The project training was done at Ahmedabad
underground metro project-UG-02 under the
awardee contractor L&T. The underground
station by top-down methodology and
tunnel construction by EPB-TBM both were
covered under this. At station all the 3
1 structural components namely Pile,
Diaphragm wall and Slab was covered. This
portfolio contains details about the casting
of tunnel lining segments at kathwada
casting yard and also tunnelling and ring
building between kalupur launching shaft and
Gheekanta station by Earth pressure balance
tunnel boring machine. For each activity
detailed construction methodology,
procedure, quantities, resources, time cycle,
costing, productivity, equipment mobilization
& cost were studied.  

 Report Content

Segment Mould
Casting of segment procedure
Casting of segment cage tying procedure
Casting of segment procedure
TBM Launching shaft plan and Section (Kalupur)
Mining by earth pressure balance tunnel boring machine
Main drive procedure as a whole,ring transportation, stacking and preparation for erection
Ring erection and grouting
Segment casting analysis glimpse
Tunneling main drive time analysis