Installation Instructions

SmartLink™ Software

GR™-12/15/20
GRC™-12
QS™-12/15/20
GS™-30/32/46/47
GS™-46AV
GS™-69 DC
GS™-69 Bi-Energy
X-12
X-14
Part No. 216767GT
Rev E
August 2018
Instructions Rev E

Introduction
Introduction
Introduction

Tools Required:
Tools Required

 Torx T10 screwdriver

 Cat5 Ethernet Cable

Observe and Obey:  PC or Laptop with an Ethernet Port and


Internet Browser
 This procedure shall be completed by a person
trained and qualified on the repair of this
machine. Glossary of Terms
 Immediately tag and remove from service a ECM - Electronic Control Module
damaged or malfunctioning machine. GCON - Ground Controller. This ECM is located at
the ground controls.
 Repair any machine damage or malfunction
before operating the machine. PCON - Platform Controller. This ECM is located at
the platform controls.
Before Starting Installation: CAT5 Cable - Standard Ethernet cable used for
networking purposes.
 Read, understand and obey the safety rules
and operating instructions in the appropriate
operator's manual.

 Be sure that all necessary tools and parts are


available and ready for use.

 Read this procedure completely and adhere to


the instructions. Attempting shortcuts may
produce hazardous conditions.
Indicates that a specific result is expected
after performing a series of steps.
Indicates that an incorrect result has occurred
after performing a series of steps.
Note: These installation instructions only apply
to the Genie models listed on the front cover.

2 SmartLink™ Software Part No. 216767GT


Rev E Instructions

Introduction
If you have any further questions regarding these Theory of Operation
instructions or need assistance, please contact
Genie Product Support at one of the following SmartLink software consists of two parts, the
telephone numbers: application software (also called firmware) and the
bootloader software. The only time an operator will
United States: + 800 536 1800 enter bootloader mode is when updating the
Canada: + 425 881 1800 software.
Europe: UK + 44 1476 584 333 Software can only be updated from bootloader
France + 33 237 260 986 mode (i.e. when the bootloader software is running
Germany + 49 4221 491 810 instead of the application software). Bootloader
mode can be started from the web service tool if
Iberica + 34 935 725 090 the machine is functioning properly. The machine
Italy + 39 075 941 8132 will always start in application mode.
Scandinavia + 46 3157 5154 Bootloader mode can be started manually if the
Other locations + 31 165 51 93 22 machine is not functioning properly.
Middle East: + 97 143 391 800 or Once in bootloader mode it is possible to update
+ 97 150 459 7937 either the application software or the bootloader
Australia: + 61 7 3456 4444 software. Genie periodically release firmware
Brazil + 0 800 031 0100 updates (i.e. new application software), and on rare
occasions releases new bootloader software.
South America - other + 56 9 6431 2110
locations
All other locations + 1 425-881 1800

Part No. 216767GT SmartLink™ Software 3


Instructions Rev E

Procedure
Procedure

Checking the Application 2 Press the ground control scroll down button.
Revision from the Ground Result: The GCON LCD will show the software
revision and hour meter information. After 5
Controls seconds, the ground controls LCD will return
1 Turn the key switch to ground controls or to machine model and hour meter information.
platform controls and pull out the red
Emergency Stop button to the on position at
both ground and platform controls. SOFTWARE REV
Result: The PCON LCD will show "CH". 00000.0 Hours

=+ -
=+ -
2

1
1 2 3 4

Result: The GCON LCD will show the machine


model and hour meter information.
After 3 seconds, the machine model will not
show on the display. 137562

READY . GS3369 1 GCON LCD


2 scroll down button
00000.0 Hours
3 Push in the red Emergency Stop button to the
off position at both the ground and platform
controls and turn the key switch to the off
position.

4 SmartLink™ Software Part No. 216767GT


Rev E Instructions

Procedure
Checking the Application 5 Read and record the IP address.
Revision Using the Web Service Note: The display wil only show the IP
Tool address for 3 seconds. Press the scroll
up button to display the IP address for
1 Open the GCON compartment. another 3 seconds.
Note: Some models will require opening the ground
control box to access the GCON. 6 Launch a web browser such as Internet
Explorer ®, Chrome ® or Firefox ® on your PC
2 Turn the key switch to ground controls or or laptop. Type the IP address from step 5 into
platform controls and pull out the red the web browser address bar and press enter.
Emergency Stop button to the on position at
both ground and platform controls. Result: The following screen will be displayed.
3 Locate the diagnostic port on the side of the
GCON. Remove one of the fasteners securing
the cover and set aside. Loosen the other
fastener. Do not remove it.

7 Enter the following username and password


then select OK.
Username: smart.link
Password: SL1000
Note: The username and password are case
sensitive.
Result: The following screen will be displayed.
1

1 diagnostic port

4 Connect one end of a CAT5 Ethernet cable


into the diagnostic port. Connect the other end
into a PC or laptop.
Result: The ground controls LCD display will 8 Select the Software tab at the header bar.
show the following: Result: The following screen will be displayed.

OPEN WEB BROWSER


<IP ADDRESS>

Part No. 216767GT SmartLink™ Software 5


Instructions Rev E

Procedure
Checking the Application 5 Locate the diagnostic port on the side of the
GCON. Remove one of the fasteners securing
Revision and Bootloader Date the cover and set aside. Loosen the other
from Bootloader Mode fastener. Do not remove it.

1 Open the GCON compartment.


Note: Some models will require opening the ground
control box to access the GCON.
2 Turn the key switch to the ground controls
position and pull out the red Emergency Stop
button to the on position at the platform
controls.
3 At the ground controls, press and hold the
Enter and Escape buttons. 1

3 1 diagnostic port
1 2 3 4

6 Connect one end of a CAT5 Ethernet cable


2
into the diagnostic port. Connect the other end
into a PC or laptop.
Result: The ground controls LCD display will
show the following:
137562

1 LCD display OPEN WEB BROWSER


2 enter button
3 escape button <IP ADDRESS>
4 Pull out the red Emergency Stop button to the
on position at the ground controls. 7 Read and record the IP address.

Result: The ground controls LCD display will 8 Launch a web browser such as Internet
show the following: Explorer ®, Chrome ® or Firefox ® on your PC
or laptop. Type the IP address from step 7 into
the web browser address bar and press enter.
SOFTWARE UPDATE
Result: The following screen will be displayed.
CONNECT ETHERNET

6 SmartLink™ Software Part No. 216767GT


Rev E Instructions

Procedure
Loading or Updating Machine Entering Bootloader Mode from
Software Machine Application Mode
Note: Before updating the machine software, open 1 Open the GCON compartment.
a web browser and navigate to the following
Note: Some models will require opening the ground
location for the Genie Machine Software Download
control box to access the GCON.
portal, http://firmware.genielift.com. Perform a
search by applying the appropriate filters and 2 Turn the key switch to ground controls or
download the machine software. Download the platform controls and pull out the red
appropriate firmware files for your machine and Emergency Stop button to the on position at
unzip them. both ground and platform controls.
To update the software, the machine will need to 3 Locate the diagnostic port on the side of the
be placed in bootloader mode. Enter Bootloader GCON. Remove one of the fasteners securing
Mode from Machine Application Mode or Manually the cover and set aside. Loosen the other
Enter Bootloader Mode. fastener. Do not remove it.
If the machine is functioning normally, software can
be updated by logging into the Machine Service
Tool. Refer to Entering Bootloader Mode from
Machine Application Mode.
If the machine is not functioning or problems are
encountered while using the Machine Service Tool,
the bootloader can be started manually. Refer to
Entering bootloader Mode Manually.

1 diagnostic port

4 Connect one end of a CAT5 Ethernet cable


into the diagnostic port. Connect the other end
into a PC or laptop.
Result: The ground controls LCD display will
show the following:

OPEN WEB BROWSER


<IP ADDRESS>

Part No. 216767GT SmartLink™ Software 7


Instructions Rev E

Procedure
5 Read and record the IP address. 8 Select the Software tab at the header bar.
Note: The display wil only show the IP Result: The following screen will be displayed.
address for 3 seconds. Press the scroll
up button to display the IP address for
another 3 seconds.

6 Launch a web browser such as Internet


Explorer ®, Chrome ® or Firefox ® on your PC
or laptop. Type the IP address from step 5 into
the web browser address bar and press enter.
Result: The following screen will be displayed.

9 Select the Update Machine Software button.


Result: Bootloader Mode is enabled.
7 Enter the following username and password 10 Continue to Software Installation.
then select OK.
Username: smart.link
Password: SL1000
Note: The username and password are case
sensitive.
Result: The following screen will be displayed.

8 SmartLink™ Software Part No. 216767GT


Rev E Instructions

Procedure
Entering Bootloader Mode 5 Locate the diagnostic port on the side of the
GCON. Remove one of the fasteners securing
Manually the cover and set aside. Loosen the other
1 Open the GCON compartment. fastener. Do not remove it.

Note: Some models will require opening the ground


control box to access the GCON.
2 Turn the key switch to the ground controls
position and pull out the red Emergency Stop
button to the on position at the platform
controls.
3 At the ground controls, press and hold the
Enter and Escape buttons.

1 1

3
1 2 3 4

1 diagnostic port
2
6 Connect one end of a CAT5 Ethernet cable
into the diagnostic port. Connect the other end
into a PC or laptop.
137562 Result: The ground controls LCD display will
show the following:
1 LCD display
2 enter button
3 escape button OPEN WEB BROWSER

4 Pull out the red Emergency Stop button to the


<IP ADDRESS>
on position at the ground controls.
Result: The ground controls LCD display will 7 Read and record the IP address.
show the following: 8 Launch a web browser such as Internet
Explorer ®, Chrome ® or Firefox ® on your PC
or laptop. Type the IP address from step 7 into
SOFTWARE UPDATE the web browser address bar and press enter.
CONNECT ETHERNET Result: Bootloader Mode is enabled.
9 Continue to Software Installation.

Part No. 216767GT SmartLink™ Software 9


Instructions Rev E

Procedure
Software Installation 3 Select the Reprogram Device(s) button to
start the ECM software update.
Note: The following screen will be displayed after
entering bootloader mode. If application software has been installed:
Result: The following screen will be displayed
after the software update is complete.
Note: Do not turn off power while the ECM is being
reprogrammed.
Note: After the software update is complete, select
Run Application to exit software update mode.

1 Select the Choose File button and navigate to


the downloaded Genie Flash file (.gff).
Note: Verify it is the correct flash file.
2 Select the Load Flash File button to verify the
file is a .gff file.
Result: The following screen will be displayed.
If bootloader software has been installed:
Result: The date at the bottom of the screen
will update when the installation is complete.

10 SmartLink™ Software Part No. 216767GT


Rev E Instructions

Procedure
4 Push in the red Emergency Stop button and
disconnect the CAT5 cable from the GCON.
5 Secure the diagnostic port cover using the
retaining fasteners removed in step 5. Do not
over tighten.
Note: Machines equipped with AGM batteries will
need to select the AGM battery type using the
GCON set parameters screen. Refer to the
Machine Setup procedure in the Service and
Repair manual that is appropriate for your machine.
Note: GS-69 DC and GS-69 Bi-Energy models are
not equipped with AGM batteries.

WARNING Tip over hazard. Updating the


SmartLink software may have
impacted the machines default
drive speeds. Tipping over the
machine will result in death or
serious injury.
Perform drive speed test. Refer
to the Maintenance Manual that
is appropriate for your machine.

6 Perform function test. Refer to the Operator's


Manual located on your machine.
7 Return the machine to service.
Instructions Part No. 216767GT SmartLink™ Software
Rev E

Part No. 216767GT SmartLink™ Software 11