Saudi Aramco Inspection Checklist: General - Instrumentation Accessories - Material Receiving SAIC-J-6017 24-Jul-18 Inst
Saudi Aramco Inspection Checklist: General - Instrumentation Accessories - Material Receiving SAIC-J-6017 24-Jul-18 Inst
Saudi Aramco Inspection Checklist: General - Instrumentation Accessories - Material Receiving SAIC-J-6017 24-Jul-18 Inst
00 30-Jun-18
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
General - Instrumentation Accessories - Material Receiving SAIC-J-6017 24-Jul-18 INST
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Schedule G
A3 New and Unused - Instrumentation materials shall be new and unused.
Sec. 2.1
Verify that the contractor or it's Saudi Aramco approved third party
Schedule Q
inspector performed the quality activities at the supplier and sub-supplier
A8 Att. III
locations as required by the inspection level assigned for the materials
3.2
and equipment identified in SAEP-1150 Inspection Requirements.
B General Requirements
All pulsation dampeners (or snubbers), siphons, diaphragm seals and SAES-J-100
B1
similar accessories shall be shown on P&IDs. Sec.6.4.1
Gauge savers protecting instruments against pressures that are very high
SAES-J-100
B3 compared to the operating range may be used, except on switches in
Sec.6.4.3
critical service
SAES-B-057
B4 An indicating pressure gauge shall be installed in the top of each tank.
Sec.10.6
All instruments and their accessories shall meet the relevant requirements SAES-J-003 Sec.
B6
pertaining to ambient conditions. 8.1
Locally mounted instruments and their accessories shall meet the relevant SAES-J-100
B7
electrical area classification requirements of SAES-B-068. Sec.3
C Material Requirements
Purchase Order and Instrument specification sheet criteria shall be
confirmed and compared with instrument stainless steel tags / labels and Schedule Q
C1
nameplates, and shipment checked for damage prior to acceptance of the Att. IV sec.3.3
shipment
All continuous measurement electronic field instruments and control valve SAES-J-003
C2
positioners, shall be smart. Sec.4
Instruments and control systems shall operate continuously under the
following ambient air temperatures without any degradation of the
manufacturer's guaranteed performance: SAES-J-003
C3
Sec.8.1
SAES-J-003
C6 HART communication protocol shall not be used for plant control.
Sec. 7.1
Verify that the FFDevices and all function blocks shall be downloadable SAES-J-904
C10
into the devices by the end user. Sec.7.1.1.3
Material selection for pressure device wetted parts shall be type 316
SAES-J-100 Sec
C15 stainless steel minimum with PTFE gaskets, unless other materials are
6.1..3
required by the process
Ranges shall be selected such that the normal operating pressure falls SAES-J-100
C16
between 30% and 70% of the scale range Sec.6.1.4
REMARKS:
REFERENCE DOCUMENTS:
1. Schedule G - Material, Tools and Equipment (Pro Forma MP-IK-LS Contract)
2. Schedule Q - Quality Requirements (Pro Forma Contract)
3.SAES-J-003 - Instrumentation and Control Buildings - Basic Design Criteria, 1 January 2018
4. SAES-J-100-Process Measurement, 1 January 2018
5.SAES-J-904 - FOUNDATION Fieldbus Systems,1 January 2018
6. PIP PCCPR001 - Pressure Measurement Criteria, 24 April 2007
7. SAES-B-057 - Safety Requirements: Refrigerated and Pressure Storage Vessels, 27 November 2016
8.SAES-B-068 -- Electrical Area Classification, 23 November 2017
NOTES:
1. Approved - Acceptable to the authority having jurisdiction (i.e., Saudi Aramco ID).
3. Listed - Equipment and materials included in a list published by an approved qualified organization concerned with evaluation of products or
services, that maintains periodic inspection of production of listed equipment or materials or periodic evaluation of services, and whose listing states
that the equipment, material, or services either meets appropriate designated standards or has been tested and found suitable for a specified purpose.
4. Labeled - Equipment or materials to which has been attached a label, symbol, or other identifying mark of an approved qualified organization
concerned with product evaluation, that maintains periodic inspection of production of labeled equipment or materials, and by whose labeling the
5. Remarks: