YOUR
METRO NETWORKS
FROM VISION TO COMMISSIONING
MORE THAN 50 YEARS SPENT SUPPORTING YOU IN
ALL YOUR METRO PROJECTS
L O N G T E R M PA R T N E R S H I P LRT
Together, we are committed to
meeting the challenges of the planet, 800
1
accompanying transitions, and acting in
the general interest to shape tomorrow’s RAILWAY AN INTEGRATED ENGINEERING CULTURE
12,000
world. Engineers, town planners, architects,
economists ... all the skills within the same team.
KM
speed line, freight
ON A METRO
Our teams adapt to each organisation and are used
to working with partners.
WE OFFER
PROJECT
3
A global offer and an ability to
manage complex projects
OF LINE EXPERIENCE AND EXPERTISE
Support for decision-makers, from
idea to commissioning Ranging from the management of major projects
A long-term commitment close to to all the technical disciplines concerned (systems
our customers integration, underground works, tracks, power,
signalling, etc.).
Solutions tailored to each context, TURNOVER
€267M
4
for sustainable mobility
2000
EMPLOYEES
IN RAIL ACTIVITIES
IN 2020 INCLUDING
ABILITY TO ADAPT TO CONSTRAINTS
Cost control, planning, site management, etc.
54 %
IN THE RAIL BUSINESS LINE
IN 2020
OUTSIDE OF FRANCE
2 | 3
underground works
and viaducts
Today we use mostly Earth Pressure Balance or Slurry Shield
Tunnel Boring Machines (TBMs) for our tunnelling work.
TBMs limit disturbance to the urban environment and utility
networks while producing smooth tunnel walls, and are thus the
most efficient and cost-effective solution
U
nderground
works
techniques Egis JMI expertise
Egis designed and built the The superb engineering structures
proven expertise
international renown and led to
driverless line) and very popular 2 Cut-and-cover retaining the creation of the firm Jean Muller
with its users. structure International (which has since become
3 Excavation by sections Egis JMI).
The four lines have enabled the
INTERVIEW* GRAND PARIS EXPRESS PROJECT: people of Lyon to reconnect with 4 Drill-and-blast
GPE
their city, due in part to
The largest
urban project in
Europe
200 km
of lines
high-quality urban developments:
pedestrian areas, redesign of Tunnel Boring Machine Egis brings proven
optimisations to your viaducts
Marianne SÉNÉCHAL
metro station surroundings,
This continuously improving method
In charge of leading and 68 37 teams of architects
and engineers mobilised
restructuring of the street
is one of the safest and quickest
coordinating project stations network and provision of
management operations for the techniques.
park-and-ride facilities. China
infrastructure of line 16 of the
2 million daily travellers Egis has used TBMs on projects in
‘‘
future Grand Paris Express. India, Riyadh and several French cities Macao, viaduct on a polder
Rennes Cut-and-cover
• A complex viaduct project partly on a polder
automatic
• Designed to withstand typhoons
Inoyour opinion, what are Egis’ major What specific means do you implement to • Commissioning of a first automatic line running 20 km (21 stations)
metro
strengths on this type of project? support a project of this scale? This technique limits difficulties caused
I would say that it is above all our experience and We are accustomed to coordinating and federating by a shallow water table (4-6m).
the cross-functionality of our business lines, which multidisciplinary forms of expertise on
EPCM of second automatic metro
The public utility networks are diverted India Thailand
today enables us to respond perfectly to a transport high-stakes and international projects. This project and the tunnel is excavated in a trench.
line, infrastructure and buildings Kolkata (Calcutta) Bangkok - Gold Line
‘‘
infrastructure project as vast as Grand Paris is nevertheless outstanding due to its size and its
Express. We have all the expertise and legitimacy unprecedented constraints, the most significant • 13 km (running from south west East-West elevated metro • 3 elevated stations
to coordinate and mobilise all the project’s undoubtedly being the simultaneous operation of to north east) • 14 km (12 stations), 6 km in tunnel • First fully automated railway system in
contributors behind the project, with the main goal 21 TBMs. Never before have we pooled so many and an 8 km viaduct, 1 control centre Thailand
• 15 stations (underground for
being its ultimate success. skills on the same project to achieve operational
tunnel segments and elevated • High capacity air conditioned rolling
excellence. This translates very concretely into
for viaduct segments) stock (1,000+ passengers per train)
many demanding coordination, organisation and
communication processes. This is the level of
• Functional design of stations,
exemplarity that must be achieved to build this
viaducts and maintenance depot
type of structure for the benefit of sustainable • Revenue service scheduled
communities. for 2021
4 | 5
stations
and transportation hubs
iconic projects
from the upstream study phase, allowing, for
example, immersion during technical reviews.
6 | 7
modernisation Focus on airports CDG VAL CDG Express
Egis assisted Paris Aéroport on Since 2017, Egis has been assisting
People movers
the automatic passenger transport the Contracting Authority for the
and renovation
system at Paris-CDG airport. Our future direct rail link between
Cairo assignment covered all systems Paris-CDG airport and Paris city
Egis carried out the complete EPCM (rolling stock, centralised control, centre. Egis is also the integrated
of an elevated people mover (2 km, etc.), interface management and project manager of the design-
4 stations), which will connect the 3 safety files. Line 1 (3.3 km - 5 build consortium in charge of
terminals, as well as providing access stations) runs above and below the civil engineering works and
to a park-and-ride facility and a ground between terminals 1 and 2. installation of railway equipment in
shopping centre (situated within the It includes several extensions and a zones G and H of the CDG Express
airport complex).
short LISA line on a viaduct linking link.
the satellites in terminal 2, as well
as a train stabling depot with a
operations control centre (OCC).
8 | 9
eco-design 70’s Marseille Lyon
Egis’ Experience
integrated into our projects EPCM line 1 EPCM lines A & B
Lyon Nuremberg
• EPCM automatic line D EPCM automation of lines
80’s • EPCM extension lines C & D
90’s Cairo
Marseille EPCM line 2
Within each project, various opportunities may arise that
Des projets maitrisés et plus responsables
can lead to the overall improvement of its impact, from an
Lyon
EPCM line C et 1st extension line B
• EPCM extension lines 1 et 2
Toulouse
New York
Design and implementation
Marseille of CBTC
environmental but also a financial point of view. Our approach EPCM line 2
Construction of VAL (light
automated metro) Line A Singapore
to propose and design more responsible and sustainable Lisbon Quality control of equipment
Canton for the Circle Line
Modernization studies
projects starts at the bid phase and continues through to the Study line 1
Eastern Railway - Huangsha Athens
optimisation of the works. Assistance to owner for lines
2 &3
2000s
THE 3 MAIN PRINCIPLES Lyon Lisbon 2010s
EPCM 2nd extension line B Operating studies for the
Red line Lyon Jaipur
Porto EPCM 3rd extension line B Assignment line 1 Independent
EPCM extension Blue line Sao Paulo Safety Assessment mission for Train
AVOID THE CONSTRUCTION OF CERTAIN REDUCE THE CONSUMPTION OF ENERGY AND Functional design of stations Marseille control and signaling subsystem
Lausanne for line 5 • EPCM for line 1 extension
ITEMS OF INFRASTRUCTURE BY OPTIMISING BUILDING MATERIALS: Safety appraisal of automatic • Removal of the central control Bangalore
AND POOLING THEM: line 2 Barcelona room ISA of sub-systems Lines 1 and 2
• REDUCTION OF ENERGY CONSUMPTION Assistance to Client on
New Delhi driverless line L9 Rio de Janeiro Bangkok
• OPTIMISATION ON THE CREATION OF CIVIL > Use of natural ventilation in the halls and first ISA for the control and Assistance and technical • Inspection and System Safety
ENGINEERING WORKS underground floor: savings on the purchase of signalling of line 1 & 2 Mashhad consultancy services for the start up Certification for the extension of
Reduction in the number of smoke heat, cooling and ventilation equipment. extensions Preliminary studies for line 2 of line 4 the Green Line
extraction and ventilation stations on > Geothermal energy in the diaphragm walls, • Studies and supervision of works
Athens Tabriz Sao Paulo for the extension of the Blue Line
Grand Paris Express with 1 structure every example of Sainte-Anne station on Rennes metro Line 2 and 3 extension studies Preliminary studies and Metro expertise CBTC system
1,600m instead of 800 m before. Avoiding line B. Ispahan
construction procurement for Macao
second line Chennai EPCM line 1
the construction of certain structures saves Assistance to owner for line 1 EPCM for lines 1 et 2
money, materials and energy. • OPTIMISATION OF THE CIVIL ENGINEERING
Ahwaz Salvador Doha
DURING THE DESIGN PHASE OF THE PROJECT. Studies and design of systems Management, Integration and Gold, Green, Red Gold Line and
So-called "bilobe" stations on Grand Paris Express line 1 Interface Services for lines 1 and 2 of Major Stations Project management
project with thinner diaphragm walls and less use the Bahia de Salvador metro and design and construction
Toulouse
• POOLING THE NETWORK of concrete.
supervision
EPCM extension line A Dehli
In Lyon, LRT line T1 and metro line B at ISA for lines 7 and 8 of Delhi metro
Debourg station: • REVALORISATION AND REUSE OF MATERIALS
> Traction energy: the energy is recovered The Société du Grand Paris requires the 2020s
and reinjected into the tram and metro processing of unpolluted natural waste, a first in
network. France.
> Equipment between the networks: Grand Paris Express Rennes Montreal Riyadh
creation of a substation shared between the • EPCM for infrastructure works line EPCM infrastructure works line B Assistance to the Owner on Blue Line Project management and works
16 supervision on lines 1, 2 et 3
metro and the tramway. • EPCM for Systems lines 15 sud, 16, Lausanne Guadalajara
17 et 18 EPCM systems and equipment for Supervision, inspection and ISA Dubai
• General coordination of lines 15 automatic lines 2 and 3 assignment for works on line 3 • Turnkey on the Red line
south, 16 et 17 • Assistance to Owner for Green and
COMPENSATE BY REPLANTING THE AREAS TO OFFSET AND CONTROL THE IMPACT OF THE WORK ON THE Cairo Kolkata Red lines
ENVIRONMENT: Lille EPCM line 3 EPCM line 2
EPCM for modernisation and Bahrain
extension of line 1 Mumbai Bangkok Technical assistance for the elevated
• GREENING OF SPACES EPCM line 3 • Project consultant on Pink Line metro network project
Lyon
Creation of a semi-buried operations centre, on the Grand Paris Express project, with landscaping and greening of EPCM for Line B extension and
• Project implementation consultant
the roof. The greening project covers 9 hectares and 19 tracks. Nagpur on Orange line
automation EPCM lines 1 and 2 • Assistance to Owner on Gold Line
10 | 11
Egis Rail Follow us :
Tel : + 33(0)4 37 72 40 50
Le Carat, 170 avenue Thiers
View our latest films on the Egis channel on Vimeo.