2021)
CENTRAL ELECTRICITY AUTHORITY
FUEL MANAGEMENT DIVISION
DAILY COAL STOCK REPORT
COAL STOCK POSITION FOR COAL LINKAGE BASED THERMAL POWER STATIONS IN THE COUNTRY
Critical(*)/
Super
Critical(**
PLF % PLF % Normative Requirement
Capacity ) as per
Region/State Mode of Transport Name of Thermal Power Station Sector (July, (Apr- Stock Reqd. for the day (In Actual Stock Reasons for critical coal stock/Remarks
(MW) Trigger
2021) July,2021) (Days) '000 Tonnes')
level &
other
conditions
Plant gets coal from its captive mine (PKCL).Total coal stock
11 RAIL CHHABRA TPP S 2320 55.4 45.5 25.0 19.91 0 0 0 0
(Linkage + Captive ) is 86.0 Th. Tonnes as on 31.07.2021
12 RAIL KAWAI TPS P 1320 80.7 73.4 25 10.25 45.43 0 45.43 4 CIL Supply 109% of prorata ACQ
13 RAIL KOTA TPS S 1240 48.2 42.9 30 14.15 27.01 0 27.01 2 Coal supply restricted due to outstanding dues
14 RAIL-1500 SURATGARH TPS S 2160 22.3 9.1 30 19.02 0 0 0 0 Coal supply restricted due to outstanding dues
Uttar Pradesh
15 PITHEAD ANPARA C TPS P 1200 80.0 75.1 15 18.62 27.25 0 27.25 1 CIL Supply 103% of prorata ACQ
16 PITHEAD ANPARA TPS S 2630 63.6 66.3 15 30.61 364.37 0 364.37 12
17 RAIL BARKHERA TPS P 90 55.3 40.6 20 1.37 7.05 0 7.05 5 CIL supply 102% of prorata ACQ
18 RAIL DADRI (NCTPP) C 1820 42.4 37.6 30 16.19 1.53 0 1.53 0 CIL supply 92% of prorata ACQ
19 RAIL HARDUAGANJ TPS S 605 35.9 36.0 30 6.71 10.6 0 10.6 2 Coal supply restricted due to outstanding dues.
20 RAIL KHAMBARKHERA TPS P 90 55.6 41.4 20 1.16 10.79 0 10.79 9
21 RAIL KUNDARKI TPS P 90 66.5 58.5 25 1.4 20.73 0 20.73 15
22 RAIL LALITPUR TPS P 1980 74.3 62.5 25 24.39 152.6 0 152.6 6 CIL supply 99% of prorata ACQ
23 RAIL MAQSOODPUR TPS P 90 55.5 41.0 20 1.32 10.52 0 10.52 8
24 RAIL MEJA STPP JV 1320 78.6 70.8 20 14.04 26.86 0 26.86 2 CIL supply 92% of prorata ACQ
25 RAIL OBRA TPS S 1094 47.8 50.2 20 10.69 112.65 0 112.65 11
26 RAIL PARICHHA TPS S 1140 54.3 44.0 30 10.68 17.36 0 17.36 2 Coal Supply regulated due to outstanding dues
27 RAIL PRAYAGRAJ TPP P 1980 76.7 71.5 20 21.25 58.23 0 58.23 3 Coal supply from CIL is 100% of prorata ACQ
28 PITHEAD RIHAND STPS C 3000 88.5 82.2 15 33.16 186.08 0 186.08 6
29 RAIL ROSA TPP Ph-I P 1200 54.0 65.2 25 15.05 27.68 0 27.68 2 Coal supply as per payments.
30 PITHEAD SINGRAULI STPS C 2000 54.3 74.3 15 32.09 132.43 0 132.43 4 CIL supply 92% of prorata ACQ
31 RAIL TANDA TPS C 1760 69.3 65.9 25 17.76 25.39 0 25.39 1 CIL supply 92% of prorata ACQ
32 RAIL UNCHAHAR TPS C 1550 59.9 62.0 25 14.16 35.99 0 35.99 3 CIL supply 92% of prorata ACQ
33 RAIL UTRAULA TPS P 90 60.2 48.5 20 1.33 12.23 0 12.23 9
Total of Northern
41779 24 449.57 2495.78 0.00 2495.78 6 0
Region
Western
Chhatisgarh
34 RAIL AKALTARA TPS P 1800 58.1 53.8 20 15.02 88.7 0 88.7 6 CIL supply 96% of prorata ACQ
35 RAIL BALCO TPS P 600 40.1 65.1 15 6.83 56.5 0 56.5 8
36 ROAD BANDAKHAR TPP P 300 91.6 90.8 15 4.26 25.69 0 25.69 6 CIL supply 76% of prorata ACQ
37 RAIL BARADARHA TPS P 1200 83.6 87.9 20 16.78 182.82 0 182.82 11
38 RAIL BHILAI TPS JV 500 87.4 85.4 20 8.46 187.49 0 187.49 22
39 RAIL BINJKOTE TPP P 600 44.1 43.6 15 6.15 6.04 0 6.04 1 Coal supply as per payment.
40 RAIL DSPM TPS S 500 90.6 86.1 15 6.23 28.55 0 28.55 5 CIL supply 107% of prorata ACQ
41 PITHEAD KORBA STPS C 2600 89.3 95.5 15 31.07 406.07 0 406.07 13
42 PITHEAD KORBA-WEST TPS S 1340 70.2 74.8 15 15.68 81.41 0 81.41 5
43 RAIL LARA TPP C 1600 77.9 82.7 15 21.72 67.11 0 67.11 3 Power plant has Bridge Linkage
44 RAIL MARWA TPS S 1000 38.4 57.9 15 11.67 76.2 0 76.2 7
45 RAIL NAWAPARA TPP P 600 6.1 25.4 15 6.15 4.6 0 4.6 1 Coal supply as per payment
46 RAIL PATHADI TPP P 600 70.6 83.1 15 5.31 91.38 0 91.38 17
47 PITHEAD SIPAT STPS C 2980 93.2 91.7 15 43.04 116.28 15.88 132.16 3 CIL supply 92% of prorata ACQ
48 RAIL TAMNAR TPP P 2400 32.1 39.0 20 30.31 67.81 0 67.81 2 Coal supply as per payment
49 RAIL UCHPINDA TPP P 1440 59.4 49.7 15 14.07 52.51 0 52.51 4 CIL Supply 128% of prorata ACQ
Gujarat
50 RAIL-1500 GANDHI NAGAR TPS S 630 26.0 42.4 30 6.66 57.76 0 57.76 9
51 RAIL SABARMATI (D-F STATIONS) P 362 75.8 71.2 30 4.17 3.79 101.4 105.19 1 CIL supply is 123% of prorata ACQ
52 RAIL UKAI TPS S 1110 43.7 51.2 30 9.52 270.22 0 270.22 28
53 RAIL-1500 WANAKBORI TPS S 2270 49.2 55.2 30 20.17 74.61 0 74.61 4 CIL supply to GSECL is 103% of prorata ACQ
Madhya Pradesh
54 PITHEAD AMARKANTAK EXT TPS S 210 42.0 72.0 15 3.12 43.48 0 43.48 14
Critical(*)/
Super
Critical(**
PLF % PLF % Normative Requirement
Capacity ) as per
Region/State Mode of Transport Name of Thermal Power Station Sector (July, (Apr- Stock Reqd. for the day (In Actual Stock Reasons for critical coal stock/Remarks
(MW) Trigger
2021) July,2021) (Days) '000 Tonnes')
level &
other
conditions
100 PITHEAD RAMAGUNDEM STPS C 2600 72.2 78.4 15 32.83 210.01 0 210.01 6
101 RAIL SINGARENI TPP S 1200 75.7 88.2 15 15.89 113.19 0 113.19 7
Total of Southern
31120 23 357.77 2842.00 110.40 2952.40 8 0
Region
Eastern
Critical(*)/
Super
Critical(**
PLF % PLF % Normative Requirement
Capacity ) as per
Region/State Mode of Transport Name of Thermal Power Station Sector (July, (Apr- Stock Reqd. for the day (In Actual Stock Reasons for critical coal stock/Remarks
(MW) Trigger
2021) July,2021) (Days) '000 Tonnes')
level &
other
conditions
(*) No. of plants with Critical Stock (<5 Days) 0 Pithead 16 35200 450.7 3308.9 7 0 day 3 6300
Non- 1 day
(**) No. of plants with Super Critical Stock (<3 Days) 0 119 133256 1462.8 9660.8 7 13 14862
Pithead
Non-Pithead TOTAL 135 168456 1913.4 12969.6 7 2 days 17 20645
(*) No. of plants with Critical Stock (<7 Days) 0 3 days 15 22950
(**) No. of plants with Super Critical Stock (<4 Days) 0 4 days 12 16310
Non-Pithead (More than 1500 kms) 5 days 4 4850
(*) No. of plants with Critical Stock (<9 Days) 0 6 days 9 8610
(**) No. of plants with Super Critical Stock (<5 Days) 0 7 days 1 1000
Total 0 8 days 0 0
NOTE: TOTAL 74 95527
(i) % Materialisation (including Deemed Delivery) as per CIL is for the period 01.04.2021 to 06.07.2021
(ii) Power Plants having less coal stock due to outstanding dues/ supply more than committed quantity/ not lifting offered coal/Bridge linkage/New Linkage are not shown as having critical /supercritical coal stock.
(iii) Daily coal requirement is based on the maximum of the requirement for average actual consumption of the plant for last 7 days or requirement for installed capacity of plant at 55%PLF.
(iv) Stock resticted to 70% Domestic and 30% Imported ratio.
C:Central Sector; S: State Sector; P: Private Sector; JV: Joint Venture
(v) Power plants located at a distance of about 1500 km from linked coal mines taking coal through Rail mode (RAIL-1500) and Rail-Sea (RAIL-SEA-1500).