Proposal for

INDONESIA hybrid plant

2020. 02
Hyundai Electric & Energy Systems
Contents

1. Location of hybrid plant

2. Project outline

3. Simulation for PV Generation

4. HE functional proposal

5. BESS capacity proposal

6. Battery information

7. Container type for BESS

2
1. Location of hybrid plant

Location of Renewable energy plant :


At Desa Suana, Nusa Penida Sub District, Klungkung Regency

3
2. Project outline

Preliminary Project outline

1. Type : Hybrid plant ( Diesel engine generator + PV + BESS)

2. Capacity
1) Diesel engine : 11.9 MW (Installed Item) & can be renewal
2) PV : 8.5 MWp
3) BESS : ‘6MW / 4MWh’ or ‘6MW / 18.8MWh’

3. Function of PV
1) Renewable energy generation instead of Diesel engine generation

4. Function of BESS
1) PV Generation Curtailment
2) PV Ramp Rate

4
2. Project outline

Standard function of PV+BESS combination.

5
3. Simulation for PV Generation

Simulation for PV Generation check

1. PV module :
380Wp (Hyundai Energy Solution)

2. Q’ty of PV module : 22,368ea

3. Total PV capacity : 8.49 MWp

4. Tilt of PV : 10°

5. Inverter :
1,000kW (Hyundai Energy Solution)

6. Q’ty of Inverter : 9ea

7. Meteo data : Meteonorm 7.2

6
3. Simulation for PV Generation

Simulation for PV Generation check

1. Produced energy : 12,833 MWh/year

2. Specific production : 1,510 kWh/kWp/year

3. Performance ration : 77.93%

4. 1st year P90 generation : 12,326MWh

7
4. HE functional proposal

Preliminary Project outline + HE proposal

1. Type : Hybrid plant ( Diesel engine generator + PV + BESS)

2. Capacity
1) Diesel engine : 11.9 MW (Installed Item) & can be renewal
2) PV : 8.5 MWp
3) BESS : ‘6MW / 4MWh’ or ‘6MW / 18.8MWh’

3. Function of PV
1) Renewable energy generation instead of Diesel engine generation

4. Function of BESS
1) PV Generation Curtailment
2) PV Ramp Rate
3) BESS charging from PV surplus
4) Frequency Regulation of Diesel engine plant
5) Emergency Backup

8
4. HE functional proposal

Proposed additional function.


Efficient & Economic operation for PV & BESS.

9
4. HE functional proposal

Proposed additional function.


Better Electricity Quality from Power Plants.

10
4. HE functional proposal

Proposed additional function.


Substitute for diesel generator in emergency situation.

11
5. BESS capacity proposal

Main Requirement for BESS capacity

- Hybrid EMS to send signals to Cogindo’s operators for engines start-up


(Min.30 minutes before).

Forcasting of PV generation
- The generation of PV in real time or near time is unreliable due to the uncertainty of
forecasting weather data.

Hence, BESS capacity should be determined in consideration of the following conditions.


1) Required capacity from PV power outage until engine runs.
2) Feasibility study.
3) Battery degradation check.

12
5. BESS capacity proposal
Optimized battery capacity simulation (example)

13
6. Battery information

1. Cell (Minimum unit of Battery) - NCM Type

Item (VENDOR : SAMSUNG SDI) E3 100Ah

Cell Dimension, L x H x W [mm]


173 x 125 x 45
(excluding terminals)

Weight [g] 2150

Capacity [Ah] Typ. 100Ah

Design Energy [Wh]


368.0
(nominal)

Gravimetric [Wh/kg] 171.1


Energy
Density
Volumetric [Wh/L] 378.1

Max [V] 4.15

Voltage Nominal [V] 3.68

Min [V] 2.70

14
6. Battery information

2. Module (Minimum unit of replaceable item)


Classification E3

Image

Cell 100Ah

Configuration 2P12S

Design Energy [kWh] (nominal) 8.832

Continuous (CHG/DCHG) 4.4(0.5CP)


Power
[kW]
Peak -

Operating Voltage(V) 38.4~49.8

Dimension (WxLxH) 370 x 637 x 160

Weight (kg) <58

Gravimetric [Wh/kg] 152


E-Density
Volumetric [Wh/L] 234

Recommended application 0.5CP ↓(1 equivalent cycle per day application)

15
6. Battery information

3. Switchgear (Rack BMS and Protective devices)


Classification Single string

Image

Dimension 413.4 x 557.2 x 160

Weight TBD

DC (+) GPR-H500A x 1
Contacto
r (-) GPR-H500A x 1
Protect
Device
(+) 1200V 160A x 1
DC Fuse
(-) 1200V 160A x 1

Dielectric strength AC 3000V for 60sec

16
6. Battery information

4. Rack frame
Classification Rack

Cell 100Ah

2P204S (17module)
2P228S (19module)
Configuration 2P240S (20module)
2P276S (23module)
2P300S (25module)

2P204S 150.1
2P228S 167.8
Energy [kWh] 2P240S 176.64
2P276S 203.1
2P300S 220.8

2P204S 652.8~846.6
2P228S 729.6~946.2
Operating Voltage(V) 2P240S 768.0~996.0
2P276S 883.2~1145.4
2P300S 960~1245

1272 (For 2P240S)


Weight(kg)
(To be confirmed after contract)

Dimension
W 876.0 x 700.8 x 1955.9 (240S)
(mm)

E-Density (Wh/L)
154
with 13 slots dual Rack

0.5CP ↓
Recommended application
(1 equivalent cycle per day application)
※ 2P300S Rack

17
6. Battery information

4. Rack frame
Switchgear installation

Module installation

18
7. Container type for BESS

PCS 500kW+Battery 1.3MWh

PCS 1MW+Battery 3.5MWh

19