Cover
Cover
Cover
Table of Contents
List of Figures..................................................................................................................................3
List of Tables...................................................................................................................................3
Introduction.....................................................................................................................................5
Hierarchical Structure..................................................................................................................7
WBS Dictionary..............................................................................................................................9
Tabular View.............................................................................................................................11
Network Diagram..........................................................................................................................12
Responsibility Matrix....................................................................................................................15
Quality Planning....................................................................................................................20
Risk Identification.....................................................................................................................22
Risk Sources..........................................................................................................................22
Risk Category........................................................................................................................23
Risk Impact............................................................................................................................24
Risk mitigation planning and contingency allocation...............................................................25
References.....................................................................................................................................29
List of Figures
List of Tables
For 9 years the Customer Service Department has been using the Bravo Call Tracking System.
This system enables map and record customer support telephone calls statistics. During this era,
the number of calls has quintupled. The Department has therefore found present system's
competence and reliability.
To avoid problems facing the department, the new technology, termed "Alpha Call Detection
System." The structure have to be bought and mounted, designed, examined and stimulated for
production, because the Alpha Call Detection System is freshly designed. Finally it was decided
in December 2020 by the Ministry of Consumer Affairs.
The new plan is to bring together the following success characteristics to an alpha call
monitoring system.
All customer service calls are regulated and tracked by the new structure following the
execution date.
All clients have the ability to employ a new structure in order to maintain work power.
Operations acknowledge dedication to the promotion of system maintenance and system
sponsorship after implementation.
Reasons for the Project The key reason for the program's termination
is the halting of the "Bravo Call Tracking
System," which is experiencing performance
and durability issues. As a result, new
projects will address these concerns.
Project Team
IT department
Operation department
HR Department
WBS is a multi-step process that offers a complicated experience. It is a way for detaching and
overcoming enormous activities that can accomplish things more quickly and competently. The
WBS is a reformistic tree structure which depicts the enterprise and divides it into less obvious
and better-adapted segments. The Work Breakdown Structure This can create a WBS by
creating coordinators and subfolders, and some time later it can continue to disengage each
effort. The goal of WBS is to improve the rationality of a massive effort. Isolated, it becomes
more discreet, that special partners can collaborate, encourage better gains and take all factors
into account.
Hierarchical Structure
Table 2 : Hierarchical Structure
01.02 Planning
01.02.01 Determine resources
01.03 Software
01.04 Hardware
01.05.02 Work with customer governments to collect and report user history
requirements
WBS Dictionary
This section outlines specific figures for each element of the work breakdown structure for
design, activities and scheduling (WBS). The WBS dictionary depicts all achievements, designs,
exercises, scope, and dates, assets, expenditures and quality of WBS once in a while. The WBS
word reference is used appropriately and exceeds an archive which displays a message. It
changes into a kaleidoscope of companies which allows you to unlimitedly view your task
details. The basic use of the WBS word reference is to help make an item accessible for the
work. They are WBS's lowest-level working groups. They talk about an extension of companies
to develop a specific work unit. WBS may utilize d to identify the achievement of the project
milestone.
1.2 Planning
1.3 Software
1.4 Hardware
1.5.2 Work with customer governments to collect and report user history
requirements
This technique is likewise used as result of the WBS, but the main differences here are that
there are 3 levels that other ways that did not give levels can be detected. This is the view,
Table 4 : Tabular View
Network Diagram
The network diagram shows how many tasks, commitments, and work procedures have been
fulfilled. It is typically represented by a table with a box and a bolt progression. It is used to
create the risk schedule and task sequence, as well as to track and complete them at each stage.
Furthermore, an organizational chart displays the breadth of the project by include all acts and
their outcomes. The organizational map not only enables a project manager to keep track of all
project components and swiftly convey their progress to others, but it also improves the
comprehension and retention of a network diagram by graphically improving and retaining data.
Table 5 : Network Diagram
Initiating Alpha A - 3
Call Detection
System
Defined C B 10
requirement
Develop Project D C 3
Charter and
approvals
Determine E D 10
Resources
Create a project F E 15
plan and obtain
approvals
Design Database I H 3
Procure server J H 2
hardware to
support the system
Execute changeover K J 2
of operations.
Provide M I&L 7
appropriate
training and
documentation
Implement the P O 1
Alpha system
The RACI matrix describes the title role accountable for every functional element, which
personnel are in charge for, and where necessary, all tasks, achievements or important
evaluations required in bringing out a plan. The RACI Charter defines the four work that can be
done by partners.
RACI matrix is the easiest and finest approach to describe and record adventure professions and
obligations. Knowing who is fit and who should be trained in all movements, both internally and
externally, improves the possibilities to achieve adventure.
Initiating Alpha A R A C -
Call Detection
System
Interview the B A R - C
Users
Defined C A R - -
requirement
Develop Project D R A - -
Charter and
approvals
Determine E A R - -
Resources
Develop Project F R A - -
Plan and
approvals
Design new G A R C -
system
Convert H I A R -
historical data to
Alpha system
Design Database I A A R -
Procure server J C A A -
hardware to
support the
system
Perform K I R A -
turnover to
operations
Work with L I R A -
customer
services to
collect document
Provide M I A - R
appropriate
training and
documentation
User Training N I A - R
Implement the P A R C -
Alpha Live
system
Budget and Cost Distribution Plan
The project budget is a tool used by accepted directors to assess the complete cost of a contract.
An expenditure design consolidates a very basic inspection of the total costs most likely to be
met before the project is completed. Colossal businesses can have a few pages of task spending
schemes. Such expansions usually involve unending expenditures such as labor costs, the cost of
procurement and the cost of work. A special chronicle is the Project Budget itself. It is
constantly strengthened throughout the whole process.
The cost distribution scheme is the strategy of the assessment of the company. Moreover, cost
control for the regular resources is under way to complete the entire expansion scheme. The cost
approach strategy of the company is one of the most important elements in the sorting phase of
the company and fills sufficiently as a safety net to make sure that test costs are kept in the
motive behind control of anything beyond what many feel attainable. When it is expressed in
finite terms, the costs are a semination plan that divides how the company costs are managed,
funded and regulated.
Only the key costs of variable costs, fixed costs and training cost were shown in the project
budget table and costs allocation plan.
1.1 Performance - - - -
requirement
1.2 Planning - - - -
1.3 Software - - - -
1.4 Hardware - - - -
The project organization quality plan collects large amounts of data that are required to
appropriately assess the nature of the company based on the correspondence requirement. It is
reflected by the subjective arrangements, procedures, areas of usage and business,
responsibilities, and strengths of an organization. The management quality strategy was
completed during the business arrangement stage. The framework's objective is to collect CEOs,
business meetings, business support and top managers, as well as other users.
Quality administration at the highest level encompasses the classification, testing, and trying to
enhance standards of corporate quality. PMI separates PMBOK into 3 procedural assemblies:
Quality Planning (QP), QA, and QC (QC). The joined areas discuss how each of these
preparatory sessions applies to the quality guidelines characterization, selection and monitoring.
Quality Planning
In order to get optimal results, the organization plans to further examine and improve the
process. Quality management plans can often be seen as a number of follow-up instructions.
They preserve the organization, usage and assessment procedures of this corporation, as any
quality assurance or quality control exercise.
Some regions could be more unpleasant than others, depending on system changes, processes or
the demands of the firm. Note that every arrangement depends on the company's requirements
and its quality management system (QMS). In any event, quality control plans must have a
structure that provides ongoing design improvements. This will help workers enhance their
skills and quality in the greatest way possible. In addition, other parties, including partners, have
to check this agreement from time to time to ensure that it goes a long way.
As explained, three components include Quality Plan (QP), Control of Quality (QC) and
Assurance of Quality (QA). The company should therefore follow those three aspects in order to
adopt the Alpha system.
In order to characterize the business risk of the board plan when the effort is launched, the
corporation must utilize a risk management strategy that is analyzed and changed. Those
definitions and guidelines are combined by the risk of the Board plan. Once possible sources
and types of hazard are established,
Risk Identification
The project risk must be acknowledged and tracked as soon as possible. Dangerous proof is
made throughout the life cycle of the company, with an unusual focus on risk successes. Danger
ID is an important topic of corporate status and standard reporting. The group of companies
understands a fraction of the threats; others are difficult to define, yet surprise. The threat report
consists of the procedures for recording all of the dangers separated throughout the endeavor.
Tooling and regulations are utilized in a composed and planned way to perceive chances to
make sure key possible threats are overlooked.
The risk is likely, either by a slight problem for a worker, to cause a negative influence on the
order, to allow work, cost more than surveyed, work turnover, major occurrences or, whatever
the case may be, to lose the whole effort. In these respects, it is vitally important to carry out a
threatening assessment to limit these consequences as sensibly as possible.
Risk Sources
Table 9 : Risk Sources
The rundown of regions under peril is caused by Risk Classification. The organization proposes
that higher categories depending on the project type should be increased.
Table 10 : Risk Category
Risk Impact
Table 12 : Risk Impact
Medium Rating B – 50
Low Rating C – 10
Probability
This is a critical task that requires you to successfully interact, meet, and collaborate with your
consumers.It sets out clear guidelines as to how information is shared and who is responsible for
each adventure correspondence and should be avoided.
As the PM, may achieve the ultimate goal. Why not use venture correspondence in the same
way. With all in mind, the risk plan must consistently advance the communications so that it
remains target-friendly.
• Email • Forums
• Get-togethers (face to face, telephone, or video call).
• Status updates.
• Applications for teamwork.
• Group stand-up
Table 16 : Communication techniques
3. Atkinson, R., 1999. . Project management: cost, time and quality, two best guesses and
phenomenon, its time to accept other success criteria... International Journal of Project
Management ,, 17(6), pp. 338-340..
4. Cooney, J. P., 2016.. Health and Safety in the Construction Industry : A Review
ofProcurement, Monitoring, Cost Effectiveness and Strategy.. School of the Built
Environment, pp. 50-70..
6. James, O., 2019. Project Portfolio Management Process | Planview. Planview.. [Online]
Available at: https://www.planview.com/resources/articles/project-portfolio-
management-process/.
[Accessed 09 09 2021].
7. John, J., 2018. Work Breakdown Structure (WBS) - Project Management Docs. Project
Management Docs. [Online]
Available at: https://www.projectmanagementdocs.com/template/project-
planning/workbreakdown-structure/#axzz60MTrmNl6.
[Accessed 09 09 2021].