcutta) Bangkok - Gold Line

‘‘
infrastructure project as vast as Grand Paris is nevertheless outstanding due to its size and its
Express. We have all the expertise and legitimacy unprecedented constraints, the most significant • 13 km (running from south west East-West elevated metro • 3 elevated stations
to coordinate and mobilise all the project’s undoubtedly being the simultaneous operation of to north east) • 14 km (12 stations), 6 km in tunnel • First fully automated railway system in
contributors behind the project, with the main goal 21 TBMs. Never before have we pooled so many and an 8 km viaduct, 1 control centre Thailand
• 15 stations (underground for
being its ultimate success. skills on the same project to achieve operational
tunnel segments and elevated • High capacity air conditioned rolling
excellence. This translates very concretely into
for viaduct segments) stock (1,000+ passengers per train)
many demanding coordination, organisation and
communication processes. This is the level of
• Functional design of stations,
exemplarity that must be achieved to build this
viaducts and maintenance depot
type of structure for the benefit of sustainable • Revenue service scheduled
communities. for 2021

*Interview: CONVERGENCE communications agency

4 | 5
stations
and transportation hubs

DIGITAL TECHNOLOGY AT THE SERVICE OF


STATION DESIGN
A station redefines a district over the long
term by restructuring spaces, flows and
landscapes. Our teams use digital mock-ups
to help stakeholders and local residents better
understand the project. New channels of
communication and decision support are used

iconic projects
from the upstream study phase, allowing, for
example, immersion during technical reviews.

MANAGING COMPLEXITY THROUGH BETTER


COLLABORATION
As engineers, we have guarantee to our
clients that the various eco-design choices
for a station are compatible with the project’s
constraints. The spatial, contractual and
technical coordination of all these elements Jeddah (Saudi Arabia) >
is facilitated by the use of digital mock-ups View of a metro station
and BIM (Building Information Modelling)
processes. Since 2010, we have deployed
E
 gis at the inception E
 gis, a leading player
these methods on the Rennes metro, then on of the world’s largest in Grand Paris Express
Grand Paris Express. This new version provides a dynamic
simulation of flows in metro metro project Paris Area
ASSET MANAGEMENT AND OPEX stations. By using Simwalk®, Egis
OPTIMISATION has helped Savannah Simulations Riyadh A leading figure in the urban development of the Paris region - Ile-de-
AG, the software designer, in the
France - Egis has supported the Société du Grand Paris (SGP) in the
Today, many metro system owners are
considering setting up a digital twin of their
Simwalk® development of new functions: Egis has spent the last ten years in Saudi Arabia
design and construction of the future Grand Paris Express metro from
supporting the Arriyadh Development Authority
stations. This will provide a centralised and or a station •D
 oor configuration, (ADA), from the initial transport blueprint through to the preliminary study phases.
reliable database of all assets managed prototype train modelling the design studies for the first of the city’s lines, and Since the summer of 2013, Egis has been in charge of the systems EPC
throughout the life of the installations and up to the construction procurement procedure.
allow them to prepare off-site maintenance •T
 rack dispatching management for management for lines 15 South, 16, 17, 18 and the infrastructure project
Station prototypes are chosen train arrivals and departures management for line 16, as well as the project management of the
operations and then support on-site Egis contributes to the project management and the
with regard to the specifications Maintenance and Storage Facility for line 15, located in Champigny. Egis
engineering work. Egis supports asset •P
 assengers waiting, boarding and construction supervision of three lines of Riyadh’s
and the legislation in force.
managers in setting up digital twinning as a alighting future metro network, covering 104 km altogether also managed the infrastructure EPC management for line 15 East from
service platform and is gradually developing Then the stations are tested autumn 2016 to autumn 2019 (when lines 15 East and 15 West were
and comprising 61 stations.
other services based on digital twinning. with the Simwalk Transport transferred to a Design & Build contract). Finally, Egis is in charge of the
application, a passenger flow The entire six-line network represents a total General Planning, Scheduling and Coordination missions for lines 15
simulator to optimise stations investment of almost 20 billion euros. south, 16 and 17.
and interchange hubs. This is a truly exceptional project with its 88 stations
In 2017, Egis, Société du Grand Paris and their partners were awarded
and 176 km of track including 59 km underground,
the Bim d’Or award in the infrastructure project category for their
81 km elevated and 36 km at grade.
collaborative work around BIM on the future line 16 of Grand Paris
Express.

6 | 7
modernisation Focus on airports CDG VAL CDG Express
Egis assisted Paris Aéroport on Since 2017, Egis has been assisting
People movers
the automatic passenger transport the Contracting Authority for the

and renovation
system at Paris-CDG airport. Our future direct rail link between
Cairo assignment covered all systems Paris-CDG airport and Paris city
Egis carried out the complete EPCM (rolling stock, centralised control, centre. Egis is also the integrated
of an elevated people mover (2 km, etc.), interface management and project manager of the design-
4 stations), which will connect the 3 safety files. Line 1 (3.3 km - 5 build consortium in charge of
terminals, as well as providing access stations) runs above and below the civil engineering works and
to a park-and-ride facility and a ground between terminals 1 and 2. installation of railway equipment in
shopping centre (situated within the It includes several extensions and a zones G and H of the CDG Express
airport complex).
short LISA line on a viaduct linking link.
the satellites in terminal 2, as well
as a train stabling depot with a
operations control centre (OCC).

System & migration


Lausanne - Lines 2 & 3 Lille double its capacity
Egis is working on the Lausanne metro for the equipement On a fully automatic 45 km network, line 1 has increased its
and systems missions. capacity from 2 to 4 cars. As a result, the stations have been
 rom assisted driving to
F On the m2 line, the increase in metro capacity involves specially equipped, the electrical and electromechanical
completely automated reconfiguring the line, replacing the current automatic equipment has been upgraded and rolling stock has been
driverless systems control system with a more efficient system and supplying purchased in accordance with the new safety standards.
additional trains.
On the new m3 line, Egis is in charge of all phases of the Mumbai
Infrastructure development
Thanks to its extensive experience, Egis
has been involved in many automatic project, from design to commissioning.
Line 3 of the Mumbai metro, which runs almost entirely
metro projects around the world. The system used will be the same as on the m2 line in order underground, will cross the island of Mumbai on a north-
to ensure interoperability between the lines.
Marseille - Fourragère Toulouse - Line A Improvement In fully automatic systems, south route over a distance of more than 30 km. It will
the trainsets run without drivers and connect the south of the island to the centre of the island,
Extending the M1 line by 4 stations (2.6 The aim of the operation was to improve safety headway are managed Lyon - Line B passing close to Mumbai International Airport. This
km) has led to several adjustments being the capacity of line A by operating automatically. The Control Centre entirely automatic system will have 27 stations, 26 of which
made: 52-metre trains. processes live information about the
Egis is currently in charge of the new extension of metro line underground.
relocation of the OCC, modification of Egis acted as project manager for the trainsets and manages data concerning
B to Hôpitaux Sud, as well as the "Avenir Métro" operation, Egis is in charge of project management and engineering for
the transmission networks, railway development of the Jean-Jaurès and the station equipment (lighting, ventila-
which involves the full automation of line B, with the this project.
signalling, audio-visual, radio and Esquirol stations, as well as conducting tion, etc.)
telephone equipment, passenger a general contracting mission for the integration of new rolling stock. Egis is involved in all phases
information systems and park-and-ride project. of this project, from studies to testing and commissioning. Montreal - Blue Line
Advantages
facilities. These improvements were carried out The studies have made it possible to define the programme
• Improved headways for the renewal of rolling stock, systems and automatic train The Blue Line is seeing its first extension since 2007, taking
while services continued, including the
Marseille metro network: • Short headways even at off-peak times control systems, in particular by defining how to migrate the line further westwards. At the same time, the project
migration of the technical premises,
• Instant capacity increase in reponse to these new systems onto the lines. includes the migration of the line to a CBTC system, the
• 2 lines the refurbishment of the platforms
demand The integration of new rolling stock and the migration will be creation of an underground maintenance centre for the
• 28 stations to accommodate 52-metre trains and
carried out in successive phases. infrastructure and the installation of platform screen doors
• 21 km (3 km elevated and 18 km the construction of a new connection
doors on the orange line.
underground) between two lines. A few references
Paris, Riyadh, Lausanne, Lyon, Lille, Egis is working on specific subjects such as system
Macao... integration, power, platform screen doors and CBTC.

8 | 9
eco-design 70’s Marseille Lyon
Egis’ Experience
integrated into our projects EPCM line 1 EPCM lines A & B

Lyon Nuremberg
• EPCM automatic line D EPCM automation of lines
80’s • EPCM extension lines C & D
90’s Cairo
Marseille EPCM line 2
Within each project, various opportunities may arise that
Des projets maitrisés et plus responsables
can lead to the overall improvement of its impact, from an
Lyon
EPCM line C et 1st extension line B
• EPCM extension lines 1 et 2

Toulouse
New York
Design and implementation
Marseille of CBTC
environmental but also a financial point of view. Our approach EPCM line 2
Construction of VAL (light
automated metro) Line A Singapore
to propose and design more responsible and sustainable Lisbon Quality control of equipment
Canton for the Circle Line
Modernization studies
projects starts at the bid phase and continues through to the Study line 1
Eastern Railway - Huangsha Athens
optimisation of the works. Assistance to owner for lines
2 &3

2000s
THE 3 MAIN PRINCIPLES Lyon Lisbon 2010s
EPCM 2nd extension line B Operating studies for the
Red line Lyon Jaipur
Porto EPCM 3rd extension line B Assignment line 1 Independent
EPCM extension Blue line Sao Paulo Safety Assessment mission for Train
AVOID THE CONSTRUCTION OF CERTAIN REDUCE THE CONSUMPTION OF ENERGY AND Functional design of stations Marseille control and signaling subsystem
Lausanne for line 5 • EPCM for line 1 extension
ITEMS OF INFRASTRUCTURE BY OPTIMISING BUILDING MATERIALS: Safety appraisal of automatic • Removal of the central control Bangalore
AND POOLING THEM: line 2 Barcelona room ISA of sub-systems Lines 1 and 2
• REDUCTION OF ENERGY CONSUMPTION Assistance to Client on
New Delhi driverless line L9 Rio de Janeiro Bangkok
• OPTIMISATION ON THE CREATION OF CIVIL > Use of natural ventilation in the halls and first ISA for the control and Assistance and technical • Inspection and System Safety
ENGINEERING WORKS underground floor: savings on the purchase of signalling of line 1 & 2 Mashhad consultancy services for the start up Certification for the extension of
Reduction in the number of smoke heat, cooling and ventilation equipment. extensions Preliminary studies for line 2 of line 4 the Green Line
extraction and ventilation stations on > Geothermal energy in the diaphragm walls, • Studies and supervision of works
Athens Tabriz Sao Paulo for the extension of the Blue Line
Grand Paris Express with 1 structure every example of Sainte-Anne station on Rennes metro Line 2 and 3 extension studies Preliminary studies and Metro expertise CBTC system
1,600m instead of 800 m before. Avoiding line B. Ispahan
construction procurement for Macao
second line Chennai EPCM line 1
the construction of certain structures saves Assistance to owner for line 1 EPCM for lines 1 et 2
money, materials and energy. • OPTIMISATION OF THE CIVIL ENGINEERING
Ahwaz Salvador Doha
DURING THE DESIGN PHASE OF THE PROJECT. Studies and design of systems Management, Integration and Gold, Green, Red Gold Line and
So-called "bilobe" stations on Grand Paris Express line 1 Interface Services for lines 1 and 2 of Major Stations Project management
project with thinner diaphragm walls and less use the Bahia de Salvador metro and design and construction
Toulouse
• POOLING THE NETWORK of concrete.
supervision
EPCM extension line A Dehli
In Lyon, LRT line T1 and metro line B at ISA for lines 7 and 8 of Delhi metro
Debourg station: • REVALORISATION AND REUSE OF MATERIALS
> Traction energy: the energy is recovered The Société du Grand Paris requires the 2020s
and reinjected into the tram and metro processing of unpolluted natural waste, a first in
network. France.
> Equipment between the networks: Grand Paris Express Rennes Montreal Riyadh
creation of a substation shared between the • EPCM for infrastructure works line EPCM infrastructure works line B Assistance to the Owner on Blue Line Project management and works
16 supervision on lines 1, 2 et 3
metro and the tramway. • EPCM for Systems lines 15 sud, 16, Lausanne Guadalajara
17 et 18 EPCM systems and equipment for Supervision, inspection and ISA Dubai
• General coordination of lines 15 automatic lines 2 and 3 assignment for works on line 3 • Turnkey on the Red line
south, 16 et 17 • Assistance to Owner for Green and
COMPENSATE BY REPLANTING THE AREAS TO OFFSET AND CONTROL THE IMPACT OF THE WORK ON THE Cairo Kolkata Red lines
ENVIRONMENT: Lille EPCM line 3 EPCM line 2
EPCM for modernisation and Bahrain
extension of line 1 Mumbai Bangkok Technical assistance for the elevated
• GREENING OF SPACES EPCM line 3 • Project consultant on Pink Line metro network project
Lyon
Creation of a semi-buried operations centre, on the Grand Paris Express project, with landscaping and greening of EPCM for Line B extension and
• Project implementation consultant
the roof. The greening project covers 9 hectares and 19 tracks. Nagpur on Orange line
automation EPCM lines 1 and 2 • Assistance to Owner on Gold Line

10 | 11
Egis Rail Follow us :

Tel : + 33(0)4 37 72 40 50
Le Carat, 170 avenue Thiers
View our latest films on the Egis channel on Vimeo.

69455 Lyon Cedex 06 FRANCE


"Egis, a player in major metro projects"

Egis - Bu Rail - RCS Versailles 702 027 376 - Crédits photos: © Mario Renzi / © Avant Première / © Aéroport de Munich / © Egis - Xavier Boisel - Jean Muller International - atelier Villes & Paysages / Istock-
photo / © Intrépide Production - KC110617A - January 2021

You might also like