CALCULATION
OF
SCBD LOT 10
2. BMU TRACK
2.1 H-Beam
2.2 Welding
2.3 Bolt
2.4 Base plate
It is proposed to install 1 building maintenance unit (BMU) on top roof level of the building.
This calculation presents the bolt calculation, when the BMU is upright it would be fixed on
top of the twin track with base plate underneath which are fixed to the plate.
The resulting loading is transfer to the track, bolted to the base plate steel, then to the I-Beam
support.
Reference :
- EN1808 - Table 8 & 9 presented according to the EN1808 Annex D
- Indonesian national standardization SNI 1726:2012 “Tata cara perencanaan
ketahanan gempa untuk struktur bangunan gedung dan non gedung”
- “Elastic properties and young modulus for some materials” The Engineering
Toolbox,Retrieved 2016-01-06.
- Certificate of inspection
- HILTI Anchor Fastening Technology Manual
Material properties
2.1 H-Beam
Ix = 10800 cm4
Iy = 3650 cm4
Sx = 867 cm3
ix = 10.8 cm
iy = 6.29 cm
221500
2000
Solution
a= s = 0.8 cm
P= 44300 Kg
e= 300 cm
A bruto = 400 mm
40 cm
A netto = A bruto - 3a
= 40 - (3 x 0.8)
= 37.6 cm
Tension
σ= M
W weld
W weld = 1/6 x a x l²
= 1/6 x 0.8cm x 37cm²
= 159.72 cmᶟ
σ= 13290000 Kgcm
159.72cmᶟ
= 83208.11 Kg/cm²
shear
τ = Fx
= 2840 kg
37.6 cm²
Mx = Fx . d
= 2840 kg x 250 mm
= 710000 kgmm
Mz = Fz . d
= 44300 kg x 250 mm
= 11075000 kgmm
Ti = Fz / A
= 44300 / 37.6
= 1178.19
Tx = Mz / Zx
= 11075000 / (bh²/6)
= 11075000/213.3
= 51922.17
TR = Tx + Ti
= 51922.17 + 1178.19
= 53100.36
2.3 Bolt
The downward wheel load will be sustained by the plate steel plinth, The horizontal force
will be restraint by bolted and transferred to the support structure.
The effective section area of the each M30 bolt = 561 mm²
The Tensile load on each bolt = 66000 / 561 = 117.65 Nmm² < 290 Nmm²
The effective section area of the each M30 bolt = 561 mm²
Shear stress on each M30 bolt = 9325 / 561 = 16.62 Nmm² < 132 Nmm ² OK
The effective section area of the each M30 bolt = 561 mm²
The Tensile load on each bolt = 65075 / 561 = 116 Nmm² < 290 Nmm²
The effective section area of the each M30 bolt = 561 mm²
Shear stress on each M30 bolt = 9190 / 561 = 16.38 Nmm² < 132 Nmm ² OK
The effective section area of the each M30 bolt = 561 mm²
The Tensile load on each bolt = 91450 / 561 = 163.01 Nmm² < 290 Nmm²
The effective section area of the each M30 bolt = 561 mm²
Shear stress on each M30 bolt = 12940 / 561 = 23.06 Nmm² < 132 Nmm ² OK
Checking bolt in load condition 4
The effective section area of the each M30 bolt = 561 mm²
The Tensile load on each bolt = 110800 / 561 = 197.5 Nmm² < 290 Nmm²
The effective section area of the each M30 bolt = 561 mm²
Shear stress on each M30 bolt = 29910 / 561 = 53.31 Nmm² < 132 Nmm ² OK
The effective section area of the each M30 bolt = 561 mm²
The Tensile load on each bolt = 46050 / 561 = 82.08 Nmm² < 290 Nmm²
The effective section area of the each M30 bolt = 561 mm²
Shear stress on each M30 bolt = 5585 / 561 = 9.95 Nmm² < 132 Nmm ² OK
The effective section area of the each M30 bolt = 561 mm²
The Tensile load on each bolt = 105780 / 561 = 188.55 Nmm² < 290 Nmm²
The effective section area of the each M30 bolt = 561 mm²
Shear stress on each M30 bolt = 46380 / 561 = 82.67 Nmm² < 132 Nmm ² OK
Shear force (seismic) = 185.52 KN, BMU Height = 5.5 m dan Bw = 2.5 m
= 1020 KNm
Ti = M + Bw
= 1022.5 KNm2
Ag = 50 cm x 2 cm
= 100 cm²
Pu = Øt x Ag x fy
= 216000 kg
= 216 Ton
Db = 30 mm + 1.5 mm
= 31.5 mm
An = Ag - (2 x 3.15 cm x 2)
= 100 - (2 x 3.15 x 2)
= 100 - 12.6
= 87.4 cm²
= 87.4 + 17.5
= 104.9 cm²
Ae = µ x An
= 1 x 87.4
= 87.4 cm²
Pu = Øt x Ae x fu
= 291042 Kg
= 291 Ton
Checking Shear
S1 = 75 mm > 1.5 x Ø
S1 = 75 mm > 1.5 x 30 mm
S1 = 75 mm > 45 mm
S1 = 350 mm > 2 x Ø
S1 = 350 mm > 2 x 30 mm
S1 = 351 mm > 60 mm
Rd = 2.4 x Øf x db x tp x fu
= 3996
= 3.9
3. FALL ARREST AND SAFETY LINE
3.1 Roof
3.1.1 Bolt
Checking Tensile
The effective section area of the each M12 bolt = 84.3 mm²
The Tensile load on each bolt = 1500 / 84.3 = 17.79 Nmm² < 290 Nmm²
Checking shear
The effective section area of the each M12 bolt = 84.3 mm²
The Tensile load on each bolt = 2700 / 84.3 = 32.03 Nmm² < 290 Nmm²
Ag = L x tp
= 15 cm x 1.7 cm
= 25.5 cm²
Pu = Øt x Ag x fy
= 55080 kg
= 55.08 Ton
db = Øbolt + L
= 12 mm + 1.5 mm
= 13.5 mm
An = Ag - (n x Db x t)
= 25.5 – 4.59
= 20.91 cm²
= 209.1 mm²
Ant = An + ((As-As²) x t)/(n x (As-As))
= 20.91 + 4.25
= 25.16 cm²
Ae = µ x An
= 1 x 20.91
= 20.91 cm²
Pu = Øt x Ae x fu
= 69630 Kg
= 69.63 Ton
Checking Shear
S1 = 100 mm > 2 x Ø
S1 = 100 mm > 2 x 12 mm
S1 = 100 mm > 24 mm
Rb = 2.4 x Ø x db x tp x fu
= 226.44
= 2.26 KN < 15 KN OK
3.2 Canopy
3.2.1 Bolt
Checking Tensile
The effective section area of the each M12 bolt = 84.3 mm²
The Tensile load on each bolt = 1500 / 84.3 = 17.79 Nmm² < 290 Nmm²
Checking shear
The effective section area of the each M12 bolt = 84.3 mm²
The Tensile load on each bolt = 2325 / 84.3 = 27.58 Nmm² < 290 Nmm²
Ag = L x tp
= 15 cm x 1.7 cm
= 25.5 cm²
Pu = Øt x Ag x fy
= 55080 kg
= 55.08 Ton
db = Øbolt + L
= 12 mm + 1.5 mm
= 13.5 mm
An = Ag - (n x Db x t)
= 25.5 – 4.59
= 20.91 cm²
= 209.1 mm²
= 20.91 + 4.25
= 25.16 cm²
Ae = µ x An
= 1 x 20.91
= 20.91 cm²
Pu = Øt x Ae x fu
= 69630 Kg
= 69.63 Ton
Checking Shear
S1 = 100 mm > 2 x Ø
S1 = 100 mm > 2 x 12 mm
S1 = 100 mm > 24 mm
Rb = 2.4 x Ø x db x tp x fu
= 226.44
= 2.26 KN < 15 KN OK
3.3 Post Anchorage (Concrete)
Critical spacing
hef = 85mm
critical spacing splitting failure
hef = 85mm , Scr,n = Scr,np =2Ccr,sp 420 mm
Ccr,sp = 141.55mm , Scr,sp = 2 Ccr,sp 283.1 mm