Professional Documents
Culture Documents
Trevithick Second Steam Locomotive Built General Arrangement in 1805, New Castle, England (Coal Fired)
Trevithick Second Steam Locomotive Built General Arrangement in 1805, New Castle, England (Coal Fired)
Trevithick Second Steam Locomotive Built General Arrangement in 1805, New Castle, England (Coal Fired)
274 10.8
44 1.7
BILL OF MATERIALS
J.A.M. DE WAAL. 12 BRIGHTWELL STREET PAPAKURA 2110.
NEW ZEALAND. PHONE: OO64 09 2988815. MOB: 0211791000
E-MAIL: dewaal@xtra.co.nz. SHEET:02 OF 07 A3 No: TREV-127-02
124 17 64.8 103 5 6
PINE 3.5 BENT AS SHOWN IN DETAIL A 102
2
101 M/S
10
10
8
6
7 10 7
R58
8 R1
4
DETAIL A 4
5.5
M/S
13
7
21
PRESS FIT AND
HARD SOLDER
11
ANGLE 12x12x2 AFTER ASSMBLY
104A
73
23
FOLD LINE
20
40.6
102 BENT DOWN
3
M/S BRZ
BRS 12 6 12 M/S
6.5 BENT DOWN 3 ALL 21 2
2 M6 24 64.8 3 4 9 8
3.5
5.5
3
226 2 93 103
177.7
4 3
6
4
10
M6
218 SCALE 1:2 FLAT PATTERN SCALE 1:2
10
17
104B MIRROR
24
12
10 8 10 BRS 128 IMAGE
218
18 12 18 OF 104A 8
18
3.5
18
3 22 104A SCALE 1:1.5
M/S CU
12 6
12 6
201 BRS
24 24 HOLES EQUALLY M/S
SPACED ON PCD 203 M/S
3 ALL SCALE 1:2 202
201 184
202
122 PCD
R10
116
BRS
CU
HARD SOLDER ONTO PART 201
30 70 25 25 BRS
3 BRS
10 10 10
M4
116
112
204
8 M4
2mm THICK SCALE 1:2
32 R102 2 18 18
TAKE HOLES
204 OVER FROM
TEFLON OR TAKE HOLES PART 202
62.5 ALUM GASKET OVER FROM 5
3
MATERIAL PART 202
35
20.5 13.5
30
19.5
20 2
30.5
34
128
112
6
74.5 24
12.5
4
3
128
112
1
6
M3 7.5 SOLDER STUDS
16
PRESS 18 6 HOLES
8 FIT ON M3
45 2 203 EQUALLY
SOLDER STUDS TUBING 205 SPACED
FROM INSIDE 1 211 ON PCD
BRS 05mm THICK SCALE 1:2
4
10
BRS
18
BRS
4
211 TAKE HOLES
2
R2 3 1 21.5 21.5 2 16.5 16.5 2
1
8
2
OVER FROM
4
9
210
6
184 12 12
9.5
45 3 15.5 15.5 PART 203
12
16
4
1 3
188 2
BRS 213
2
7
BRS
5.5
3.5
3
3
12 4
6
22
209 9.5
SCALE 1:2 2 3.5 2
20
2
2 ALL R2 BRS
4
209 215
18
BENT UP 208 9 4x4=16 9 213 BRS
6.5
12.5 2 2
206 2 2
51.5
BRS BRS 205
9
8
207 33 214
4.5
11
43 212
36
0.5mm
13.5
3.5
7 8 5
1
30 CHAMFER
33
32
12
19
11
FOLD LINE
10
6.5
5
12 12 4 21
R28
13 13 R1.5 R33
22
5
10
8
DETAIL A
3
BENT UP CHAMFER
1.5
2
1.5
4
8.5 M/S 217 26 35
8.5
216 33 11
TAKE OVER 219 30
216 6 120 6
BRZ FROM 5.5
R6 9 6
8.5 PART 203
19 2
5 4 1
178
7
9
34.8 18 18 34.8
6
1
0-80PSI TO
20
40.5
PRESS FIT
35
35
67
40
BE LOCALLY
SOURCED
R2
18
3.5
11.5
7 9
1
12.5
17 234
1.5
3 49
R5
1
4
CU SOLDER
SCALE 1:1.5 4 ALL PARTS TO BE 8
R28
220 97 HARD SOLDERED
BRS SCALE 1:2
1.5
235
7
5
.5
220
R4
M/S
R4
M6 219
.5
R54
67
BRS
R52.
221
M/S
3 BRS
HARD
1.5
SOLDER 8 0.5 SCALE 1:2 15 15 46 240
229 230
2
6 8.7 12 12 40 PCD BRS BRS CU
CU 230 31 2 20 M/S
4
35
BRS 45° 2 46
1.5
M2
R4 R58
11
R6 60 3 40 PCD
8
5
M5
9
3
3.5 3.5
1.5
6 5.5 2.5
8
2
M8
11
35
235 239
2 SCALE 1:1.5 4.5 13
2.2 15
2 5
10 4 R3 8 HOLES
EQUALLY
4
R5
45°
16
3
R5
67
236 RUBBER
30°
2.5
SPACED
3
ON PCD 240
4.5 9.5
M2.5
1
BRS 241A
8 3
10
238
2
38 6
4
6 SCALE 1:2 M6
5
229 8 HOLES
38 3
66
60
BRS 232 BRS 241B EQUALLY
16
20
BRS
4
29 SPACED
1.5
4 REFER TO 0.5mm THICK ON PCD
5
1 16 OFF
3
241A
5
29 TAKE HOLES PART 236 SCALE 1:2
5
13
9
SP/S 13
4.5
7
SCALE 1:1.5 M6 0.5mm THICK TEFLON OR M/S
106
14 COILS 2 246
R11
6 6
UNCOMPRESSED 6 SCALE 1:1.5 2 GASKET MATERIAL R23
81
A
10 2
BRS BRS 3
4
GLASS 39 39
3
M8 4 1
M6
5
4
245
3
3 3 R4
M1.5
BRS CU BRS 18
22 244 246 2mm THICK
6x10=60
4.5 222 10
2
94 5
7
2 222
2
35
66
55
R2 M8 11 11
6 4
228 6 249 2.5
225 3 4.5 BRS 1mm THICK
2.5
5
R52.
2.5
238
40.5
28 PCD
8
5
7 6
52
1.5
18
5
R6
61.5
5.3
3
M2
15
5
40 3 15
7
5 3 SCALE 1 : 1.5 M3 R1 245
5
R14
S/S OR M/S 29 1 244 247 M8 TEFLON OR 0.5mm THICK
SCALE 1:2 SCALE 1:1.5 4.5 4.5 SCALE 1:1.5 GASKET MAT. SCALE 1:2
CU=COPPER BRS=BRASS BRZ=BRONZE M/S=MILD STEEL S/S=STAINLESS STEEL OR SILVER STEEL SP/S=SPRING STEEL
TITLE DRAWING CONTENTS PROJECT No
PROJECTION
MODEL SCALE: 1:11.3
TREVITHICK SECOND STEAM LOCOMOTIVE BUILT PARTS AND ASSEMBLIES JDW DRAUGHTING SERVICES DWG SCALE: 1:1 @A3 OR AS SHOWN
J.A.M. DE WAAL PAPAKURA NZ
IN 1805, NEW CASTLE, ENGLAND (COAL FIRED)
Copyright ©
J.A.M. DE WAAL. 12 BRIGHTWELL STREET PAPAKURA 2110.
NEW ZEALAND. PHONE: OO64 09 2988815. MOB: 0211791000
E-MAIL: dewaal@xtra.co.nz. SHEET:04 OF 07 A3 No: TREV-127-04
B 8 35
192 150 4 75 3
260 R2. 1 28 PCD
11 27 43 20.7
2 R11
2 3HOLES AS PER
5.5
C'SINK 4.5 4 4 2 PRESS 11 3
35 SECTION B-B 4 FIT 45°
2.5
BUSH
28 PCD
14 PCD
A A A A 250
10
18
4
6
8
M5
18
15
141 M/S
243 63 A 23.5 5 12 M/S BRZ
TAKE HOLES A= 4 8
OVER OF 258 250 TAKE HOLES
51 B 134 SOLDER 243 FOR ALL
PART241A 50 BRS 8 257 OVER FROM
75 22 10 6 DETAILS PART 243 M2 5 TAPPED HOLES
60° 258
60° SCALE 1:1.5 C REFER TO
BRS
EQUALLY
8 2 18 251 90° 4 PART 257 SPACED ON PCD
4
3
TEFLON
1 252 C 29 FOR ALL BRS
M/S 256 R2 3.5 43 259
R11
2
4
DETAILS
8
14 PCD
PRESS
2
FIT R2 REFER TO
8
33
BUSH 3mm THICK 259 2 2 2
2 BRZ
9 251 TAKE HOLES TEFLON 257 BRS
4
SECTION B-B OVER FROM 252 262
SCALE 1 : 1.5 PART 250 M/S S/S
5 M/S 260 5 16 128.5 PRESS FIT
6 30° CU 261 AFTER
2.5 253 152 2.5
253 4 1.5 2 C'SINK ASSEMBLY
M/S
2
A
3.5
M2
3 8 3
BRZ
14 PCD
264 M/S
M2
18
6 TAPPED LOCALLY 5
2
6.8
M2 NIPPLE 263 BRS
2
A PRESS SECTION A-A SPACED S/S
10 SOLDER
13
FIT
7
M3 R5
2 262 BUSH 2 R56
2 2 R132 5 14 109 14 5 302
M4
263
5
7.3
317
9.8
74.5
5
6
SCALE 1:2 M4
22
72.5 R4 3
4 4 4 4
3
1.5
4
67.5
R15
3
SCALE 1:1.5
8
265 39
21°
3
10 4
60 PCD 307 R102
39 39 R1
18
1
7.4
7
1
95 15 3 3
12 SCALE 1:1.5 8 163
88 22 2
145 8
5mm THICK 5
80 H 2 2
° TAKE OVER
F 93 Z=115
R1
HOLES FROM
56
3°
PART 301
18
4
8
4 1
M3
16
3 7 303 M/S
303
M/S 60°
2 60° 313 2
Z=50 4 12
5
2.5 BRZ
5
8
14
60 PCD
6mm THICK
15
10
15
4
SCALE 1:1.5
160
155
20
20
12
R12 R12 M/S BRZ
2 R10
1.5 R2 PRESS
2 FIT 304 16 1
DETAIL G BUSH
M2
0.0
18.2
4 6 PER DETAIL G
2
12 SPOKES 304 CUT
309 3
4
SPACED M/S
10
16
M4
2.5
2.5
5.5
M3 14 143 14
1
5
4
4 120
5
SCALE 1:1.5 R3 310
44.7
49.7
BRZ 6 4 R3
37
PRESS FIT BUSH
14
306 PRESS FIT BUSH
310
4
4 3 M/S
1 off LEFT AND 1 off RIGHT R5 15 5
6
5 15
R5
305 295
305 BRS
311 SCALE 1:2 PIN TO PESS FIT
TOOTH PROFILE A SECTION A-A M/S 20
AS PER DETAIL G 6 98 103.5 8.3
SCALE 1:1.5 SCALE 1 : 1.5
M3
SHT-05 164 316
BRZ
M3
0
222 9 3 43 39 39 43 3 9 2 1
4
15 312
205 4 4 4 SCALE 1:2 S/S
M4
4
312
15
11
M4
6
18
18
16
16
18
M/S
8
C'SINK
7 4 3 4
4mm THICK
4
10
10
M4 220
BRZ
8 8 8 221
R6 311 M/S
SCALE 1:1.5
39
12 8 16 8 41
315
10
11 PCD 5.5 1 1
16
10
6
315 2 222
4
219
16
15
10
8
M2
232
PRESS FIT BUSH
18 4 3.5 3.5
308 231
301
265
202
301
303 302
310
AS-3120
235 AS-3101
201 AS-2119
AS-3101
AS-1102
AS-3101
AS-3104
AS-2119
AS-2109
AS-2120
CU=COPPER BRS=BRASS BRZ=BRONZE M/S=MILD STEEL S/S=STAINLESS STEEL OR SILVER STEEL SP/S=SPRING STEEL
TITLE DRAWING CONTENTS PROJECT No
PROJECTION
MODEL SCALE: 1:11.3
TREVITHICK SECOND STEAM LOCOMOTIVE BUILT PARTS AND ASSEMBLIES JDW DRAUGHTING SERVICES DWG SCALE: NTS @A3 OR AS SHOWN
J.A.M. DE WAAL PAPAKURA NZ
IN 1805, NEW CASTLE, ENGLAND (COAL FIRED)
Copyright ©
J.A.M. DE WAAL. 12 BRIGHTWELL STREET PAPAKURA 2110.
NEW ZEALAND. PHONE: OO64 09 2988815. MOB: 0211791000
E-MAIL: dewaal@xtra.co.nz. SHEET:07 OF 07 A3 No: TREV-127-07