CURICULUM VITAE
Alex Iskandar
DATE OF BIRTH:
25th November 1974
HOUSE – JAKARTA PLACE OF BIRTH:
Kota Wisata, Pesona Florence Banjarmasin, South – Kalimantan -
Blok H6 No.10 Indonesia
Jl. Transyogi Km 6 Cieulengsi – HEALTH:
Cibubur Bogor (16968) Good
Tel. +62 21 84930647 STATUS:
Mobile. +61 818 905673 Married with one daughter
E-mail: axlpce@gmail.com PASSPORT No:
Alex.Iskandar@ConocoPhillips.com M 631116
Page 1 of 5
Sharing Contractor) Based on Kepres 18/2000 PT. Surveyor Indonesia – Jakarta
September 1998
Alex Iskandar
Kota Wisata Pesona Florence
Blok H-6 No.10 Cibubur
Cieulengsi - Bogor (16968)
HP. 0818 905673
Page 2 of 5
Alex Iskandar
Kota Wisata Pesona Florence
Blok H-6 No.10 Cibubur
Cieulengsi - Bogor (16968)
HP. 0818 905673
Page 3 of 5
for Projects Dept. (e.g : Onshore – Bungin Development and Future onshore (LRP)
Alex Iskandar
Kota Wisata Pesona Florence
Blok H-6 No.10 Cibubur
Cieulengsi - Bogor (16968)
HP. 0818 905673
Projects).
- Provided budget estimation for Bungin Development. Proactively assist Project
Coordinator in all cost estimation related matter. Appointed as Cost Engineer for
Bungin Development (FEL 0/1 (Appraisal) Phase)
- Updated cost estimation and provide cost data for preparing LRP Future Onshore
project together with Development Groups.
(Mar 2003 – Feb 2005) Planning Engineer for South Jambi B Project (2003-2004)
& Suban Phase 2 Project (2004-2005)
South Jambi B: Onshore Gas Plant with 2 Train 30MMSCFD – total project Value $40MM
Suban Phase 2 : Onshore Gas Plant – 2 train with 400MMscfd – total Value $135MM
Planning Engineer:
Maintaining a Project Master Schedule, tracking and review if any changes.
EPC Contractor performance monitoring, Thoroughly review the Project progress
Reports to check accuracy and inconsistencies & measuring progress with using a
system such as Earned Value Analysis and Critical Path Methods to provide early
warning of slippage against plan.
Controlling an integrated project schedule, producing reports & data incorporating.
And ensure that plans prepared by contractors are in the right path
Involve for preparation of Suban Phase 2 Project PEER review
Achievements:
Establishing and maintaining effective interfaces with various groups in
order to maintain the integrated project schedule. Significant Company internal
interfaces developed with other Department s/Groups , such as :Land Acquisition
group , Business Development, Certification, & HSE.
Involve in AMDAL (Environmental Impact Assessments) as member of
Ad-Hoc team for Amdal - RKL/RPL required documentations.
Page 4 of 5
Alex Iskandar
Kota Wisata Pesona Florence
Blok H-6 No.10 Cibubur
Cieulengsi - Bogor (16968)
HP. 0818 905673
I certified that the above information is true and provided here by me, all in good faith.
Page 5 of 5