Professional Documents
Culture Documents
Bhaweesha Project of Lasting Department
Bhaweesha Project of Lasting Department
Bhaweesha Project of Lasting Department
An
Assignment
On
Lasting constructions & machines
At
FDDI (Ankleshwar)
Submitted by:-
Bhaweesha kalsi
Roll no. : - 04
Subject:-
Footwear lasting
Technique-ii
B.Sc. (FDP)
Under the guidance of:-
Vikas Bhatia
ACKNOWLEDGEMENT
Page |2
DECLARATION
Page |3
Signature of student
BHAWEESHA KALSI
B.Sc. (FDP)
Page |4
INDEX
SR. TITLE PG. NO. REMARKS
NO.
1. Introduction 5-6
to lasting &
constructions.
2. Cemented 6-7
construction
3. Sequence of 7-8
operation for
cemented
construction.
4. Machines 8-9
used for
cemented
construction.
5. Machines 9-44
parts, safety,
operating
&setup
perimeters
Lasting
Page |5
What is construction?
Construction is defined as the method of attachment of sole
with upper. There are many ways to attach the sole to the
upper but commercially only a few methods are preferred.
Shoes where traditionally made by molding leather to a
wooden last. Modern technology has introduced many new
materials and mechanism and much of the manufacture.
Cemented construction
In recent years there have been many development in
machineries used for lasting in the cemented construction.
The result has been that cemented lasting has been
considerably in simplified. Many firms now completely last
the shoe in three stages. There are many systems available,
this being of react advantage to the footwear manufacturer
has he can select a system which is suitable for his
particular product. Factors such as heel height, waist
curvature, whether it is lasting for men’s women’s or
children’s work will all have a consideration.
Page |7
Upper checking
Insole attachment with masking tape.
Toe-puff attachment
Counter molding
Lacing
Toe conditioning
Toe lasting
Heel conditioning
Seat & side lasting
Heel Crowning
Heat setting
Wrinkle chasing
Sole marking
Roughing and scouring
Adhesive application first Coat
Drying
Adhesive application second coat
Drying
Heat reactivation
Sole spotting
Sole pressing
Edge cleaning
Chilling
De-Lasting
Finishing
Final QC
Packing
Page |8
Operation:
1. Switch on the air compressor before switching on
the machine.
2. Switch on the machine and set time at 15 second
and temperature at 130 C.
3. Wait for at least 30 minutes before starting
operation.
4. Make sure the thermo plastic coated toe puff is
properly skived.
5. Place toe puff in between upper and lining keeping
its edge 8-10m.m away from upper edge.
6. In this posture place the upper under the clamp and
press foot pedal.
P a g e | 11
centigrade
Temperature of cold mould – -10 degree centigrade
Operation:
Safety:
Do not the thermal units and any other heated and moving
parts while operating machine. Concentrate on job while
operating machine.
Operation:
machine
Safety:
.
Operation:
Safety:
Safety:-
1. Do not touch the Pincer, Extrusion nozzle, heel band,
side pads and any other heated and moving parts while
operating machine.
2. Concentrate on job while operating machine.
3. Do not operate the machine without a Last.
Operation:-
1. Switch on the air compressor before switching on the
machine.
2. Switch on the machine and set time at 7 seconds and
Date temperature at 2100 C.
3. Set machine as per heel height.
4. Set pincer pull as per material.
5. Set adhesive quantity.
6. Place toe lasted upper on the spindle after setting back
height and feed the machine. Press initiation button to
start machine cycle.
7. After the machine release the lasted upper check
following points as stated in the given handout.
P a g e | 24
material)
Air line pressure – 6-8 bars.
Safety:
1. Concentrate on job while operating machine.
2. Do not operate the machine without a Last.
3. Keep your hands away from the last bottom while
operating machine.
4. Keep your hands away from the last bottom while
operating machine.
5. Ladies must keep dupatta / shawls tied back firmly.
Operation:-
1. Switch on the air compressor before switching on the
machine.
2. The machine supply pressure is 6 bars. Set the
temperature at 1100 C.
P a g e | 26
machine.
Safety:
1. Do not put your hand within the tunnel when machine
is running.
2. Do not raise heat setting temperature more than 140°C
for leather Upper.
3. Ensure that there is enough water in the tank before
switching on the machine. Use distilled water only.
4. Concentrate on job while operating machine.
Operations:
9. POUNDING MACHINE
Temperature: - 70 – 80
Dwell Time: - 8 – 10 sec
Safety:
P a g e | 29
Machine operation:
Sole Preparation:
Scour surface lightly. Use of brushing operation to
remove all traces of dust. Apply special EVA
primmer by brush. Ensure a minimum of 10 minutes
between wiping and cementing.
Apply polyurethane (PU) adhesive.
It is important that the cemented sole be allowed to
dry for at least of 30 minutes before sole pressing.
Heat reactivates the adhesives film to 85-90 degree
Celsius. When using special EVA primer, correct
heat reactivation of the adhesive films a must.
Safety: -
1. Heat reactivation machine must not be touched while it
is switched on.
2. Nothing should be kept unattended or for long period
on the Heat reactivator to avoid damage.
3. Do not operate machines without understanding
functions of its various parts
4. Consult the concerned faculty before operation.
5. Do not touch the sensor of conveyor sensor.
Operation:-
Safety:-
1. Do not touch the control panel.
2. Concentrate on job while operating machine.
3. Do not play with or operate the machine without last.
Breach of instruction will Cause serious physical injuries
Operation: -
1. Switch on the air compressor before switching on the
machine.
2. Concentrate on job while operating machine.
3. Do not play with or operate the machine without last.
Breach of instruction will Cause serious physical
injuries .
Operation: -
1. Switch on the air compressor before switching on the
machine.
2. Ensure line air compressor at least 6-7 bar or at least 90
psi.
P a g e | 39
Warning: -
It is important to ensure that the positions of the last and
the sole are correct in relation to the rubber pad and the
shoe tip support, because if there are any cracks or slits
where the rubber can enter during the first pressing
operation, there is a danger that the membrane will break.
P a g e | 40
Safety:-
1. Switch off the machine when not in use.
2. Concentrate on job while operating machine.
3. Keep your hands away from the conveyor while
operating machine.
Operation: -
1. Switch on the air compressor at least 15 minutes before
operation.
2. The operator must pay very careful attention while
working on this machine at all times.
3. Set the required temperature using the adjustment
switch.
4. The operator must pay very careful attention while
working on this machine at all times.
5. Set the conveyor rotation time 1 minute and
temperature – 15.
P a g e | 42
Pre-Production Check: