(As on 30.08.

2021)
CENTRAL ELECTRICITY AUTHORITY
FUEL MANAGEMENT DIVISION
DAILY COAL STOCK REPORT
COAL STOCK POSITION FOR COAL LINKAGE BASED THERMAL POWER STATIONS IN THE COUNTRY

Critical(*)/
Super
Critical(**
PLF % PLF % Normative Requirement
Capacity ) as per
Region/State Mode of Transport Name of Thermal Power Station Sector (July, (Apr- Stock Reqd. for the day (In Actual Stock Reasons for critical coal stock/Remarks
(MW) Trigger
2021) July,2021) (Days) '000 Tonnes')
level &
other
conditions

In '000 Tonnes' In Days


Indigenous Import Total
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Northern
Haryana
1 RAIL INDIRA GANDHI STPP JV 1500 44.2 42.6 30 15.47 44.33 0 44.33 3 CIL supply 92% of prorata ACQ
2 RAIL MAHATMA GANDHI TPS P 1320 71.7 70.5 25 18.24 71 0 71 4 CIL Supply 101% of prorata ACQ
3 RAIL PANIPAT TPS S 710 28.2 23.0 30 7.05 103.83 0 103.83 15
4 RAIL RAJIV GANDHI TPS S 1200 24.4 11.0 30 11.2 157.9 0 157.9 14
5 RAIL YAMUNA NAGAR TPS S 600 36.6 49.4 25 5.2 74.31 0 74.31 14
Punjab
6 RAIL-1500 GH TPS (LEH.MOH.) S 920 63.6 26.0 30 8.59 101.54 0 101.54 12
7 RAIL-1500 GOINDWAL SAHIB TPP P 540 76.3 43.8 30 4.93 30.44 0 30.44 6 CIL Supply 115% of prorata ACQ
8 RAIL RAJPURA TPP P 1400 89.3 89.6 25 18.38 223.54 0 223.54 12
9 RAIL ROPAR TPS S 840 58.0 23.2 30 7.76 112.7 0 112.7 15
10 RAIL-1500 TALWANDI SABO TPP P 1980 26.9 37.1 25 17.44 263.41 0 263.41 15
Rajasthan

Plant gets coal from its captive mine (PKCL).Total coal stock
11 RAIL CHHABRA TPP S 2320 55.4 45.5 25.0 19.91 0 0 0 0
(Linkage + Captive ) is 86.0 Th. Tonnes as on 31.07.2021

12 RAIL KAWAI TPS P 1320 80.7 73.4 25 10.25 45.43 0 45.43 4 CIL Supply 109% of prorata ACQ
13 RAIL KOTA TPS S 1240 48.2 42.9 30 14.15 27.01 0 27.01 2 Coal supply restricted due to outstanding dues
14 RAIL-1500 SURATGARH TPS S 2160 22.3 9.1 30 19.02 0 0 0 0 Coal supply restricted due to outstanding dues
Uttar Pradesh
15 PITHEAD ANPARA C TPS P 1200 80.0 75.1 15 18.62 27.25 0 27.25 1 CIL Supply 103% of prorata ACQ
16 PITHEAD ANPARA TPS S 2630 63.6 66.3 15 30.61 364.37 0 364.37 12
17 RAIL BARKHERA TPS P 90 55.3 40.6 20 1.37 7.05 0 7.05 5 CIL supply 102% of prorata ACQ
18 RAIL DADRI (NCTPP) C 1820 42.4 37.6 30 16.19 1.53 0 1.53 0 CIL supply 92% of prorata ACQ
19 RAIL HARDUAGANJ TPS S 605 35.9 36.0 30 6.71 10.6 0 10.6 2 Coal supply restricted due to outstanding dues.
20 RAIL KHAMBARKHERA TPS P 90 55.6 41.4 20 1.16 10.79 0 10.79 9
21 RAIL KUNDARKI TPS P 90 66.5 58.5 25 1.4 20.73 0 20.73 15
22 RAIL LALITPUR TPS P 1980 74.3 62.5 25 24.39 152.6 0 152.6 6 CIL supply 99% of prorata ACQ
23 RAIL MAQSOODPUR TPS P 90 55.5 41.0 20 1.32 10.52 0 10.52 8
24 RAIL MEJA STPP JV 1320 78.6 70.8 20 14.04 26.86 0 26.86 2 CIL supply 92% of prorata ACQ
25 RAIL OBRA TPS S 1094 47.8 50.2 20 10.69 112.65 0 112.65 11
26 RAIL PARICHHA TPS S 1140 54.3 44.0 30 10.68 17.36 0 17.36 2 Coal Supply regulated due to outstanding dues
27 RAIL PRAYAGRAJ TPP P 1980 76.7 71.5 20 21.25 58.23 0 58.23 3 Coal supply from CIL is 100% of prorata ACQ
28 PITHEAD RIHAND STPS C 3000 88.5 82.2 15 33.16 186.08 0 186.08 6
29 RAIL ROSA TPP Ph-I P 1200 54.0 65.2 25 15.05 27.68 0 27.68 2 Coal supply as per payments.
30 PITHEAD SINGRAULI STPS C 2000 54.3 74.3 15 32.09 132.43 0 132.43 4 CIL supply 92% of prorata ACQ
31 RAIL TANDA TPS C 1760 69.3 65.9 25 17.76 25.39 0 25.39 1 CIL supply 92% of prorata ACQ
32 RAIL UNCHAHAR TPS C 1550 59.9 62.0 25 14.16 35.99 0 35.99 3 CIL supply 92% of prorata ACQ
33 RAIL UTRAULA TPS P 90 60.2 48.5 20 1.33 12.23 0 12.23 9
Total of Northern
41779 24 449.57 2495.78 0.00 2495.78 6 0
Region
Western
Chhatisgarh
34 RAIL AKALTARA TPS P 1800 58.1 53.8 20 15.02 88.7 0 88.7 6 CIL supply 96% of prorata ACQ
35 RAIL BALCO TPS P 600 40.1 65.1 15 6.83 56.5 0 56.5 8
36 ROAD BANDAKHAR TPP P 300 91.6 90.8 15 4.26 25.69 0 25.69 6 CIL supply 76% of prorata ACQ
37 RAIL BARADARHA TPS P 1200 83.6 87.9 20 16.78 182.82 0 182.82 11
38 RAIL BHILAI TPS JV 500 87.4 85.4 20 8.46 187.49 0 187.49 22
39 RAIL BINJKOTE TPP P 600 44.1 43.6 15 6.15 6.04 0 6.04 1 Coal supply as per payment.
40 RAIL DSPM TPS S 500 90.6 86.1 15 6.23 28.55 0 28.55 5 CIL supply 107% of prorata ACQ
41 PITHEAD KORBA STPS C 2600 89.3 95.5 15 31.07 406.07 0 406.07 13
42 PITHEAD KORBA-WEST TPS S 1340 70.2 74.8 15 15.68 81.41 0 81.41 5
43 RAIL LARA TPP C 1600 77.9 82.7 15 21.72 67.11 0 67.11 3 Power plant has Bridge Linkage
44 RAIL MARWA TPS S 1000 38.4 57.9 15 11.67 76.2 0 76.2 7
45 RAIL NAWAPARA TPP P 600 6.1 25.4 15 6.15 4.6 0 4.6 1 Coal supply as per payment
46 RAIL PATHADI TPP P 600 70.6 83.1 15 5.31 91.38 0 91.38 17
47 PITHEAD SIPAT STPS C 2980 93.2 91.7 15 43.04 116.28 15.88 132.16 3 CIL supply 92% of prorata ACQ
48 RAIL TAMNAR TPP P 2400 32.1 39.0 20 30.31 67.81 0 67.81 2 Coal supply as per payment
49 RAIL UCHPINDA TPP P 1440 59.4 49.7 15 14.07 52.51 0 52.51 4 CIL Supply 128% of prorata ACQ
Gujarat
50 RAIL-1500 GANDHI NAGAR TPS S 630 26.0 42.4 30 6.66 57.76 0 57.76 9
51 RAIL SABARMATI (D-F STATIONS) P 362 75.8 71.2 30 4.17 3.79 101.4 105.19 1 CIL supply is 123% of prorata ACQ
52 RAIL UKAI TPS S 1110 43.7 51.2 30 9.52 270.22 0 270.22 28
53 RAIL-1500 WANAKBORI TPS S 2270 49.2 55.2 30 20.17 74.61 0 74.61 4 CIL supply to GSECL is 103% of prorata ACQ
Madhya Pradesh
54 PITHEAD AMARKANTAK EXT TPS S 210 42.0 72.0 15 3.12 43.48 0 43.48 14
Critical(*)/
Super
Critical(**
PLF % PLF % Normative Requirement
Capacity ) as per
Region/State Mode of Transport Name of Thermal Power Station Sector (July, (Apr- Stock Reqd. for the day (In Actual Stock Reasons for critical coal stock/Remarks
(MW) Trigger
2021) July,2021) (Days) '000 Tonnes')
level &
other
conditions

In '000 Tonnes' In Days


Indigenous Import Total
55 RAIL ANUPPUR TPP P 1200 81.3 69.3 20 15.29 59 0 59 4 CIL supply to MPPGCL is 84 % of prorata ACQ
56 RAIL BINA TPS P 500 50.1 56.9 25 4.67 55.28 0 55.28 12
57 RAIL GADARWARA TPP C 1600 29.6 35.5 20 17.17 32.83 0 32.83 2 CIL supply 92% of prorata ACQ
58 RAIL KHARGONE STPP C 1320 0.0 0.0 25 11.33 44.12 0 44.12 4 CIL supply 92% of prorata ACQ
59 RAIL SANJAY GANDHI TPS S 1340 47.2 58.1 20 12.43 176.43 0 176.43 14
60 RAIL SATPURA TPS S 1330 31.2 29.2 20 12.71 114.49 0 114.49 9
61 RAIL SEIONI TPP P 600 73.5 71.5 25 9.38 62.99 0 62.99 7
62 RAIL SHREE SINGAJI TPP S 2520 39.0 33.7 25 23.45 66.34 0 66.34 3 CIL supply to MPPGCL is 84 % of prorata ACQ
63 PITHEAD VINDHYACHAL STPS C 4760 81.2 89.8 15 68.31 343.01 0 343.01 5
Maharashtra
64 RAIL AMRAVATI TPS P 1350 66.7 80.5 25 15.07 48.33 0 48.33 3 CIL Supply 99 % of prorata ACQ
65 RAIL BHUSAWAL TPS S 1210 43.4 55.8 20 15.78 24.48 0 24.48 2 CIL Supply 89% of prorata ACQ
66 RAIL BUTIBORI TPP P 600 0.0 0.0 15 5.15 59.73 0 59.73 12
CHANDRAPUR(MAHARASHTRA)
67 RAIL S 2920 54.1 56.3 20 36.46 167.19 0 167.19 5 CIL Supply 89% of prorata ACQ
STPS
68 RAIL DAHANU TPS P 500 57.1 67.5 30 7.13 60.3 0 60.3 8
69 RAIL DHARIWAL TPP P 600 77.5 83.1 20 5.16 43.79 0 43.79 8
70 RAIL GMR WARORA TPS P 600 66.5 56.9 20 5.01 5.1 0 5.1 1 Coal supply as per payments.
71 RAIL KHAPARKHEDA TPS S 1340 39.9 57.9 25 20.47 94.32 0 94.32 5 CIL Supply 89% of prorata ACQ
72 RAIL KORADI TPS S 2400 41.3 44.6 25 28.25 75.4 0 75.4 3 CIL Supply 89% of prorata ACQ
73 RAIL MAUDA TPS C 2320 46.7 62.7 20 35.02 32.85 95.28 128.13 1 CIL Supply 92% of prorata ACQ
74 RAIL NASIK TPS S 630 22.4 35.2 25 6.75 9.4 0 9.4 1 CIL Supply 89% of prorata ACQ
75 RAIL PARAS TPS S 500 49.2 62.2 20 4.99 8.18 0 8.18 2 CIL Supply 89% of prorata ACQ
76 RAIL PARLI TPS S 750 4.0 25.1 25 8.02 10.68 0 10.68 1 CIL Supply 89% of prorata ACQ
77 RAIL-1500 SOLAPUR STPS C 1320 35.6 22.5 30 11.84 121.07 34.83 155.9 13
78 RAIL TIRORA TPS P 3300 78.8 71.3 20 34.67 256.64 0 256.64 7
79 ROAD WARDHA WARORA TPP P 540 35.6 45.7 15 4.48 27.71 0 27.71 6 Restriction on coal supply as per court order
Total of Western
60692 20 705.38 3988.68 247.39 4236.07 6 0
Region
Southern
Andhra Pradesh
DAMODARAM SANJEEVAIAH
80 RAIL-SEA S 1600 42.4 35.6 25 13.6 95.17 0 95.17 7
TPS
81 RAIL Dr. N.TATA RAO TPS S 1760 76.8 81.0 25 21.19 13.33 0 13.33 1 Coal supply regulated by MCL due to outstanding dues.
82 RAIL-SEA PAINAMPURAM TPP P 1320 85.0 86.1 25 17.24 270.43 97.18 367.61 21
83 RAIL RAYALASEEMA TPS S 1650 59.6 36.4 20 16.77 25.3 0 25.3 2 Coal supply regulated by MCL due to outstanding dues.
84 RAIL SIMHADRI C 2000 72.1 51.6 25 31.48 82.92 0 82.92 3 CIL supply 92% of prorata ACQ
85 RAIL VIZAG TPP P 1040 0.0 0.0 25 10.45 152.4 0 152.4 15
Karnataka
86 RAIL BELLARY TPS S 1700 44.0 41.4 25 21.82 13.23 0 13.23 1 Coal supply is as per program submitted.
87 RAIL KUDGI STPP C 2400 10.2 11.8 25 17.11 122.22 0 122.22 7
88 RAIL RAICHUR TPS S 1720 28.8 36.4 25 18.16 79.29 0 79.29 4 Coal supply is as per program submitted.
89 RAIL YERMARUS TPP S 1600 2.2 22.3 25 13.73 102.39 0 102.39 7
Tamil Nadu
90 RAIL-SEA-1500 METTUR TPS S 840 58.7 50.0 30 15.27 47.97 0 47.97 3 CIL Supply 84% of prorata ACQ
91 RAIL-SEA-1500 METTUR TPS - II S 600 55.4 66.2 30 5.56 73.79 0 73.79 13
92 RAIL-SEA NORTH CHENNAI TPS S 1830 51.6 43.5 30 17.87 405.3 13.22 418.52 23
93 RAIL-SEA-1500 NTPL TUTICORIN TPP JV 1000 54.6 59.2 30 13.32 98.62 0 98.62 7 CIL supply 92% of prorata ACQ
94 RAIL-SEA-1500 TUTICORIN TPS S 1050 29.8 41.4 30 17.17 103.89 0 103.89 6 CIL Supply 84% of prorata ACQ
95 RAIL-SEA VALLUR TPP JV 1500 63.8 61.4 30 14.81 307.48 0 307.48 21
Telangana
96 RAIL BHADRADRI TPP S 810 0.0 0.0 15 9.26 59.43 0 59.43 6 Unloading Constraint
97 PITHEAD KAKATIYA TPS S 1100 76.0 70.8 15 11.56 173.85 0 173.85 15
98 RAIL KOTHAGUDEM TPS (NEW) S 1000 61.1 66.0 15 14.54 161.84 0 161.84 11
99 RAIL KOTHAGUDEM TPS (STAGE-7) S 800 85.3 86.3 15 8.14 129.95 0 129.95 16

100 PITHEAD RAMAGUNDEM STPS C 2600 72.2 78.4 15 32.83 210.01 0 210.01 6
101 RAIL SINGARENI TPP S 1200 75.7 88.2 15 15.89 113.19 0 113.19 7
Total of Southern
31120 23 357.77 2842.00 110.40 2952.40 8 0
Region
Eastern
Critical(*)/
Super
Critical(**
PLF % PLF % Normative Requirement
Capacity ) as per
Region/State Mode of Transport Name of Thermal Power Station Sector (July, (Apr- Stock Reqd. for the day (In Actual Stock Reasons for critical coal stock/Remarks
(MW) Trigger
2021) July,2021) (Days) '000 Tonnes')
level &
other
conditions

In '000 Tonnes' In Days


Indigenous Import Total
Bihar
102 RAIL BARAUNI TPS C 710 31.0 29.5 20 6.09 26.07 0 26.07 4 CIL supply 92% of prorata ACQ
CIL supply 92% of prorata ACQ. Power Plant has Bridge
103 RAIL BARH II C 1320 68.7 71.2 20 17.39 23.21 0 23.21 1
Linkage
104 PITHEAD KAHALGAON TPS C 2340 75.3 84.9 15 28.21 57.2 0 57.2 2 CIL supply 92% of prorata ACQ
105 RAIL MUZAFFARPUR TPS JV 610 48.3 60.5 20 5.76 38.51 0 38.51 7 CIL supply 92% of prorata ACQ
106 RAIL NABINAGAR STPP JV 1320 69.6 82.1 20 13.4 29.7 0 29.7 2 CIL supply 92% of prorata ACQ
107 RAIL NABINAGAR TPP JV 750 60.4 77.7 20 7.03 21.79 0 21.79 3 CIL supply 92% of prorata ACQ
Jharkhand
108 RAIL BOKARO TPS `A` EXP C 500 90.3 77.3 20 7.01 12.69 0 12.69 2 CIL supply 124% of prorata ACQ
109 RAIL CHANDRAPURA(DVC) TPS C 500 90.5 88.5 20 6.25 42.04 0 42.04 7
110 RAIL JOJOBERA TPS P 240 73.4 77.1 20 3.96 34.97 0 34.97 9
111 RAIL KODARMA TPP C 1000 66.6 84.6 20 8.07 115.6 0 115.6 14
112 RAIL MAHADEV PRASAD STPP P 540 83.8 81.4 20 5.05 29.5 0 29.5 6 CIL supply 124% of prorata ACQ
113 RAIL MAITHON RB TPP JV 1050 99.5 91.2 20 15.26 155.97 0 155.97 10
114 RAIL TENUGHAT TPS S 420 35.0 39.2 20 3.94 8.32 0 8.32 2 CIL supply 106% of prorata ACQ
Odisha
115 PITHEAD DARLIPALI STPS C 1600 0.0 0.0 15 14.78 345.09 0 345.09 23
116 RAIL DERANG TPP P 1200 82.7 83.3 20 12.99 695.59 0 695.59 54
117 PITHEAD IB VALLEY TPS S 1740 62.2 61.4 15 24.84 104.67 0 104.67 4 CIL supply 113% of prorata ACQ
118 RAIL KAMALANGA TPS P 1050 75.9 80.9 15 18.05 123.06 0 123.06 7
119 RAIL STERLITE TPP P 600 25.2 23.1 15 7.27 14.9 0 14.9 2 CIL supply 158% of prorata ACQ
120 PITHEAD TALCHER STPS C 3000 79.7 84.3 15 43.4 665.38 0 665.38 15
West Bengal
121 RAIL BAKRESWAR TPS S 1050 91.0 90.5 20 9.73 59.2 0 59.2 6 Coal supply restricted due to outstanding dues.
122 RAIL BANDEL TPS S 330 59.2 59.6 20 4.07 12.35 0 12.35 3 Coal supply restricted due to outstanding dues.
123 RAIL BUDGE BUDGE TPS P 750 92.8 91.6 20 10.33 133.67 0 133.67 13
124 RAIL D.P.L. TPS S 550 58.9 54.0 20 5.07 15.15 0 15.15 3 Coal supply is as per payments
125 RAIL DURGAPUR STEEL TPS C 1000 61.3 71.1 25 11.08 33.18 0 33.18 3 CIL supply 124% of prorata ACQ
126 RAIL DURGAPUR TPS C 210 11.2 8.1 20 2.31 75.34 0 75.34 33
127 PITHEAD FARAKKA STPS C 2100 61.3 65.6 15 19.35 36.39 0 36.39 2 CIL supply 92% of prorata ACQ
128 RAIL HALDIA TPP P 600 91.9 89.5 20 9 64.2 0 64.2 7
129 RAIL KOLAGHAT TPS S 1260 38.7 34.2 20 14.79 11.97 0 11.97 1 Coal supply restricted due to outstanding dues
130 RAIL MEJIA TPS C 2340 71.9 72.8 20 23.11 85.11 0 85.11 4 CIL supply 124% of prorata ACQ
131 RAIL RAGHUNATHPUR TPP C 1200 56.8 52.9 15 11.46 48.61 0 48.61 4 CIL supply 124% of prorata ACQ
132 RAIL SAGARDIGHI TPS S 1600 61.9 81.8 20 15.5 44.4 0 44.4 3 Coal supply restricted due to outstanding dues
133 RAIL SANTALDIH TPS S 500 88.8 92.5 20 8.68 18.58 0 18.58 2 Coal supply restricted due to outstanding dues
134 RAIL SOUTHERN REPL. TPS P 135 0.2 12.7 20 1.23 42.05 0 42.05 34
Total of Eastern
34115 18 394.46 3224.46 0.00 3224.46 8 0
Region
North Eastern
Assam
135 RAIL BONGAIGAON TPP C 750 63.3 62.1 25 6.24 60.93 0 60.93 10
Total of North
750.00 25 6.24 60.93 0.00 60.93 10 0
Eastern Region
Region-wise/All
168456 21 1913.42 12611.85 357.79 12969.64 7 0
India total

As per trigger level and other Total Stock Total


conditions ('000 T) Stock (in Stock in Days
No. of Capacity Daily Req Number of
Pithead Plants Mode Days) (Critical/Super Capacity (MW)
Plants (MW) ('000 T) Plants
Critical)

(*) No. of plants with Critical Stock (<5 Days) 0 Pithead 16 35200 450.7 3308.9 7 0 day 3 6300
Non- 1 day
(**) No. of plants with Super Critical Stock (<3 Days) 0 119 133256 1462.8 9660.8 7 13 14862
Pithead
Non-Pithead TOTAL 135 168456 1913.4 12969.6 7 2 days 17 20645
(*) No. of plants with Critical Stock (<7 Days) 0 3 days 15 22950
(**) No. of plants with Super Critical Stock (<4 Days) 0 4 days 12 16310
Non-Pithead (More than 1500 kms) 5 days 4 4850
(*) No. of plants with Critical Stock (<9 Days) 0 6 days 9 8610
(**) No. of plants with Super Critical Stock (<5 Days) 0 7 days 1 1000
Total 0 8 days 0 0
NOTE: TOTAL 74 95527

(i) % Materialisation (including Deemed Delivery) as per CIL is for the period 01.04.2021 to 06.07.2021
(ii) Power Plants having less coal stock due to outstanding dues/ supply more than committed quantity/ not lifting offered coal/Bridge linkage/New Linkage are not shown as having critical /supercritical coal stock.
(iii) Daily coal requirement is based on the maximum of the requirement for average actual consumption of the plant for last 7 days or requirement for installed capacity of plant at 55%PLF.
(iv) Stock resticted to 70% Domestic and 30% Imported ratio.
C:Central Sector; S: State Sector; P: Private Sector; JV: Joint Venture
(v) Power plants located at a distance of about 1500 km from linked coal mines taking coal through Rail mode (RAIL-1500) and Rail-Sea (RAIL-SEA-1500).