Overloading of ATBs:
both ATBs are loaded at
2 500kV Yousafwala 2X 600MVA 500/220KV ATBs
FULL LOAD throughout
year
Note: In constraint column, the constraint due to damged tranformer or underrated transformer should also be mentioned
Current Status Proposed Solution
NIL
500KV New Gakkhar Overloading of ATRs above 3 x 160MVA ATRs should be replaced
1 3X 160MVA 220/132KV ATRs with 3 x 250MVA ATRs
(Nokhar) 90% in summer.
Addition of 1No. 250MVA ATR.
Over loading and under
220KV New Kot
2 3x250MVA 220/132kv ATRs voltage during summer season
Lakhpat, Lahore. due to Industrial load
220KV Wapda Town, 3 X 160MVA 220/132KV ATRs Overloading of ATRs above 3 x 160MVA ATRs should be replaced
4 Lahore Full load in summer with 3 x 250MVA ATRs
220kV 01 No.
132kV 05 Nos.
132KV 18
Nil Nil
Nil Nil
Nil Nil
NIL Nil
NIL Nil
NIL Nil
NIL NIL
NIL NIL
NIL NIL
NIL NIL
NIL NIL
Nil Nil
Voltage level (500KV, 220KV,
Sr. No. Name of Grid Station No. of Isolators
132KV)
220kV 44 Nos.
2 220kV Kala Shah Kaku
132kV 18 No.
220KV 26
220KV New Kot
4
Lakhpat 132KV 38
220KV 32
6 220kv Sarfraz Nagar
132KV 40
Nil Nil
Nil Nil
Voltage level (500KV, 220KV,
Sr. No. Name of Grid Station No. of CTs
132KV)
220KV Bund Road,
1 132kV 01 No.
Lahore.
NIL NIL
NIL NIL
Nil Nil
Nil Nil
Nil Nil
Voltage level (500KV, 220KV,
Sr. No. Name of Grid Station No. of CVTs
132KV)
NIL NIL
NIL NIL
NIL NIL
NIL NIL
NIL NIL
NIL NIL
NIL NIL
Nil Nil
Nil Nil
Nil Nil
NIL Nil
NIL Nil
NIL Nil
NIL NIL
Voltage level (500KV, 220KV,
Sr. No. Name of Grid Station Breif Description oh hardware issue Current Status
132KV)
Clamps, cleats and nut bolts often corrode due
to rust/flash-over/over-load/polluted
220kV Clamps surroundings and require repair/replacement 400 Nos.
from time to time.
Arrangements of shut Downs , Conductor 500 Meters Hawthorn Conductor & 20Nos.
220 KV
220KV New Kot Hawthorn for replacement of old age insttaled Dead end body
3 pipe connectors in between isolators,breakers
Lakhpat
in old 220 kv yard with all hardware
220KV New Kot
3
Lakhpat
132 KV Clamps Hard ware of newly installed pipe (Rigid) Bus 100Nos.
Bar dia 6" in 132 kv yard
Battery Banks I & II for 500kV System have
been dismantled after TSG Recommendation
220V DC for 500kV system and 600AH battery cells must be installed for 02 No Set.
500kV DC system.
5 220kv Okara New Battery Bank 220v 300AH = 26 cells and 110v 150AH = 20 01 No.
cells required
6 220KV Wapda Town,
Lahore NIL NIL NIL
Non-availabilty of Shunt
500KV Grid station Reactor at 500KV
1 3X 37MVAR 500KV SR-01
Nokhar Nokhar-Neelum Jhelum
T/L.
Note: In constraint column, the constraint due to damged tranformer or underrated transformer should also be mentioned
Current Status Proposed Solution
Nevertheless One of Shunt Reactors
(3×37MVAR) for Two Neelum
Jhelum Circuits (under
construction) has been connected to
Existing 500kV Neelum Jhelum
circuit through Transfer bus aided
by temporary arrangement.
NIL
NIL
11KV VCB 31 Nos. Spare parts of the VCB's are not available by the
LESCO.
220kV Grid Station
2 40MVA, 132/ 11.5 kV Power Transformer T-6 was
KSK
Power transformer 3 No. commissioned at the grid station by LESCO on dated
18/09/17. 11kV capacitor bank of the transformer did
not commission up till now.
220KV New Kot Load sharing Paths of some 132 KV circuits are under
3 - - rated and incomplete. Distance protection at lesco end
Lakhpat
out of order.
500kV Grid Station 7 Nos. VCBs need replacement and same has been
4 11KV VCBs 7 Nos repeatedly communicated to Planning/ Design Dept &
Yousafwala
MEPCO
4 220KV Gakkhar
220KV New Kot
5
Lakhpat
6 500KV Yousafwala
220KV Wapda Town,
7
Lahore
220KV NEW
8 SHALAMAR LAHORE
NIL
NIL
NIL
NIL
NIL
NIL
Nil
Nil
Nil
Nil
NIL
NIL
NIL
NIL
NIL
Issues related to Environment / Disposal of waste etc