Problem Statement: 3
Layout Plan: 4
Floor space index (FSI): 5
Material Properties: 5
Load Calculations: 5
Dead Load: 5
Live Load: 6
Alternative: 7
SAP Modelling: 8
Load Pattern: 8
Load Combinations: 8
SAP Model 9
BENDING MOMENT DIAGRAM 10
Beam Design: 10
Beam Detailing: 15
Slab Design: 15
Calculation of Reinforcement: 17
Detailing: 19
Column Design : 21
Grouping of Columns 21
Design Loads: 22
Group A Design: 23
Group B Design: 24
FOOTING DESIGN: 26
DESIGN OF ISOLATED FOOTING FOR GROUP A 26
DESIGN OF ISOLATED FOOTING FOR GROUP B: 29
Detailing: 31
STAIRCASE DESIGN: 32
Problem Statement:
Layout Plan:
Material Properties:
Load Calculations:
Dead Load:
Slab
Slab thickness 250 mm
2
Dead load 6.25 KN/𝑚
2
Area of slab 178.5 𝑚
Total load 1115.625 KN
Beam
Cross-Section 300 mm 400mm
Total length of
beam 131 mm
Self weight 393 KN
Column
Cross-Section 450mm 450 mm
Length 3m
Number 24
Total load 364.5 KN
Walls
Thickness of wall 230 mm
Load intensity 13.11 KN/m
Total length 131 m
Self weight 1717.41 KN
Live Load:
Floor
2
Live load at floor 3 KN/𝑚
2
Slab area 178.5 𝑚
Live load 535.5 KN
Roof
2
Live load at roof 1.5 KN/𝑚
2
Slab area 178.5 𝑚
Live load 267.75 KN
Alternative:
Load
2 2 2
Room Intensity(KN/𝑚 ) Area(𝑚 ) Numbers Total Area( 𝑚 ) Total Load(KN)
Bedroom 2.00 10.00 6.00 60.00 120.00
Load Pattern:
Load Combinations:
1. 1.5DL
2. 1.5(DL + LL)
3. 1.5(DL + EQx)
4. 1.5(DL + EQy)
5. 1.2DL + 1.5LL
6. 1.2(DL + LL + WL)
7. 1.2(DL + LL + WL)
8. 1.2(DL + WL)
9. 1.2(DL - WL)
10. 1.2(DL + LL + EQx)
11. 1.2(DL + LL + EQy)
12. 0.9DL + 1.5WL
13. 0.9DL - 1.5WL
14. 0.9DL + 1.5EQx
15. 0.9DL + 1.5EQy
SAP Model
Figure: For the envelope of all load cases, one of the 2D frame
Beam Design:
Material & Section Properties
Fck 25 MPa
Fy 420 MPa
Beam width 300 mm
Beam Depth 400 mm
Nominal Cover 24 mm
Effective cover 40 mm
Reinforcement Diameter 16 mm
2
Max Reinforcement (%) 2.5 𝑚𝑚
2
Ast Maximum 2700 𝑚𝑚
Mu,lim 134.136 KNm SP16 (Table C) Mu,lim 134.13 KNm SP16 (Table C)
Using formula for singly reinf. to find Ast, as Mu is less than Mu,lim = 134.16
kNm
Ast (%) 0.781 % SP16 (Table 3) Ast (%) 0.495 % SP16 (Table 3)
2 2
Ast (top) 843.48 𝑚𝑚 Ast(bottom) 534.6 𝑚𝑚
OK as per max, min. limit defined above
Asc (%) 0.3905 % Asc (%) 0.2475
2 2
Asc (bottom) 421.74 𝑚𝑚 Asc (top) 267.3 𝑚𝑚
Asc shall be at least 50% of top, as per Clause 6.2.3, IS 13920: 2016
Provided Reinforcement
5-16mm bars at top 3-16mm bars at bottom
2 2
Area of steel 1004.8 𝑚𝑚 Area of steel 602.9 𝑚𝑚
Development length
Dia 16 mm
Sigma S 415 MPa
2
Tbd (M25) 1.4 N/𝑚𝑚
Development length 1185.7 mm
(As per Clause 26.2.3.3.c, IS 456: 2000,
the development length should be greater
than the anchorage length)
Reinforcement Summary
Left Centre Right
Top 5-16 mm bars 5-16 mm bars 5-16 mm bars
Bottoom 3-16 mm bars 3-16 mm bars 3-16 mm bars
Beam Detailing:
Cross-Section of Beam
Load Calculation
2
Dead load 6.25 KN/𝑚
2
Live load 3 KN/𝑚
2
Total load 9.25 KN/𝑚
2
Factored load 13.875 KN/𝑚
Detailing:
Grouping of Columns
Group A
Combination Axial Shear M2(y) M3(x)
11 0.9DL-1.5EQX 565.20 8 0.1 14
10 0.9DL+1.5EQX 885.70 12 0.1 11.3
3 1.2(DL+LL-EQX) 1,017.48 5.953622 -0.60908 -7.37274
Group B
Combination Axial Shear M2(Y) M3(X)
1 1.5(DL+LL) 877.941 0.867336 3.010415 -1.04702
2 1.2(DL+LL+EQX) 595.558 86.70529 151.9326 131.1417
3 1.2(DL+LL-EQX) 184.489 -34.2797 -0.2179 -47.0353
Group A Design:
Design Loads
Factored Load fPu 2500.41 kN
Moment Mu 26 KN-m
Column Data
width b 400 mm
depth d 400 mm
length l 3.00 meters
Minimum eccentricity
ex 1.93 mm OK
ey 1.93 mm OK
Pu/(fckbd) 0.63
Mu/(fckbd2) 0.02
d'/d 0.05
Refer Chart 31 of SP 16, Page no: 116
pt/fck 0.1
pt 2.50%
20 mm 6 1885 𝑚𝑚2
20 mm 4 1257 𝑚𝑚2
20 mm 4 1257 𝑚𝑚2
Group B Design:
Group B
Design Loads
Factored Load fPu 1315.5kN
Moment Mu 151 KN-m
Column Data
width b 400 mm
depth d 400 mm
length l 3.00 meters
d'/d 0.05
Minimum eccentricity
ex 1.93 mm
ey 1.93 mm
Refer Chart 31 of SP 16, Page no: 116
pt/fck 0.1
pt 2.50%
20 mm 6 1885 𝑚𝑚2
20 mm 4 1257 𝑚𝑚2
20 mm 4 1257 𝑚𝑚2
Area of Footing
Load case 1.5(DL+LL)
Footing Design
Load case 1.5(DL+LL)
Factored
Load 1335 kN
Factored Soil
2
Pressure 103 kN/𝑚
Depth Calculation
One way
shear
Critical
section distance d from column edge Clause 34.2.3.2 IS 456
Assumed p 0.3 %
Shear stress Table 19 IS
2
for M25 0.384 N/𝑚𝑚 456
Depth 410 mm
Two way
shear
Critical distance d/2 from column
section edge
Factored SF 1271.82 kN
Shear
strength of
2
concrete 1.25 N/𝑚𝑚
Shear
Resistance 1304 kN Safe
Depth 410 mm
Moment Consideration
Critical At column
section edge
Bending
Moment 459.95 KNm
M25 grade
Fe 415
Xu/d 0.48
Ru 3.44
2
Ast required 4053.37 𝑚𝑚
2
Ast min 1425.6 𝑚𝑚
2
Ast Provided 4071.5 𝑚𝑚 36 bars of 12mm diameter
Spacing 100 mm
Footing Design
Load case 1.5(DL+LL)
Factored
Load 2500 kN
Factored Soil
2
Pressure 108.5 kN/𝑚
Depth Calculation
One way
shear
Critical
section distance d from column edge Clause 34.2.3.2 IS 456
Assumed p 0.3 %
Shear stress Table 19 IS
2
for M25 0.384 N/𝑚𝑚 456
Depth 548 mm
Two way
shear
Critical distance d/2 from column
section edge
Factored SF 2406.3 kN
Shear
strength of
2
concrete 1.25 N/𝑚𝑚
Shear
Resistance 2226.26 kN Safe
Depth 548 mm
Moment Consideration
Critical At column
section edge
Bending
Moment 1232 KNm
M25 grade
Fe 415
Xu/d 0.48
Ru 3.44
2
Ast required 7533.77 𝑚𝑚
2
Ast min 1900.8 𝑚𝑚
2
Ast Provided 7577.52 𝑚𝑚 68 bars of 12mm diameter
Spacing 70 mm
General Arrangement
Rise, R 150 mm
Tread, T 300 mm
width of each flight 2 m
No. of flights 2
Height of each flight 1.5 m
No of riser/steps 10
No. of treads 9
Projected horizontal length 2.7 m
Landing width 1.5 m
Passage width 1.66 m