CONSTRUCTION: COMPLETED
Slab on Grade
CONSTRUCTION: UNSTARTED
Slab on Grade
NOTES:
1. COMPLETED CONCRETE WORKS DATED AS PER ACTUAL FINISH OF CONCRETE POURING.
2. INFORMATION APPLIED IN THE MODEL ARE GATHERED FROM THE ACTUAL SITE ACTIVITY.
3. INFORMATION APPLIED IN THE MODEL ARE REFERENCED TO SHOP DRAWINGS APPROVED
BY THE ENGINEER; IN LINE WITH SHOP DRAWINGS FOR APPROVAL.
4. INFORMATION OF THE MODEL SHOWN INDICATED AS PER DATE OF PREPARATION.
CONSTRUCTION: COMPLETED
Slab on Grade
1. COMPLETED CONCRETE WORKS DATED AS PER ACTUAL FINISH OF CONCRETE POURING. SLAB ON GRADE: TYPE - E
2. INFORMATION APPLIED IN THE MODEL ARE GATHERED FROM THE ACTUAL SITE ACTIVITY. Date of Actual Finish
3. INFORMATION APPLIED IN THE MODEL ARE REFERENCED TO SHOP DRAWINGS APPROVED Dec. 11, 2020
BY THE ENGINEER; IN LINE WITH SHOP DRAWINGS FOR APPROVAL. COMPLETED
4. INFORMATION OF THE MODEL SHOWN INDICATED AS PER DATE OF PREPARATION. SLAB ON GRADE: TYPE - B
SLAB ON GRADE: TYPE - C SLAB ON GRADE: TYPE - A
Date of Actual Finish
Date of Actual Finish Date of Actual Finish
Jan. 16, 2021
Mar. 02, 2021 Dec. 07, 2021 SLAB ON GRADE: TYPE - D1
DATE PREPARED: MAY 17, 2021 COMPLETED
COMPLETED COMPLETED Date of Actual Finish
SLAB ON GRADE: TYPE - C Jan. 21, 2021
SLAB ON GRADE: TYPE - C SLAB ON GRADE: TYPE - E Date of Actual Finish COMPLETED
Date of Actual Finish Date of Actual Finish Dec. 18, 2020
Mar. 02, 2021 Dec. 16, 2020 COMPLETED
COMPLETED COMPLETED
SLAB ON GRADE: TYPE - B SLAB ON GRADE: TYPE - C1
SLAB ON GRADE: TYPE - A Date of Actual Finish
Date of Actual Finish
Date of Actual Finish Dec. 18, 2020
Mar. 05, 2021
Feb. 26, 2021 COMPLETED
COMPLETED
COMPLETED
C
D
BALAGTAS STATION
KEYPLAN
BALAGTAS STATION
CONSTRUCTION ACTIVITY AT SLAB ON GRADE
As of 2021-05 (May)
LEGEND:
CONSTRUCTION: COMPLETED
Slab on Grade
SLAB ON GRADE: TYPE - B
Date of Actual Finish
Feb. 10, 2021
COMPLETED
BALAGTAS STATION
KEYPLAN
BALAGTAS STATION
CONSTRUCTION ACTIVITY AT SLAB ON GRADE
As of 2021-05 (May)
LEGEND:
CONSTRUCTION: COMPLETED
Slab on Grade
CONSTRUCTION: UNSTARTED
Slab on Grade
NOTES:
SLAB ON GRADE: TYPE - J
1. COMPLETED CONCRETE WORKS DATED AS PER ACTUAL FINISH OF CONCRETE POURING. Date of Actual Finish
2. INFORMATION APPLIED IN THE MODEL ARE GATHERED FROM THE ACTUAL SITE ACTIVITY. Mar. 09, 2021
3. INFORMATION APPLIED IN THE MODEL ARE REFERENCED TO SHOP DRAWINGS APPROVED COMPLETED
BY THE ENGINEER; IN LINE WITH SHOP DRAWINGS FOR APPROVAL.
SLAB ON GRADE: TYPE - C SLAB ON GRADE: TYPE - J
4. INFORMATION OF THE MODEL SHOWN INDICATED AS PER DATE OF PREPARATION.
Date of Actual Finish Date of Actual Finish
Jan. 26, 2021 Mar. 09, 2021
COMPLETED COMPLETED
DATE PREPARED: MAY 17, 2021
SLAB ON GRADE: TYPE - B SLAB ON GRADE: TYPE - C5
SLAB ON GRADE: TYPE - E Date of Actual Finish
Date of Actual Finish Date of Actual Finish
Jan. 17, 2021 Jan. 26, 2021
Jan. 23, 2021 COMPLETED
COMPLETED COMPLETED
SLAB ON GRADE: TYPE - C
SLAB ON GRADE: TYPE - E SLAB ON GRADE: TYPE - A
Date of Actual Finish SLAB ON GRADE: TYPE - C5
Date of Actual Finish Date of Actual Finish
Feb. 02, 2021 Date of Actual Finish
Feb. 30, 2021 Jan. 23, 2021
COMPLETED Apr. 06, 2021
COMPLETED COMPLETED
SLAB ON GRADE: TYPE - A COMPLETED
Date of Actual Finish
Feb. 30, 2021
COMPLETED
SLAB ON GRADE: TYPE - C7
SLAB ON GRADE: TYPE - B Date of Actual Finish
Date of Actual Finish Feb. 02, 2021
Feb. 10, 2021 COMPLETED
COMPLETED
SLAB ON GRADE: TYPE - D1
Date of Actual Finish
SLAB ON GRADE: TYPE - A6 Feb. 22, 2021
Date of Actual Finish COMPLETED
Feb. 04, 2021
SLAB ON GRADE: TYPE - E
COMPLETED
Date of Actual Finish
SLAB ON GRADE: TYPE - B Feb. 04, 2021
Date of Actual Finish COMPLETED
Feb. 10, 2021
SLAB ON GRADE: TYPE - E2 COMPLETED
Date of Actual Finish
Feb. 06, 2021
COMPLETED
SLAB ON GRADE: TYPE - A2
Date of Actual Finish
Feb. 06, 2021
COMPLETED
A
B
C
D
BALAGTAS STATION