Basic Report

You might also like

Download as txt, pdf, or txt
Download as txt, pdf, or txt
You are on page 1of 23

Basic Report

<div>
<table class="table table-striped table-hover text-center table-sm"
cellspacing="0" align="Center" id="ContentPlaceHolder1_DG" style="font-
size:Smaller;width:100%;border-collapse:collapse;">
<tr class="bg-primary text-white">
<th scope="col">Emp.No.</th><th scope="col">Name</th><th
scope="col">Department</th><th scope="col">Function</th><th
scope="col">Designation</th><th scope="col">Location</th><th scope="col">Final
Approving Authority</th><th scope="col">Type of Reward Nominated for</th><th
scope="col">Date of Nomination</th><th scope="col">Reward Received</th><th
scope="col">Reporting Officer Name</th><th scope="col">Achivements</th><th
scope="col">Current Status</th><th scope="col">Nominee ID</th><th
scope="col">Nomination Duration</th><th scope="col">Divisional HR</th><th
scope="col">Divisional Head HR</th><th scope="col">Cluster Head HR</th><th
scope="col">Work Level</th>
</tr><tr>
<td>152447</td><td>Mr K Mohammed</td><td>Saki Receiving
Station</td><td>T&D</td><td>Lead Engineer - SMC, Saki Node</td><td>TATA POWER, SAKI
SUB STATION</td><td>Mr P S Sawant</td><td>STAR OF THE MONTH AWARD</td><td>05 Apr
2021 </td><td>Yes</td><td>Mr V B Gawali</td><td>1.Implemented 5S for Saki Node,
Prepared 5S Road Map for Saki, Sahar, Powai &amp; Kurla HDIL Sub Station. Total 16
nos Gemba''s reached 3 S level and 8 Gembas achieved 5S level at Saki Node,
identified for achieving 5S Level. 2. Regularly Conducted weekly meeting with
Engineers & Staff for Tracking progress across Saki Node. 3. To Sustain 5S prepared
Cleaning scheduled for all Gembas and Weekly Track the same for Compliance. 4. 5S &
House Keeping at Saki Node was apprecaited by Head Transmission project during high
Visibility Safety Tour. 5. Created Maintenance plan for Kurla HDIL Sub Station in
SAP PM and uploaded Measuring Points in SAP PM.</td><td>Status -Award
Given</td><td>10346</td><td>2020-2021 March</td><td>Rochelle Albuquerque</td><td>Ms
Neeta Sharma</td><td>Mr Manu S</td><td>ME01</td>
</tr><tr class="bg-light">
<td>157490</td><td>Mr S B Gauri</td><td>DNMG
Cable</td><td>T&D</td><td>Chargehand (Cable)</td><td>TATA POWER, DISTRIBUTION
DIVISION, LOWER PAREL</td><td>Mr P S Sawant</td><td>GOING BEYOND AWARD</td><td>13
Apr 2021 </td><td>Yes</td><td>Mr S A Bendkhale</td><td>Repair of the 220kV
Salsette_Saki#7 ( Cable section: NIE to L&T Tower #28 ). The job was very
dedicatedly executed under stringent site conditions.
Was very well executed. the repair job involved breaking the concrete road under
the stringent site conditions wherein there were lot of Utilities which had to be
supported so that the space be created for carrying out the jointing work in the
minimum available space. The job was executed working round the clock for 36 hrs.
</td><td>Status -Award Given</td><td>10601</td><td>2020-2021 Instant</td><td>Mr A
Sainath</td><td>Ms Neeta Sharma</td><td>Mr Manu S</td><td>Tech. IV</td>
</tr><tr>
<td>158224</td><td>Mr P L B Yadav</td><td>DNMG
Cable</td><td>T&D</td><td>Assistant Foreman (Cable)</td><td>TATA POWER,
DISTRIBUTION DIVISION, LOWER PAREL</td><td>Mr P S Sawant</td><td>GOING BEYOND
AWARD</td><td>13 Apr 2021 </td><td>Yes</td><td>Mr S A Bendkhale</td><td>Repair of
the 220kV Salsette_Saki#7 ( Cable section: NIE to L&T Tower #28 ). The job was very
dedicatedly executed under stringent site conditions.
was very well executed and the repair job involved breaking the concrete road under
the stringent site conditions wherein there were lot of Utilities which had to be
supported so that the space be created for carrying out the jointing work in the
minimum available space. </td><td>Status -Award Given</td><td>10599</td><td>2020-
2021 Instant</td><td>Mr A Sainath</td><td>Ms Neeta Sharma</td><td>Mr Manu
S</td><td>Tech. III</td>
</tr><tr class="bg-light">
<td>158232</td><td>Mr V S Paul</td><td>DNMG
Cable</td><td>T&D</td><td>Foreman</td><td>TATA POWER, DISTRIBUTION DIVISION, LOWER
PAREL</td><td>Mr P S Sawant</td><td>GOING BEYOND AWARD</td><td>13 Apr 2021
</td><td>Yes</td><td>Mr S A Bendkhale</td><td>The Repair job of 220kV Cable section
NIE to L&T Tower#28 was repaired under stringent site conditions . The jointing was
completed with utmost safety ensuring the quality of the work which helped in
faster restoration of the availability of the cable section.
very well supervised and executed as foreman .The repair job involved breaking the
concrete road under the stringent site conditions wherein there were lot of
Utilities which had to be supported so that the space be created for carrying out
the jointing work in the minimum available space</td><td>Status -Award
Given</td><td>10596</td><td>2020-2021 Instant</td><td>Mr A Sainath</td><td>Ms Neeta
Sharma</td><td>Mr Manu S</td><td>Tech. II</td>
</tr><tr>
<td>163104</td><td>Mr S S Bhalekar</td><td>PSCC
Planning</td><td>T&D</td><td>Group Head-Outage Planning</td><td>Tata Power, Trombay
Station</td><td>Mr Sanjay Kumar Banga</td><td>CHAMPION MANAGER AWARD</td><td>20 Jun
2021 </td><td>No</td><td>Mr D S Mhase</td><td>1. Carried out intensive
training of the team members, there by enabling them to take independent charge.
2. Hand held the team during various critical emergencies by leading from front.
Example - Taukte cyclone operations.
3. Provided opportunities to team member to do presentation in front of senior
leadership team and to external.
4. Appreciated the team through various avenues.
5. Received appreciation from internal and external teams for various help,
assistance and guidance provided.
6. Achieved 100% Employee Engagement Score.
7. Prepared review sheet for PMS evolution.
8. Always keeps on learning and improving self, taking feedback.
9. Highly energetic and enthusiastic, kind and compose.
10. Possess excellent domain knowledge.
</td><td>Pending At -QC172791</td><td>11456</td><td>2021-2022 Annual</td><td>Ms
Neeta Sharma</td><td>Ms Neeta Sharma</td><td>Mr Manu S</td><td>MD2</td>
</tr><tr class="bg-light">
<td>163317</td><td>Mr Mehboob K H Shaikh</td><td>Salsette-
Maintenance</td><td>T&D</td><td>Technician 'A'</td><td>TATA POWER, SALSETTE
R.S.</td><td>Mr S G Bhangaonkar</td><td>STAR OF THE MONTH AWARD</td><td>06 May 2021
</td><td>Yes</td><td>Mr J P Pandya</td><td>He played important role in
commissioning ICTs and DT-6 LT PILC cable replacement by XLPE cables.
2. he played key role in commissioning of 110KV line + ground GODs at Salsette &
kolshet. Total 8 nos. cameras (6 nos. at Salsette & 2 nos. at kolshet) installed
and commissioned.
All these jobs were carried safely , quality and with due diligence </td><td>Status
-Award Given</td><td>11096</td><td>2021-2022 April</td><td>Mr S A Harane</td><td>Ms
Neeta Sharma</td><td>Mr Manu S</td><td>Tech. V</td>
</tr><tr>
<td>169374</td><td>Mr L S Nalla</td><td>DNMG
Cable</td><td>T&D</td><td>Chargehand (Cable)</td><td>TATA POWER, DISTRIBUTION
DIVISION, LOWER PAREL</td><td>Mr P S Sawant</td><td>GOING BEYOND AWARD</td><td>13
Apr 2021 </td><td>Yes</td><td>Mr S A Bendkhale</td><td>Repair of the 220kV
Salsette_Saki#7 ( Cable section: NIE to L&T Tower #28 ). The job was very
dedicatedly executed under stringent site conditions.
was very well executed and the repair job involved breaking the concrete road under
the stringent site conditions wherein there were lot of Utilities which had to be
supported so that the space be created for carrying out the jointing work in the
minimum available space and working round the clock for 36 hrs.</td><td>Status
-Award Given</td><td>10600</td><td>2020-2021 Instant</td><td>Mr A
Sainath</td><td>Ms Neeta Sharma</td><td>Mr Manu S</td><td>Tech. IV</td>
</tr><tr class="bg-light">
<td>170577</td><td>Mr R M Deshmukh</td><td>Salsette-
Maintenance</td><td>T&D</td><td>Chargehand</td><td>TATA POWER, SALSETTE
R.S.</td><td>Mr S G Bhangaonkar</td><td>STAR OF THE MONTH AWARD</td><td>20 Jun 2021
</td><td>Yes</td><td>Mr J P Pandya</td><td>He participated actively for all major
activities of DT # 4 commissioning at Salsette. He supervised and safely handled
unloading, mounting of DT # 4, attaching its accessories and devices commissioning
Re-commissioning of its emulsifier system and balance cabling, wiring and other
allied works. All jobs were done with safety agility and care for self, for his
team and for contractor workers.
</td><td>Status -Award Given</td><td>12163</td><td>2021-2022 May</td><td>Mr S A
Harane</td><td>Ms Neeta Sharma</td><td>Mr Manu S</td><td>Tech. IV</td>
</tr><tr>
<td>170739</td><td>Mr P L Londhe</td><td>DNMG
Cable</td><td>T&D</td><td>Chargehand (Cable)</td><td>TATA POWER, DISTRIBUTION
DIVISION, LOWER PAREL</td><td>Mr P S Sawant</td><td>GOING BEYOND AWARD</td><td>13
Apr 2021 </td><td>Yes</td><td>Mr S A Bendkhale</td><td>Repair of the 220kV
Salsette_Saki#7 ( Cable section: NIE to L&T Tower #28 ). The job was very
dedicatedly executed under stringent site conditions.
Was very well executed. the repair job involved breaking the concrete road under
the stringent site conditions wherein there were lot of Utilities which had to be
supported so that the space be created for carrying out the jointing work in the
minimum available space. The job was executed working round the clock for 36 hrs.
</td><td>Status -Award Given</td><td>10602</td><td>2020-2021 Instant</td><td>Mr A
Sainath</td><td>Ms Neeta Sharma</td><td>Mr Manu S</td><td>Tech. IV</td>
</tr><tr class="bg-light">
<td>174921</td><td>Mr A K Mehta</td><td>Transmission-North Zone-
Administration</td><td>T&D</td><td>Office Assistant</td><td>TATA POWER, SALSETTE
R.S.</td><td>Mr Himal Tewari</td><td>CHAMPION STAFF (Non-Technical)
AWARD</td><td>23 Jun 2021 </td><td>No</td><td>Mr S A Naik</td><td>Avinash Mehta has
been an integral part of the ES&A team and works extremely hard to ensure that all
processes are in place and every ES&A service is available 24X7 even during Covid
19. He has ensured:
1.
1. Covid Protocol 100 % compliance
2. Helping the team achieving savings of Rs.1.59crs despite a Pandemic scenario
3. Ensuring Statutory Compliance is in place
4. Safety initiatives
5. Consolidation of ES&A services
6. Analysis of data
7. Collation of data and checking accuracy during Internal Audit
8. Managing the dynamics of multiple locations
9. Coordinating and ensuring that all CAPEX works for Salsette were completed on
time. A state of the art canteen was renovated, completed and inaugurated by
President T&D despite a Pandemic</td><td>Pending At
-QC200954</td><td>12059</td><td>2021-2022 Annual</td><td>Mr S A Naik</td><td>Ms
Neeta Sharma</td><td>Mr Manu S</td><td>Non. Tech. I</td>
</tr><tr>
<td>175170</td><td>Mr A P Joshi</td><td>Salsette-
Maintenance</td><td>T&D</td><td>Chargehand</td><td>TATA POWER, SALSETTE
R.S.</td><td>Mr Sanjay Kumar Banga</td><td>CHAMPION STAFF (Technical)
AWARD</td><td>20 Jun 2021 </td><td>No</td><td>Mr J P Pandya</td><td>Out of 178
Crores, Salsette contributed 11.59 Crores in overall capitalisation in Transmission
level and Ajay Joshi played lead role, helped in completion of multiple projects
with utmost care, agility and safety. He not only ensured safety of self but took
ownership of safety for his team and also for safety of contractor people. His EMD
head asked if we can take up challenge of additional capex of projects worth Rs.
4.1 Crores, he expressed his willingness to extend all possible help in execution
and leading the team of EMD and contractor team, Cable team and helped in
completing them All jobs were completed with agility, safety, and quality.
He participates in all monthly safety meetings on line and in person, gives
excellent suggestions benefitting team immensely. He was won MD safety award. He
participates in Hazard hunt, safety observations, 5S activities He is an asset to
Team Transmission.
He helped the team in commissioning of CRP panel for 250MVA ICT-2, replacement of
110 kV B phase bushing (had high tan delta value), facilitated Painting, attended
Oil leakages, installation of Temperature & Humidity sensor & replacement of old
WTI, OTI box.
He ensured and helped in effectively supervised Fire DPR work at Salsette &
Kolshet- Capitalization of 52 Lakh. The vendor was warned for initial quality and
safety issues and letter was issued to based on input form Ajay .
He coordinated with the vendor for carrying out online oil filtration and handled
completion supervisions of ICT # 3 to remove the dissolved gases. This was done
first time in transmission division and saved Rs. 5.58 Lakhs (48 hours outage
require for carry out offline filtration non availability charge for ICT is Rs
15,548 per hour).
He played key role and supervised all quality and safety aspects of 220 kV Kalwa
Salsette # 3 issue at Kalwa to attend major SF6 gas leakage & spring charging
issue. He suggested usage of two man lifters and a Farhana that helped in
reduction of repair time to less than ½.
For 220 kV Toshiba make GIS 12 nos. hydraulic cylinders were replaced with new
achieving total Rs. 5.39 Cr. Of Capex & Capitalization. This was done inhouse by a
team lead by Ajay Joshi under supervision of the NMC and without taking line
outage, involving different technicians team, helping in skill development and
cost saving.
All ICTs and DT-6 PILC type LT cables were by XLPE cables. Ajay under guidance of
NMC and site cable team, Ajay executed the job with agility, complete safety and
with utmost care and diligence.
Total 24 nos. GODs procured, and Capex achieved worth Rs.1.2 Cr and Capitalization
worth Rs.0.56 Cr. Total 8 nos. 110 kV GODs replaced at Kolshet and 5 nos. 110 kV
GODs replaced at Salsette. With this at Kolshet, all 110 kV GODs are motorized and
can be operated through SCADA. Ajay played key role in coordinating the with the
vendor, with EMD team and executed job ensuring SCALE vales SACRED way.

</td><td>Declined</td><td>12162</td><td>2021-2022 Annual</td><td>Mr S A
Harane</td><td>Ms Neeta Sharma</td><td>Mr Manu S</td><td>Tech. IV</td>
</tr><tr class="bg-light">
<td>175536</td><td>Mr D D Veer</td><td>PSCC Power Purchase &
ABT</td><td>T&D</td><td>Group Head-DSM & Billing</td><td>Tata Power, Trombay
Station</td><td>Mr Sanjay Kumar Banga</td><td>ILLUMINOUS AWARD</td><td>27 Apr 2021
</td><td>Yes</td><td>Mr V V Rane</td><td>1) Contributed to queries of Advocate on
APTEL and MERC court cases of TPC D & TPC G and prepared notes and presentations on
the issues and submitted to Regulation.
2) Contributed to report preparation and analysis of Mumbai blackout.
3) Contributed and coordinated for data submission of Mumbai blackout to various
agencies and committees such as CEA, MERC, Factory inspector, SLDC, WRLDC
4) Knowledge sharing session on FBSM and DSM to Hydro & Regulation Dept
5) Prepared and compiled availability and backing down data of Trombay and Hydro
for FY 2019-20, submitted the data and followed up with SLDC for certification as
per our data submission successfully.
6) Submitted comments on DSM scheduling and billing software on Logics, methodology
and software</td><td>Status -Award Given</td><td>10527</td><td>2020-2021 Quarter
4</td><td>Ms Neeta Sharma</td><td>Ms Neeta Sharma</td><td>Mr Manu
S</td><td>MD1</td>
</tr><tr>
<td>177253</td><td>Mr K B Pawar</td><td>DNMG
Cable</td><td>T&D</td><td>Lead Engineer - Cable Group, South</td><td>TATA POWER,
DISTRIBUTION DIVISION, LOWER PAREL</td><td>Mr V R Shrikhande</td><td>STAR OF THE
MONTH AWARD</td><td>06 May 2021 </td><td>Yes</td><td>Mr S A Bendkhale</td><td>1.
Fault Repair of the HT cable faults of 6.6 kv Tata memorial Css to Veg-oil, 11kV
PNB to BDB and 11kV Chembur Tower11 to Calico Dyeing . The fault were repaired
under the critical site conditions where the fault was in the middle of the road.
The jobs were executed with utmost safety and same completed within minimum
timeline ensuring no disturbance to the vehicular traffic.
Installation of the Cameras at the terminal yards at Sewree and Chunabhatti for
real time condition monitoring of the 220/110kV Sealing ends.</td><td>Status -Award
Given</td><td>4954</td><td>2020-2021 August</td><td>Rochelle Albuquerque</td><td>Ms
Neeta Sharma</td><td>Mr Manu S</td><td>ME01</td>
</tr><tr class="bg-light">
<td>177687</td><td>Mr A S Desai</td><td>Transmission Projects
Zone III</td><td>T&D</td><td>Head - Transmission Project (Zone-III)</td><td>TATA
POWER, POWAI R.S.</td><td>Mr Sanjay Kumar Banga</td><td>CHAMPION MANAGER
AWARD</td><td>23 Jun 2021 </td><td>No</td><td>Mr S R Mujumdar</td><td>Work done-
• Successful commissioning of 220 kV Antop Hill GIS RSS in pandemic:
? Work at Antop Hill project site stopped in March 2020 due to lockdown.
Project site was closed for about a month. Basis circular issued by MCGM,
permission was obtained from MCGM for taking up urgent pre-monsoon work at site.
GCW contractor- M/s. Kanwar Enterprises was remobilized in May 2020 and urgent pre-
monsoon work was taken up.
? BOP contractor- M/s. L&T was also persuaded for remobilization and necessary
support was provided by obtaining police permission for travel.
? Priority was given to commissioning of auxiliary system, which are mandatory
for charging. 220 kV GIS RSS at Antop Hill was successfully test charged on
27.06.2020.
? Total capitalization Rs.154.55 crore was achieved in FY21, surpassing yearly
target of Rs.152 crore (Rs.3.59 crore contribution to RoE for Mumbai Transmission
business in FY21).

• Customer centricity:
? External customer-BEST:
BEST officials were periodically appraise progress of readiness of infrastructure
for receiving power at 33 kV level. After laying of cables by BEST, help was
extended to BEST for completing 33 kV cable laying work by providing services of
our contractor for part of cable trenching and laying work during lockdown. As a
result, first 33 kV outgoing feeder of BEST was taken into load service on
29.08.2020. Subsequently, all the feeders were taken into service one by one. Thus,
all 7 nos. 33 kV feeders allotted to BEST were taken into load service within first
year of commissioning of Antop Hill RSS.

• Safety:
? Facilitated continuous improvement of safety, health & environment through
Collaborative Leadership model.
? Implemented 45 nos. various safety best practices and improvements at Antop
Hill project during construction. Some of them were selected as step change in
safety:
o Use of nozzle mixing torch for gas cutting with oxy-acetylene gas
o Use of multifunctional flashback (ESAB make PROTEX) in gas cutting
o Use of dust extracting grinding machine for construction activities
o Use of perforated false ceiling in place of conventional gypsum based false
ceiling

• Business Excellence:
? Taken over additional responsibility of TBEM Coordinator and Risk Management
for Transmission Projects.
? Put in place Defects-Complaints Tracker, Knowledge Management Tracker,
Leadership Stakeholder Engagement Plan for Transmission Projects. Divisional
Quality Index (DQI) was improved from 89 to 95 in FY21.
? Internal benchmarking exercise completed for 90-125 MVA Power Transformers,
245 kV GIS & 145 kV GIS.
? Implementation of IEC 61850 based Auto Restoration Scheme for 33 kV GIS at
Antop Hill Receiving Station- received second prize in T&D Cluster Best Delta
Competition.
? Incident investigation, RCA and CAPA to improve safety- selected as Best
Practice in T&D Cluster Best Practice Challenge.
? Actively participated in TBEM action plan closure and preparation for TBEM
external assessment for Transmission Projects as also in TBEM internal assessment
for TPDDL, PSCC & Corp HR functions to prepare for external assessment.
</td><td>Pending At -QC172791</td><td>11932</td><td>2021-2022 Annual</td><td>Ms
Neeta Sharma</td><td>Ms Neeta Sharma</td><td>Mr Manu S</td><td>MC2</td>
</tr><tr>
<td>177725</td><td>Mr V B Gawali</td><td>Saki Receiving
Station</td><td>T&D</td><td>Group Head – Saki Node</td><td>TATA POWER, SAKI SUB
STATION</td><td>Mr Sanjay Kumar Banga</td><td>CUSTOMER SERVICE EXCELLENCE
AWARD</td><td>27 Apr 2021 </td><td>Yes</td><td>Mr P S Sawant</td><td>Mr Vikas has
very well coordinated the new outlets for TPC-D & AEML in best possible time
without compromising on Safety & by continuously following up with the consumer
for laying the cables for the allocated outlets.
He was instrumental in utilization of 09 Nos. outlets from Saki node for TPC- D &
AEML -01 No from Powai & Saki, 03 Nos from Sahar & 04 Nos from Kurla. 2.
Completed Installation & Commissioning of 2 Nos Isolator arrangement on 33 kV
Bus Sec-1 & 2 at Powai with in limited time of 54 hrs against schedule of 72 hrs.
There by improving Reliability of supply to TPC-D & Adani customers.
Coordinated and completed cable laying activity inside Saki Premises for metro-1 &
2 bay
Recommended for "Customer Service Award" from North Circle -Saki
node</td><td>Status -Award Given</td><td>10788</td><td>2020-2021 Quarter
4</td><td>Ms Neeta Sharma</td><td>Ms Neeta Sharma</td><td>Mr Manu
S</td><td>MD2</td>
</tr><tr class="bg-light">
<td>178667</td><td>Mr M D Dias</td><td>Borivli Receiving
Station</td><td>T&D</td><td>Group Head - Malad Node</td><td>TATA POWER, BORIVALI
R.S.</td><td>Mr Sanjay Kumar Banga</td><td>CUSTOMER SERVICE EXCELLENCE
AWARD</td><td>27 Apr 2021 </td><td>Yes</td><td>Mr P S Sawant</td><td>Mr M D Dias
has displayed excellent customer response on the stretch target planning of
shifting of feeders from AIS to GIS in best possible time & without any Safety
incident.
In North Circle at Malad, Node had taken up Project of 22KV AIS to GIS Conversion.
There were Many Constraints i.e. Space Constraints, Loaded Feeders, Back to Back
Connections, Completely Cable Filled Trenches etc.
1)TPC-D 11KV Malad Network was Congested & They required Space for their 11KV
Switchgear to decongest their 11KV Network. Had initial Planning Meetings with TPC-
D and Planned our 22KV GIS Installation to accommodate max 22KV Feeders as per our
Malad DPR and their Requirement. Also, Space Created for their 11KV Switchgear.
Coordinated well with TPC-D so that AIS to GIS Replacement was carried out in Min &
Stretched targeted time of 4Months, which included Cable Shifting, AIS Dismantling,
Civil foundation works, New GIS Installation, Commissioning & Load Service. Also
Supported them in installation of their switchgear.
2)AEML had Loaded & Back to Back Connected Feeders. Had Frequent meetings & Planned
Phasing of 22KV GIS Commissioning so there was min Outage time for AEML Feeders.
Coordinated well with AEML for Feeder Shifting in Interim & Final stage, so that
AIS to GIS Replacement was carried out smoothly & within stretched timelines. Also
supported them during Cable Shifting. AEML expressed satisfaction as their Back to
Back Feeders were segregated .
These has helped in Ensuring Excellent Customer Satisfaction & also in Exceeding
Capex/Capitalisation & Bay Utilization targets.
Recommended for the “Customer Service Excellence Award” from North Circle Borivili
node.
</td><td>Status -Award Given</td><td>10789</td><td>2020-2021 Quarter 4</td><td>Ms
Neeta Sharma</td><td>Ms Neeta Sharma</td><td>Mr Manu S</td><td>MD2</td>
</tr><tr>
<td>200503</td><td>Mr R Dixit</td><td>Chembur-
Maintenance</td><td>T&D</td><td>Lead Engineer-NMC, Chembur RSS</td><td>TATA POWER,
CHEMBUR R.S.</td><td>Mr S G Bhangaonkar</td><td>STAR OF THE MONTH AWARD</td><td>20
Jun 2021 </td><td>Yes</td><td>Mr V M Bhondve</td><td>Replacement of 110 kV
Porcelain make CT's with Polymer make CT's. Step change process.
Replacement of 110 kV Breaker at Chembur with New siemens make breaker
Exemplary performance in response to an important organizational need i.e. Customer
Satisfaction

On 17th May, due to Cyclone Tauktae, Multiple trippings of 110 KV lines occurred.
During this tough time Mr. R Dixit executed his duties in exemplary manner. For
every tripping he inspected switchyard terminal equipment's in this crucial period
and ensured that these lines go in service at earliest safely. He has exhibited his
commitment towards customers satisfaction.
</td><td>Status -Award Given</td><td>12172</td><td>2021-2022 May</td><td>Rochelle
Albuquerque</td><td>Ms Neeta Sharma</td><td>Mr Manu S</td><td>ME01</td>
</tr><tr class="bg-light">
<td>200536</td><td>Mr R K Sahu</td><td>Carnac-
Maintenance</td><td>T&D</td><td>Lead Engineer - NMC, Carnac Node</td><td>TATA
POWER, CARNAC R.S.</td><td>Mr D Ravikumar</td><td>STAR OF THE MONTH
AWARD</td><td>13 Apr 2021 </td><td>Yes</td><td>Mr K P Umak</td><td>1. Safely
completing old Parel-Car Bay dismantling in switchyard
2. Safely completing the scrap disposal using Manlifter
3. Safely completing 110 kV CBB-1,2 and 3 bay cable replacement work (Sf6
removal, vaccuming, gas filling in GIS)
4. Safely completing 33 kV Spare bay utilisation to BEST (fabrication for cable
cleating, sheath grounding, core cutting for laying BEST cables)
5. Safely completing Power cable drum shifting, cable laying for Trf-7 LILO
cable replacement
6. Safely completing the Backbay EOT crane lifeline arrangement.
7. Safely replaced Carnac Fire hydrant and emulsifier MCC Panels.
8. Safely completing Fire door installation , MVWS installation under Fire DPR.
</td><td>Status -Award Given</td><td>10502</td><td>2020-2021 March</td><td>Rochelle
Albuquerque</td><td>Ms Neeta Sharma</td><td>Mr Manu S</td><td>ME01</td>
</tr><tr>
<td>200589</td><td>Mr P Sharma</td><td>Transmission-
Camps</td><td>T&D</td><td>Lead Engineer-Trans. Lines Construction</td><td>TATA
POWER, TRANSMISSION DIVISION, KALYAN</td><td>Mr Sanjay Kumar
Banga</td><td>ILLUMINOUS AWARD</td><td>23 Jun 2021 </td><td>Yes</td><td>Mr M V
Deodhar</td><td>Piyush is nominated for his excellent contribution in completion of
Customer funded and Company funded jobs in Q4 . </td><td>Status -Award
Given</td><td>10656</td><td>2020-2021 Quarter 4</td><td>Rochelle
Albuquerque</td><td>Ms Neeta Sharma</td><td>Mr Manu S</td><td>ME01</td>
</tr><tr class="bg-light">
<td>200621</td><td>Mr P C Budhe</td><td>Saki-
Maintenance</td><td>T&D</td><td>Lead Engineer-NMC, Saki Node</td><td>TATA POWER,
SAKI SUB STATION</td><td>Mr P S Sawant</td><td>GOING BEYOND AWARD</td><td>06 May
2021 </td><td>Yes</td><td>Mr V B Gawali</td><td>
1. Carried out onLine Maintenance of ICT thereby saving Grid availability of
8hrs approximately.
2. 50 % completion of Pre-monsoon activities for Saki Node and 100 % Completion
of all Testing and Preventive maintenance activity for April-21
3. Worked in Shift due to shortage of O&M engineers due to COVID-19 pandemic.
4. Timely submitted safety observation and done follow up with civil team for
attending the same.
5. Updated Transformer health parameters in SAP system for Saki Node Transformer
6. Carried out 5S audit in GEMBAS assigned to him
</td><td>Status -Award Given</td><td>11098</td><td>2021-2022
Instant</td><td>Rochelle Albuquerque</td><td>Ms Neeta Sharma</td><td>Mr Manu
S</td><td>MD2</td>
</tr><tr>
<td>200629</td><td>Mr P P Kamble</td><td>Transmission-
Camps</td><td>T&D</td><td>Group Head - Line Maintenance</td><td>TATA POWER,
TRANSMISSION DIVISION, KALYAN</td><td>Mr T Muraleedharan</td><td>STAR OF THE MONTH
AWARD</td><td>14 Apr 2021 </td><td>Yes</td><td>Mr M V Deodhar</td><td>Excellent
contribution in reviving the Hot line practices in Transmission Lines after almost
16 years. Pandurang had taken lead in implementation of PID testing to assess the
electrical condition of Old insulators. Insulator replacement in hotline condition
on 220 KV line was also carried out successfully under his leadership .
</td><td>Status -Award Given</td><td>10655</td><td>2020-2021
March</td><td>Rochelle Albuquerque</td><td>Ms Neeta Sharma</td><td>Mr Manu
S</td><td>MD2</td>
</tr><tr class="bg-light">
<td>200762</td><td>Mr Rohit P Barde</td><td>Parel-
Maintenance</td><td>T&D</td><td>Lead Engineer-NMC,Parel/Mahalaxmi</td><td>TATA
POWER, PAREL R.S.</td><td>Mr M K Vaidya</td><td>STAR OF THE MONTH AWARD</td><td>13
Jun 2021 </td><td>Yes</td><td>Mr M K Vaidya</td><td>During COVID-19 Pandemic
adverse conditions, working continuously at Parel Node as NMC.
Transformer R/M , Premonsoon check & Testing
6.6 / 22 / 33kV bus outages, breaker R/M & Testing
Transmission PM Maintenance Compliance of Parel Node = 125.81%
TRANSMISSION TESTING ORDERS TOTAL COMPLAINCE = 105.48%
TRANSMISSION EQUIPMENT TESTING ORDERS COMPLAINCE =114.52%
ZERO ACCIDENTS.
O&M budget in control.</td><td>Status -Award Given</td><td>11713</td><td>2021-2022
May</td><td>Rochelle Albuquerque</td><td>Ms Neeta Sharma</td><td>Mr Manu
S</td><td>ME01</td>
</tr><tr>
<td>200834</td><td>Mr Vinod Karunakaran</td><td>Central
Construction Department</td><td>T&D</td><td>Technician 'A'</td><td>Tata Power,
Trombay Station</td><td>Mr Sanjay Kumar Banga</td><td>CHAMPION STAFF (Technical)
AWARD</td><td>20 Jun 2021 </td><td>No</td><td>Mr Y V Dhongade</td><td>Vinod
Karunakaran has demonstrated good quality of sincerity, interpersonal skills to
address local issues, balanced between contractor workers and hutment dwellers
during critical concreting works, taken care of people surrounding site during high
risk activities and overall managed site very well.
Hence, he is recommended for Champion Staff (Technical) award.</td><td>Pending At
-QC156426</td><td>11608</td><td>2021-2022 Annual</td><td>Mr P A Railkar</td><td>Ms
Neeta Sharma</td><td>Mr Manu S</td><td>Tech. V</td>
</tr><tr class="bg-light">
<td>200954</td><td>Mr S A Naik</td><td>Transmission-North Zone-
Administration</td><td>T&D</td><td>Specialist-ES&A
(MIS,Analytics&DataMgmt)</td><td>TATA POWER, SALSETTE R.S.</td><td>Mr Himal
Tewari</td><td>CHAMPION EXECUTIVE AWARD</td><td>23 Jun 2021 </td><td>No</td><td>Ms
Kashmira K Pavri</td><td>Satish has been an integral part of Team initiatives such
as:
- Consolidation of common services to leverage on costs as well as quality of
vendors
- Inputs for centralized PRs which help ensure uniformity of scope and outline
agreements reduce the teams cycle time for delivery
- Inputs and updating the Dashboard for Quarterly reviews which bring out best
practices which are then rolled out across all locations. Other ES&A teams too are
shared the information to implement if applicable. At each review Avinash is also
part of the team who brainstorms on how a process could be made digital so as to
reduce the administrative burden and bring in more controls
- Working on continuous improvements and rolling out the same across T&D
- Annual Business Plan (ABP) was prepared for across T&D by the team sitting
together for two days and understating the ideology as well as the methodology.
This was done to ensure that each team lead was on the same page and there was no
scope for budget falling short as well as over budgeting (thus keeping the best
interests of the company in mind) Satish spearheaded this process
STATUTORY COMPLAINCE: -
Ensuring adherence of regulatory compliance such as timely renewal of Shops &
Establishment License, Storage License, Hoarding license, Registration of
Contractor Certificate renewal before due date for across locations. Maintaining
Statutory Checklist for contractors enabled track on compliance documents such as
Wages Register, ESIC/PF paid by the contractor, half yearly ESIC return, Annual PF
return, half yearly contribution to Labour Welfare Fund by contractor.
11 COVID-19 ORGANIZATIONAL PREPAREDNESS: -
Instant action on all SOPs laid down by Govt as well as the organization for
preventive & precautionary measures for COVID 19
o Covid 19 PPE procurement
o Adherence to Covid 19 SOP at offices
o Special cleaning and sanitization efforts
o Hired Vehicles and drivers available round the clock for emergencies (power
outage, vigilance, fault duty etc.)
o Support to any employees and family of the affected
o Benchmark process in managing residential colonies where a COVID 19 positive
case is reported

Even during Lockdown scenario, he ensured 24X7 uninterrupted operation of canteen,


housekeeping, and transport services for 19 Receiving Stations including 3 unmanned
stations, 5 Transmission Project sites, DSS & CRCs. Welfare of all residents of
residential colonies was ensured by timely issuance of guidelines to safeguard
against Covid 19

</td><td>Pending At -QC206192</td><td>12152</td><td>2021-2022
Annual</td><td>Rochelle Albuquerque</td><td>Ms Neeta Sharma</td><td>Mr Manu
S</td><td>ME03</td>
</tr><tr>
<td>201020</td><td>Mr P P Gunjal</td><td>Transmission Projects-
Safety & Fire</td><td>T&D</td><td>Specialist-Safety & Fire</td><td>TATA POWER,
POWAI R.S.</td><td>Mr S R Mujumdar</td><td>STAR OF THE MONTH AWARD</td><td>26 Apr
2021 </td><td>Yes</td><td>Mr M B Kale</td><td>Pratap has been leading our audits
and closure of the same in timely fashion. He has also ensured that deployment of
improvement initiatives across various projects.</td><td>Status -Award
Given</td><td>10568</td><td>2020-2021 March</td><td>Mr Yash Kalyani</td><td>Ms
Neeta Sharma</td><td>Mr Manu S</td><td>ME02</td>
</tr><tr class="bg-light">
<td>201144</td><td>Mr V Singh</td><td>DNMG
Cable</td><td>T&D</td><td>Lead Engineer - Cable Group, North</td><td>TATA POWER,
DISTRIBUTION DIVISION, LOWER PAREL</td><td>Mr P S Sawant</td><td>STAR OF THE MONTH
AWARD</td><td>13 Apr 2021 </td><td>Yes</td><td>Mr S A Bendkhale</td><td>Mr. Vivek
Singh has handled the divisional Capex jobs in the North Node with appreciable and
tremendously dedicated approach with utmost responsibility and ownership.
Following Jobs were completed successfully:
1) Shifting of feeders from AIS to GIS at Malad Rss.
2) Replacement of the PILC cables of ICT#1,2,3 & DT#6 at Salsette Rss.
3) O/H to underground Conversion of the LT Lines of transformer#1,2,3 at Kalyan
Rss.
All the above jobs were very planned and managed so that the same be executed under
stringent timelines ensuring the quality of the work and safety to the satisfaction
of the division.
In addition to the above , he has personally and individually handled and executed
the Cable -Identification/spiking and Meggering of the 220/110kV cables of
Karanjade-Waghivali for lILO into GIS at Waghivali. The job was single handedly
executed sparing time time of the busy schedule of the divisional Capex jobs and
breakdown activities with responsibility and helped the project team in
commissioning of the LILO job at Wahivali. Also attended the oil leak from the
sealing end of the Bhokarpada - karanajde at the karanajde in co-ordination with
the KEI team. The job was very planned and coordinated with the planning group and
division.</td><td>Status -Award Given</td><td>10609</td><td>2020-2021
March</td><td>Rochelle Albuquerque</td><td>Ms Neeta Sharma</td><td>Mr Manu
S</td><td>ME01</td>
</tr><tr>
<td>201144</td><td>Mr V Singh</td><td>DNMG
Cable</td><td>T&D</td><td>Lead Engineer - Cable Group, North</td><td>TATA POWER,
DISTRIBUTION DIVISION, LOWER PAREL</td><td>Mr P S Sawant</td><td>GOING BEYOND
AWARD</td><td>02 Apr 2021 </td><td>Yes</td><td>Mr S A Bendkhale</td><td>A very
dedicated and appreciable efforts taken by him in successful LILO of the
220kV/110kV Cables of Karanjade-Waghivali in the GIS at Waghivali.
The job involve identification and spiking of the Cables for LILO into the GIS and
after preparation of the sealing ends, the cables had to meggered and phasing
confirmed prior to insertion in the GIS.
The Activities were well planned and executed within the timelines.</td><td>Status
-Award Given</td><td>10208</td><td>2020-2021 Instant</td><td>Rochelle
Albuquerque</td><td>Ms Neeta Sharma</td><td>Mr Manu S</td><td>ME01</td>
</tr><tr class="bg-light">
<td>201234</td><td>Mr R P Kopewar</td><td>Dharavi-
Maintenance</td><td>T&D</td><td>Lead Engineer-NMC, Dharavi Node</td><td>TATA POWER,
DHARAVI R.S.</td><td>Mr D Ravikumar</td><td>STAR OF THE MONTH AWARD</td><td>13 Apr
2021 </td><td>Yes</td><td>Mr S D Shitut</td><td>He has coordinated for erection,
testing and commissioning of Natural ester oil 125MVA ABB make Transformer in
stipulated time i.e. 21 days and taken Transformer in normal load service. This has
happened due to proper planning, execution in time and controlled coordination with
various Vendor of Transporter, Civil, electrical, ABB, Emulsifier system, MCGM,
Cables etc.</td><td>Status -Award Given</td><td>10519</td><td>2020-2021
March</td><td>Ms Neeta Sharma</td><td>Ms Neeta Sharma</td><td>Mr Manu
S</td><td>MD2</td>
</tr><tr>
<td>201288</td><td>Mr R M Ingle</td><td>Saki Receiving
Station</td><td>T&D</td><td>Lead Engineer - SMC, Saki Node</td><td>TATA POWER, SAKI
SUB STATION</td><td>Mr P S Sawant</td><td>STAR OF THE MONTH AWARD</td><td>06 May
2021 </td><td>Yes</td><td>Mr V B Gawali</td><td>Conducted Training session for
Contractor workers on Fire Safety, worked round the clock for entire month due to
shortage of engineers due to COVID-19 Pandemic. conducted 5S and Safety round in
GEMBA assigned to him, completed safety observation as per target and done follow
up with civil team for attending the same. </td><td>Status -Award
Given</td><td>11097</td><td>2021-2022 April</td><td>Rochelle Albuquerque</td><td>Ms
Neeta Sharma</td><td>Mr Manu S</td><td>ME03</td>
</tr><tr class="bg-light">
<td>201290</td><td>Mr N P Telange</td><td>PSCC Grid
Operations</td><td>T&D</td><td>Shift Incharge Grid Opns-PSCC</td><td>Tata Power,
Trombay Station</td><td>Mr Sanjay Kumar Banga</td><td>ILLUMINOUS AWARD</td><td>27
Apr 2021 </td><td>Yes</td><td>Mr M L Gole</td><td>For his valuable contribution for

1. Load flow studies for integrating new equipment


2. Load flow studies for PRD for study of single phase railway load
3. Load flow studies for studying feasibility of 1200 MW extra generation at
Trombay
4. Preparation of Black start procedure of Tata Power Hydro - Trombay Unit-7 as
desired by Western Regional Load Despatch Centre
5. KAIZEN Platinum award for Black start management
</td><td>Status -Award Given</td><td>10668</td><td>2020-2021 Quarter 4</td><td>Ms
Neeta Sharma</td><td>Ms Neeta Sharma</td><td>Mr Manu S</td><td>MD2</td>
</tr><tr>
<td>201507</td><td>Mr U B Singh</td><td>PSCC Grid
Operations</td><td>T&D</td><td>Shift Incharge Grid Opns-PSCC</td><td>Tata Power,
Trombay Station</td><td>Mr Devanand Pallikuth</td><td>STAR OF THE MONTH
AWARD</td><td>11 Jun 2021 </td><td>Yes</td><td>Mr D S Mhase</td><td>1) Participated
in Best Practice Challege on 'Monitoring and cost control' & won the first prize in
the T&D cluster.

Seekh session for the same is arranged on 5th of June.

2) Regarding Viva connect messages to management, prepared templates as per DLT


guidelines of TRAI. Got the necessary templates whitelisted with API testing, for
sending system based messages from PSCC.

3) Presented the 'Working of PSCC' on HR Talent Rise session arranged on 24th May.
Got appreciation for the same from CHRO and others.

4) Completed Six Sigma project on 'Reduction on ADSM penalty' on the basis of trial
bills as the DSM regulation is yet to be implemented. Control phase shall be re
evaluated after the regulation comes into force.

5) Raised various SCADA & Ewatch data related issues regarding monitoring and
succeeded in closing all. I am also leading the SDM project to easily arrest
station wise error and rectification notification to be generated to the concerned
party.

6) Actively build up the desinging of training and evaluation with the team for
Blackstart procedure on AR VR based module. Same shall be available to use by mid
of June.

7) Was member in sessions arranged on various topics such as Discussion on RTM


participation and Inter ministerial session regarding study to be commissioned
under IEMF(India Energy Modelling Forum).
</td><td>Status -Award Given</td><td>11466</td><td>2021-2022 May</td><td>Mr S A
Harane</td><td>Ms Neeta Sharma</td><td>Mr Manu S</td><td>ME01</td>
</tr><tr class="bg-light">
<td>201584</td><td>Mr A R Jadhav</td><td>DNMG
Cable</td><td>T&D</td><td>Lead Engineer - Cable Group, South</td><td>TATA POWER,
DISTRIBUTION DIVISION, LOWER PAREL</td><td>Mr P S Sawant</td><td>STAR OF THE MONTH
AWARD</td><td>13 Apr 2021 </td><td>Yes</td><td>Mr S A Bendkhale</td><td>Mr. Avinash
Jadhav has taken appreciable and dedicated efforts towards successful commissioning
of the transformer#3 at BKC. The job was very well planned and co-ordinated with
the division and executed ensuring the quality of the work and with utmost safety.
the job was completed within the set timeline to the total satisfaction of the
division.
Also the job of shifting 110kV Dharavi-Mahalaxmi Cable from bay 12 to bay 14 to
facilitate the termination of the 110kV Cable of Metro in Bay 12. The job was
executed by in-house staff to support the project team. Very well planned and
supervised ensuring the quality of the existing sealing end.
Also the 220kV Cable fault of Salsette-Saki#7 for the cable section was restored
within the stringent timeline ensuring the faster availability of the line. The
cable fault location was a challenge which was very well executed and the repair
job involved breaking the concrete road under the stringent site conditions wherein
there were lot of Utilities which had to be supported so that the space be created
for carrying out the jointing work in the minimum available space. The entire job
was very well managed and supervised and during the period of re-surge of the
COVID-19 cases.</td><td>Status -Award Given</td><td>10594</td><td>2020-2021
March</td><td>Rochelle Albuquerque</td><td>Ms Neeta Sharma</td><td>Mr Manu
S</td><td>ME01</td>
</tr><tr>
<td>201584</td><td>Mr A R Jadhav</td><td>DNMG
Cable</td><td>T&D</td><td>Lead Engineer - Cable Group, South</td><td>TATA POWER,
DISTRIBUTION DIVISION, LOWER PAREL</td><td>Mr P S Sawant</td><td>GOING BEYOND
AWARD</td><td>02 Apr 2021 </td><td>Yes</td><td>Mr S A Bendkhale</td><td>Appreciable
efforts towards successful commissioning of the transformer#3 at BKC.
Very well planned and executed the project within the committed timelines with
utmost safety to the complete satisfaction of the Dharavi Division.</td><td>Status
-Award Given</td><td>10207</td><td>2020-2021 Instant</td><td>Rochelle
Albuquerque</td><td>Ms Neeta Sharma</td><td>Mr Manu S</td><td>ME01</td>
</tr><tr class="bg-light">
<td>201671</td><td>Mr A K Vedula</td><td>PSCC Grid
Operations</td><td>T&D</td><td>Lead Engg Grid Opns-PSCC</td><td>Tata Power, Trombay
Station</td><td>Mr Devanand Pallikuth</td><td>STAR OF THE MONTH AWARD</td><td>16
Jun 2021 </td><td>Yes</td><td>Ms Trusha Biswas</td><td>• Excellent efforts for
maintaining power supply during Cyclone Tauktae.
• Ensured availability of all critical systems by working seamlessly and
ensuring that none of consumers face any shutdown.
• Great efforts for 100% successful PSCC Strategy Deployment Workshop - FY22
• Prepared SAP discrepancy report on monthly basis.
• Prepared load flow scenarios across system.
• Prepared Transmission dashboard on monthly basis.
• Organizing PSCC Review meeting on a monthly basis.
</td><td>Status -Award Given</td><td>11788</td><td>2021-2022 May</td><td>Mr S A
Harane</td><td>Ms Neeta Sharma</td><td>Mr Manu S</td><td>ME02</td>
</tr><tr>
<td>202401</td><td>Mr R K Singh</td><td>PSCC Grid
Operations</td><td>T&D</td><td>Lead Engg Distribution Opns-PSCC</td><td>Tata Power,
Trombay Station</td><td>Mr Devanand Pallikuth</td><td>STAR OF THE MONTH
AWARD</td><td>19 Apr 2021 </td><td>Yes</td><td>Mr T V Kulkarni</td><td>Good
developmental activities of alphabetical arrangement of CSS mimics assisting our
operational KPI achievement of Restoration through SCADA,
Good Safety related improvements of isolation list checking model and current limit
monitoring and analysis improving operational excellence

Keep doing good job</td><td>Status -Award Given</td><td>10523</td><td>2020-2021


March</td><td>Mr Yash Kalyani</td><td>Ms Neeta Sharma</td><td>Mr Manu
S</td><td>ME01</td>
</tr><tr class="bg-light">
<td>202430</td><td>Mr N R Lothe</td><td>Power System Control
Center</td><td>T&D</td><td>Lead Engg Power Procurement-PSCC</td><td>Tata Power,
Trombay Station</td><td>Mr Devanand Pallikuth</td><td>STAR OF THE MONTH
AWARD</td><td>16 Jun 2021 </td><td>Yes</td><td>Mr V V Rane</td><td>- Created a
portal for serving the block-wise Green power to the Consumers as directed by Top
Management.
- Prepared all scenarios for different Tie--ups for TPC-D after FY-24.
- Floated short term Solar & Non-Solar Tenders towards meeting RPO Target.
- Followed up efficiently with the LT Solar developer for commissioning of Solar
Plant.
- Visited the site for witnessing the commissioning the LT Solar Plant equipment.
- Ensured all the bilateral energy & statutory payments in time by proper co-
ordination with respective agencies & finance department.
- Co-ordinated with generation team for working out the combinations for medium
Term Tie-ups.
- Efficiently prepared the data for monthly generation billing.
</td><td>Status -Award Given</td><td>11775</td><td>2021-2022 May</td><td>Mr S A
Harane</td><td>Ms Neeta Sharma</td><td>Mr Manu S</td><td>ME01</td>
</tr><tr>
<td>202445</td><td>Mr R Kumar</td><td>PSCC Grid
Operations</td><td>T&D</td><td>Lead Engg Grid Opns-PSCC</td><td>Tata Power, Trombay
Station</td><td>Mr Sanjay Kumar Banga</td><td>CHAMPION EXECUTIVE AWARD</td><td>20
Jun 2021 </td><td>No</td><td>Ms Trusha Biswas</td><td>Awards & Recognition:
1) Process Management Convention - FY21 - Updated EPM process for network
operation. Network operation process is selected in top-4 process.
2) National CII Kaizen 3M Competition Platinum award for Project “Black start
Load restoration process improvement” under Restorative category.
3) Tata Innovista FY-20: - Our project “Prudent management of grid operation” is
nominated as winner in Tata Innovista FY-20 competition.
4) Star of the month: Won star of the month award twice in April-21 & Nov-21.
5) Wow appreciation card: 6 Nos
6) Peer to peer recognition: 2Nos
Delta completed:
1) Easy data access of Line's Auto recloser on LVS display.
2) OSI SCADA- Online feeder priority list on SCADA mimic.
3) PI Display - Island/Shutdown identification and status.
4) SCADA layout upgradation for error free operation.
5) Real time web/notification driven station condition monitoring system

Additional activity completed:


1) Conducted C-SAT survey among Generation, Transmission & Distribution.
2) Updated Soochna file in system for correct incident reporting to concerned
person and higher management.
3) Updated under frequency connected feeder’s list for black start & islanding
manual.
4) Updated priority list of feeders for TPCD, BEST, AEML and MSEDCL: This help
in effective load shedding and load restoration during any system emergency.
5) Prepared and updated Transmission line’s Auto Reclosure status file. This
file help to improve transmission grid availability. Help in analysing line
tripping.
6) Updated SAP outage WCD template for Kalyan, Ambernath, Mankhurd, Chembur &
Kurla. This help in avoiding outage delay and any safety incident due to wrong
isolation list.
7) Prepared Operating instruction for Waghivali 220KV GIS, BKC, Mankhurd,
Mankhurd and Kalyan Node for error free operation.
8) Reviewed test charging procedure of following equipment’s for safe and error
free test charging: 220KV Antop hill R/S , Waghivali 110KV GIS, BKC 125 MVA TRF-3,
Mahalaxmi 110KV Metro-1 & 2 bays, Mahalaxmi 110Kv DH-MHL bay, Kalyan 22KV ST-1 &
ST-2 new Breaker, Borivali -110KV BM-1 & 2 BKR, Borivali ICT-3 110KV BKR, Waghivali
220KV GIS, Borivali 110KV Metro bays.
9) Handled operational responsibility of both Transmission desk as well as ALD
side.
Projects handled in FY-20-21
1) Black start – Load restoration process Improvement:
Objective: To Reduce restoration time of the Mumbai supply after Blackout.
. Faster restoration of system will increase customer satisfaction as well as
reduce financial loss.
2) Situational awareness and Intelligent Visualization using OSI PI:
Objective: Better visualisation of SCADA alarms for faster analysis and system
restoration during any major grid disturbance/tripping.
This will increase customer satisfaction as well as reduce financial loss.
This display will to reduce chances of missing important alarm thus preventing any
wrong test charging.
3) Real time web/notification driven station condition monitoring system:
Objective: Realtime visibility of the system alarms through desired web pages by
O&M teams at mobile locations.
</td><td>Pending At -QC185205</td><td>11614</td><td>2021-2022 Annual</td><td>Mr S A
Harane</td><td>Ms Neeta Sharma</td><td>Mr Manu S</td><td>ME02</td>
</tr><tr class="bg-light">
<td>202460</td><td>Mr S N Potdar</td><td>Office of Head-North
Circle</td><td>T&D</td><td>Lead Engineer-Testing,NorthCircle</td><td>TATA POWER,
SAKI SUB STATION</td><td>Mr P S Sawant</td><td>STAR OF THE MONTH AWARD</td><td>06
May 2021 </td><td>Yes</td><td>Mr P S Sawant</td><td>Mr Sagar Potdar has Carried out
Replacement of Defective Static Main-1 Islanding Relays of 220KV AEMl-Borivali line
& AEML-Aarey Line by Numerical Relays. He has prepared Replacement Checklist &
Ensured all Wirings & Testing of this critical job of Islanding relay replacement
was done as per Approved Checklist .He has shared Important Observations with
Relay Setting Group and based on his sharings & analysis .Revised Relay settings
were issued. He has timely completed Protection testing as per Plan</td><td>Status
-Award Given</td><td>11099</td><td>2021-2022 April</td><td>Rochelle
Albuquerque</td><td>Ms Neeta Sharma</td><td>Mr Manu S</td><td>ME01</td>
</tr><tr>
<td>202736</td><td>Mr Manjunath Gowda</td><td>DNMG
Cable</td><td>T&D</td><td>Cable Jointer Mate 'B'</td><td>TATA POWER, DISTRIBUTION
DIVISION, LOWER PAREL</td><td>Mr P S Sawant</td><td>GOING BEYOND AWARD</td><td>13
Apr 2021 </td><td>Yes</td><td>Mr S A Bendkhale</td><td>Repair of the 220kV
Salsette_Saki#7 ( Cable section: NIE to L&T Tower #28 ). The job was very
dedicatedly executed under stringent site conditions.
Was very well executed. the repair job involved breaking the concrete road under
the stringent site conditions wherein there were lot of Utilities which had to be
supported so that the space be created for carrying out the jointing work in the
minimum available space. The job was executed working round the clock for 36 hrs.
</td><td>Status -Award Given</td><td>10603</td><td>2020-2021 Instant</td><td>Mr A
Sainath</td><td>Ms Neeta Sharma</td><td>Mr Manu S</td><td>Tech. VI</td>
</tr><tr class="bg-light">
<td>202793</td><td>Mr Uday Gharat</td><td>Carnac-
Maintenance</td><td>T&D</td><td>Technician 'B'</td><td>TATA POWER, CARNAC
R.S.</td><td>Mr D Ravikumar</td><td>STAR OF THE MONTH AWARD</td><td>13 Apr 2021
</td><td>Yes</td><td>Mr K P Umak</td><td>1. Successfully completing the old
Parel-Car Bay dismantling work in switchyard with good safety observation
2. Safely completing 110 kV CBB-1,2 and 3 bay cable replacement work (Sf6
removal, vacuuming, gas filling in GIS)
3. Shown hard work for completing 33 kV Spare bay utilisation to BEST
(fabrication for cable cleating, sheath grounding, core cutting for laying BEST
cables)
4. Given safety suggestions for completing the Backbay EOT crane lifeline
arrangement.
5. Safely replaced Carnac Fire hydrant and emulsifier MCC Panels.
6. Active participation in Fire door installation , MVWS installation under
Fire DPR.
7. Attended the Fire hydrant leak by replacing foot valve.

</td><td>Status -Award Given</td><td>10503</td><td>2020-2021 March</td><td>Mr S K


Vetcha</td><td>Ms Neeta Sharma</td><td>Mr Manu S</td><td>Tech. VI</td>
</tr><tr>
<td>202886</td><td>Mr N M Patel</td><td>Salsette-
Maintenance</td><td>T&D</td><td>Lead Engineer-NMC,Salsette Node</td><td>TATA POWER,
SALSETTE R.S.</td><td>Mr S G Bhangaonkar</td><td>STAR OF THE MONTH AWARD</td><td>06
May 2021 </td><td>Yes</td><td>Mr J P Pandya</td><td>A) All ICTs and DT-6 LT PILC
cable replacement by XLPE cables. Capex and Capitalisation achieved worth Rs.3.07
crore. ICTs cable replacement activity completed in 12 hours outage which is
fastest in transmission. Prepared delta for the same.
B) Replacement of 220KV GIS relay room and 110KV relay room ductable ACs: Capex &
Capitalisation achieved worth Rs. 0.17Cr. Continuous follow up done with CC for
placing PO on time to achieved capex and Capitalisation.
C) Installation of CCTV system for remote operation of 110KV line + ground GODs at
Salsette & kolshet. Total 8 nos. cameras (6 nos. at Salsette & 2 nos. at kolshet)
installed and commissioned. Capex & Capitalisation achieved worth Rs. 0.12Cr.
d) Procured various items like scissor lift (0.17Cr), SF6 gas purity measurement
(0.18Cr), portable DGA kit for east circle(0.35cr) , ladders & aluminum
scaffolding(0.10Cr).
e) Commissioned new CRP panel for 250MVA ICT-2 which was pending since 2018. Also,
Replaced 110KV B phase bushing due to high tan delta value at the same outage,
Painting, Oil leakage, Temperature & Humidity sensor, WTI, OTI box replaced.
2) 110KV GODs replacement at Salsette & kolshet. Total 24 nos. GODs procured, and
Capex achieved worth Rs.1.2 Cr and Capitalisation achieved worth Rs.0.56Cr. Total 8
nos. 110KV GODs replaced at Kolshet and 5 nos. 110KV GODs replaced at Salsette.
With this at kolshet, all 110KV GODs are motorized and can be operated through
SCADA. In FY'21, total 10 nos. GODs replacement planned but replaced 13 nos. of
110KV GODs. It helps to eliminate frequent hot spot issue at Salsette. Also,
introduce new MBS GOD for 110KV DT-6 PASS breaker which helps to avoid 110KV bus
zone-1 outage for working on pass breaker. Delta submitted.
3) Commissioned 4 nos. 22KV breakers(22KV cap bank, thana-1 & 2, KMKB-2) at kolshet
and achieved Capitalisation worth Rs. 0.35 Cr. 22KV cap bank taken in service after
commissioning of new breaker.
All above capex job completed with agility, diligence and 100% safety..
</td><td>Status -Award Given</td><td>11095</td><td>2021-2022 April</td><td>Rochelle
Albuquerque</td><td>Ms Neeta Sharma</td><td>Mr Manu S</td><td>ME01</td>
</tr><tr class="bg-light">
<td>202891</td><td>Mr S Mallick</td><td>Borivli Receiving
Station</td><td>T&D</td><td>Lead Engineer - SMC, Malad Node</td><td>TATA POWER,
BORIVALI R.S.</td><td>Mr P S Sawant</td><td>STAR OF THE MONTH AWARD</td><td>04 Jun
2021 </td><td>Yes</td><td>Mr M D Dias</td><td>Has Identified Critical Defects &
Attended the Same. Prevented Transformer tripping at Malad by displaying
alertness.Also contributed towards Maintenance Activities.</td><td>Status -Award
Given</td><td>11492</td><td>2021-2022 May</td><td>Rochelle Albuquerque</td><td>Ms
Neeta Sharma</td><td>Mr Manu S</td><td>ME01</td>
</tr><tr>
<td>203506</td><td>Ms Trusha Biswas</td><td>PSCC Grid
Operations</td><td>T&D</td><td>Group Head-Power Purchase Planning-PSCC</td><td>Tata
Power, Trombay Station</td><td>Mr Sanjay Kumar Banga</td><td>CHAMPION MANAGER
AWARD</td><td>20 Jun 2021 </td><td>No</td><td>Mr V V Rane</td><td>• Safety –
Quarterly Safety Award Q4 FY-21
o Automation of E-Asset mapping process (SAP based) for Transmission System
encompassing the parameters of ensuring safety, cycle time reduction, regulatory
compliance & recording to avoid any unsafe situation & delay
• Best Practice- Winner of Monitoring and Optimizing Cost comp
• Process Management Convention - 2nd Winner for Day ahead Power Planning
• BE Co-Ordinator for PSCC – Top DQI score (98%) in T&D for FY-21
• ILLuminous award for Q2
• TATA Innovista and regional round for E2E Solution - PP Cost Portfolio and
Optimization“
• TATA Innovista and regional round --“Virtual Forecasting - Predicting The
Unknown“.
• CII National 3M Competition-21 for MURI category - for E2E solution for Power
Purchase Cost Optimization portfolio
• CII NATIONAL KAIZEN COMPETITION- FEB-21 for Innovative category - for Change
over Load forecasting Module
• CSIR Diamond Jubilee Technology Award and Anjani Mashelkar Inclusive
Innovation Award nomination being jointly nominated by Tata Power, KJSIEIT, and
IMD for Weather-Based Short-Term Electrical Load Demand Forecasting using AI"
• Completed first Six Sigma project for PSCC on for reducing ADSM penalty and
awarded as Green belt
• Arranged customer meet to improvise CSI index and know their needs
• Participated for ISGF Innovation award for FY-21
• Achieved digitalization score 95% for PSCC
• Total 7 SEEKH sessions for T&D and Generation.
• Worked as EPM process champion and achieved rating of 4.2 for one and rest
all 4.1 rating.
• Employee engagement activities for PSCC
• CSR activities for PSCC
• Ethics week - winner of video competition -Ethics and Me
• Winners of T&D Navratri Celebrations-Day 5
• Peer to Peer and Wow Card
Regular work :-
• Achieved total PP cost for TPC-D for the year Rs 3.96PU as against ABP
approved cost of Rs 4.0 PU by optimum planning and scheduling of generation.
• Development of OA consumer portal .
• Analysis of daily Exchange Market for power purchase and sale.
• Co-ordination with external agencies.
• Achieved yearly MAPE of 1.79 % by forecasting TPC-D load against Target of
2.0%.
• Input given to IIT for modification of software for correct load forecast .
• Project taken up in coloration with IMD and Somaiya college for weather and
load forecasting for TPC-D for Day ahead and intraday.
• Regular Inputs given to BluWave for Day ahead and Intra Day forecasting.
• Successfully completion of Project on RTM Power planner to reduce ADSM
penalty.
Team achievements
• Process Management Convention - FY21 -4th winner for Network operation
process.
• National CII Kaizen 3M Competition Platinum award.
• Tata Innovista FY-20 winner team for “Prudent management of grid operation”
• All four achieved Star of the month awards
• WOW card: 15 Nos P to P recognition: 10 Nos
• SAFTY Maestro awards</td><td>Pending At -QC172791</td><td>11683</td><td>2021-
2022 Annual</td><td>Ms Neeta Sharma</td><td>Ms Neeta Sharma</td><td>Mr Manu
S</td><td>MD2</td>
</tr><tr class="bg-light">
<td>203950</td><td>Mr. Manish Gautamrao Thool</td><td>Power
System Control Center</td><td>T&D</td><td>Lead Engg Distribution Opns-
PSCC</td><td>Tata Power, Trombay Station</td><td>Mr Devanand Pallikuth</td><td>STAR
OF THE MONTH AWARD</td><td>28 Jun 2021 </td><td>Yes</td><td>Mr S S
Bhalekar</td><td>Handling Network operations very effectively with all safety
process and handled the six sigma project and process improvement
done.</td><td>Status -Award Given</td><td>11792</td><td>2021-2022 May</td><td>Mr S
A Harane</td><td>Ms Neeta Sharma</td><td>Mr Manu S</td><td>ME01</td>
</tr><tr>
<td>203978</td><td>Mr Robin Giri</td><td>DNMG
Cable</td><td>T&D</td><td>Lead Engineer - Cable Group, North</td><td>TATA POWER,
DISTRIBUTION DIVISION, LOWER PAREL</td><td>Mr Sanjay Kumar Banga</td><td>ILLUMINOUS
AWARD</td><td>23 Jun 2021 </td><td>Yes</td><td>Mr V Singh</td><td>Mr. Robin Giri
has been responsible for improving efficiency of the patrolling and safeguarding
activities in Metro zone after there were several cases of external damages owing
to intensified work by MMRDA and other agencies. He has developed several tools for
monitoring the performance of the teams deployed at site, Power app is being used
to track threat level at sites and also a short training video has been made to
empower the posting teams which being in the language of comfort is of great value
to the teams at site.
In addition to this, Metro Cable laying and trenching work between Aarey to Saki
RSS is being very well handled and supervised by Mr. Robin Giri who has not only
ensured quality of new work but at the same time also ensured safeguarding of
existing utilities throughout the stretch.
In addition to this, since other colleagues were busy with several divisional
projects that came up the the last time and were not planned ahead, Mr. Robin Giri
ensured that O&M activities and DNMG project at Borivali were smoothly executed
during this period.</td><td>Status -Award Given</td><td>10235</td><td>2020-2021
Quarter 4</td><td>Rochelle Albuquerque</td><td>Ms Neeta Sharma</td><td>Mr Manu
S</td><td>ME02</td>
</tr><tr class="bg-light">
<td>203990</td><td>Mr Sandeep Mundhe</td><td>Transmission
Projects-Cable Dept.</td><td>T&D</td><td>Specialist - Cables</td><td>TATA POWER,
POWAI R.S.</td><td>Mr Sanjay Kumar Banga</td><td>CHAMPION EXECUTIVE
AWARD</td><td>23 Jun 2021 </td><td>No</td><td>Mr V V Patil</td><td>Sandeep Mundhe
has worked on a benchmarked cable project involving 4.5 KM cable laying in a very
busy area from Carnac to Backbay. The key highlight of his achievement are as
below,

1. In a 5 months, 4.5KM route length of 110kV cable laying completed (3 circuits).


Earlier best for Tata Power was 2.5KM route length (2 circuits) in 5 months
2. Commissioning of this project added assets of Rs. 163 Cr in Transmission
Business in FY22.
3. As high value cables worth about 125 Cr were brought just in time, minimal CWIP
was generated.
4. He ensured high level of engagement with MCGM, traffic and other statutory
authorities were maintained. This enabled multiple work fronts to be opened
simultaneously, without causing nay hinderance to traffic
5. With very rigorous implementation of safety practices, Sandeep ensured injury
free work throughout the project duration.</td><td>Pending At
-QC205926</td><td>11681</td><td>2021-2022 Annual</td><td>Mr Yash Kalyani</td><td>Ms
Neeta Sharma</td><td>Mr Manu S</td><td>ME02</td>
</tr><tr>
<td>204105</td><td>Mr Surjit Singh</td><td>DNMG
Cable</td><td>T&D</td><td>Lead Engineer - Cable Group, North</td><td>TATA POWER,
DISTRIBUTION DIVISION, LOWER PAREL</td><td>Mr Sanjay Kumar Banga</td><td>CUSTOMER
SERVICE EXCELLENCE AWARD</td><td>16 Apr 2021 </td><td>Yes</td><td>Mr V
Singh</td><td>Divisional Capex work at Salsette which came up at the last moment
and was not planned ahead with respect to resources as well as timelines keeping in
mind other high value projects like Metro cable laying work at Borivali between
Tata Power Borivali to Metro Nancy Colony RSS and HT cable safeguarding work in
Metro work were going on. All of these activities were nicely handled and
coordinated in a way that no work was hampered.
In addition to Capex work of almost 3 crores at Salsette, divisional projects at
Powai and LASER project of installation of Intrusion Detection System at Sewree
Fort was completed in the last quarter.</td><td>Status -Award
Given</td><td>10238</td><td>2020-2021 Quarter 4</td><td>Rochelle
Albuquerque</td><td>Ms Neeta Sharma</td><td>Mr Manu S</td><td>ME03</td>
</tr><tr class="bg-light">
<td>204420</td><td>Mr Manish Gupta</td><td>Carnac Receiving
Station</td><td>T&D</td><td>Lead Engineer-SMC, Carnac Node</td><td>TATA POWER,
CARNAC R.S.</td><td>Mr V R Shrikhande</td><td>STAR OF THE MONTH AWARD</td><td>06
May 2021 </td><td>Yes</td><td>Mr K P Umak</td><td>1.Managing station jobs when
two SMC engineers are quarantine and NMC engineer on urgent leave .
2.Hydraulic Oil Pressure of 220 KV Bus coupler breaker, Backbay dropped (260 Bar):
Trouble shooting carried out and Attended the problem immediately , during the
shift . Tripping of 220 Kv Bus coupler, Backbay R/S avoided.
3. 220 kv CBB#4 Line M1 VT fail alarm ( B-Phase) at Carnac R/S attended during the
shift and abnormal condition on M1 protection relay and SCADA are normalized
4.Participated in the TBEM audit preparation for Carnac R/S .
5. identified multiple unsafe conditions for 220 kV GIS projects and ensuring to
attending it timely.</td><td>Status -Award Given</td><td>4955</td><td>2020-2021
August</td><td>Rochelle Albuquerque</td><td>Ms Neeta Sharma</td><td>Mr Manu
S</td><td>ME01</td>
</tr><tr>
<td>204626</td><td>Mr Bhrigu K Nath</td><td>Transmission-Camps-
Trombay Camp</td><td>T&D</td><td>Lead Engineer - Trombay Camp</td><td>TATA POWER
BILL COLLECTION CENTER, TROMBAY COLONY</td><td>Mr V R Shrikhande</td><td>STAR OF
THE MONTH AWARD</td><td>06 May 2021 </td><td>Yes</td><td>Mr M V
Deodhar</td><td>Knowledge management is key to success of any world class
organization. Going digital is the way to maximize multifold percolation of
available tacit knowledge and internal expertise than any other platform. Bhrigu
has lead the team working on migration of the improvements captured
DELTA(excel)format into an online portal which will be used across TATA power. His
efforts in developing the same shows his attitude to go beyond his expected roles
and his desire to excel in digitalization initiatives. He is nominated for his
excellent contribution in digitalization initiatives. Well done Bhrighu! We, all
members of Team Transmission are proud of You! </td><td>Status -Award
Given</td><td>4797</td><td>2020-2021 August</td><td>Rochelle Albuquerque</td><td>Ms
Neeta Sharma</td><td>Mr Manu S</td><td>ME02</td>
</tr><tr class="bg-light">
<td>204626</td><td>Mr Bhrigu K Nath</td><td>Transmission-Camps-
Trombay Camp</td><td>T&D</td><td>Lead Engineer - Trombay Camp</td><td>TATA POWER
BILL COLLECTION CENTER, TROMBAY COLONY</td><td>Mr T Muraleedharan</td><td>STAR OF
THE MONTH AWARD</td><td>12 Jun 2021 </td><td>Yes</td><td>Mr M V Deodhar</td><td>I
wish to appreciate your untiring efforts in restoration of Transmission Line
network during “Tauktae cyclone” which hit western coast of Maharashtra on 17th May
2021. There were multiple line trippings due to gusty winds . In spite of
challenging nature the team stood rock solid and worked relentlessly for
restoration of network till wee hours of 18th May. It is matter of pride that in
spite of this there was no shutdown to any customer. I am really proud to be part
of such a wonderful team. I once again thank you and your team for excellent
display of team work during such testing times.

Well done ! Keep up the good work!

</td><td>Status -Award Given</td><td>11650</td><td>2021-2022 May</td><td>Rochelle


Albuquerque</td><td>Ms Neeta Sharma</td><td>Mr Manu S</td><td>ME02</td>
</tr><tr>
<td>204630</td><td>Mr Shiv Hari P Gautam</td><td>Saki Receiving
Station</td><td>T&D</td><td>Lead Engineer – SMC, Saki Node</td><td>TATA POWER, SAKI
SUB STATION</td><td>Mr P S Sawant</td><td>STAR OF THE MONTH AWARD</td><td>04 Jun
2021 </td><td>Yes</td><td>Mr V B Gawali</td><td>
1. During Present Cyclone condition helped Transmission team for restoration of
Overhead network, detected tree falling on 22 kV SAKI-5 &6 feeder over head section
which helped Transmission tea to immediately mobilize the team and remove uprooted
Tree.
2. Help Transmission team to detect Hutment in Span 11 & 12 of 110 kV Salsatte
Saki-4 line which came in arcing zone of line due to cyclonic condition , the same
was demolished with help of encroachment team & BMC disaster management team.
3. Helped NMC engineer for restoration of supply during cyclonic condition to
affected feeders.
4. Timely reported Safety observation as per assigned Target and tracked same
for completion.
5. Driving 5S in GEMBA's assigned to him. Tracking monthly schedule of 5S
activities.
</td><td>Status -Award Given</td><td>11493</td><td>2021-2022 May</td><td>Rochelle
Albuquerque</td><td>Ms Neeta Sharma</td><td>Mr Manu S</td><td>ME02</td>
</tr><tr class="bg-light">
<td>205816</td><td>Mr Shivshakti Yadav</td><td>Borivli-
Maintenance</td><td>T&D</td><td>Works Attendant</td><td>TATA POWER, BORIVALI
R.S.</td><td>Mr P S Sawant</td><td>GOING BEYOND AWARD</td><td>05 Apr 2021
</td><td>Yes</td><td>Mr M D Dias</td><td>During Old AIS Panels Shifting Work at
Malad ,There were lot of Constraints as Area around Building was dug up for GIS
Cable Laying.Extreme care had to be taken to Ensure Safe Loading of Panels and
shifting to Scrap site. Mr Shiva has ensured all Panels were safetly shifted by
following all safety rules and Procedures. He has also assisted Dist Team for
Commissioning activity of their 11KV Panels.</td><td>Status -Award
Given</td><td>10405</td><td>2020-2021 Instant</td><td>Mr S A Harane</td><td>Ms
Neeta Sharma</td><td>Mr Manu S</td><td>Tech. VIII</td>
</tr><tr>
<td>205824</td><td>Mr Yogesh Chandrakant Mestry</td><td>Borivli-
Maintenance</td><td>T&D</td><td>Works Attendant</td><td>TATA POWER, BORIVALI
R.S.</td><td>Mr P S Sawant</td><td>GOING BEYOND AWARD</td><td>05 Apr 2021
</td><td>Yes</td><td>Mr M D Dias</td><td>At Malad & Versova ,Old Panels are
disconnected & Old Control Cables were required to be Removed Completly. There were
Constraints as these panels are very Old & Cable trenches are full. Mr Mestry has
ensured that these cables were removed carefully without effecting healthy
system .He has ensured compliance of all safety parameters.</td><td>Status -Award
Given</td><td>10407</td><td>2020-2021 Instant</td><td>Mr S A Harane</td><td>Ms
Neeta Sharma</td><td>Mr Manu S</td><td>Tech. VIII</td>
</tr><tr class="bg-light">
<td>205859</td><td>Mr Kailas Vaman Koli</td><td>DNMG
Cable</td><td>T&D</td><td>Works Attendant</td><td>TATA POWER, DISTRIBUTION
DIVISION, LOWER PAREL</td><td>Mr P S Sawant</td><td>GOING BEYOND AWARD</td><td>13
Apr 2021 </td><td>Yes</td><td>Mr S A Bendkhale</td><td>Repair of the 220kV
Salsette_Saki#7 ( Cable section: NIE to L&T Tower #28 ). The job was very
dedicatedly executed under stringent site conditions.
Was very well executed. the repair job involved breaking the concrete road under
the stringent site conditions wherein there were lot of Utilities which had to be
supported so that the space be created for carrying out the jointing work in the
minimum available space. The job was executed working round the clock for 36 hrs.
</td><td>Status -Award Given</td><td>10606</td><td>2020-2021 Instant</td><td>Mr A
Sainath</td><td>Ms Neeta Sharma</td><td>Mr Manu S</td><td>Tech. VIII</td>
</tr><tr>
<td>205861</td><td>Mr Chandrikaprasad Shivpujan
Vishwakarma</td><td>DNMG Cable</td><td>T&D</td><td>Works Attendant</td><td>TATA
POWER, DISTRIBUTION DIVISION, LOWER PAREL</td><td>Mr P S Sawant</td><td>GOING
BEYOND AWARD</td><td>13 Apr 2021 </td><td>Yes</td><td>Mr S A
Bendkhale</td><td>Repair of the 220kV Salsette_Saki#7 ( Cable section: NIE to L&T
Tower #28 ). The job was very dedicatedly executed under stringent site conditions.
Was very well executed. the repair job involved breaking the concrete road under
the stringent site conditions wherein there were lot of Utilities which had to be
supported so that the space be created for carrying out the jointing work in the
minimum available space. The job was executed working round the clock for 36 hrs.
</td><td>Status -Award Given</td><td>10604</td><td>2020-2021 Instant</td><td>Mr A
Sainath</td><td>Ms Neeta Sharma</td><td>Mr Manu S</td><td>Tech. VIII</td>
</tr><tr class="bg-light">
<td>205863</td><td>Mr Nilesh Kalu Chorghe</td><td>DNMG
Cable</td><td>T&D</td><td>Works Attendant</td><td>TATA POWER, DISTRIBUTION
DIVISION, LOWER PAREL</td><td>Mr P S Sawant</td><td>GOING BEYOND AWARD</td><td>13
Apr 2021 </td><td>Yes</td><td>Mr S A Bendkhale</td><td>Repair of the 220kV
Salsette_Saki#7 ( Cable section: NIE to L&T Tower #28 ). The job was very
dedicatedly executed under stringent site conditions.
Was very well executed. the repair job involved breaking the concrete road under
the stringent site conditions wherein there were lot of Utilities which had to be
supported so that the space be created for carrying out the jointing work in the
minimum available space. The job was executed working round the clock for 36 hrs.
</td><td>Status -Award Given</td><td>10607</td><td>2020-2021 Instant</td><td>Mr A
Sainath</td><td>Ms Neeta Sharma</td><td>Mr Manu S</td><td>Tech. VIII</td>
</tr><tr>
<td>206277</td><td>Mr Mithlesh Mahendra Singh</td><td>PSCC Grid
Operations</td><td>T&D</td><td>Lead Engg Distribution Opns-PSCC</td><td>Tata Power,
Trombay Station</td><td>Mr Sanjay Kumar Banga</td><td>CUSTOMER SERVICE EXCELLENCE
AWARD</td><td>09 Apr 2021 </td><td>No</td><td>Mr N P Telange</td><td>1. Control of
voltage within SOP limit in distribution - proactive in nature before customer
complaints
2. Outage schedule coordination with Distribution zone on regular basis to avoid
any delay at the actual time of outage
3. Zone short nomenclature in DMS so that the zone can be easily identified in
MIMIC
And can be communicated to zones faster.
4. Critical load like hospital load and similar important consumers had been
highlighted in DMS this helps in easy identifying the critical consumers and the
priority of consumer restoration can be done
5.Implementation of LoRa dashboard in DMS which helps for any discrepancy related
to selected Bon automated station by communicating to PSCC in minimum time
6.Topology improved in Various zones which is used for SMS to consumer duting
tripping.
7.Support provided to Distribution zones in various test charging of new equipments
which was executed with proper safety procedures
</td><td>Pending At -Mr M L Gole175587</td><td>10521</td><td>2020-2021 Quarter
4</td><td>Mr S A Harane</td><td>Ms Neeta Sharma</td><td>Mr Manu S</td><td>ME04</td>
</tr><tr class="bg-light">
<td>206277</td><td>Mr Mithlesh Mahendra Singh</td><td>PSCC Grid
Operations</td><td>T&D</td><td>Lead Engg Distribution Opns-PSCC</td><td>Tata Power,
Trombay Station</td><td>Mr Devanand Pallikuth</td><td>STAR OF THE MONTH
AWARD</td><td>18 Jun 2021 </td><td>Yes</td><td>Mr N P Telange</td><td>Improvements
observed from learning , Safety & development.
Autocadd - layout updating
Transmission training - undergoing interview
Data analysis in post Taukte cyclone
Achieving safety targets- Wrong Breaker Status correction.
MiMIC Correction/ Non Automated CSS updating</td><td>Status -Award
Given</td><td>11822</td><td>2021-2022 May</td><td>Mr S A Harane</td><td>Ms Neeta
Sharma</td><td>Mr Manu S</td><td>ME04</td>
</tr><tr>
<td>206381</td><td>Mr Swapnil Laxman Patil</td><td>DNMG
Cable</td><td>T&D</td><td>Lead Engineer - Cable Group,North</td><td>TATA POWER,
BORIVALI R.S.</td><td>Mr V R Shrikhande</td><td>STAR OF THE MONTH AWARD</td><td>06
May 2021 </td><td>Yes</td><td>Mr V Singh</td><td>In the month of August, despite
limited resources and ongoing preventive maintenance jobs Mr. Swapnil Patil has
ensured that DNMG-West Zone was fault free and there were no external damage cases.
In addition to MCGM, PWD & MMRDA roads he has also carried out safeguarding of
cables inside consumer premises like Dimple Realtors through proper coordination
and ensuring services rendered to consumer in time. He is handling teams of our BAs
and the union staff efficiently. Mr. Swapnil Patil is one of the younger team-
members and he has been doing all these network maintenance activities extremely
efficiently during the whole lock-down period and has successfully completed
various network maintenance jobs including cable fault repairs as well as cable
safeguarding All this in addition to the efforts towards the Digitalisation
initiative of the company where he is giving valuable contribution at divisional
level for cable analysis and cable fault data capturing tools. He has also prepared
a technical paper on how Intermittent LT Cable faults lead to failures in
unprotected HT cables which was shared internally and well received.</td><td>Status
-Award Given</td><td>4900</td><td>2020-2021 August</td><td>Rochelle
Albuquerque</td><td>Ms Neeta Sharma</td><td>Mr Manu S</td><td>ME03</td>
</tr><tr class="bg-light">
<td>206381</td><td>Mr Swapnil Laxman Patil</td><td>DNMG
Cable</td><td>T&D</td><td>Lead Engineer - Cable Group,North</td><td>TATA POWER,
BORIVALI R.S.</td><td>Mr Sanjay Kumar Banga</td><td>CUSTOMER SERVICE EXCELLENCE
AWARD</td><td>15 Apr 2021 </td><td>Yes</td><td>Mr V Singh</td><td>Divisional Capex
work of 33kV LT cable laying at Kalyan for OH to UG conversion and at Ambernath for
old PILC cable replacement of TRF#4 which came up at the last moment and was not
planned ahead with respect to resources as well as timelines keeping in mind other
high value projects like cable diversion of 15 nos. of HT cables at Nesco, cable
diversion at Malad at 3 different locations for SWD work and other safeguarding
projects were going on. All of these activities were nicely handled and coordinated
in a way that no work was hampered.
In addition to Capex work of almost 3 crores at Kalyan and Ambernath, LASER project
of installation of Intrusion Detection System at Sewree Fort was completed in the
last quarter. Mr. Swapnil Patil has been successful in handling all these
activities effectively.</td><td>Status -Award Given</td><td>10244</td><td>2020-2021
Quarter 4</td><td>Rochelle Albuquerque</td><td>Ms Neeta Sharma</td><td>Mr Manu
S</td><td>ME03</td>
</tr><tr>
<td>206381</td><td>Mr Swapnil Laxman Patil</td><td>DNMG
Cable</td><td>T&D</td><td>Lead Engineer - Cable Group,North</td><td>TATA POWER,
BORIVALI R.S.</td><td>Mr P S Sawant</td><td>GOING BEYOND AWARD</td><td>06 May 2021
</td><td>Yes</td><td>Mr V Singh</td><td>Excellent planning and coordination for
successful completion of cable work at Kalyan and Ambernath in a very short span of
time.</td><td>Status -Award Given</td><td>10612</td><td>2020-2021
Instant</td><td>Rochelle Albuquerque</td><td>Ms Neeta Sharma</td><td>Mr Manu
S</td><td>ME03</td>
</tr><tr class="bg-light">
<td>206514</td><td>Mr Nitin Ganpat Gawde</td><td>Parel Receiving
Station</td><td>T&D</td><td>Lead Engineer – SMC, Kalyan Node</td><td>TATA POWER,
TRANSMISSION DIVISION, KALYAN</td><td>Mr M K Vaidya</td><td>STAR OF THE MONTH
AWARD</td><td>13 Jun 2021 </td><td>Yes</td><td>Mr M K Vaidya</td><td>During COVID-
19 Pandemic adverse conditions, working continuously at Parel Node as SMC & also
actively participating in Maintenance activities as well. Zero accidents. Excellent
shift management.</td><td>Status -Award Given</td><td>11714</td><td>2021-2022
May</td><td>Rochelle Albuquerque</td><td>Ms Neeta Sharma</td><td>Mr Manu
S</td><td>ME01</td>
</tr><tr>
<td>206747</td><td>Mr Harshal Amin</td><td>Power System Control
Center</td><td>T&D</td><td>Lead Engg Distribution Opns-PSCC</td><td>Tata Power,
Trombay Station</td><td>Mr Devanand Pallikuth</td><td>STAR OF THE MONTH
AWARD</td><td>14 Jun 2021 </td><td>Yes</td><td>Mr T V Kulkarni</td><td>Prominent
developmental activities in developing ring criticality index database for and a
forecasting model to assist operational excellence. Good Individual Contribution in
BCDMP related documentation and activities. This has certainly helped us to achieve
operational KPI of Business Continuity and Restoration. </td><td>Status -Award
Given</td><td>11664</td><td>2021-2022 May</td><td>Mr S A Harane</td><td>Ms Neeta
Sharma</td><td>Mr Manu S</td><td>ME03</td>
</tr><tr class="bg-light">
<td>207105</td><td>Mr Pranit Ganesh Pagare</td><td>Civil &
Estate</td><td>T&D</td><td>Associate - Civil</td><td>Tata Power, Trombay
Station</td><td>Mr D S Mehta</td><td>GOING BEYOND AWARD</td><td>15 Apr 2021
</td><td>No</td><td>Mr M D Raut</td><td>Brief Details as follows:
• Successfully completed & Handed over of EV chargers for EV project at Backbay
BEST depot & at Ahmedabad depot in coordination with TML & other concerns well
within schedule.
• Liassoning with authorities to get required clearances at sites.
• Successfully & Safely handling all Civil works independently at Ahmedabad
site.
• Managing assigned Civil works of DNMG area.
</td><td>Pending At -Award Given</td><td>10716</td><td>2020-2021 Instant</td><td>Mr
Avijeet Shekhar</td><td>Ms Neeta Sharma</td><td>Ms Anupama Ratta</td><td>FDAs</td>
</tr><tr>
<td>207122</td><td>Mr Abhiraj Vijay Kadam</td><td>EHV
Cables</td><td>T&D</td><td>Lead Engineer - Cable Group</td><td>TATA POWER,
DISTRIBUTION DIVISION, LOWER PAREL</td><td>Mr P S Sawant</td><td>STAR OF THE MONTH
AWARD</td><td>13 Apr 2021 </td><td>Yes</td><td>Mr S A Bendkhale</td><td>Mr. Abhiraj
Kadam has taken tremendous appreciable efforts towards the restoration of the cable
faults in the south node.
The restoration involved testing of the faults and repair jobs. excellent co-
ordination with the division if obtaining the SAP tags and with the vendors for the
manpower arrangement and liasonning with the MCGM for permission. He has taken
appreciable individual responsibility.
Also he was involved in the Caable identification/spiking and meggering/phasing of
the 220/110kV cables at Waghivali along with Mr. Vivek Singh in LILO project at
Waghivali.</td><td>Status -Award Given</td><td>10611</td><td>2020-2021
March</td><td>Rochelle Albuquerque</td><td>Ms Neeta Sharma</td><td>Mr Manu
S</td><td>ME04</td>
</tr><tr class="bg-light">
<td>207123</td><td>Mr Amitkumar Manojbhai Chauhan</td><td>PSCC
Grid Operations</td><td>T&D</td><td>Lead Engg DSM & Billing-PSCC</td><td>Tata
Power, Trombay Station</td><td>Mr Devanand Pallikuth</td><td>STAR OF THE MONTH
AWARD</td><td>16 Jun 2021 </td><td>Yes</td><td>Mr D D Veer</td><td>1. Validated
revised VC Bills of TPC D issued by SLDC for FY 2011-12 and 2012-13 on 15 min basis
worth Rs 46 Cr.
2. Validated provisional monthly VC Bills of TPC D for FY 2020-21 H1 worth Rs 11
Cr.
3. Prepared Renewable data of TPC D on 15 min basis for FY 2020-21 and submitted to
SLDC for energy accounting of TPC D.
4. Analysed MOD violations in Generation schedules issued by SLDC w.r.t. power
exchange procurement of MSEDCL for FY 2020-21.
</td><td>Status -Award Given</td><td>11801</td><td>2021-2022 May</td><td>Mr S A
Harane</td><td>Ms Neeta Sharma</td><td>Mr Manu S</td><td>ME04</td>
</tr><tr>
<td>207399</td><td>Mr Anirudh Anand Velamore</td><td>Saki
Receiving Station</td><td>T&D</td><td>Graduate Engineer Trainee</td><td>TATA POWER,
SAKI SUB STATION</td><td>Mr P S Sawant</td><td>STAR OF THE MONTH AWARD</td><td>03
Jun 2021 </td><td>Yes</td><td>Mr V B Gawali</td><td>1. As a Operational Improvement
project and reduce confusion between PSCC and NMC engineer removed all unwanted
tags & Notes displayed on Equipment Mimic on SCADA.
2. Driving 5S along with all team members at Saki Node by regularly conducting
Audit of respective Gembas assigned to him.
</td><td>Status -Award Given</td><td>11470</td><td>2021-2022 May</td><td>Mr S A
Harane</td><td>Ms Neeta Sharma</td><td>Mr Manu S</td><td>ME03</td>
</tr><tr class="bg-light">
<td>207476</td><td>Mr Shishir Shekhar Suvarna</td><td>Saki
Receiving Station</td><td>T&D</td><td>Graduate Engineer Trainee</td><td>TATA POWER,
DHARAVI R.S.</td><td>Mr P S Sawant</td><td>GOING BEYOND AWARD</td><td>05 Apr 2021
</td><td>Yes</td><td>Mr V B Gawali</td><td>1. Involved Round the clock for
Installation and commissioning of 33 kV Isolators at Powai Sub Station on 33 KV Bus
Sec-1 & 2 with tie cable. 2. Timely completed fixing of SAP Equipment QR codes on
all equipment Panels at Sahar and Kurla S/S which will help in scanning the
equipment for raising defects through saamarthya App </td><td>Status -Award
Given</td><td>10348</td><td>2020-2021 Instant</td><td>Mr S A Harane</td><td>Ms
Neeta Sharma</td><td>Mr Manu S</td><td>ME03</td>
</tr><tr>
<td>207488</td><td>Mr Pradip Ganapati Patil</td><td>Transmission
Projects-Safety & Fire</td><td>T&D</td><td>Lead Engineer - Safety</td><td>TATA
POWER, DHARAVI R.S.</td><td>Mr S R Mujumdar</td><td>STAR OF THE MONTH
AWARD</td><td>20 May 2021 </td><td>Yes</td><td>Mr M B Kale</td><td>Worked for Orisa
for 15 days on depudation. also arranged L 1 training for contract employees / work
men in order to complete the targets.</td><td>Status -Award
Given</td><td>11187</td><td>2021-2022 April</td><td>Mr S A Harane</td><td>Ms Neeta
Sharma</td><td>Mr Manu S</td><td>ME04</td>
</tr>
</table>
</div>

You might also like