F802

SD. Ref. TMAM/20017/MSCEB


No. /SKH/SD/ELV/019A R2
REQUEST FOR SHOP DRAWING Date : 03/04/2021
APPROVAL Prev. SD TMAM/20017/MSCEB
Ref. No. /SKH/SD/ELV/019 R1
Date 02/03/2021
PROJECT: SAFIA ALI KANOO HUB AT SEEF UMM AL HASSAM

To : MSCEB
  04-04-2021
Attn : Mr. Abraham Koshy, Sr.Resident Engineer RS
11/04
12/4
From : M/S. TMAM CONTRACTING WLL RECEIVED  JK/RS/AP/PD PPU
AK 11/4
Works Element : ELV-Tel.Data & TV 05 APR 2021 
MSCEB ‐ MEP
Area / Location : FF, SF & Third Floor

We request approval of the following shop drawings for implementation in the above works. We confirm that the
shop drawings have been verified by us and are in line with contract documents. We have fully co-ordinated the
drawings for the provision of requirements for all related services. We shall revert back to you within seven days
from the receipt of commented shop drawings in case of any reservation on your comments.

Drawing No’s Rev. Drawing Title Status No. of Sets


By
MSCEB
Aloala/SKH/ELV/FF 02 First Floor Tel. Data & TV Layout 02
Aloala/SKH/ELV/SF 02 Second Floor Tel. Data & TV Layout 02
Aloala/SKH/ELV/TF 02 Third Floor Tel. Data & TV Layout 02

For the Contractor :

Name : M.John Britto Designation : Project Engineer Signed :

Consultants Comments / Approval.


Refer the comments noted in the drawing.

Status:
B) Approved  B) Approved subject to comments  C) Revise & Resubmit, Works shall proceed 
D) Not Approved 

Signed : ………………………………………..
For MSCEB Date : ……………………………

PD/AP:14/04
1. The location of the ceiling mounted wi-fi routers and TV points shall be coordinated
with the ceiling services layout. Alignments shall be maintained.
2. Ensure wi-fi coverage and signal strength is as per the specifications and guidelines.
RS:
Why 4 months delay for
Resubmission
F802
SD. Ref. TMAM/20017/MSCEB
No. /SKH/SD/ELV/019A
REQUEST FOR SHOP DRAWING Date : 02/03/2021
APPROVAL Prev. SD TMAM/20017/MSCEB
Ref. No. /SKH/SD/ELV/019
Date 23/11/2020
 
PROJECT: SAFIA ALI KANOO HUB AT SEEF UMM AL HASSAM

To : MSCEB RECEIVED  7-3-2021

Attn : Mr. Abraham Koshy, Sr.Resident Engineer 07 MAR 2021 


RS
MSCEB ‐ MEP 11/03
From : M/S. TMAM CONTRACTING WLL JK/PPU/RS/AP/PD
11/3
11/3
AK
Works Element : ELV-Tel.Data & TV

Area / Location : FF, SF & Third Floor

We request approval of the following shop drawings for implementation in the above works. We confirm that the
shop drawings have been verified by us and are in line with contract documents. We have fully co-ordinated the
drawings for the provision of requirements for all related services. We shall revert back to you within seven days
from the receipt of commented shop drawings in case of any reservation on your comments.

Drawing No’s Rev. Drawing Title Status No. of Sets


By
MSCEB
Aloala/SKH/ELV/FF 01 First Floor Tel. Data & TV Layout C 02
Aloala/SKH/ELV/SF 01 Second Floor Tel. Data & TV Layout C 02
Aloala/SKH/ELV/TF 01 Third Floor Tel. Data & TV Layout C 02

For the Contractor :

Name : M.John Britto Designation : Project Engineer Signed :


MEP:
Consultants Comments / Approval. Revise & Resubmit
AP: Refer comments on attached drawing
1. Training room on 2nd floor:
a. The centre training table does not have electrical or ELV provision. Please confirm if the floor boxes on either side
suffice the requirement for the centre tables as well.
b. The trainer's table does not have a floor box but has provisions on the wall. Is this acceptable to the Client? Please
get this verified by the Client’s IT team and obtain a sign-off.
2. Offices on the 3rd floor:
a. The electrical & ELV provisions are provided on the wall nearest to the workstations/desks. This is done as the
flooring in this area is hard flooring and not carpet. It is imperative to obtain the Clients and operator sign-off on these
provisions. Also, how the transfer of the cables on the wall to the desks needs to be thought of and agreed beforehand.

Signed : ………………………………………..
For MSCEB Date : ……………………………

Received by Contractor:………………………………. Date:……………………………

Note: The above approval does not relieve the Contractor from his responsibilities to carry out the works in
accordance with specification and IFC drawings.
1 2 3 4 5

A
LIFT
M.TOI. F.TO.
STAIRCASE-1
H.C TOI.
WORKSHOP-2 WORKSHOP-3 WORKSHOP-4

FTB TERRACE
SHOP DRAWING
WORKSHOP-1

M. SHAFT T.LOBBY
L.LOBBY

FTB FTB
B
WIFI
TO GF
TO GF
ELV Room WIFI
FTB ELV Room

C
PROJECT

OPEN SPACE
RS:
Why cable length & distances not provided similar to Ground Floor drawing.
CLIENT / OWNER

WIFI FTB CONSULTANT:

TO GF WIFI
ELV Room MS Centre, Building 22, Avenue 58,
Al Seef District 436 P.O. Box 111,
E FTB FTB FTB OPEN SPACE Kingdom of Bahrain.
TO GF
Tel: (+973) 17 815 775
ELV Room
TRAINING ROOM-1 WIFI Fax: (+973) 17 825 010 / 17 910 825
WIFI
CV CV WORKSHOP-8 WORKSHOP-7 WORKSHOP-6
MAIN CONTRACTOR:
TO GF TO GF
STAIRCASE-2 TERRACE
ELV Room ELV Room GARDEN
M/S TMAM Contracting
? WORKSHOP-5 Office No. 24, Bldg. No. 83
TO GF
ELV Room Road No.13, Block No. 711, Riffa
Kingdom Of Bahrain

F Tel: 17750979; Fax;17750981

ELECT. CONTRACTOR:

ELV. CONTRACTOR:

1) All TV/Data/Telephone outlet & FTB to be marked in the site for

FIRST FLOOR DATA TEL TV LAYOUT


approval prior to installation of back boxes to avoid any abortive works.
DRAWING TITLE:

FIRST FLOOR
SCALE - 1:100 DATA TEL TV LAYOUT
PROJECT CODE: CHECKED BY: PROJECT DRAWN BY:
MANAGER:

SAK RRC BAT MNJ

DATE: SCALE: REV NO:


DRWG No:
ALOALA/SAK/
ELV/FF
01 - 03 - 2021 NTS R1
1 2 3 4 5

A
FTB
TO GF
LIFT M. TOI. F.TOILET
ELV Room HC.TOI. STR.
STAIRCASE-1 TERRACE
GARDEN
WORKSHOP-11 SHOP DRAWING
FTB WORKSHOP-9
WORKSHOP-10
TO GF
ELV Room
MEP TO GF
L.LOBBY ELV Room
T.LOBBY OPEN SPACE
FTB
RS:
B
Why cable route & distance not shown
OPEN SPACE
TO GFL ELV ROOM Similar to Ground Floor.
9U RACK
C WIFI TO GF PROJECT
FTB ELV Room FTB
TO GF TO GF
ELV Room SHIFT ELV Room
WORKSHOP-16
OPEN SPACE
CLIENT / OWNER
OPEN SPACE

D WORKSHOP-12
SHIFT

TO GF
WIFI WIFI ELV Room CONSULTANT:
OPEN SPACE TO GFL ELV ROOM
TO GF
9U RACK
MS Centre, Building 22, Avenue 58,
FB FB FB ELV Room Al Seef District 436 P.O. Box 111,
E Kingdom of Bahrain.
FTB

TO GF FTB
TO GF ELV Room FTB
TRAINING ROOM-2 TO GF TERRACE Tel: (+973) 17 815 775
ELV Room
ELV Room TO GF GARDEN Fax: (+973) 17 825 010 / 17 910 825
ELV Room
WORKSHOP-14 WORKSHOP-13
WORKSHOP-15 MAIN CONTRACTOR:
STAIRCASE-2
TERRACE
GARDEN M/S TMAM Contracting
FB FB FB Office No. 24, Bldg. No. 83
Road No.13, Block No. 711, Riffa
TO GF Kingdom Of Bahrain
ELV Room
F TO GF Tel: 17750979; Fax;17750981
ELV Room

Provide Legend ELECT. CONTRACTOR:

ELV. CONTRACTOR:

1) All TV/Data/Telephone outlet & FTB to be marked in the site for


approval prior to installation of back boxes to avoid any abortive works.

SECOND FLOOR DATA TEL TV LAYOUT


2) Legends should be shown in the shop drawings.
3) How many Data & Telephone outlets in floor boxes? DRAWING TITLE:

SECOND FLOOR
SCALE - 1:100 DATA TEL TV LAYOUT
PROJECT CODE: CHECKED BY: PROJECT DRAWN BY:
MANAGER:

SAK RRC BAT MNJ

DATE: SCALE: REV NO:


DRWG No:
ALOALA/SAK/
ELV/SF
01 - 03 - 2021 NTS R1
RS
Provide Legend

1 2 3 4 5

STAIRCASE-1 LIFT
M. TOI. F.TOI.
HC.TOI.

OFFICE-1 PANTRY ?
SHOP DRAWING
TO GF
ELV Room
OFFICE-2 T.LOBBY
TO GF TO GF
ELV Room ELV Room
MEP
L.LOBBY
No data outlet?
B
OPEN SPACE

C OPEN SPACE PROJECT


TERRACE

TOTOAL 4 NOS. SPN 2 GANG SWITCH


SHUTTERED SOCKET OUTLET
12NOS. DATA OUTLET TO GF CLIENT / OWNER
WIFI
ELV Room
D
OPEN OFFICE

WIFI OPEN SPACE


CONSULTANT:

TO GF
ELV Room MS Centre, Building 22, Avenue 58,
TOTOAL 4 NOS. SPN 2 GANG SWITCH
TO GF Al Seef District 436 P.O. Box 111,
E SHUTTERED SOCKET OUTLET &
ELV Room Kingdom of Bahrain.
8NOS. DATA OUTLET
TO GF Tel: (+973) 17 815 775
TERRACE Fax: (+973) 17 825 010 / 17 910 825
ELV Room

WIFI
MEETING ROOM
FB? STAIRCASE-2 MAIN CONTRACTOR:

M/S TMAM Contracting


TOTOAL 4 NOS. SPN 2 GANG SWITCH TO GF Office No. 24, Bldg. No. 83
SHUTTERED SOCKET OUTLET & TO GF ELV Room Road No.13, Block No. 711, Riffa
8NOS. DATA OUTLET FOR OFFICE ELV Room Kingdom Of Bahrain

F HDMI cable from Floor box to wall. Tel: 17750979; Fax;17750981

ELECT. CONTRACTOR:

TOTOAL 4 NOS. SPN 2 GANG SWITCH


SHUTTERED SOCKET OUTLET &
8NOS. DATA OUTLET FOR OFFICE

Data/Telephone point location to be


updated as per approved electrical lay out
ELV. CONTRACTOR:

1) All TV/Data/Telephone outlet & FTB to be marked in the site for


approval prior to installation of back boxes to avoid any abortive works.
2) Legends should be shown in the shop drawings.
THIRD FLOOR DATA TEL TV LAYOUT DRAWING TITLE:

THIRD FLOOR
SCALE - 1:100 DATA TEL TV LAYOUT
3) Data /telephone points locations shall be coordinated as per approved
furniture lay out. PROJECT CODE: CHECKED BY: PROJECT DRAWN BY:
MANAGER:

SAK RRC BAT MNJ

DATE: SCALE: REV NO:


DRWG No:
ALOALA/SAK/
ELV/TF
01 - 03 - 2021 NTS R1
PROJECT: SAFIA ALI KANOO HUB FOR ART & HANDICRAFTS AT
SEEF UMM AL HASSAM

SHOP DRAWINGS
DATA, TEL, TV LAYOUT - FF, SF, TF
COMPLIANCE STATEMENT
CLIENT: BAHRAIN TRUST FOUNDATION & MS. SAFIA ALI KANOO

CONSULTANT: MSCEB ARCHITECTS & ENGINEERS

MAIN CONTRACTOR: TMAM CONTRACTING

ELE CONTRACTOR: AL MUFEED ELECTRICAL SERVICES CO. W.L. L

ELV CONTRACTOR: AL OALA INFORMATION TECHNOLOGY


Drawing Ref No. Description Submit Comments Action Remarks
Date
ALOALA/SAK/ELV/FF-R1 First Floor 1-3-2021 1.Why cable length & distances Complied
-Data, Tel, TV Layout not provided similar to ground
floor drawing.
2.Location shift Complied
3.All TV/Data/Tel & FTB to be
marked in site. Coordinated

ALOALA/SAK/ELV/SF-R1 Second Floor 1-3-2021 1.Why cable length & distances Complied
-Data, Tel, TV Layout not provided similar to ground
floor drawing.
2.Location shift Complied
3.Provide Legend. Complied
4.How many data and tel outlets Shown in
in floor boxes legend.
5.All TV/Data/Tel & FTB to be
marked in site. Coordinated

ALOALA/SAK/ELV/TF-R1 Third Floor 1-3-2021 1.All TV/Data/Tel & FTB to be Coordinated


-Data, Tel, TV Layout marked in site.
2.Legends should be shown. Complied
3.Data Tel point locations shall
be coordinated as per furniture Complied
layout.
4.Data Tel points shall be
coordinated as per approved Complied
electrical layout.
LEGEND

- TELEPHONE

- WIFI

- TV
1 2 3 4 5

FB - FLOOR BOX
( 1 Telephone & 2 Data )

- FTB

A
LIFT
M.TOI. F.TO.
STAIRCASE-1
H.C TOI.
WORKSHOP-2 WORKSHOP-3 WORKSHOP-4

FTB TERRACE
SHOP DRAWING
WORKSHOP-1
AVG 20 M FIBER
TO GF ELV Room
M. SHAFT T.LOBBY
AVG 50 M FIBER
TO GF ELV Room L.LOBBY AVG 15 M FIBER
TO GF ELV Room
FTB FTB
B
AVG 55 M FIBER WIFI
TO GF ELV Room Avg. 40 m to
GF ELV Room TO GF
Avg. 25 m to
FTB TO GF ELV Room
GF ELV Room WIFI UNLESS OTHERWISE NOTED. LINEAR DIMENSIONS ARE IN MILLIMETERS.
ELV Room
C
PROJECT

OPEN SPACE

CLIENT / OWNER

D
TO GF
ELV Room

WIFI FTB CONSULTANT:


Avg. 36 m to AVG 25 M FIBER
TO GF TO GF ELV Room
GF ELV Room WIFI
ELV Room MS Centre, Building 22, Avenue 58,
Al Seef District 436 P.O. Box 111,
E FTB FTB OPEN SPACE Kingdom of Bahrain.
FTB AVG 35 M FIBER
WIFI AVG 50 M FIBER TO GF ELV Room Tel: (+973) 17 815 775
AVG 45 M FIBER
CV TO GF ELV Room Fax: (+973) 17 825 010 / 17 910 825
TRAINING ROOM-1 TO GF ELV Room

MAIN CONTRACTOR:
TO GF WORKSHOP-6
WORKSHOP-8 WORKSHOP-7 STAIRCASE-2 TERRACE
ELV Room
GARDEN
M/S TMAM Contracting
? WORKSHOP-5 Office No. 24, Bldg. No. 83
TO GF
Road No.13, Block No. 711, Riffa
ELV Room
Kingdom Of Bahrain

F Tel: 17750979; Fax;17750981

ELECT. CONTRACTOR:

ELV. CONTRACTOR:

FIRST FLOOR DATA TEL TV LAYOUT DRAWING TITLE:

FIRST FLOOR
SCALE - 1:100 DATA TEL TV LAYOUT
PROJECT CODE: CHECKED BY: PROJECT DRAWN BY:
MANAGER:

SAK RRC BAT MNJ

DATE: SCALE: REV NO:


DRWG No:
ALOALA/SAK/
ELV/FF
01 - 04 - 2021 NTS R2
LEGEND

- TELEPHONE

- WIFI

- TV
1 2 3 4 5
FB - FLOOR BOX
( 1 Telephone & 2 Data )

- FTB

A
FTB
FIBER TO GF
Avg. 45 m to
ELV Room LIFT M. TOI. F.TOILET
GF ELV Room HC.TOI. STR.
STAIRCASE-1 TERRACE
GARDEN
WORKSHOP-11 SHOP DRAWING
FTB WORKSHOP-9
WORKSHOP-10
FIBER TO GF
ELV Room
MEP FIBER TO GF
L.LOBBY
T.LOBBY OPEN SPACE ELV Room

Avg. 55 m to FTB
B GF ELV Room
Avg. 25 m to
OPEN SPACE GF ELV Room

WIFI UNLESS OTHERWISE NOTED. LINEAR DIMENSIONS ARE IN MILLIMETERS.

C TO GF
Avg. 25 m to Avg. 20 m to PROJECT
FTB FIBER TO GF Avg. 55 m to ELV Room FTB GF ELV Room
ELV Room GF ELV Room GF ELV Room
FIBER TO GF
WORKSHOP-16 RS: ELV Room

Keep extra cable in the ceiling WIFI OPEN SPACE


CLIENT / OWNER
OPEN SPACE at each WiFi point for minor
D adjustments on the ceiling as per TO GF WORKSHOP-12
ELV Room
coverage requirement.
Avg. 55 m to Avg. 15 m to
GF ELV Room
(Typical) GF ELV Room

CONSULTANT:
OPEN SPACE TO GFL ELV ROOM
WIFI
TO GF
9U RACK
MS Centre, Building 22, Avenue 58,
FB FB FB ELV Room Al Seef District 436 P.O. Box 111,
E Kingdom of Bahrain.
FTB
FTB

FIBER TO GF Avg. 35 m to
TRAINING ROOM-2 ELV Room FIBER TO GF GF ELV Room FTB Tel: (+973) 17 815 775
TERRACE
Avg. 45 m to ELV Room FIBER TO GF GARDEN Fax: (+973) 17 825 010 / 17 910 825
TO GF ELV Room
GF ELV Room
ELV Room WORKSHOP-14 WORKSHOP-13
WORKSHOP-15 MAIN CONTRACTOR:
Avg. 40 m to STAIRCASE-2 Avg. 25 m to
TERRACE GF ELV Room GF ELV Room
GARDEN M/S TMAM Contracting
FB FB FB Office No. 24, Bldg. No. 83
Road No.13, Block No. 711, Riffa
Kingdom Of Bahrain
TO GF
F TO GF ELV Room Tel: 17750979; Fax;17750981
ELV Room
ELECT. CONTRACTOR:

ELV. CONTRACTOR:

SECOND FLOOR DATA TEL TV LAYOUT DRAWING TITLE:

SECOND FLOOR
SCALE - 1:100 DATA TEL TV LAYOUT
PROJECT CODE: CHECKED BY: PROJECT DRAWN BY:
MANAGER:

SAK RRC BAT MNJ

DATE: SCALE: REV NO:


DRWG No:
ALOALA/SAK/
ELV/SF
01 - 04 - 2021 NTS R2
LEGEND

- TELEPHONE

- WIFI

- TV
1 2 3 4 5
FB - FLOOR BOX
( 1 Telephone & 2 Data )

- FTB

STAIRCASE-1 LIFT
M. TOI. F.TOI.
HC.TOI.

OFFICE-1 PANTRY ?
SHOP DRAWING
TO GF
OFFICE-2 ELV Room
T.LOBBY
TO GF TO GF
ELV Room ELV Room
MEP
L.LOBBY
Avg. 55 m to
B GF ELV Room
OPEN SPACE

UNLESS OTHERWISE NOTED. LINEAR DIMENSIONS ARE IN MILLIMETERS.


Avg. 50 m to
C GF ELV Room
PROJECT
TERRACE
OPEN SPACE

One data point CLIENT / OWNER


WIFI

D TO GF
ELV Room
Avg. 50 m to
OPEN OFFICE GF ELV Room

OPEN SPACE
WIFI CONSULTANT:

TO GF
One data point ELV Room MS Centre, Building 22, Avenue 58,
Al Seef District 436 P.O. Box 111,
E WIFI Access point Kingdom of Bahrain.
TO GF TO GF Avg. 30 m to
ELV Room Avg. 55 m to GF ELV Room
Tel: (+973) 17 815 775
TERRACE ELV Room
GF ELV Room Fax: (+973) 17 825 010 / 17 910 825

WIFI STAIRCASE-2 MAIN CONTRACTOR:


TO GF
ELV Room FB
HDMI CABLE M/S TMAM Contracting
MEETING ROOM
TO GF Office No. 24, Bldg. No. 83
ELV Room Road No.13, Block No. 711, Riffa
Kingdom Of Bahrain

F Tel: 17750979; Fax;17750981

ELECT. CONTRACTOR:

ELV. CONTRACTOR:

THIRD FLOOR DATA TEL TV LAYOUT DRAWING TITLE:

THIRD FLOOR
SCALE - 1:100 DATA TEL TV LAYOUT
PROJECT CODE: CHECKED BY: PROJECT DRAWN BY:
MANAGER:

SAK RRC BAT MNJ

DATE: SCALE: REV NO:


DRWG No:
ALOALA/SAK/
ELV/TF
01 - 04 - 2021 NTS R2
PROJECT: SAFIA ALI KANOO HUB FOR ART & HANDICRAFTS AT
SEEF UMM AL HASSAM

SHOP DRAWINGS
DATA, TEL, TV- First, Second & Third
Floor
COMPLIANCE STATEMENT
CLIENT: BAHRAIN TRUST FOUNDATION & MS. SAFIA ALI KANOO

CONSULTANT: MSCEB ARCHITECTS & ENGINEERS

MAIN CONTRACTOR: TMAM CONTRACTING

ELE CONTRACTOR: AL MUFEED ELECTRICAL SERVICES CO. W.L. L

ELV CONTRACTOR: AL OALA INFORMATION TECHNOLOGY


Drawing Ref No. Description Submit Comments Action Remarks
Date
ALOALA/SAK/ELV/FF/R2 Ground floor 1-4-2021 1.The location of the ceiling
-Data, Tel, TV Layout mounted Wi-Fi routers and Noted
TV Points shall be
coordinated with the
ceiling services layout
Alignments shall be
maintained.

2.Ensure Wifi coverage and Noted


signal strength is as per the
specifications and
guidelines
Wi-Fi Location change Incorporated in
drawing
ALOALA/SAK/ELV/SF/R2 Second floor 1-4-2021 Keep extra cable in the
-Data, Tel, TV Layout ceiling at each Wi-Fi point Noted
for minor adjustments on
the ceiling as per coverage
requirement (Typical)
ALOALA/SAK/ELV/TF/R2 Third floor 1-4-2021 Changes in data points Incorporated in
-Data, Tel, TV Layout drawing
LEGEND

- TELEPHONE

- WIFI

- TV
1 2 3 4 5

FB - FLOOR BOX
( 1 Telephone & 2 Data )

- FTB

A
LIFT
M.TOI. F.TO.
STAIRCASE-1
H.C TOI.
WORKSHOP-2 WORKSHOP-3
SHOP DRAWING
WORKSHOP-4

WORKSHOP-1 FTB TERRACE


AVG 20 M FIBER
TO GF ELV Room
M. SHAFT T.LOBBY
AVG 50 M FIBER
TO GF ELV Room L.LOBBY AVG 15 M FIBER
TO GF ELV Room
FTB FTB
B
AVG 55 M FIBER WIFI
TO GF ELV Room Avg. 40 m to
GF ELV Room TO GF
Avg. 25 m to ELV Room
FTB TO GF
GF ELV Room WIFI UNLESS OTHERWISE NOTED. LINEAR DIMENSIONS ARE IN MILLIMETERS.
ELV Room
C
PROJECT

OPEN SPACE

CLIENT / OWNER

D
TO GF
ELV Room

FTB
WIFI CONSULTANT:
Avg. 36 m to AVG 25 M FIBER
TO GF TO GF ELV Room
GF ELV Room WIFI
ELV Room MS Centre, Building 22, Avenue 58,
Al Seef District 436 P.O. Box 111,
E FTB FTB OPEN SPACE Kingdom of Bahrain.
FTB AVG 35 M FIBER
WIFI AVG 50 M FIBER Tel: (+973) 17 815 775
AVG 45 M FIBER TO GF ELV Room
CV TO GF ELV Room Fax: (+973) 17 825 010 / 17 910 825
TRAINING ROOM-1 TO GF ELV Room

MAIN CONTRACTOR:
TO GF WORKSHOP-6
WORKSHOP-8 WORKSHOP-7 STAIRCASE-2 TERRACE
ELV Room
GARDEN
M/S TMAM Contracting
? WORKSHOP-5 Office No. 24, Bldg. No. 83
TO GF
Road No.13, Block No. 711, Riffa
ELV Room
Kingdom Of Bahrain

F Tel: 17750979; Fax;17750981

ELECT. CONTRACTOR:

ELV. CONTRACTOR:

FIRST FLOOR DATA TEL TV LAYOUT DRAWING TITLE:

FIRST FLOOR
SCALE - 1:100 DATA TEL TV LAYOUT
PROJECT CODE: CHECKED BY: PROJECT DRAWN BY:
MANAGER:

SAK RRC BAT MNJ

SCALE: REV NO:


DRWG No: DATE:

ALOALA/SAK/
ELV/FF
07 - 07 - 2021 NTS R3
LEGEND

- TELEPHONE

- WIFI

- TV
1 2 3 4 5
FB
- FLOOR BOX
( 1 Telephone & 2 Data )

- FTB

A
FTB
FIBER TO GF
Avg. 45 m to
ELV Room LIFT M. TOI. F.TOILET
GF ELV Room HC.TOI. STR.
STAIRCASE-1 TERRACE
GARDEN
WORKSHOP-11 SHOP DRAWING
FTB WORKSHOP-9
WORKSHOP-10
FIBER TO GF
ELV Room
MEP FIBER TO GF
L.LOBBY
T.LOBBY OPEN SPACE ELV Room

Avg. 55 m to FTB
B GF ELV Room
Avg. 25 m to
OPEN SPACE GF ELV Room

WIFI UNLESS OTHERWISE NOTED. LINEAR DIMENSIONS ARE IN MILLIMETERS.

C TO GF
Avg. 25 m to Avg. 20 m to PROJECT
FTB FIBER TO GF Avg. 55 m to ELV Room FTB GF ELV Room
ELV Room GF ELV Room GF ELV Room
FIBER TO GF
ELV Room
WORKSHOP-16

WIFI OPEN SPACE


CLIENT / OWNER
OPEN SPACE
TO GF
D ELV Room
WORKSHOP-12

Avg. 55 m to Avg. 15 m to
GF ELV Room GF ELV Room

CONSULTANT:
OPEN SPACE TO GFL ELV ROOM
WIFI
TO GF
9U RACK
MS Centre, Building 22, Avenue 58,
FB FB FB ELV Room Al Seef District 436 P.O. Box 111,
E Kingdom of Bahrain.
FIBER TO GF FTB
FTB

Avg. 35 m to
TRAINING ROOM-2 ELV Room FIBER TO GF GF ELV Room FTB Tel: (+973) 17 815 775
TERRACE
Avg. 45 m to ELV Room FIBER TO GF GARDEN Fax: (+973) 17 825 010 / 17 910 825
TO GF ELV Room
GF ELV Room
ELV Room WORKSHOP-15 WORKSHOP-14 WORKSHOP-13 MAIN CONTRACTOR:
Avg. 40 m to STAIRCASE-2 Avg. 25 m to
TERRACE GF ELV Room GF ELV Room
GARDEN M/S TMAM Contracting
FB FB FB Office No. 24, Bldg. No. 83
Road No.13, Block No. 711, Riffa
Kingdom Of Bahrain
TO GF
F TO GF ELV Room Tel: 17750979; Fax;17750981
ELV Room

ELECT. CONTRACTOR:

ELV. CONTRACTOR:

SECOND FLOOR DATA TEL TV LAYOUT DRAWING TITLE:

SECOND FLOOR
SCALE - 1:100 DATA TEL TV LAYOUT
PROJECT CODE: CHECKED BY: PROJECT DRAWN BY:
MANAGER:

SAK RRC BAT MNJ

DATE: SCALE: REV NO:


DRWG No:
ALOALA/SAK/
ELV/SF
07 - 07 - 2021 NTS R3
LEGEND

- TELEPHONE

- WIFI

- TV
1 2 3 4 5
FB
- FLOOR BOX
( 1 Telephone & 2 Data )

- FTB

STAIRCASE-1 LIFT M. TOI. F.TOI.


HC.TOI.

OFFICE-1 PANTRY ?
SHOP DRAWING
TO GF
OFFICE-2 ELV Room
T.LOBBY
TO GF TO GF
ELV Room ELV Room
MEP
L.LOBBY
Avg. 55 m to
B GF ELV Room
OPEN SPACE

UNLESS OTHERWISE NOTED. LINEAR DIMENSIONS ARE IN MILLIMETERS.


Avg. 50 m to
C GF ELV Room
PROJECT
TERRACE
OPEN SPACE

CLIENT / OWNER
WIFI

D TO GF
ELV Room
Avg. 50 m to
OPEN OFFICE GF ELV Room

OPEN SPACE
WIFI CONSULTANT:

TO GF
ELV Room MS Centre, Building 22, Avenue 58,
Al Seef District 436 P.O. Box 111,
E Kingdom of Bahrain.
TO GF TO GF Avg. 30 m to
ELV Room Avg. 55 m to GF ELV Room Tel: (+973) 17 815 775
TERRACE ELV Room
GF ELV Room Fax: (+973) 17 825 010 / 17 910 825

WIFI STAIRCASE-2 MAIN CONTRACTOR:


TO GF
ELV Room FB
HDMI CABLE M/S TMAM Contracting
MEETING ROOM
TO GF Office No. 24, Bldg. No. 83
ELV Room Road No.13, Block No. 711, Riffa
Kingdom Of Bahrain

F Tel: 17750979; Fax;17750981

ELECT. CONTRACTOR:

ELV. CONTRACTOR:

THIRD FLOOR DATA TEL TV LAYOUT DRAWING TITLE:

THIRD FLOOR
SCALE - 1:100 DATA TEL TV LAYOUT
PROJECT CODE: CHECKED BY: PROJECT DRAWN BY:
MANAGER:

SAK RRC BAT MNJ

DATE: SCALE: REV NO:


DRWG No:
ALOALA/SAK/
ELV/TF
07 - 07 - 2021 NTS R3