MMETHOD STATEMENT
THOD STATEMENT
FOR
ROSSHP
PIPE/Material
P Loading and Unloading
P INSTALLA U ING
USINGCRANE
VERHEAD
OVERHEAD CRANE
SA04CC2-MS-MET-AAG-00014
SA04 2 003
Internal Code:
SWRO SHUQAIQ 3 Plant
SA04C2-MS-MET-AAG-00014
TABLE OF CONTENTS
1. PURPOSE
2. SCOPE
3. DEFINITIONS
4. APPLICABLE DOCUMENTS
5. MANPOWER
SA04C2-MS-MET-AAG-00014
SWRO SHUQAIQ 3 Plant
SA04C2-MS-MET-AAG-00014 REV 00
1. PURPOSE
1.1 This method statement shall provide MET of minimum guideline
to carry out loading/Unloading of SS/Material using Overhead
Crane (estimated load less than one ton per bundle of pipe) for Shuqaiq
3 Independent Water Project, to ensure that the work is carried
out safely and properly.
2. SCOPE
2.1 This method statement covers the following method and
procedures but not limited to:
2.1.1 Delivery/Transportation of SS PIPE and Material to Loading in
RO Building
3. DEFINITIONS
5. MANPOWER
1
SA04C2-MS-MET-AAG-00014
SWRO SHUQAIQ 3 Plant
SA04C2-MS-MET-AAG-00014 REV 00
6.1.3 Crane
6.1.6 Shackle
6.1.7 Sling
2
SA04C2-MS-MET-AAG-00014
SWRO SHUQAIQ 3 Plant
SA04C2-MS-MET-AAG-00014 REV 00
6.2 Procedure
7
SA04C2-MS-MET-AAG-00014
SWRO SHUQAIQ 3 Plant
SA04C2-MS-MET-AAG-00014 REV 00
7. SAFE PRECAUTIONS
6
SA04C2-MS-MET-AAG-00014
SWRO SHUQAIQ 3 Plant
SA04C2-MS-MET-AAG-00014 REV 00
7
SA04C2-MS-MET-AAG-00014
SWRO SHUQAIQ 3 Plant :
Internal Code:
APPENDIX I
SA04C2-MS-MET-AAG-00014
BOTTOM OF OBSTRUCTION:
D E T A I L `1'
ELEVATION
GENERAL ARRANGEMENT OF
20T x 24.5M SPAN DOUBLE GIRDER EOT CRANE
PROJECT : SHUQAIQ PROJECT - SWCC
19-12-1923
PLAN
KEYPLAN 19-12-1923E-01 5