SRC INTERNATIONAL PANEL SYSTEMS INC.

OPERATION GENERAL CLEANING


TIME TABLE

NEW PROPOSED
CONCERNED ORIGINAL TIME
PLACE ACTION PLAN DATE OF
DEPARTMENT FRAME
ACCOMPLISHMENT

Repair of Cubicle Doors,


ceiling, sink, faucet &
shower heads
Assigned Contractor,
COMFORT ROOM Installation of additional July 17-31, 2021 September 30, 2021
SRC Panel Workers
lighting
Cleaning of Toilets and
Floors

Installation if Additional
lighthing
Cleaning of Sink & General Services, SRC
July 31- August
WORKERS' PANTRY Disposal of trash and Panel Workers, HR September 30, 2021
14, 2021
unecessary things Personnel
Grass Cutting and
Trimming of Trees
Roof Repair

SRC Panel Workers &


Disposal of Uneccesary
Property Dept. for August 14-28,
TOOL ROOM Things inside. September 30, 2021
purchasing of storage 2021
cabinet
Provide Storage Cabinet
for safe keeping of tools
Disposal of Trash
SRC Panel Workers,
FAÇADE AREA Disposal of Scrap General Services, July 31, 2021 September 30, 2021
Materials Motorpool
Repair of Roof

Removal of uneccesary August 28-


REPAIR AND SRC Panel Workers,
things and place them in September 4, September 30, 2021
MACHINE AREA Motorpool
a designated area. 2021

Purchase of the following

Goggles- 60pcs.
SAFETY MATERIALS Welding Apron- SRC Production Office September 30, 2021
60pcs. Steel
Lockers (15 doors) -
4pcs.

Prepared by: Approved by:

JOHN GLENN L. BIBLANIAS GRACE BUENAVENTURA


PM