Professional Documents
Culture Documents
LN 2.1 IBS - Issues and Challenges
LN 2.1 IBS - Issues and Challenges
LN 2.1 IBS - Issues and Challenges
The Implementation Of
Industrialised Building
Systems In Malaysia
Horizontal
connection
Precast
concrete
wall
Vertical
connection
• Lack of knowledge in
structural analysis and
design of pre-fabricated
components.
• Poor connection system.
• Steel framed buildings that
are designed to imitate the
conventional reinforced
concrete structural system
results in serviceability
problems.
Successful Implementation of
IBS Projects
• Wawasan Hall,
Jitra, Kedah
• Putrajaya
Petronas Twin Towers
• Kuala Lumpur
Convention
Centre
Challenges in the IBS
construction industry
1.
Designing a Feasible
IBS System
• Standardisation may
lead to improvement in
quality, decrease
variability and increase
the ease of
manufacturing.
2.
Investment on Heavy
Equipment for Mechanized
Construction System