RCC Poles
a) 9.5 M 350kg WL Nos. 7675 1373
I b) 9M 145kg WL Nos. 5941 1060
c) 9M 150kg WL Square section Nos. 7210 1060
d) 8M 115kg WL Nos. 4351 848
II
PCC Poles
8M PCC Poles 140kg WL Nos. 2495 848
PSC Poles
a) 11M 365kg WL Nos. 7924 1552
III
b) 9M 200kg WL Nos. 3401 1060
d) 8M 200kg WL Nos. 2942 848
IV
Pre-Stressed Tubular Spun Pole
11M Long Nos. 15800 2353
PSCC Poles
9M PSCC pole WL 300Kg Nos. 4578 1060
9M PSCC pole 160Kg WL in Transverse
direction and 136Kg WL in Longitudinal Nos. 3558 1060
directional
Guy Less Pole Nos. New Item
Double Pole Structure complete
including 5 KG , 8SWG G.I. Wire for
V Structure Grounding
a) 9M RCC Poles Set 15910 3252
b) 8M RCC Poles Set 12730 3104
c) 9M PSCC Poles with 300Kg WL Set 13184 3252
Three Pole structure complete
including 5 KG , 8SWG G.I. Wire for
VII Structure Grounding
a) 9M RCC Poles Set 27446 6271
b) 8M RCC Poles Set 22676 6049
c) 9M PSCC Poles with 300Kg WL Set 23357 6271
Transformer Structure complete
VII with cross arms braces, clamps,
bolt&nuts and washers,
For 25/63 kVA
1) a) Using 2nos 9M RCC Poles Set 19271 4115
b) Using 2 nos 8M RCC Poles Set 16091 3560
c) 9M PSCC Poles with 300Kg WL Set 16545 4115
For 25/63 kVA- Star Rated Transformers
1) a) Using 2nos 9M RCC Poles Set 22532 4115
b) Using 2 nos 8M RCC Poles Set 19352 3560
c) 9M PSCC Poles with 300Kg WL Set 19806 4115
For 100 / 250 kVA
a) Using 2nos 9M RCC Poles Set 24575 4238
b) Using 2 nos 8M RCC Poles Set 21395 3816
2)
c) 9M PSCC Poles with 300Kg WL Set 21849 4238
Note: The items V, VI, includes the cost of poles, structure materials & 5 kgs of G.I wire required
for earthing of structure materials.
Fixing Single pole mounted
transformer kit on 9 mtr RCC pole
(square sec) / 9 Mtr PSCC pole
3) 300KG WL (Excluding Errection of
pole)
for 25/63kVA Transformer Set 4088 1016
for 100kVA Transformer Set 6129 1016
For Single pole mounted
transformer kit for 100/250kVA on
4) Set 23035 2033
11 mtr spun pole (Excluding
Errection of pole)
11 kV Horizontal cross arm with
H.T.Single top support,
VIII clamp,bolts, nuts and washers MS
a) For RCC Poles Set 382 99
b) For PSC Poles Set 377 99
b) For PCC Poles Set 374 99
Included in
b) Rod Type Set 2000
Material cost
Material cost
SL.
Particulars Unit Qty
No
Rate Amt
1 11kV Class 3x400 Sqmm XLPE UG Cable (Flat Armoured) Km 1 1565000 1565000
11kV Class 3x400 Sqmm XLPE UG Cable (Round
2 Km 1 1956000 1956000
Armoured)
Straight Through Jointing Kits HS Type suitable for
3 Nos 3 8050 24150
3x400 Sqmm Cable
Cable Termination Kit Outdoor HS Type Suitable for
4 Per Kit 1 3940 3940
3x400 Sqmm Cable
Cable Termination Kit Indoor HS Type Suitable for 3x400
5 Per Kit 1 3540 3540
Sqmm Cable
4000 /
6 Cable Covering Tiles 250x125x40 mm or 125x125x40 mm Nos 10/5 40000
8000
8 RCC Hume Pipe, 2000mm Long, 150mm Dia Nos 30 300 9000
10 GI Pipe, 150 mm Dia for drain crossing, cable raising etc., Mtrs 8 1144 9152
10 Labour charges
a) Cable trench excavation, 1000x0.6x1=600, Ordinary
Cmt 600 205 123000
soil
b) Laying of cable in trench Km 1 39774 39774
c) Refilling and consolidation Cmt 550 45 24750
d) Making of straight through joints Nos 3 1695 5085
e) Making of cable terminations Nos 2 1554 3108
f) Covering the cable with tiles Km 1 2603 2603
g) Spreading Sand and forming with Sand round the cable Km 1 9146 9146
a) Casual 211586
b) Regular 42317
When multiples cables have to be laid in the common trench the following excavation is to be followed: a)
2) 0.75 Mtrs x 1 Mtrs for 2 cables. b) 1 Mtr x 1 Mtr for 3 cables. c) 1.25 Mtr x 1 Mtr for 4 nos. of cables and
so on (As per Ltr No. BESCOM/BC-14/F-45
Where cables are laid using trenchless technology, there may be a necessity to lay the cable in open
3) trench excavation. Hence provisionshall be made for both in the estimate and the bills shall be paid as
per actual inventory taken.
COST DATA SHEET - 22
For laying of 1 Km Length of 11kV, 3 Core, 400 Sqmm XLPE UG Cable
Using Horizontal Drilling
Material cost
SL.
Particulars Unit Qty
No
Rate Amt
Material Cost
1 11kV Class 3x400 Sqmm XLPE UG Cable (Flat Armoured) Km 1 1565000 1565000
6 RCC Hume Pipe, 2000 mm Long, 150 mm Dia Nos 3 300 900
8 GI Pipe, 150 mm Dia for drain crossing, cable raising etc., Mtrs 8 1144 9152
a) Casual 977502
b) Regular 195500
While preparing estimates for turnkey / total tunkey projects please refer to Sl. No. ......... of General
1)
Guidelines vide a to .... in Page No. ...........
When multiples cables have to be laid in the common trench the following excavation is to be followed: a)
2) 0.75 Mtrs x 1 Mtrs for 2 cables. b) 1 Mtr x 1 Mtr for 3 cables. c) 1.25 Mtr x 1 Mtr for 4 nos. of cables and
so on (As per Ltr No. BESCOM/BC-14/F-45
Where cables are laid using trenchless technology, there may be a necessity to lay the cable in open
3)
trench excavation. Hence provisionshall be made for both in the estimate and the bills shall be paid as
per actual inventory taken.
COST DATA SHEET - 21
For Laying of 1 Km Length of 11kV, 3 Core, 240 Sqmm XLPE UG Cable
Using Conventional Laying with Excavation in Soil
Material cost
SL.
Particulars Unit Qty
No Rate Amt
1 11kV Class 3x240 Sqmm XLPE UG Cable (Flat Armoured) Km 1 1038890 1038890
11kV Class 3x240 Sqmm XLPE UG Cable (Round
2 Km 1 1279950 1279950
Armoured)
Straight Through Jointing Kits HS Type suitable for
2 Nos 3 6555 19665
3x240 Sqmm Cable
Cable termination kit Outdoor HS Type Suitable for
3 Per Kit 1 3910 3910
3x240 Sqmm Cable
Cable termination kit Indoor HS Type Suitable for 3x240
Per Kit 1 3450 3450
Sqmm Cable
4000 /
4 Cable Covering Tiles 250x125x40 mm or 125x125x40 mm Nos 10/5 40000
8000
6 RCC Hume pipe, 2000 mm Long, 150 mm Dia Nos 30 300 9000
7 Collars for RCC Hume Pipe Nos 30 80 2400
8 GI Pipe, 100 mm Dia for drain crossing, cable raising etc., Mtrs 8 1144 9152
10 Labour charges
a) Cable trench excavation, 1000x0.6x1=600, Ordinary
Cmt 600 205 123000
soil
b) Laying of cable in trench Km 1 37786 37786
g) Spreading Sand and forming with Sand round the cable Km 1 9146 9146
a) Casual 209598
b) Regular 41920
NOTE
While preparing estimates for turnkey / total tunkey projects please refer to Sl. No. ......... of General
1)
Guidelines vide a to .... in Page No. ...........
When multiples cables have to be laid in the common trench the following excavation is to be followed: a)
2) 0.75 Mtrs x 1 Mtrs for 2 cables. b) 1 Mtr x 1 Mtr for 3 cables. c) 1.25 Mtr x 1 Mtr for 4 nos. of cables and
so on (As per Ltr No. BESCOM/BC-14/F-45
Where cables are laid using trenchless technology, there may be a necessity to lay the cable in open
3) trench excavation. Hence provisionshall be made for both in the estimate and the bills shall be paid as
per actual inventory taken.
COST DATA SHEET - 20
Material cost
SL.
Particulars Unit Qty
No
Rate Amt
Material Cost
5 RCC Hume Pipe, 2000 mm Long, 150 mm Dia Nos 3 300 900
9 Labour charges
While preparing estimates for turnkey / total tunkey projects please refer to Sl. No. ......... of
1)
General Guidelines vide a to .... in Page No. ...........
When multiples cables have to be laid in the common trench the following excavation is to be
2) followed: a) 0.75 Mtrs x 1 Mtrs for 2 cables. b) 1 Mtr x 1 Mtr for 3 cables. c) 1.25 Mtr x 1 Mtr for 4
nos. of cables and so on (As per Ltr No. BESCOM/BC-14/F-45
Where cables are laid using trenchless technology, there may be a necessity to lay the cable in
3) open trench excavation. Hence provision shall be made for both in the estimate and the bills
shall be paid as per actual inventory taken.
COST DATA SHEET - 19
For Laying of 1 Km Length of 11kV, 3 Core, 95 Sqmm XLPE UG Cable
Using Conventional Laying with Excavation of Soil
7 RCC Hume Pipe, 2000 mm Long, 150 mm Dia Nos 30 300 9000
11 Labour charges
While preparing estimates for turnkey / total tunkey projects please refer to Sl. No. ......... of General
1)
Guidelines vide a to .... in Page No. ...........
When multiples cables have to be laid in the common trench the following excavation is to be
2) followed: a) 0.75 Mtrs x 1 Mtrs for 2 cables. b) 1 Mtr x 1 Mtr for 3 cables. c) 1.25 Mtr x 1 Mtr for 4
nos. of cables and so on (As per Ltr No. BESCOM/BC-14/F-45
Where cables are laid using trenchless technology, there may be a necessity to lay the cable in open
3)
trench excavation. Hence provision shall be made for both in the estimate and the bills shall be paid
as per actual inventory taken.
COST DATA SHEET - 18
For laying of 1 Km Length of 11kV, 3 Core 95 Sqmm XLPE UG Cable
Using Horizontal Drilling
Material cost
SL.
Particulars Unit Qty
No
Rate Amt
Material Cost
1 11kV Class 3x95 Sqmm XLPE UG Cable (Flat Armoured) Km 1 548860 548860
5 RCC Hume Pipe, 2000 mm Long, 150 mm Dia Nos 3 300 900
7 GI Pipe, 100 mm Dia for drain crossing, cable raising etc., Mtrs 8 1144 9152
9 Labour charges
a) Casual 977303
b) Regular 195461
Total Cost/Km in Rs. (Flat Armoured) 1760646
When multiples cables have to be laid in the common trench the following excavation is to be followed: a)
2) 0.75 Mtrs x 1 Mtrs for 2 cables. b) 1 Mtr x 1 Mtr for 3 cables. c) 1.25 Mtr x 1 Mtr for 4 nos. of cables and
so on (As per Ltr No. BESCOM/BC-14/F-45
Where cables are laid using trenchless technology, there may be a necessity to lay the cable in open
3) trench excavation. Hence provision shall be made for both in the estimate and the bills shall be paid as
per actual inventory taken.
COST DATA SHEET -17
Estimate for Providing Metering to IP Set Installations Using SMC Box
2 SMC Meter Housing box with 6 mm hylam sheet Nos 1 2100 2100
6 3 Nos Porcelain Cutouts 60A with Wooden Plank Set 1 474 474
Total 6992
COST DATA SHEET -16
SL.
Paritculars Unit Qty Material cost Labour Cost
No
3 Guy Set With No.15 Strain Insulator Complete Sets 3 742 2226 354 1062
10 Labour Charges
a) Casual 7671
b) Regular 1534
Note:
1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports
2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
COST DATA SHEET -15
Providing 2 Pole Structrue at the Tapping Point Using RCC Poles
SL.
Paritculars Unit Qty Material cost Labour Cost
No
Total Part A
Labour Charges
a) Casual 5340
b) Regular 1068
Labour Charges
a) Casual 5488
b) Regular 1098
Note: 1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports
2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
COST DATA SHEET - 14
Running Single Circuit 11 kV, 3-phase Power Line on 9.0 Mtr Supports Using RABBIT ACSR Conductor With an Average Span of
40 Mtrs in Vertical Configuration in Congested Areas
3 DP Structure using 9 Mtrs RCC poles Set 1 15910 15910 3252 3252
10 EG Stirrups with GI wire lacing Set of 2 No's 370 424 156880 99 36630
11 Concreting Materials for guy sets (Without Cement) Nos 9 158 1422 0 0
13 Labour charges
a) Casual 85797
b) Regular 17159
1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports
2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
COST DATA SHEET - 13
Running LT, 3-Phase 5 Wire Power Line with Continuous Earth Wire on 9.0 Mtr Supports Using RABBIT ACSR for Phase and
Neutral, and WEASEL Conductor for Street Light and 8 SWG GI Wire for Continuous Earth Wire with an Average Span of 40 Mtrs
in Vertical Configuration
1.015
9 No.8 SWG GI wire for continuous earth wire Kms 54.674 5631 1913 1942
(103 kgs)
12 Concreting Materials for guy sets (Without Cement) Nos 8 140 1120 0 0
17 Labour charges
a) Casual 56395
b) Regular 11279
Note: 1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports
2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
COST DATA SHEET - 12
Running LT, Single Phase 3 Wire Power Line on 8.0 Mtr Supports with an Average Span of 40 Mtrs
Using WEASEL ACSR Conductor
12 Concreting Materials for guy sets (without cement) Nos 8 158 1264 0 0
17 Labour charges
a) Casual 37702
b) Regular 7540
Note: 1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports
2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
COST DATA SHEET - 11
Running LT, 3 Phase 5 Wire for Power Line on 8.0 Mtr Supports Using RABBIT ACSR Conductor for Phase and Neutral, and
WEASEL Conductor for Street Light with an Average Span of 50 mtrs
13 Concreting Materials for guy sets (Without Cement) Nos 8 158 1264 0 0
Note: The no. of RCC poles and PCC poles have to be used as per field conditions and hence estimates have to be prepared
accordingly.
18 Labour charges
a) Casual 39412
b) Regular 7882
1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports
Note:
2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
COST DATA SHEET - 10
Running LT, 3-Phase 5 Wire for Power Line on 9.0 Mtr Supports Using RABBIT ACSR Conductor for Phase and Neutral, and
WEASEL Conductor or Street Light with an Average Span of 40 Mtrs (For Cities, Towns and Residential Layouts)
13 Concreting Materials for guy sets (without Cement) No's 8 158 1264 0 0
18 Labour charges
a) Casual 50319
b) Regular 10064
Note:
1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports
2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
COST DATA SHEET - 9
Running LT, 3-Phase 4 Wire Power Line on 9.0 Mtr Supports Using RABBIT ACSR Conductor with an
Average Span of 40 Mtrs
1 RCC Pole - 9 Mtrs Long, 145 kg WL Nos 1 5941 5941 1060 1060
2 PSC Pole - 9 Mtrs Long, 200 kg WL Nos 24 3401 81624 1060 25440
10 Concreting materials for guy sets without cement Nos 8 158 1264 0 0
12 Labour charges
a) Casual 44320
b) Regular 8864
Note: 1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports
2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
COST DATA SHEET - 8
Running LT , 3-Phase 4 Wire Power Line on 8.0 Mtr Supports Using RABBIT ACSR Conductor with an
Average Span of 40 Mtrs
1 RCC Pole - 8 Mtrs Long, 145 kg WL Nos 1 4351 4351 848 848
2 PCC Pole - 8 Mtrs Long, 200 kg WL Nos 24 2495 59880 848 20352
10 Concreting materials for guy sets without cement Nos 8 158 1264 0 0
12 Labour charges
a) Casual 39020
b) Regular 7804
Note: 1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports
2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
COST DATA SHEET - 7
Running LT, 3-Phase 4 Wire Power Line on 8.0 Mtr Supports Using WEASEL ACSR Conductor with an
Average Span of 60 Mtrs (IP Installations)
1 RCC Pole - 8 Mtrs Long, 145 kg WL Nos 1 4351 4351 848 848
2 PCC Pole - 8 Mtrs Long, 200 kg WL Nos 17 2495 42415 848 14416
10 Concreting materials for guy sets without cement Nos 8 158 1264 0 0
12 Labour charges
a) Casual 29031
b) Regular 5806
Note: 1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports
2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
COST DATA SHEET - 6
Running Single Circuit 11 kV, 3-Phase Power Line & 3 Phase 4 Wire Secondary Line on 9.0 Mtr Supports with an Average Span of
40 Mtrs Using RABBIT ACSR conductor for HT & LT Lines
1 RCC Pole - 9 Mtrs Long, 145 kg WL Nos 1 5941 5941 1060 1060
2 PSC Pole - 9 Mtrs Long, 200 kg WL No's 23 3401 78223 1060 24380
7 DP Structure with 9 mtr RCC Poles Set 1 15910 15910 3252 3252
17 Concreting materials for guy sets without cement Nos 8 158 1264 0 0
20 Labour charges
a) Casual 72369
b) Regular 14474
Note: 1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports
2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
COST DATA SHEET - 5
Running Single Circuit 11 kV 3 Phase Power Line and 3 Phase - 4 Wire Secondary Line on 9 Mtr Supports with an Average Span of
50 Mtrs using RABBIT Conductor for HT and WEASEL for LT Lines
1 RCC Pole - 9 Mtrs Long, 145 kg WL Nos 1 5941 5941 1060 1060
2 PSC Pole - 9 Mtrs Long, 200 kg WL Nos 18 3401 61218 1060 19080
7 DP Structure with 9 mtr RCC Poles Set 1 15910 15910 3252 3252
13 Rabbit ACSR for HT Lines Kms 3.045 33676 102543 2608 7941
14 Weasel ACSR for LT lines Kms 4.06 20100 81606 1913 7767
21 Labour charges
a) casual 59809
b) Regular * 11962
Total Cost/Km in Rs 435455
Note: 1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports
2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
COST DATA SHEET - 4
Running Single Circuit 11 kV, 3-Phase Power Line on 9.0 Mtr Supports with an Average Span of 40 Mtrs Using COYOTE ACSR
conductor
1 RCC Pole - 9 Mtrs Long, 145 kg WL Nos 1 5941 5941 1060 1060
2 PSC Pole - 9 Mtrs Long, 200 kg WL Nos 22 3401 74822 1060 23320
5 DP Structure with 9 Mtrs RCC Poles Sets 2 15910 31820 3252 6504
8 Strain Clamp 3 bolt type for Disc Insulator Nos 12 468 5616 0 0
Set of 2
13 EG Stirrups with GI wire lacing 23 370 8510 99 2277
Nos
14 Concreting materials for guy sets without cement Nos 6 158 948 0 0
17 Labour charges
a) Casual 54072
b) Regular 10814
Note: 1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports
2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
COST DATA SHEET - 3
Running Single Circuit 11 kV , 3-Phase Power Line on 8.0 Mtr Supports with an Average Span of 50 Mtrs Using RABBIT ACSR
Conductor
1 RCC Pole - 8.0M Long, 145 kg WL Nos 1 4351 4351 848 848
2 PCC Pole - 8.0M Long, 200 kg WL Nos 18 2495 44910 848 15264
5 DP Structure with 8 Mtrs RCC Poles Set 1 12730 12730 3104 3104
Set of 2
12 EG Stirrups with GI wire lacing 19 370 7030 99 1881
Nos
13 Concreting materials for guy sets without cement Nos 6 158 948 0 0
16 Labour charges
a) Casual 35107
b) Regular 7021
Note: 1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports
2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
COST DATA SHEET - 2
Running Single Circuit 11 kV, 3-Phase Power Line on 9.0 Mtr Supports with an Average Span of 50 Mtrs Using Rabbit ACSR
Conductor
1 RCC Pole - 9 Mtrs Long, 145 kg WL Nos 1 5941 5941 1060 1060
2 PSC Pole - 9 Mtrs Long, 200 kg WL Nos 18 3401 61218 1060 19080
5 DP Structure with 9 Mtrs RCC Poles Set 1 15910 15910 3252 3252
Set of
12 EG Stirrups with GI wire lacing 19 370 7030 99 1881
2 Nos
13 Concreting materials for guy sets without cement Nos 6 158 948 0 0
16 Labour charges
a) Casual 39283
b) Regular 7857
Note: 1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports
2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
COST DATA SHEET - 1
Running Single Circuit 11kV, 3 Phase Power Line On 9.0 Mtr Supports With An Average Span Of 40 Mtrs Using Rabbit ACSR
Conductor
1 RCC Pole - 9 Mtrs Long, 145 kg WL Nos 1 5941 5941 1060 1060
2 PSC Pole - 9 Mtrs Long, 200 kg WL Nos 23 3401 78223 1060 24380
5 DP Structure with 9 Mtrs RCC Poles Set 1 15910 15910 3252 3252
Set of 2
12 EG Stirrups with GI wire lacing 24 370 8880 99 2376
Nos
13 Concreting materials for guy sets without cement Nos 6 158 948 0 0
16 Labour charges
a) Casual 45973
b) Regular 9195
Note: 1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports
2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
COST DATA SHEET - 49
Standard Requirement of Materials for providing LT Wiring for Distribution
Transformer Centers of various capacities
LT Wiring for - 250/500 KVA
Rate/Unit
Sl No Material Unit
(in Rs)
1 Al Lead Wire - 240 Sqmm Mtrs 200
2 Copper lugs - 240 Sqmm Nos 184
3 PG Clamps - Rabbit to 240 Sqmm Nos 307
4 Spacers for DTC Wiring Nos 38
4 Pin Cross Arm with necessary Clamps,bolts & nuts etc
5 Nos 352
complete (Galvanised )
Fish Plate with necessary Clamps,bolts & nuts etc
6 Nos 155
complete (Galvanised )
The size of the lead wire provisioned are as per Standard requirement depending on the
Ampere rating of the transformer.
The Size of the cable mabe modified to suite field requirement where ever necessary.
COST DATA SHEET - 48
Labour
Sl. No. Description of the work Unit charges of the
work
Consolidated Labour charges for shifting of conductor terminations and all other
fittings existing on the deteriorated pole while replaceing termination(cut point)
poles(Does not include labour chages for releasing and erection of pole)
Labour charges of
Sl. No. Description of the work Unit
the work
PART-A (Materials)
The labour charges includes all works such as digging of pits, Erection of Poles, Fixing of
1 Cross Arms, Strining of conductor, fixing of Conductore accessories, insulators, Fixing
guy sets, Anti climbing device, spiral earth electrode and danger board etc complete
No other labour charges or any other charges towards special locality allowance LC
2 Charges, additional labour charges, transportation charges etc., are payable.
Certificate has to be furnished by the section officer who prepares the estimate that the
4 estimates are not split to claim the above labour charges
5 The above rates are not applicable for works awarded on tender
COST DATA SHEET - 45
Estimate for Carrying Out 3 to 5 (THREE to FIVE) Poles Works in respect of Ganga
Kalyana and Drinking Water Supply Works only
Note:-
The labour charges includes all works such as digging of pits, Errection of
1
Poles, Fixing of Cross Arms, insulators, Strining of wire, providing guy sets.
PART-B (Labour)
Consolidated labour charges involving 1
to 2 (ONE to TWO) pole works for Ganga
2 Nos 1 8829
Kalyana and Drinking Water supply
works only.
Note:-
The labour charges includes all works such as digging of pits, Erection of
1 Poles, Fixing of Cross Arms, insulators, Strining of wire, providing guy sets.
Estimates coverig more than 2 pole works shall not split to bring them into
3 this catageory.
Material +
Total Material Labour
Labour
a) For 25KVA Transformer 1107 725 382
While preparing estimates for turnkey / total turnkey projects please refere to Sl. No. …….. To general guidelines
1
vide a to …. page No. ……. To ……..
COST DATA SHEET - 42
For Providing Electronic Trivector Meters with Associated CT's Metering Box etc., on LT Side of
Distribution Transformer Center
While preparing estimates for turnkey/total turnkey projects please refere to Sl. No. …….. To general
1
guidelines vide a to …. page No. ……. To ……..
COST DATA SHEET - 41
Providing Compact Pre-fabricated Packaged Sub-station 11kV/433V
Sl
Particulars Unit Total Cost
No
Packaged Sub-station 11kV/433V consisting of 3 Way SF6/VCB insulated Compact RMU,
1
Oil cooled type Copper Wound Transformer and LT section with one ACB as incoming and 7
(i) With 100kVA oil cooled Transformer Set
Material cost
Rate Amt
7 Current Transformers 150/5 amps for 100 kVA DTC No 3 306 918
10 Miscellaneous materials LS LS 62 62
11 Labour Charges
a) Casual 3483
b) Regular 697
While preparing estimates for turnkey / total tunkey projects please refer to Sl. No. ......... of General
1)
Guidelines vide a to .... in Page No. ...........
COST DATA SHEET - 39
Installing RLMU for the Existing 63 kVA Distribution Transformer Center
Material cost
Sl No Particulars Unit Qty
Rate Amt
10 Miscellaneous materials LS LS 23 23
11 Labour Charges
a) Casual 3483
b) Regular 697
While preparing estimates for turnkey/total tunkey projects please refer to Sl. No. ......... of General
1)
Guidelines vide a to .... in Page No. ...........
COST DATA SHEET - 38
Installing RLMU for the Existing 15/25kVA Distribution Transformer Center
Material cost
Sl No Particulars Unit Qty
Rate Amt
7 Current Transformers 50/5 amps for 15/25 kVA DTC No 3 554 1662
11 Labour Charges
a) Casual 3483
b) Regular 697
While preparing estimates for turnkey / total tunkey projects please refer to Sl. No. ......... of General
1)
Guidelines vide a to .... in Page No. ...........
COST DATA SHEET - 37
Running Single Circuit 1.1 kV 3 Phase 5 Wire Power Line on 9 Mtr Supports with Average Span of 40 Mtrs Using
3x95 + 1x16 + 1x70 Sqmm Aerial Bunched Cables (ABC)
1 RCC Poles 9 Mtr long with 145 Kg WL Nos 10 5941 59410 1060 10600
2 PSC Poles 9 Mtr long with 200 Kg WL Nos 15 3401 51015 1060 15900
Note: RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports and hence
the quantity of RCC and PSC poles may be revised as per field condition.
1.1kV Class 3 Phase Aerial Bunched Cable of
3 kms 1.015 410000 416150 20426 20732
size 3x95+1x16+1x70 Sqmm
4 Three Phase Distribution box for 6 Connections Nos 20 2065 41300 538 10760
8 Pole clamp for HT/LT AB cable Sets 20 100 2000 192 3840
18 Labour Charges
a) Casual 81519
b) Regular 16304
While preparing estimates for turnkey / total turnkey projects please refere to Sl. No. …….. To general
1
guidelines vide a to …. page No. ……. To ……..
COST DATA SHEET - 36
Running Single Circuit 11kV, 3 Phase Power Line on 9 Mtr Supports with an Average Span of 30 Mtrs Using 3x95
Sqmm + 1x70 Sqmm Aerial Bunched Cables (ABC)
1 RCC Poles 9 Mtr long with 145 Kg WL Nos 10 5941 59410 1060 10600
2 PSC Poles 9 Mtr long with 200 Kg WL Nos 24 3401 81624 1060 25440
Note: RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports and hence
the quantity of RCC and PSC poles may be revised as per field condition.
11kV Class 3 phase Aerial Bunched Cable 3x95
3 Kms 1.015 631000 640465 20426 20732
+ 70 Sqmm
Pole clamp for HT/LT AB cable Sets 30 100 3000 192 5760
16 Labour Charges
a) Casual 80892.4
b) Regular 16178.5
While preparing estimates for turnkey / total turnkey projects please refere to Sl. No. …….. To general
guidelines vide a to …. page No. ……. To ……..
COST DATA SHEET-35
Providing Compact RMU 11kV Class SF6/VCB Type (1VL)
2 Bed Conceting with CC 1:2:4 as per Labour Charges Cmt 5084 0.07 355.88 0.09 457.56 0.1 508.4 0.16 813.44
Labour Charges
Note:-
The measurements for Earth work and concreting works have been provision as per the dimensions of the equipments of makes which are in use at
1
present in BESCOM. Detail for the measurement are furnished in the data sheet furnished in Page No. ………..
2 While preparing estimates for turnkey / total turnkey projects please refere to Sl. No. …….. To general guidelines vide a to …. page No. ……. To ……..
3 Revised Cost Data Sheet will be furnished after the rates for CSS, RMU etc. are finalised by the committee.
COST DATA SHEET-34
Providing Compact RMU 11kV Class SF6/VCB Type (1OD)
2 Bed Conceting with CC 1:2:4 as per Labour Charges Cmt 5084 0.07 355.88 0.09 457.56 0.1 508.4 0.16 813.44
5 Providing Plinth with CC 1:2:4 on the Stone Masonary Cmt 5084 0 0 0 0 0 0 0.02 101.68
Labour Charges
Note:-
The measurements for Earth work and concreting works have been provision as per the dimensions of the equipments of makes which are in use at
1
present in BESCOM. Detail for the measurement are furnished in the data sheet furnished in Page No. ………..
2 While preparing estimates for turnkey / total turnkey projects please refere to Sl. No. …….. To general guidelines vide a to …. page No. ……. To ……..
3 Revised Cost Data Sheet will be furnished after the rates for CSS, RMU etc. are finalised by the committee.
COST DATA SHEET-33
Providing Compact RMU 11kV Class SF6/VCB Type (1 Incomer +1 Breaker +1 Outgoing)
Labour Charges
Note:-
The measurements for Earth work and concreting works have been provision as per the dimensions of the equipments of makes which are in
1
use at present in BESCOM. Detail for the measurement are furnished in the data sheet furnished in Page No. ………..
While preparing estimates for turnkey / total turnkey projects please refere to Sl. No. …….. To general guidelines vide a to …. page No. …….
2
To ……..
3 Revised Cost Data Sheet will be furnished after the rates for CSS, RMU etc. are finalised by the committee.
COST DATA SHEET-32
Providing Compact RMU 11kV Class SF6/VCB Type (1 Incomer + 2 Breaker + 1 Outgoing)
RMU (3 Way), One Incomer + Two Breakers + One Will be Will be Will be Will be Will be
1 No 1 1 1 1
out going (2OD + 2VL), 350 MVA, 630Amps intimated intimated intimated intimated intimated
Bed Conceting with CC 1:2:4 as per Labour
2 Cmt 5084 0.15 762.6 0.37 1881.08 0.53 2694.52 0.64 3253.76
Charges
Foundation with Reinforcement CC 1:2:4 as per
3 Cmt 5084 0.65 3304.6 1.44 7320.96 0.56 2847.04 0 0
Labour Charges
Providing Reinforcement as per Labour Charges
4 Kgs 60.1 40 2403.2 14 841.12 23 1381.84 0 0
Item No. 28.1
Providing Plinth with CC 1:2:4 on the Stone
5 Cmt 5084 0 0 0 0 0 0 0.08 406.72
Masonary
Labour Charges
Note:-
The measurements for Earth work and concreting works have been provision as per the dimensions of the equipments of makes which are in use at
1
present in BESCOM. Detail for the measurement are furnished in the data sheet furnished in Page No. ………..
2 While preparing estimates for turnkey / total turnkey projects please refere to Sl. No. …….. To general guidelines vide a to …. page No. ……. To ……..
3 Revised Cost Data Sheet will be furnished after the rates for CSS, RMU etc. are finalised by the committee.
COST DATA SHEET-31
Erection of 3 Phase, 11kV/433V, 250 kVA Single Pole Mounted Distribution Transformer on 11.0 Mtr Spun Pole With
3 GOS System
2 Single Pole Transformer Structure Kit for 250kVA Set 1 23035 23035 2033 2033
3 HT Single Top Support with bolts, nuts & washers Sets 9 89 801 64 576
6 Alkathene Tube 19mm Dia and in coils of 30 Mtrs Coils 2 500 1000 0 0
Single
Earthing materials pipe type for grounding as per
Electrode
17 Drawing No. BESCOM/GM/CP/15 & 34/Dt: 3 1277 3831 573 1719
with
24.10.07.
accessories
a) LT Distribution Box for 250kVA with MCCB No 1 16705 16705 455 455
18 iii. PG Clamps - Rabbit to 240 Sqmm Nos 4 307 1228 728 728
iv. Spacers for DTC Wiring Nos 8 38 304
v. Fish Plate with necessary Clamps,bolts & nuts
Nos 2 155 310
etc complete (Galvanised)
c) LT Metering box with CTs and necessary wiring
No 1 5080 5080 514 514
for housing ETV Meter (Please see CDS-42)
d) LT Electronic Tri-Vector Meter 5A, Class-
No 1 2250 2250 631 631
0.5/1.0 accuracy
19 11kV Lightning Arester, Metal Oxide, 9kV, 5kA Set/3 Nos 1 2070 2070 71 71
1 9 Mtr long RCC pole (Square Section) No 1 7210 7210 1060 1060
b) LT Distribution Box for 100kVA with MCB No 1 16705 16705 455 455
14 11kV Solid Core Type HG Fuse Unit Set/3 Nos 1 827 827 423 423
15 11kV, 200Amps, Single Break GOS Nos 1 6951 6951 636 636
Total
Total Cost for Erection of a Single Pole Mounted 100kVA Transformer with
196685
LT Distribution Box in Rs
Total Cost for Erection of a Single Pole Mounted 100kVA Transformer with
183130
LT Protection KIT in Rs
COST DATA SHEET - 29
Erection of 3 Phase, 11kV/433V, 63kVA BEE 3 Star Rated Single Pole Mounted Transformer
Centre on 9 Mtrs RCC Pole (Square Section)
Material cost Labour Cost
Sl.
Materials Unit Qty
No Rate Amt Rate Amt
1 9 Mtr long RCC pole (Square Section) No 1 7210 7210 1060 1060
15 11kV, 200Amps, Single Break GOS Nos 1 6951 6951 636 636
19 Labour Charges
a) Casual 8157
b) Regular 1631
Total cost for Erection of a Single Pole Mounted 63kVA Transformer in Rs 150810
COST DATA SHEET - 28
Erection of 3 Phase, 11kV/433V, 25kVA BEE 3 Star Rated Single Pole Mounted Transformer Centre
on 9 Mtrs RCC Pole (Square Section)
Sl. Material cost Labour Cost
Materials Unit Qty
No
Rate Amt Rate Amt
1 9 Mtr long RCC pole (Square Section) No 1 7210 7210 1060 1060
15 11kV, 200Amps, Single Break GOS Nos 1 6951 6951 636 636
Labour Charges
a) Casual 7952
b) Regular 1590
Total cost for erection of a single pole mounted 25kVA Transformer in Rs 104759
COST DATA SHEET - 27
Erection of 3 Phase, 11kV/433V, 250kVA 3 Star rated Distribution Transformer Centre Using
DPTS
250 KVA
Sl.No Particulars Unit Qty Material cost Labour Cost
Rate Amt Rate Amt
1 Part-A: TRANSFORMER
12 Labour Charges
a) Casual 7597
b) Regular 1519
a) Casual 7301
b) Regular 1460
a) Casual 71
b) Regular 14
a) LT Distribution box for 250kVA with MCCB No 1 16705 16705 455 455
17 iii. PG Clamps - Rabbit to 240 Sqmm Nos 4 307 1228 644 644
18 11kV Solid Core Type HG Fuse Unit Set/ 3 nos 1 827 827 423 423
20 Labour Charges
a) Casual 3303
b) Regular 661
22 Total (A+B+C)
Labour Charges:
a) Casual 10971
b) Regular 2194
Labour Charges:
a) Casual 10675
b) Regular 2135
Note: Provision for actual quantity of additional materials viz 45kN Disc Insulator, 11 kV Pin Insulators ACSR/AAA
Conductor, Transparent Alkathine Tube, PG Clamps and Terminal Connectors etc. Whenever required may be made in
the estimate separately for
While preparing estimates for turnkey / total tunkey projects please refer to Sl. No. ......... of General Guidelines
1
vide a to .... in Page No. ...........
COST DATA SHEET -26
Erection of 3 Phase, 11kV/433 V, 100kVA BEE – 3 Star Rated Distribution Transformer Centre Using
DPTS
100 KVA
1 Part-A: TRANSFORMER
12 Labour Charges
a) Casual 8381
b) Regular 1676
a) Casual 7959
b) Regular 1592
Part-B:
11kV Lightning Arester, Metal Oxide
14 Set of 3 Nos 1 2070 2070 71 71
9kV, 5kA
15 Labour Charges
a) Casual 71
b) Regular 14
b) LT Distribution box for 100 kVA with MCB No 1 16705 16705 455 455
iii. PG Clamps - Rabbit to 120 Sqmm Nos 4 204 816 568 568
18 11kV Solid Core Type HG Fuse Unit Set/3 Nos 1 827 827 423 423
With LT Protection
With Distribution Box
kit
20 Labour Charges
22 Total (A+B+C)
Labour Charges:
Labour Charges:
Note: Provision for actual quantity of additional materials viz 45kN Disc Insulator, 11kV Pin Insulators ACSR/AAA Conductor,
Transparent Alkathine Tube, PG Clamps and Terminal Connectors etc. Whenever required may be made in the estimate
separately for
COST DATA SHEET -25
Erection of 3 Phase, 11kV/433V, 63kVA BEE – 3 Star Rated Distribution Transformer Centre
Using DPTS
63 KVA
Sl
Particulars Unit Qty Material Cost Labour Cost
No
Rate Amt Rate Amt
1 Part-A: TRANSFORMER
Single
Earthing materials pipe type for grounding as per
Electrode
6 Drawing No. BESCOM/GM/CP/15 & 34/ Dt: 3 1277 3831 573 1719
with
24.10.07
accessories
12 Labour Charges
a) Casual 8030
b) Regular 1606
a) Casual 7475
b) Regular 1495
Part-B:
11kV Lightning Arester, Metal Oxide
14 Set of 3 Nos 1 2070 2070 71 71
9kV, 5kA
15 Labour Charges
a) Casual 71
b) Regular 14
18 11kV Solid Core Type HG Fuse Unit Set/ 3 nos 1 827 827 423 423
20 Labour Charges
a) Casual 3182
b) Regular 636
22 Total (A+B+C)
Labour Charges:
a) Casual 11283
b) Regular 2257
Labour Charges:
a) Casual 10728
b) Regular 2146
Note: Provision for actual quantity of additional materials viz 45kN Disc Insulator, 11kV Pin Insulators ACSR/AAA
Conductor, Transparent Alkathine Tube, PG Clamps and Terminal Connectors etc. Whenever required may be made in the
estimate separately for
COST DATA SHEET - 24
Erection of 3 Phase, 11kV/433V, 25kVA BEE – 3 Star Rated Distribution Transformer Centre
Using DPTS
25 KVA
Sl
Particulars Unit Qty Material Cost Labour Cost
No
Rate Amt Rate Amt
1 Part-A: TRANSFORMER
Single
Earthing materials pipe type for grounding as per
Electrode
6 Drawing No. BESCOM/GM/CP/15 & 34/ Dt: 3 1277 3831 573 1719
with
24.10.07
accessories
Caution/Danger Board as per Drawing No.
7 No 1 120 120 48 48
BESCOM/GM/CP/40/ Dt: 24.10.07
Anti Climbing Device (12mtrs/1Kg GI Barbed
8 Kgs 2 64 128 25 50
Wire) Lumpsum
12 Labour Charges
a) Casual 8030
b) Regular 1606
a) Casual 7475
b) Regular 1495
Part-B:
11kV Lightning Arester, Metal oxide,
14 Set of 3 Nos 1 2070 2070 71 71
9kV, 5kA
15 Labour Charges
a) Casual 71
b) Regular 14
20 Labour Charges
a) Casual 2977
b) Regular 595
22 Total (A+B+C)
Labour Charges:
a) Casual 11078
b) Regular 2216
Labour Charges:
a) Casual 10523
b) Regular 2105
Note: Provision for actual quantity of additional materials viz 45kN Disc Insulator, 11kV Pin Insulators ACSR/AAA
Conductor, Transparent Alkathine Tube, PG Clamps and Terminal Connectors etc. Whenever required may be made in the
estimate separately for
COST DATA SHEET -60
SL.
Paritculars Unit Qty Material cost Labour Cost
No
3 Guy Set With No.15 Strain Insulator Complete Sets 3 742 2226 354 1062
10 Labour Charges
a) Casual 7671
b) Regular 1534
Note:
1) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
COST DATA SHEET -59
Providing 2 Pole Structrues at the Tapping Point Using 9Mtrs PSCC Poles of 300.Kg WL
SL.
Paritculars Unit Qty Material cost Labour Cost
No
1 DP Structure using 9 Mtrs PSCC Poles of 300Kg WL Set 1 13184 13184 3252 3252
Labour Charges
a) Casual 5488
b) Regular 1098
Note: 1) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
COST DATA SHEET - 58
Running Single Circuit 11 kV, 3-phase Power Line on 9.0 Mtr Supports Using RABBIT ACSR Conductorand using PSCC poles
of 300 Kg WL for dead ends and Anchor Points, With an Average Span of 40 Mtrs in Vertical Configuration in Congested Areas
3 DP Structure using 9 Mtrs RCC poles Set 1 13184 13184 3252 3252
10 EG Stirrups with GI wire lacing Set of 2 No's 370 424 156880 99 36630
11 Concreting Materials for guy sets (Without Cement) Nos 9 158 1422 0 0
13 Labour charges
a) Casual 85797
b) Regular 17159
1) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
COST DATA SHEET - 57
Running LT, 3-Phase 5 Wire Power Line with Continuous Earth Wire on 9.0 Mtr Supports Using RABBIT ACSR for Phase and
Neutral, and WEASEL Conductor for Street Light and 8 SWG GI Wire for Continuous Earth Wire with an Average Span of 40 Mtrs in
Vertical Configuration and using PSCC poles of 300 Kg WL for dead ends and Anchor Points
2 PSC Pole -9 Mtrs Long, 200 kg WL (for Intermediate Poles) Nos 19 3401 64619 1060 20140
1.015
9 No.8 SWG GI wire for continuous earth wire Kms 54.674 5631 1913 1942
(103 kgs)
12 Concreting Materials for guy sets (Without Cement) Nos 8 140 1120 0 0
15 PVC Insulated wire 25 Sqmm Single Core Multi Stranded Mtrs 25 32 800 0 0
17 Labour charges
a) Casual 56395
b) Regular 11279
Note:
1) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
COST DATA SHEET - 56
Running LT, 3-Phase 5 Wire for Power Line on 9.0 Mtr Supports Using RABBIT ACSR Conductor for Phase and Neutral, and
WEASEL Conductor or Street Light with an Average Span of 40 Mtrs and using PSCC poles of 300 Kg WL for dead ends and
Anchor Points (For Cities, Towns and Residential Layouts)
13 Concreting Materials for guy sets (without Cement) No's 8 158 1264 0 0
18 Labour charges
a) Casual 50319
b) Regular 10064
Note:
1) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
COST DATA SHEET - 55
Running LT, 3-Phase 4 Wire Power Line on 9.0 Mtr Supports Using RABBIT ACSR Conductor with an
Average Span of 40 Mtrs and using PSCC poles of 300 Kg WL for dead ends and DP structure
1 PSCC Pole - 9 Mtrs Long, 300 kg WL Nos 1 4578 4578 1060 1060
2 PSC Pole - 9 Mtrs Long, 200 kg WL Nos 24 3401 81624 1060 25440
10 Concreting materials for guy sets without cement Nos 8 158 1264 0 0
12 Labour charges
a) Casual 44320
b) Regular 8864
Note: 1) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
COST DATA SHEET - 54
Running Single Circuit 11 kV, 3-Phase Power Line & 3 Phase 4 Wire Secondary Line on 9.0 Mtr Supports with an Average Span of
40 Mtrs Using RABBIT ACSR conductor for HT & LT Lines and using PSCC poles of 300 Kg WL for dead ends and DP structure
1 PSCC Pole - 9 Mtrs Long, 300 kg WL Nos 1 4578 4578 1060 1060
2 PSC Pole - 9 Mtrs Long, 200 kg WL No's 23 3401 78223 1060 24380
7 DP Structure with 9 Mtrs PSCC Poles of 300Kg WL Set 1 13184 13184 3252 3252
17 Concreting materials for guy sets without cement Nos 8 158 1264 0 0
20 Labour charges
a) Casual 72369
b) Regular 14474
Note: 1) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
COST DATA SHEET - 53
Running Single Circuit 11 kV 3 Phase Power Line and 3 Phase - 4 Wire Secondary Line on 9 Mtr Supports with an Average Span of
50 Mtrs using RABBIT Conductor for HT and WEASEL for LT Lines and using PSCC poles of 300 Kg WL for dead ends and DP
structure
1 PSCC Pole - 9 Mtrs Long, 300 kg WL Nos 1 4578 4578 1060 1060
2 PSC Pole - 9 Mtrs Long, 200 kg WL Nos 18 3401 61218 1060 19080
7 DP Structure with 9 Mtrs PSCC Poles of 300Kg WL Set 1 13184 13184 3252 3252
13 Rabbit ACSR for HT Lines Kms 3.045 33676 102543 2608 7941
14 Weasel ACSR for LT lines Kms 4.06 20100 81606 1913 7767
21 Labour charges
a) casual 59809
b) Regular * 11962
Total Cost/Km in Rs 431356
Note: 1) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
COST DATA SHEET - 52
Running Single Circuit 11 kV, 3-Phase Power Line on 9.0 Mtr Supports with an Average Span of 40 Mtrs Using COYOTE ACSR
conductor and PSCC poles of 300 Kg WL for dead ends and DP structure
1 PSCC Pole - 9 Mtrs Long, 300 kg WL Nos 1 4578 4578 1060 1060
2 PSC Pole - 9 Mtrs Long, 200 kg WL Nos 22 3401 74822 1060 23320
5 DP Structure with 9 Mtrs PSCC Poles of 300Kg WL Sets 2 13184 26368 3252 6504
8 Strain Clamp 3 bolt type for Disc Insulator Nos 12 468 5616 0 0
Set of 2
13 EG Stirrups with GI wire lacing 23 370 8510 99 2277
Nos
14 Concreting materials for guy sets without cement Nos 6 158 948 0 0
17 Labour charges
a) Casual 54072
b) Regular 10814
Note: 1) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
COST DATA SHEET - 51
Running Single Circuit 11 kV, 3-Phase Power Line on 9.0 Mtr Supports with an Average Span of 50 Mtrs Using Rabbit ACSR
Conductor and PSCC poles of 300 Kg WL for dead ends and DP structure
1 PSCC Pole - 9 Mtrs Long, 300 kg WL Nos 1 4578 4578 1060 1060
2 PSC Pole - 9 Mtrs Long, 200 kg WL Nos 18 3401 61218 1060 19080
5 DP Structure with 9 Mtrs PSCC Poles of 300Kg WL Set 1 13184 13184 3252 3252
Set of
12 EG Stirrups with GI wire lacing 19 370 7030 99 1881
2 Nos
13 Concreting materials for guy sets without cement Nos 6 158 948 0 0
16 Labour charges
a) Casual 39283
b) Regular 7857
Note 1) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
COST DATA SHEET -50
Running Single Circuit 11kV, 3 Phase Power Line On 9.0 Mtr Supports With An Average Span Of 40 Mtrs Using Rabbit ACSR
Conductor and PSCC poles of 300 Kg WL for dead ends and DP structure
1 PSCC Pole - 9 Mtrs Long, 300 kg WL Nos 1 4578 4578 1060 1060
2 PSC Pole - 9 Mtrs Long, 200 kg WL Nos 23 3401 78223 1060 24380
5 DP Structure with 9 Mtrs PSCC Poles of 300Kg WL Set 1 13184 13184 3252 3252
Set of 2
12 EG Stirrups with GI wire lacing 24 370 8880 99 2376
Nos
13 Concreting materials for guy sets without cement Nos 6 158 948 0 0
16 Labour charges
a) Casual 45973
b) Regular 9195
Note: 1) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
COST DATA SHEET - 69
Running Single Circuit 1.1 kV 3 Phase 5 Wire Power Line on 9 Mtr Supports with Average Span of 40 Mtrs Using
3x95 + 1x16 + 1x70 Sqmm Aerial Bunched Cables (ABC) using 9mtr PSCC pole of 300kg WL for Dead Ends and
Anchor Points
1 PSCC Poles 9 Mtr long with 300 Kg WL Nos 10 4578 45780 1060 10600
2 PSC Poles 9 Mtr long with 200 Kg WL Nos 15 3401 51015 1060 15900
4 Three Phase Distribution box for 6 Connections Nos 20 2065 41300 538 10760
8 Pole clamp for HT/LT AB cable Sets 20 100 2000 192 3840
18 Labour Charges
a) Casual 81519
b) Regular 16304
While preparing estimates for turnkey / total turnkey projects please refere to Sl. No. …….. To general
1
guidelines vide a to …. page No. ……. To ……..
COST DATA SHEET - 68
Running Single Circuit 11kV, 3 Phase Power Line on 9 Mtr Supports with an Average Span of 30 Mtrs Using 3x95
Sqmm + 1x70 Sqmm Aerial Bunched Cables (ABC) using 9mtr PSCC pole of 300kg WL for Dead Ends and Anchor
Points
1 PSCC Poles 9 Mtr long with 300 Kg WL Nos 10 4578 45780 1060 10600
2 PSC Poles 9 Mtr long with 200 Kg WL Nos 24 3401 81624 1060 25440
Pole clamp for HT/LT AB cable Sets 30 100 3000 192 5760
16 Labour Charges
a) Casual 80892.4
b) Regular 16178.5
While preparing estimates for turnkey / total turnkey projects please refere to Sl. No. …….. To general
guidelines vide a to …. page No. ……. To ……..
COST DATA SHEET - 67
Erection of 3 Phase, 11kV/433V, 100kVA BEE 3 Star Rated Single Pole Mounted Transformer
Centre on 9 Mtrs PSCC Pole 300kg WL
Sl. Material cost Labour Cost
Materials Unit Qty
No Rate Amt Rate Amt
b) LT Distribution Box for 100kVA with MCB No 1 16705 16705 455 455
14 11kV Solid Core Type HG Fuse Unit Set/3 Nos 1 827 827 423 423
15 11kV, 200Amps, Single Break GOS Nos 1 6951 6951 636 636
Total
Total Cost for Erection of a Single Pole Mounted 100kVA Transformer with
193336
LT Distribution Box in Rs
Total Cost for Erection of a Single Pole Mounted 100kVA Transformer with
179781
LT Protection KIT in Rs
COST DATA SHEET - 66
Erection of 3 Phase, 11kV/433V, 63kVA BEE 3 Star Rated Single Pole Mounted Transformer
Centre on 9 Mtrs PSCC Pole 300kg WL
Material cost Labour Cost
Sl.
Materials Unit Qty
No Rate Amt Rate Amt
15 11kV, 200Amps, Single Break GOS Nos 1 6951 6951 636 636
19 Labour Charges
a) Casual 8157
b) Regular 1631
Total cost for Erection of a Single Pole Mounted 63kVA Transformer in Rs 147461
COST DATA SHEET - 65
Erection of 3 Phase, 11kV/433V, 25kVA BEE 3 Star Rated Single Pole Mounted Transformer Centre
on 9 Mtrs PSCC Pole 300kg WL
Sl. Material cost Labour Cost
Materials Unit Qty
No
Rate Amt Rate Amt
15 11kV, 200Amps, Single Break GOS Nos 1 6951 6951 636 636
Labour Charges
a) Casual 7952
b) Regular 1590
Total cost for erection of a single pole mounted 25kVA Transformer in Rs 101410
COST DATA SHEET - 64
Erection of 3 Phase, 11kV/433V, 250kVA BEE – 3 Star Rated Distribution Transformer Centre Using
DPTS With 9 Mtrs PSCC Pole 300Kg WL
250 KVA
Sl.No Particulars Unit Qty Material cost Labour Cost
Rate Amt Rate Amt
1 Part-A: TRANSFORMER
12 Labour Charges
a) Casual 7597
b) Regular 1519
a) Casual 7301
b) Regular 1460
a) Casual 71
b) Regular 14
a) LT Distribution box for 250kVA with MCCB No 1 16705 16705 455 455
17 iii. PG Clamps - Rabbit to 240 Sqmm Nos 4 307 1228 644 644
18 11kV Solid Core Type HG Fuse Unit Set/ 3 nos 1 827 827 423 423
20 Labour Charges
a) Casual 3303
b) Regular 661
22 Total (A+B+C)
Labour Charges:
a) Casual 10971
b) Regular 2194
Will be
Total using 8 mtr PSC Poles 200kg WL
intimated
Labour Charges:
a) Casual 10675
b) Regular 2135
Note: Provision for actual quantity of additional materials viz 45kN Disc Insulator, 11 kV Pin Insulators ACSR/AAA Conductor,
Transparent Alkathine Tube, PG Clamps and Terminal Connectors etc. Whenever required may be made in the estimate
separately for
While preparing estimates for turnkey / total tunkey projects please refer to Sl. No. ......... of General Guidelines vide a
1
to .... in Page No. ...........
COST DATA SHEET -63
Erection of 3 Phase, 11kV/433V, 100kVA BEE – 3 Star Rated Distribution Transformer Centre Using
DPTS With 9 Mtrs PSCC Pole 300Kg WL
100 KVA
a) Casual 8381
b) Regular 1676
a) Casual 7959
b) Regular 1592
a) Casual 71
b) Regular 14
b) LT Distribution box for 100 kVA with MCB No 1 16705 16705 455 455
iii. PG Clamps - Rabbit to 120 Sqmm Nos 4 204 816 568 568
18 11kV Solid Core Type HG Fuse Unit Set/3 Nos 1 827 827 423 423
With LT Protection
With Distribution Box
kit
20 Labour Charges
22 Total (A+B+C)
Labour Charges:
Note: Provision for actual quantity of additional materials viz 45kN Disc Insulator, 11kV Pin Insulators ACSR/AAA Conductor,
Transparent Alkathine Tube, PG Clamps and Terminal Connectors etc. Whenever required may be made in the estimate
separately for
COST DATA SHEET -62
Erection of 3 Phase, 11kV/433V, 63kVA BEE – 3 Star Rated Distribution Transformer Centre Using
DPTS With 9 Mtrs PSCC Pole 300Kg WL
63 KVA
Sl
Particulars Unit Qty Material Cost Labour Cost
No
Rate Amt Rate Amt
1 Part-A: TRANSFORMER
Single
Earthing materials pipe type for grounding as per
Electrode
6 Drawing No. BESCOM/GM/CP/15 & 34/ Dt: 3 1277 3831 573 1719
with
24.10.07
accessories
Caution/Danger Board as per Drawing No.
7 No 1 120 120 48 48
BESCOM/GM/CP/40/ Dt: 24.10.07
Anti Climbing Device (12mtrs/1Kg GI Barbed
8 Kgs 2 64 128 25 50
Wire) Lumpsum
a) Casual 8030
b) Regular 1606
a) Casual 7475
b) Regular 1495
b) Regular 14
18 11kV Solid Core Type HG Fuse Unit Set/ 3 nos 1 827 827 423 423
20 Labour Charges
a) Casual 3182
b) Regular 636
22 Total (A+B+C)
Labour Charges:
a) Casual 11283
b) Regular 2257
Will be
Total using 8 mtr PSC Poles 200kg WL
intimated
Labour Charges:
a) Casual 10728
b) Regular 2146
Note: Provision for actual quantity of additional materials viz 45kN Disc Insulator, 11kV Pin Insulators ACSR/AAA Conductor,
Transparent Alkathine Tube, PG Clamps and Terminal Connectors etc. Whenever required may be made in the estimate
separately for
COST DATA SHEET - 61
Erection of 3 Phase, 11kV/433V, 25kVA BEE – 3 Star Rated Distribution Transformer Centre Using
DPTS With 9 Mtrs PSCC Pole 300Kg WL
25 KVA
Sl
Particulars Unit Qty Material Cost Labour Cost
No
Rate Amt Rate Amt
1 Part-A: TRANSFORMER
will be
Total using 8 mtr PSC Poles 200kg WL 7475
intimated
12 Labour Charges
a) Casual 8030
b) Regular 1606
a) Casual 7475
b) Regular 1495
a) Casual 71
b) Regular 14
20 Labour Charges
a) Casual 2977
b) Regular 595
22 Total (A+B+C)
Labour Charges:
a) Casual 11078
b) Regular 2216
will be
Total using 8 mtr PSC Poles 200kg WL
intimated
Labour Charges:
a) Casual 10523
b) Regular 2105
Note: Provision for actual quantity of additional materials viz 45kN Disc Insulator, 11kV Pin Insulators ACSR/AAA Conductor,
Transparent Alkathine Tube, PG Clamps and Terminal Connectors etc. Whenever required may be made in the estimate
separately for
Schedule of Rate for Standard Stock Materials Common
SR 2016-17 (11kV System)
Common SR Common SR
2014-15 2016-17
Sl Item Material in Rs FORD in Rs FORD
Name of the Material UoM
No No Code Rates inclusive Rates inclusive
of duties of duties
taxes & F&I taxes & F&I
2 1.02 RCC Pole - 9 Mtr Long, 150 Kg WL Sq Section 200106 No 7210 7210
11 1.11 9 Mtr PSCC Pole with working load of 300Kg 4578 4578
17 2.02 11kV Horizontal X Arms - Galvanised Iron (GI) 280020 No 359 315
67 5.15 Anchor Rod using 12mm rounds/Guy Rod - MS 279140 No 191 162
68 5.16 Anchor Rod using 12mm rounds/Guy Rod - GI 280140 No 244 215
69 5.17 RCC pole type C clamp for GOS Operating Handle 279524 No 61 53
148 13.14 500kVA, BEE 3 star rated No New Item Will be intimated
Special Design Transformer 354.2kVA for
149 13.15 Niranthara Jyothi Works (11KV AUTO 321400 No 171030 Deleted
Transformer)
B. CABLE ENTRY TYPE
150 13.16 25kVA, Aluminum Wdg, BEE 3 Star Rated 321441 No 71455 78455
151 13.17 25kVA, Aluminum Wdg, BEE 4 Star Rated 61969
152 13.18 63kVA, Aluminum Wdg, BEE 3 Star Rated 321442 No 117635 125635
153 13.19 63kVA, Aluminum Wdg, BEE 4 Star Rated 102757
154 13.20 100kVA, Aluminium Wdg, BEE 3 Star Rated 321443 No 156408 166408
155 13.21 100kVA, Aluminium Wdg, BEE 4 Star Rated 135856
156 13.22 250kVA, Aluminum Wdg 321444 No 249696 236700
157 13.23 500kVA, Aluminum Wdg 321445 No 391532 371150
27 SPMT Materials
Single Pole Mounted Transformer kit for 25/63
213 27.01 279115 Set 4703 4088
kVA on 9 mtr RCC Poles (Square Section) - MS
244 34.03 Low Voltage Link Box - 2 Way 300315 No Will be intimated
335 46.02 One Breaker (VL) Panel with Al Busbar 302316 No 320445
3 Way RMU, 2OD + 1VL (One Incomer + One
336 46.03 Breakers + One Outgoing), 350MVA, 800Amps 302320 Set 983160
with Cu Busbar
3 Way RMU, 2OD + 1VL (One Incomer + One
337 46.04 Breakers + One Outgoing), 350MVA, 800Amps 302321 Set 943860
with Al Busbar Will be intimated
3 Way RMU, 2OD + 1VL (One Incomer + One
338 46.05 Breakers + One Outgoing), 250MVA, 400Amps, 302325 Set 908480
VCB Type with Cu Busbar
3 Way RMU, 2OD + 1VL (One Incomer + One
339 46.06 Breakers + One Outgoing), 250MVA, 400Amps, 302326 Set 876297
VCB Type with Al Busbar
Retrofitting of MEI make oil switch type OD with
340 46.07 302470 No 171590
VCB
359 48.04 11KV Fault Passage Indicator for Overhead Line 302580 No 14810 14810
393 53.18 Universal Hook and Bolts & Nuts 284284 No 305 305
Dead End Clamp/Anchor Clamp Assembly 25 to
394 53.19 95 Sqmm Bare Messenger(Exclusive of pole clamp 284825 No 152 131
and eye hook)
Dead End Clamp/Anchor Clamp Assembly 16 to
395 53.20 70 Sqmm Bare Messenger(Exclusive of pole clamp New Item 200
and eye hook)
Dead End Clamp/Anchor Clamp Assembly 70 to
396 53.21 210 Sqmm Bare Messenger(Exclusive of pole New Item 300
clamp and eye hook)
414 53.39 Pole Clamp for HT/LT AB cables New Item 100
415 53.40 Eye Hook (Flat Type) for fixing clamps New Item 90
11kV Jointing and Cable Termination
54
Kits
Heat Shrinkable Type Transition Jointing
Kit for XLPE Cable
416 54.01 3x95 Sqmm 288312 Set 8815 8815
417 54.02 3x240 Sqmm 288314 Set 10894 10894
418 54.03 3x400 Sqmm 288315 Set 11095 11095
Heat Shrinkable Indoor Type Cable
Termination Kit for XLPE Cable
419 54.04 3x95 Sqmm 288332 Set 2753 2753
420 54.05 3x240 Sqmm 288334 Set 3450 3450
421 54.06 3x400 Sqmm 288336 Set 3540 3540
Heat Shrinkable Outdoor Type Cable
Termination Kit for XLPE Cable
422 54.07 3x95 Sqmm 288302 Set 2990 2990
423 54.08 3x240 Sqmm 288304 Set 3910 3910
424 54.09 3x400 Sqmm 288305 Set 3940 3940
Heat Shrinkable Indoor Type Cable
Termination Kit for PILC Cable
425 54.10 3x95 Sqmm 288462 Set 2307 2307
426 54.11 3x240 Sqmm 288464 Set 2478 2478
427 54.12 3x400 Sqmm 288465 Set 2530 2530
Heat Shrinkable Outdoor Type Cable
Termination Kit for PILC Cable
428 54.13 3x95 Sqmm 288456 Set 2924 2924
429 54.14 3x240 Sqmm 288458 Set 3669 3669
430 54.15 3x400 Sqmm 288460 Set 3685 3685
Heat Shrinkable Straight Through Jointing
Kits for XLPE Cable with Copper Lugs & Al
Ferrules
431 54.16 3x95 Sqmm 288322 Set 5375 5375
432 54.17 3x240 Sqmm 288324 Set 6555 6555
433 54.18 3x400 Sqmm 288329 Set 8050 8050
Heat Shrinkable Straight Through Jointing
Kits for PILC Cable with Copper Lugs & Al
Ferrules
434 54.19 3x95 Sqmm 288450 Set 5734 5734
435 54.20 3x240 Sqmm 288452 Set 6479 6479
436 54.21 3x400 Sqmm 288453 Set 7827 7827
55 Service Connection Accessories
Pole Mounted Fibre Glass Reinforced Aerial Fuse
437 55.01 612614 No 1022 1022
Board 60Amps - 3 Way
Pole Mounted Fibre Glass Reinforced Aerial Fuse
438 55.02 612615 No 730 730
Board 30Amps - 3 Way
439 55.03 FGRP Aerial Fuse Boards 30Amps - 4 Way 612617 No 952 952
440 55.04 FGRP Aerial Fuse Boards 30Amps - 5 Way 612618 No 1077 1077
441 55.05 FGRP Aerial Fuse Boards 30Amps - 6 Way 612616 No 1180 1180
56 LT Service Connector
442 56.01 For Weasel 288502 No 33 28
443 56.02 For Rabbit 288503 No 33 28
57 PVC Pipes
A. Pipes
444 57.01 PVC Pipe - 20 mm Dia 778020 Mtr 21 21
445 57.02 PVC Pipe - 25 mm Dia 778025 Mtr 27 27
446 57.03 PVC Pipe - 32 mm Dia 778032 Mtr 45 45
447 57.04 PVC Pipe - 40 mm Dia 778040 Mtr 50 50
448 57.05 PVC Pipe - 50 mm Dia 778050 Mtr 56 56
449 57.06 PVC Pipe - 63 mm Dia 778063 Mtr 74 74
450 57.07 PVC Pipe - 75 mm Dia 778075 Mtr 88 88
451 57.08 PVC Pipe - 80 mm Dia 778080 Mtr 123 123
452 57.09 PVC Pipe - 100 mm Dia 778100 Mtr 140 140
453 57.10 PVC Pipe - 150 mm Dia 778105 Mtr 291 291
454 57.11 PVC Pipe - 200 mm Dia 778110 Mtr 440 440
B. Bends
455 57.12 PVC Bend - 20 mm Dia 778000 No 7 7
456 57.13 PVC Bend - 25 mm Dia 778001 No 10 10
457 57.14 PVC Bend - 32 mm Dia 778002 No 22 22
458 57.15 PVC Bend - 40 mm Dia 778003 No 35 35
459 57.16 PVC Bend - 50 mm Dia 778004 No 54 54
460 57.17 PVC Bend - 63 mm Dia 778005 No 65 65
461 57.18 PVC Bend - 75 mm Dia 778006 No 71 71
462 57.19 PVC Bend - 80 mm Dia 778007 No 100 100
463 57.20 PVC Bend - 100 mm Dia 778008 No 151 151
464 57.21 PVC Bend - 150 mm Dia 778009 No 200 200
465 57.22 PVC Bend - 200 mm Dia 778010 No 254 254
58 GI Pipes B - Class
466 58.01 GI Pipe - 20 mm Dia 768040 Mtr 110 110
467 58.02 GI Pipe - 25 mm Dia 768042 Mtr 155 155
468 58.03 GI Pipe - 32 mm Dia 768043 Mtr 209 209
469 58.04 GI Pipe - 40 mm Dia 768044 Mtr 220 220
470 58.05 GI Pipe - 50 mm Dia 768046 Mtr 286 286
471 58.06 GI Pipe - 63 mm Dia 768047 Mtr 310 310
472 58.07 GI Pipe - 65 mm Dia 768048 Mtr 409 409
473 58.08 GI Pipe - 100 mm Dia 768052 Mtr 1143 1143
474 58.09 GI Pipe - 150 mm Dia 768058 Mtr 1144 1144
PVC Insulated & Sheathed Aluminium
59 Wires, Single Core Multistrand 1.1 kV
Class
100
475 59.01 PVC Wire - 2.5 Sqmm 289022 863 880
Mtr
100
476 59.02 PVC Wire - 4 Sqmm 289023 1045 1065
Mtr
100
477 59.03 PVC Wire - 6 Sqmm 289024 1264 1288
Mtr
100
478 59.04 PVC Wire - 10 Sqmm 289025 1713 1747
Mtr
PVC Insulated & Un-Sheathed
60 Aluminium Wires, Single Core
Multistrand 1.1 kV class
100
479 60.01 PVC Wire - 16 Sqmm 289026 2306 2352
Mtr
100
480 60.02 PVC Wire - 25 Sqmm 289027 3182 3246
Mtr
100
481 60.03 PVC Wire - 35 Sqmm 289028 3552 3624
Mtr
100
482 60.04 PVC Wire - 50 Sqmm 289029 4364 4451
Mtr
100
483 60.05 PVC Wire - 70 Sqmm 289030 6548 6680
Mtr
100
484 60.06 PVC Wire - 95 Sqmm 289031 8059 8200
Mtr
100
485 60.07 PVC Wire - 120 Sqmm 289032 10558 10753
Mtr
100
486 60.08 PVC Wire - 150 Sqmm 289033 12981 13240
Mtr
100
487 60.09 PVC Wire - 185 Sqmm 289034 14978 15277
Mtr
488 60.10 PVC Wire - 240 Sqmm 289036 Coil 19424 19945
61 Fuse Wires
489 61.01 Tinned Copper Fuse Wire, 5A 625020 Kg 780 700
490 61.02 Tinned Copper Fuse Wire, 10A 625230 Kg 780 700
491 61.03 Tinned Copper Fuse Wire, 20A 625250 Kg 780 700
492 61.04 Tinned Copper Fuse Wire, 100A 625075 Kg 780 700
62 Porcelain cut outs (500 Volts)
493 62.01 15/16A 300003 No 38 38
494 62.02 30/32A 300005 No 53 53
495 62.03 60/63A 300007 No 158 158
496 62.04 100A 300010 No 283 283
497 62.05 200A 300020 No 450 450
498 64.06 300A 300030 No 825 825
Grounding Materials for RMUs &
65
Transformers
Pipe Grounding
GI Grounding pipe, B - Class, 40mm dia, 2.5mtrs
499 65.01 long, 2.9mm thick with bolts nuts, GI Strips and 281674 No 605 527
washers complete
GI Grounding pipe, B - Class, 40mm dia, 2.5mtrs
500 65.02 long, 3.2mm thick with bolts nuts, GI Strips and No New Item Will be Intimated
washers complete
Good Quality well burnt Charcoal for grounding
501 65.03 purposes packed in non returnable gunny bags of 600095 No 450 450
30kg each
Good Quality Salt for grounding purposes packed
502 65.04 607054 Bag 300 300
in 50kg gunny bags
Rod Earthing
Rod type of earthing using 40mm dia, 3mtr long
MS rod as ground rod, in earth pit of 300mm
width and 3300mm depth and using 50x6mm flat
503 65.04 281685 No 2000 2000
welded to ground rod as terminal & connected to
equipment ground terminal using pvc Al wire as
specified
50 kg
504 65.05 Bentonite clay slurry for earthing in 50 kg bags 607220 400 400
Bag
66 Alkathine tube
Transparent Alkathine tube 19mm dia, 2mm
505 66.01 821900 Coil 500 500
thick in coils of 30 mtrs
67 Measuring Equipments
High precision Single phase Electromechanical
506 67.01 meters with magnetic suspension 2.5 - 10A, Class- 357001 No Deleted Deleted
2 accuracy
High precision 3 phase Electromechanical meters
507 67.02 with magnetic suspension 5-20A, Class-2 357021 No Deleted Deleted
accuracy
LT Electronic Tri - Vector Meter 5A, Class-0.5/1.0
508 67.03 357511 No Deleted Deleted
accuracy
LT Electronic Tri - Vector Meter 5A, Class-0.5
509 67.04 357510 No 3000 2250
accuracy
HT Electronic Tri - Vector Meter 5A, Class-0.5
510 67.05 357512 No 3463 2600
accuracy
HT Electronic Tri - Vector Meter 5A, Class-0.2
511 67.06 357500 No 15750 11658
accuracy with ABT features
Electronic Meter, 5-10A/5-20A, SPh Class-1
512 67.07 357003 No Deleted Deleted
Accuracy
LT Single phase 5-30A, DLMS complaint static
513 67.08 357006 No 905 733
energy meter, class-1.0 Accuracy
Electronic Meter, 2.5-10A/5-20A, 3 Ph Class-1
514 67.09 357205 No Deleted Deleted
Accuracy
LT AC Three Phase 4 wire, 5-30A Static whole
515 67.10 unidirectional complaint energy meter, Class – 1.0 357531 No 2499 2450
Accuracy
516 67.11 Electronic Meter, 10-40A, 3 Ph Class-1 Accuracy 357201 No Deleted Deleted
532 68.06 SMC Meter protection box 358005 No 480 will be intimated
643 77.22 Portable Inflatable Emergency Lighting System 427435 No 1898135 deleted
644 77.23 Insulated cutting pilers 12 inches size 425040 No 200 200
645 77.24 Insulated cutting pilers 8 inches size 425041 No 152 152
646 77.25 Live Line Tester (HT) 440000 No 70 70
647 77.26 LT Line Tester 440005 No 38 38
648 77.27 High Voltage Detector 440008 No 15863 15863
649 77.28 Screw driver 18 Inches Size 425522 No 80 80
650 77.29 Screw driver 12 Inches Size 425521 No 69 69
651 77.30 Screw driver 8 Inches Size 425518 No 72 72
652 77.31 Hammer 8 Lbs 418141 No 200 200
653 77.32 Hammer 2 Lbs 418100 No 150 150
654 77.33 Allen Keys 424260 No 192 192
655 77.34 Adjustabale Screw Spanner 8 Inches 424364 No 142 142
656 77.35 Adjustabale Screw Spanner 12 Inches 424365 No 227 227
657 77.36 Box Spanners 424120 Set 2000 2000
658 77.37 Transil Oil Dielectric Breakdown Test Kit 440060 No 63000 63000
659 77.38 SF6 Gas Leak Detector 440830 No 31539 31539
660 77.39 DC Volt Meter Range - 3V to +5V 359180 No 450 450
661 77.40 Hydrometer syrings suitable for vent holes 422811 No 150 150
662 77.41 Specific Gravity Correction Chart 620172 No 150 150
663 77.42 Wall Mounting Type Holder for Hydrometer 430311 No 100 100
664 77.43 Earth Resistance Tester 359481 No 5400 5400
665 77.44 Rubber Appron 427341 No 185 185
666 77.45 Pippette 430140 No 350 350
667 77.46 Protective Goggle 427330 No 350 350
668 77.47 Acid Resisting jars (4 Pint capacity) 429814 No 375 375
669 77.48 Rain Coats with Hoods 427300 No 439 439
670 77.49 Rubber Shoes Knee Height 427360 No 504 504
671 77.50 Glass Funnel 430200 No 105 105
672 77.51 Hickery Rods 427120 No 957 957
Mtr
673 77.52 Manilla Rope 1" 406226 2200 2200
(100)
Mtr
674 77.53 Manilla Rope 3/4" 406220 1800 1800
(100)
675 77.54 Polypropyline Rope of 26mm dia 406351 Kg 211 211
676 77.55 Files of sizes 426000 Set 250 250
677 77.56 Safety Belts 427320 No 610 610
678 77.57 Safety Belts with Accessories Set New Item
679 77.58 Safety Helmets 427310 No 112 112
Electrical Safety (FRP) Helmets attached with
680 77.59 427311 811 811
electronic induction tester (FRP)
Hand Operated Crimping tool 25 Sqmm to 400
681 77.60 425320 No 7870 7870
Sqmm
682 77.61 Common Meter Reading Instrument 358361 No 25925 25925
683 77.62 Thermal Imaging Camera 440661 No 357000 357000
Hydraulic Crimping Tool with suitable Dies for
684 77.63 425360 Set 9500 9500
crimping lugs of size upto 400Sqmm
685 77.64 Hi Visibility Reflective Jackets 407301 No 672 672
686 77.65 Hi Visibility Reflective Rain Wear 407302 No 2939
Protective Eye Wear for Safety with integral hands
687 77.66 407303 No 847
free LED Lighting
688 77.67 Leather Shoes 407304 Pair 933 Will be intimated
689 77.68 Socks 407305 Pair 90
690 77.69 Safety shoes with socks Pair New Item
691 77.70 Waist Leather Belt 407306 No 469
Chain saw (Motorised), extremely robust and long
lasting chain saw. Highly suitably for cutting
692 77.71 414371 Set 24793 24793
firewood, thinning shrubs and bushes and
shaping trees.
693 77.72 FRP wall extension ladder 427075 Set New Item
694 77.73 Search Lights (Hand Held & Fixable to Vehicle) 427440 No Will be Intimated Will be Intimated
695 77.74 LDPE Safety Cone with ESCOMs Logo 407370 No Will be Intimated Will be Intimated
HM HDPE Flexible Poly Film Barricade Tape of 50
696 77.75 Microns with ESCOMs Logo, Caution, Danger & 407375 Mtr Will be Intimated Will be Intimated
Men At Work
697 77.76 Men at work Sign Board 407380 No Will be Intimated Will be Intimated
699 77.78 Helmet with Miner Light 427312 No Will be Intimated Will be Intimated
700 77.79 Foldable Insulated Fibre Ladder 427076 No Will be Intimated Will be Intimated
712 78.10 Pre - cast hollow blocks (40x20x20 cms) grade 30 802007 No 26 38
729 78.27 Cotton Tapes 19 mm wide and in rolls of 50 Mtrs 622124 Roll 35 35
760 79.25 Street light metering box made of MS sheet steel 358012 No 1913 1913
761 79.26 Street light metering box made of SMC 1700 1700
80 Compact Fluorescent Lamps
762 80.01 5 Watts 611545 No 100 100
763 80.02 8 Watts 611548 No 104 104
764 80.03 11 Watts 611551 No 120 120
765 80.04 14 Watts 611554 No 116 116
766 80.05 18 Watts 611558 No 148 148
767 80.06 23 Watts 611563 No 168 168
81 Bolts & Nuts
MS
768 81.01 B & N Size 16x40mm 733612 MT 74102 63000
769 81.02 B & N Size 16x50mm 733613 MT 74102 63000
770 81.03 B & N Size 16x65mm 733616 MT 74102 63000
771 81.04 B & N Size 16x75mm 733618 MT 74102 63000
772 81.05 B & N Size 16x85mm 733620 MT 74102 63000
773 81.06 B & N Size 16x100mm 733623 MT 74102 63000
774 81.07 B & N Size 16x125mm 733625 MT 74102 63000
775 81.08 B & N Size 16x150mm 733628 MT 74102 63000
776 81.09 B & N Size 16x175mm 733630 MT 74102 63000
777 81.10 B & N Size 16x200mm 733633 MT 74102 63000
778 81.11 B & N Size 16x225mm 733634 MT 74102 63000
GI
779 81.12 B & N Size 16x40mm 280612 MT 90102 85000
780 81.13 B & N Size 16x50mm 280613 MT 90102 85000
781 81.14 B & N Size 16x65mm 280616 MT 90102 85000
782 81.15 B & N Size 16x75mm 280618 MT 90102 85000
783 81.16 B & N Size 16x85mm 280620 MT 90102 85000
784 81.17 B & N Size 16x100mm 280623 MT 90102 85000
785 81.18 B & N Size 16x125mm 280625 MT 90102 85000
786 81.19 B & N Size 16x150mm 280628 MT 90102 85000
787 81.20 B & N Size 16x175mm 280630 MT 90102 85000
788 81.21 B & N Size 16x200mm 280633 MT 90102 85000
789 81.22 B & N Size 16x225mm 280634 MT 90102 85000
LT Brass Terminal Connector for
82 Transformer (630 Amps, Aprrox.
Weight 0.790kg)
780 82.01 250 kVA 542180 No 822 822
781 82.02 500 kVA 542185 No 822 822
83 Brass Cable Glands
782 83.01 25mm 542190 No 62 62
783 83.02 32mm 542192 No 75 75
784 83.03 40mm 542194 No 117 117
785 83.04 45mm 542196 No 156 156
LT Capacitor 3 Ph Housed in a encloser
with necessary fusses, wiring,
84
mounting arrangement as per tech
Spec
786 84.01 3 kVAr 333103 Set 525 725
787 84.02 9 kVAr 333109 Set 931 1131
788 84.03 18 kVAr 333118 Set 1733 1933
789 84.04 27 kVAr 333127 Set 2758 2958
790 84.05 54 kVAr 333154 Set 4883 5083
815 87.01 With 100 kVA Oil Cooled Transformer 276530 No 1132904
816 87.02 With 250 kVA Oil Cooled Transformer 276540 No 1491923
817 87.03 With 500 kVA Oil Cooled Transformer 276550 No 2009325
818 87.04 With 750 kVA Oil Cooled Transformer 276575 No 2415622
819 87.05 With 990 kVA Oil Cooled Transformer 276590 No 2821919
Will be intimated
820 87.06 With 100 kVA Dry Type Transformer 276531 No 1182768
821 87.07 With 250 kVA Dry Type Transformer 276541 No 1611596
822 87.08 With 500 kVA Dry Type Transformer 276560 No 2212473
823 87.09 With 750 kVA Dry Type Transformer 276585 No 2711112
824 87.10 With 990 kVA Dry Type Transformer 276599 No 3191280
87.11 Breakup prices
Copper wound Oil Cooled Distribution
Transformer
825 87.12 500 kVA 321450 No 805743
826 87.13 750 kVA 321475 No 997537
827 87.14 990 kVA 321490 No 1331175
Will be intimated
828 87.15 LT ACB 2000A 310520 No 115716
829 87.16 MCCB 400A 358097 No 14100
85 SCRAP MATERIALS
Note: The rates are indicative and the
respective zones are authorized to fix the floor
price suitabaly as approved in the Common SR
2012-13 meeting held on 09.11.2012 and
confirmed vide proceedings CEE/T&P/KPTCL -
6998 - 7013 Dt: 15.11.2012
830 85.01 Copper Wire 791210 Kg 512 518
Released Copper winding released from failed
831 85.02 731211 Kg 192 192
distribution transformers
832 85.03 Copper Conductor 791200 Kg 512 518
833 85.04 Copper Ingots 791205 Kg 358 358
834 85.05 Copper Cable with Leads 791207 Kg 248 248
835 85.06 Aluminium 791010 Kg 124 124
836 85.07 Aluminium wire in pieces 791100 Kg 85 88
837 85.08 ACSR Conductor in Rings/Coils New Item 100
Released Aluminium winding released from failed
838 85.09 791175 Kg 100 130
distribution transformers
839 85.10 Scrap HT/LT Aluminium Winding New Item 161
840 85.11 ACSR Conductor 791101 Kg 89 100
841 85.12 Alumininium UG cable 791531 Kg 103 103
842 85.13 Scrap Al Released From UG Cable 791530 Kg 88 88
Iron Items
843 85.14 a) SM Rail Pole, I beam 790100 Kg 20 32
844 85.15 b) Ladder Pole, Tower Parts, Tubular Poles 790101 Kg 20 18
845 85.16 c) Cross arms,Clamps etc 790104 Kg 20 20
846 85.17 d) Released steel from RCC Poles (Skeleton rods) 790103 Kg 20 20
2 Erection of Poles
Erection of steel supports 9.0 to 10.00 mtr long such
as 22.68 kg (50 lbs) Rail, 27.22 kg (60 Lbs) Rail I
Beam of sizes 200x100mm, 175x90 mm, 125x100
50 2.1 No 269 304
mm. Fabricates poles tubular poles in pits of 1.8 mtr
Depth, Aligning, Refilling with soil and ramming as
approved drawing
Same as above but erection of 7.5 to 8.0 mtr long
51 2.2 steel supports (18.75 kgs., /41Lbs) Rail, 125x75 No 240 271
mm, I beam in pit of 1.5 mtr depth.
Same as above but erection of RCC/PCC/PSC poles
52 2.3 No 482 544
of 7.5 to 8 mtr long in pit of 1.5 mtr depth.
Erection of RCC/PSCC poles 9 to 10 mtr long but in
53 2.4 No 603 682
a pit of 1.8 mtr depth
Erection of RCC poles 9.5 mtr long 350Kg WL but in
54 2.5 No 850 960
a pit of 2.0 mtr depth for 33KV lines
Erection of 11 mtr PSC pole with working load of
55 2.6 No 963 1088
365kg in a pit of 2.2 mtrs depth.
Erection of 11mtr long Concrete spun pole in a pit of
56 2.7 No 1077 1216
2.5 mtr depth.(Manual Labour)
61 2.12 Same as above using RCC poles 9 mtr to 10 mtr long Per structure 2209 2496
Same as above using RCC poles 7.5/8 mtr long in
62 2.13 Per structure 2209 2496
pits of 1.5 mtr depth.
providing spiral earth electrode type earthing along
63 2.14 No 49 55
with pole (without charcoal, salt etc.,)
64 2.15 Errection of H Frame. No 169 191
Erection of Double pole transformers structure
including fixing of structural materials, erection of
65 2.16 poles etc., complete for mounting of transformers as Per structure 2216 2504
per approved drawing using I-Beems or MS Rail 8
mtrs. long.
2.17 Same as item above with RCC pole 9/8 mtr. long.
Upto 63 kVA
66 2.18 with 9 mtrs. RCC pole Per structure 2973 3359
67 2.19 with 8 mtrs. RCC pole 2612 2952
100 to 250 kVA
68 2.20 with 9 mtrs. RCC pole Per structure 3081 3482
69 2.21 with 8 mtrs. RCC pole 2839 3208
Above 250 kVA
70 2.22 with 9 mtrs. RCC pole Per structure 3405 3848
71 2.23 with 8 mtrs. RCC pole 3050 3447
Erection of single pole mounted Transformer
3
structures
for 250 kVA Transformer on the existing 11 mtrs.
72 3.1 Per structure 1799 2033
Spun pole (excluding erection of pole)
for 100 kVA on the existing 9 mtrs. RCC pole (Squre
73 3.2 Per structure 899 1016
Section) (excluding erection of pole)
for 25/63 kVA on the existing 9 mtrs. RCC pole
74 3.3 Per structure 899 1016
(Square Section) (excluding erection of pole)
For 25kVA transformer existing 9mtr PSCC Pole of
75 3.4 Per structure New Item 1575
300Kg WL.(excluding erection of pole)
3 Pole structure: Erection of 3 pole structure
formed with 3 Nos 9 mtr RCC Pole with platform for
mounting 100 to 500 kVA transformers as per
76 3.5 Per structure 4546 5137
approved Drawing including fixing structure
materials, erection of poles etc., complete. (excluding
excavation charges)
4 Pole Structure: Erection of 4 pole structure
formed with SM Rail or I Beam of size 200x100 mm
175x90 mm, 225x100 mm size, 9 to 10 mtr long in
77 3.6 Per structure 3753 4241
pits for line deviation with necessary foundation,
including fixing of cross arm, braces, strain/disc
insulators.
Erection of 4 Pole structure as in item above with
78 3.7 platform for mounting of Transformer. (excluding Per structure 4299
excavation charges)
New Item
104 6.7 Rabbit per km/wire 2347
147 14.6 Fixing of GOS including wiring (11kV DB 400A) 625 706
Fixing of 11KV GOS SB or DB including wiring on
148 14.7 old existing structure (were only fixing of GOS work 1250 1413
is involved)
Modification of GOS Operating System for making
Foot path free for pedestrian(Work involves cutting
149 14.8 Per GOS 1979 1979
of existing vertical GOS Pipe and fixing the cuppling
plate by welding, grinding etc., for operating the GOS
150 14.9 Fixing of 3 Nos lightning arrestors including wiring. Set/3 No's 63 71
151 14.10 Fixing Pole Fuse Board No 76 86
Fixing PVC pipe for taking the leads form the
conductor to the pole fuse board (including taking
152 14.11 the lead wire inside the PVC pipe & giving Set 116 131
connection to the overhead line & pole fuse
box/Aerial fuse Board).
153 14.12 Fixing of LT Line spacers No 36 41
Releasing & Refixing of over head service mains
Per
(single phase/three phase) for consumer installation
154 14.13 connection/ 35 40
and street lighting and similar work (While executing
installation
reconductoring work)
25 ACSR Conductor
per Km of
251 33.1 3x95 to 150 Sqmm 10120 11436
cable
per Km of
252 33.2 3x185 to 3x240 Sqmm 12145 13724
cable
per Km of
253 33.3 1x300 to 1x1000 Sqmm (Single Core) 12145 13724
cable
per Km of
254 33.4 3x300 to 3x500 Sqmm 14168 16009
cable
-do- for LT Cables
per Km of
255 33.5 2.5 to 25 Sqmm (Single Core, 4 Core, 3.5 Core) 625 706
cable
per Km of
256 33.6 35 to 95 Sqmm (4 Core/3.5 Core) 1250 1413
cable
per Km of
257 33.7 120 to 240 Sqmm (4 Core/3.5 Core) 1375 1554
cable
Laying of cable in Existing trench/GI pipe/Stone Ware/RCC Hume
34
pipe using Wooden/Aluminum Rollers as directed by the
HT Cable
258 34.1 3x95 to 150 Sqmm Km 31679 35797
259 34.2 3x185 to 240 Sqmm Km 33439 37786
260 34.3 1x1000 Sqmm Km 33439 37786
261 34.4 3x300 to 3x500 Sqmm Km 35198 39774
35 LT Cable
262 35.1 2.5 to 25 Sqmm Km 11304 12774
263 35.2 35 to 95 Sqmm Km 16543 18694
264 35.3 120 to 240 Sqmm Km 16893 19089
36 Cable Joint and wiring(for HT Cable only)
36.1 Epoxy straight through joint
265 36.2 3x95 to 3x150 Sqmm No 875 989
266 36.3 3x185 to 3x240 Sqmm No 875 989
267 36.4 3x300 to 3x400 Sqmm No 875 989
37 Heat shrinkable straight through joint
268 37.1 3x95 to 3x150 Sqmm No 1500 1695
269 37.2 3x185 to 3x240 Sqmm No 1500 1695
270 37.3 3x300 to 3x400 Sqmm No 1500 1695
38 Making and Fixing pot head for HT Cable only
Epoxy type
271 38.1 3x95 to 3x150 Sqmm No 875 989
272 38.2 3x185 to 3x240 Sqmm No 875 989
273 38.3 3x300 to 3x400 Sqmm No 875 989
39 Heat shrinkable type
274 39.1 3x95 to 3x150 Sqmm No 1375 1554
275 39.2 3x185 to 3x240 Sqmm No 1375 1554
276 39.3 3x300 to 3x400 Sqmm No 1375 1554
Releasing of HT cable after excavation refilling,
277 39.4 Km 31678 35796
consolidation Rewinding to the drum etc.,
278 39.5 -do- for LT cable Km 10884 12299
Earth Excavation for R.M.U. Foundation Depositing of earth on Bank
40
up to a lead of 50 mtr and with a lift up to 1.5 mtr
279 40.1 Ordinary Soil Cmt 141 178
336 46.31 11kV AB Cable T-joint installation for 3 Core No's 916 1035
11kV AB Cable Straight thru' joint installation for 3
337 46.32 No's 733 828
Core
338 46.33 11kV AB Cable Termination installation for 3 Core No's 620 700
57 11KV SWITCHGEAR
Erection, alignment and fixing to the foundation,
indoor/outdoor 11KV switchgear panel/unit
363 57.1
including movement from the point of unloading to
thr point of erction.
364 57.2 11KV Indoor/outdoor switchgear 1839 2078
Per Panel
365 57.3 11KV Kiosk 1530 1729
Wiring & assisting in testing &
58
Commissioning
366 58.1 11KV indoor/outdoor switchgear 610 689
367 58.2 11KV Kiosk 610 689
59 a) Wiring b)Testing & Commissioning
Identification of wires, Ferruling Crimping &
368 59.1 Termination of wires fir annunciation, etc., Testing
of Relays, CTs, PTs, & Breaker for operation.
370 59.3 For single 11KV panel indoor/outdoor type /kiosk Each 13950 13098
371 59.4 For additional 11KV panel (indoor type) Each 6975 6544
372 59.5 For single 11KV panel outdoor type/Kiosk Each 10661 10009
Consolidated labour charges involving 1 to 2 (ONE to
373 60 TWO) pole works for Ganga Kalyana and Drinking Set 7813 8829
Water supply works only.
NOTE:
The loading and unloading charges shall be included at the following rates in all estimates for
1
the works which are proposed to be taken up on labour contract.
2 For Poles - As per the rates provided for Loading and unloading of poles in the SR
For all other materials excluding transformers and conductors - 10% of the rates
3
provisioned for Loading and unloading of poles in the estimate.
4 For Transformers and Conductor - As per the rates provided in the S.R.
The Labour charges for erection of Poles, Guy Sets, DP Structures etc., involving excavation of
soil provided in the cost sheet for general works is for ordinary soil only. Wherever other type of
5
soil is encountered, the difference in rates for excavation in such soil provided in the Schedule
of labour shall be worked out and adopted.
Special labour charges for Ganga Kalyna and Water Works, Drinking Water Works
and SC & E&I Works: (These rates are Applicable for works carried out under
6
labour awards only. THESE RATES SHALL NOT BE OPERATED FOR RATE
CONTRACT AWRADS AND OTHER TENDERED AWARDS).
Note:-
(1) These labour charges are applicable for 1 to 2 pole and 3 to 5 poles in respect of
Ganga Kalyana and Water Works
(2) These rates are applicable only when 1 to 2 pole and 3 to 5 poles are involved and no
other associated works.
(3) These rates are applicable only when 1 to 4 pole works for Service Main and E&I Works
The Labour charges are all inclusive i.e., digging of pits, erretion of poles, fixing of cross
arms, insulators, stringing of wires, providing of guy sets, fixing of spiral earthrodes, Etc.,
No other labour charges or any other charges towards special locality allowance, LC
charges, additional labour charges, Transportation charges, etc., are payable.
(4) Certificate has to be furnished by the section officer who prepares the estimate that
the estimates are not split to claim the above labour charges.
Labour Charges for one to two pole and three to five pole works in respect of all types of
works wherein other works such as DTC erection etc., and other works are not involved.
Schedule of Rate for Standard Stock Materials
Common SR 2016-17 (33kV System) Common Common
SR 2014- SR 2016-
15 17
in Rs in Rs
Sl Item Material FORD FORD
Name of the Material UoM
No No Code Rates Rates
inclusive inclusive
of duties of duties
taxes & taxes &
F&I F&I
33/11 kV Transformer with all fittings and
1 accessories, OLTC, RTCC, First filling of oil No.
and 10 % Spare oil
1 1.1 5 MVA No. 322205 4557570 3865685
Will be
intimated
by
2 1.2 10 MVA No. 322210 10267860
independe
nt
committee
4 2.1 33 kV Circuit Breaker SF6 type 800A, 25kA No. 311601 349540 306000
7 Lightning Arrester
a) 30 kV Lightning Arrester Normal Duty
45 7.1 No. 303510 12225 9000
Metal oxide (Discharge Class-2)
b) 30 kV Lightning Arrester Normal Duty
46 7.2 No. 303512 8784 7970
Metal oxide (Discharge Class-3)
30 kV Lightning Arrester Normal Duty
47 7.3 No. 303520 11096 10950
polymeric
8 Isolators
Isolators 33kV 800A, 25kA Upright with
48 8.1 Earth Switch complete metallic portion with Set 304536 78367 78000
insulator
Isolators 33kV 800A, 25kA Upright without
49 8.2 Earth Switch complete metallic portion with Set 304524 72978 59000
insulator (live point height 3750mm)
52 9.2 Battery Set (Tubular) 110 V, 100 Ah Set 344011 165600 300000
Battery Set (Maintance free VRLA) 48 V, 100
53 9.3 Set 344107 38400 69565
Ah
Battery Set (Maintance free VRLA) 110 V,100
54 9.4 Set 344111 82800 15000
Ah
55 9.5 Battery Charger 48 V, 100 Ah Set 344416 42135 58854
11 Towers
a) Design,fabrication,galvansing and supply of
61 11.1 transmission line tower materials including M.T. 201050 102614 94000
stubs
b) Fabrication,galvanization and supply of
62 11.2 M.T. 201055 87203 85000
mild steel tower materials
63 11.3 c) Supply of galvanised Bolts & Nuts M.T. 736002 102614 119000
67 12.3 Meter box suitable for fixing 3 ETV meters No. 358043 6149 6149
13 Insulators
68 13.4 Solid Core Insulator 33kV No. 283125 3253 3149
74 14.1.1 Single Lynx ACSR conductor 70/90 kN 16mm No. 285080 1015 963
77 14.2.1 Single Lynx ACSR conductor 70/90 kN 16mm No. 285050 799 860
80 14.4.1 Single Lynx ACSR conductor 127/76mm No. 285699 596 643
81 14.4.2 Single Coyote ACSR conductor 127/76mm No. 285697 545 595
82 14.4.3 Single Rabbit ACSR conductor 76mm No. 285696 507 445
89 15.3 Double pole structure for 33kV Set 279103 5672 4931
99 17.1.2 33 kV 3 Core XLPE UG Cable- 150 Sq.mm No. 288052 23100 23100
104 17.2.2 33 kV 3 Core XLPE UG Cable- 150 Sq.mm No. 288062 5840 5840
109 17.3.2 33 kV 3 Core XLPE UG Cable- 150 Sq.mm No. 288072 7255 7255
113 17.4.1 33 kV 3 Core XLPE UG Cable- 95 Sq.mm No. 288080 18920 18920
114 17.4.2 33 kV 3 Core XLPE UG Cable- 150 Sq.mm No. 288082 18920 18920
Latest KPWD SR
Latest KPWD SR
43 i) Normal Soil Cmt Rates for hard
Rates for hard soil
soil
Latest KPWD SR Latest KPWD SR
44 ii) B.C. Soil Cmt Rates for Ordinary Rates for
soil Ordinary soil
Latest KPWD SR Latest KPWD SR
45 iii) Partially Submerged soil Cmt Rates for Ordinary Rates for
soil Ordinary soil
Latest KPWD SR Latest KPWD SR
46 iv) Fully submerged soil Cmt Rates for Ordinary Rates for
soil Ordinary soil
Note :
a) Extra as indicated in the relevant KPWD SR
may be allowed
for providing concrete in watery situation
including cost of bailing out water and removing
slush.
b) Only machine mixing is to be used for
concreting.
c) Jelly to be used is 20mm and down size for
1:1.5:3, 1:2:4 and 1:3:6 concrete and 40mm and
down size for CC 1:4:8.
9 Towers
Sorting of tower parts made of fabricated angle
67 a) MT 306 346
iron
Setting up of stubs templates and from one Per
68 b) 398 450
location to another location Location
88 a) Anchoring single span upto 320 mtrs. 1 Span 5128 With Coyote 5795 With Coyote
17 Station Structures
Errection, assembly and alignment of Station
116 a) MT 2099 2372
structure as per the directions of site Engineer.
Erection, alignment & assembly of fabricated
steel lattice structure, pedestal structures &
117 b) MT 1956 2210
Mounting structures, for G.O.S., CT's, PT's LA's
etc.,
18 Erection of Transformers
Moving the Transformer on to the plinth
(Maximum allowable distance is 50 mtrs.) more Per MT/
118 a) 41 47
than 50 mtrs. approval of the CEE, O&M Zone Mtr
has to be obtained)
Assembly of Transformer parts like bushings,
119 b) radiators, filling oil into Tr. etc., (for the total wt. MT 938 1059
of the Tr.)
b) Testing:
1. Ratio
Test
2. SC test
3. Excitation test
4.
Magnetic Balance test
125 5. Vector group test. Each 33481 23668
Tests:
Insulation, Polarity, Ratio,
Potential Transformers: Excitation
Wiring:
Indentification of wires Ferruling
Crimping of lugs Set
133 ii) 13947 9860
Connections up to marshalling box. (3 Nos)
Potential Transformers:
Tests: Insulation,
Polarity, Ratio,excitation.
25 Erection of NCTs
Erection of NCTs with ground including
134 a) movement from the point of unloading to the Set 443 500
point of erection
135 b) Assisting in Testing and Commissioning Set 56 64
26 Erection of Isolators
Assembly, Errection alignment and wiring
136 a) including movement from the point of unloading Set 920 1040
to the point of erection. (Upright)
137 b) Assisting in Testing and Commissioning (Upright) Set 94 106
Note :
1) Assisting in
testing and commissioning for item No. 13 to 18
means contractors should provide labourers for
testing and commissioning by RT/MT/Firm
engineers.
2) Testing &
Commissioning in item 13 & 18 means the
testing will be carried out bythe firms themselves
using their own testing equipments and staff in
presence of the MRT staff who will witness the
tests.
27 Erection of Lightening Arrestors
Erection of Lightning arrestors and wiring
138 including movement from the point of unloading Set 230 260
to the point of erection
139 28 Fixing of Solid Core insulator Per Stack 76 86
(i) Burnt brick/size stone/RCC Cable duct As per Latest As per Latest
including form box, back filling the sides, KPWD electrical KPWD electrical
141 a) Cmt
removing the excess escavated soil, duct covering SR applicable to SR applicable to
with RCC slabs. respective areas. respective areas.
(ii) Supplying 300 mm dia 1.5" to 2" thick RCC
As per Latest As per Latest
Hume pipes including loading unloading, and
KPWD electrical KPWD electrical
142 transportation charges and laying at required Rmtr
SR applicable to SR applicable to
level and gradient as per the direction of field
respective areas. respective areas.
engineer
32 11 kV Switchgear
Erection, alignment and fixing to the foundation,
indoor/outdoor 11kV switchgear Panel/unit
159 a)
including movement from the point of unloading
to the point of erection.
172 34 Faradays Cage Formation as per specification: Per Bay 225 254
35 Groundmat
Laying of M.S. Flats, welding, applying ACB paint
173 a) to welded portion and covering with sodium Rmtr 25 33
bentonite clay
Supplying and laying of MS flats, of various sizes, 50x6mm - 262 50x6mm - 273
welding and applying ACB paint to welded 50x8mm - 280 50x8mm - 291
b)
174 portion and covering with sodium bentonite clay, Rmtr 75x6mm - 486 75x6mm - 566
as per the drawing/standard specifications and 75x8mm - 514 75x8mm - 505
consolidation. 75x12mm - 545 75x12mm - 535
50x6mm - 129 50x6mm - 135
50x8mm - 146 50x8mm - 152
175 c) Same as above but without sodium bentonite clay Rmtr 75x6mm - 353 75x6mm - 367
75x8mm - 380 75x8mm - 395
75x12mm - 413 75x12mm - 429
Grounding of equipment with various sizes, G.I.
Flat and connecting Equipment to the
earthmat/ground pit. Each point of earthing 50x6mm - 217 50x6mm - 226
with all formation works like bending, twisting, 50x8mm - 242 50x8mm - 253
176 d) drilling of holes and connecting by welding Per point 75x6mm - 520 75x6mm - 541
(inclusive of all T&P and consumables) to the 75x8mm - 549 75x8mm - 571
earthmat/ ground pit/ point of earth 75x12mm - 594 75x12mm - 618
connection,all the materials supplied by the
contractor.
Providing 25mm dia M.S.rod 1.05 Mtr. Long
earthmat spikes including heating, bending top
50mm over lap flattening and making spike edge
177 e) Each 239 260
at one end driving into the earth below the
ground level and welding the rod with ground mat
flat.
Supplying & Providing 450 mm dia 450 mm
height 1.5" to 2" thick hume pipe collar (non
178 f) Each 689 864
pressure type) for earth pits including all lead and
lifts etc.,
36 Providing Deep Bore earthing
193 d) As per (b) but with synthetic enamel paint Sq Mtr 121 60+77
222 b) Transportation of other materials 27% of the above 27% of the above
c) Using light vehicle including fuel, oil,
lubricants and crew subject to a minimum of 100 Prevailing Board Prevailing Board
223 Per Set
Kms per day in case of break down/ subject to approved Rates approved Rates
prior approval of CEE.
46 Loading and Unloading
a) Loading of Power Trs, CT's. PT's Breakers, C&R
Panels, 11KV Switchgears, wavetrap, coupling
224 MT 1614 1824
capacitors, HT UG Cables, Insulators, ACSR
Conductor, Ground Conductors, etc.,
Providing granite rough stone 30 to 50 cms thick For substation For substation
dry packing of revetments and pitching side works as per works as per
slopes of quadrant including providing the walls, KPWD SR and for KPWD SR and
228 Cmt
jelly packing, 0.15 cms thick and wedging etc., Transmission line for Transmission
Complete including cost of conveyance of all works Add 25% line works Add
materials. extra 25% extra
16 mm dia 20 mm
Length/ Hexaganal dia. Class
SL. MS Angle Wt/Mtr in total wt/set Qty in
Particulars Qty piece in Bolt & Nut 'A' GI Pipe
No Flat in mm Kgs in kgs No
mm x Nos Length in Length in
mm mm/Qty
1 Set
1 HT + LT side power X-arm 65x65x6 5.8
2 No
1 Set 45x45x6 4
3 Belting cross arm and belting support X-arm
4 No 50x50x6 4.5
Transformer Seating and Transformer seating 1 Set
4 65x65x6 5.8
angle support X-arm 4 No
5 Distribution box Fixing Clamps 0 0
6 GI Pipe 0 20x5
7 H Frame Set 0
Note :
1. The bill of materials are prepared as per DRG No.SIC/WS/017/date 28.6.85.
2.The weights given are for raw materials as per ISI structural steel Hand book.
3. All holes are of 18 mm for 16 mm bolts.
4. All slotted holes are of 18x35 mm long.
5. Bolts required to fix Las are not included as the same are to be supplied along with LAs
6 Since the D.O.L.O cut out is being fixed on the pervious support of the T.C and depending on
ILL OF MATERIALS-4
suitable for Conventional Transformer Only, Separate BoM- 6 is furnished for Star Rated
Clamp
made
Length/ Total 16 mm dia 20 mm
out of
Piece in Wt/Set in Hexgonal Qty class 'A' GI Qty Qty
No.Bolt & Nut
50x6
mtr x No kgs pipe
mm MS
flat No
2.7x2 31.32 175 7 120 3 0 0
2.7x2
12.96 65 4 0 0 460 2
(0.06x3)
2.7x2 50 4 0 0 0 0
21.6 4.5
0.5x2 65 4 0 0 465 2
2.7x2 31.32 12 7 0 0 0 0
0.285x2 3.19 50 4 160 3 465 2
0 0 120 0 3 536 2
160 0 0 0 3 0 0
1 No 62.69 0 0 0 0 0 0
e 28.6.85.
Wt/Set
in Kgs
2.16
0
2.23
0
2.23
2.6
0
0
D.O.L.O fixing X
BILL OF MATERIALS-5
H.FRAME
Sl. MS Angle Wt/Mtr Length in Wt/Set in
Particulars Unit
No Flat in mm in Kgs mm Kgs
1 2 3 4 5 6 7
No 65x65x6 5.8 1200x2 13.92
1 GOS- H Frame Fixing Cross-Arm
No 50x6 2.4 473x2 2.27
No 45x45x5 3.4 1360x2 9.25
GOS H Frame Fixing Cross arm Clamps Brace Fish
2 No 50x6 2.4 503x2 2.41
Plate
No 50x6 2.4 285x2 1.37
No 45x45x5 3.4 2350x2 15.98
No 45x45x5 3.4 310x2 2.11
3 GOS Frame
No 45x45x5 3.4 70x4 0.95
No 45x45x5 3.4 60x6 1.22
GOS Handle Frame Fixing Cross-arm No 65x65x6 5.8 1100x1 6.38
4
Clamp for above No 50x6 2.4 548x1 1.32
No 45x45x5 3.4 1000x1 3.40
GOS Handle Frame Fixing Cross set arm Brace
5 No 50x6 2.4 558x1 1.34
Clamps Fish Plate
No 50x6 2.4 320x1 0.77
16*50 3 Nos
6 MS Bolts & Nuts 16mm with washers Kgs 16*65 12 Nos
16*150 6 Nos
62.69
Note
1 The hole have to be provided at locations as mentioned in the drawings
2 All holes are in mm and slot holes 18*35 ,, to suit 16mm unless otherwise stated.
3 the weight mentioned in the BoM is as per Steel Table
4 The Bolts & Nuts shall confirm ISS
BILL OF MATERIALS - 6
25/63 kVA TC Structure suitable for mounting Star Rated 25 & 63kVA Transformers
BESCOM for 3 Star Rated
Transformers as
Sl. Wt/Mtr in
Part No. Part No. approved in PFC/ADB
No. Kgs
Approx wt in
Qty/set Kg
MS Angle 65x65x6mm x 2700 mm - HT side Power X arms 5.8 1 No
1 T1 31.32
MS Angle 65x65x6mm x 2700 mm - LT side Power X arms 5.8 1 No
2 MS Angle 50x50x6mm x 2700 mm - PI Support X arms T2 4.5 1 No 12.15
MS Cleat 50x50x6mm x 70 mm 4.5 3 Nos 0.945
3 MS Angle 45x45x6mm x 2700 mm Belting X arms DTC-10 4 2 No 21.6
4 MS Angle 45x45x6mm x 500 mm Belting support X arms DTC-9 4 2 No 4.5
5 MS Channel 100x50x4.7 (ISMC) mm x 2700mm Transformer seating T4 9.2 2 No 49.68
6 MS Angle 65x65x6mm x 310 mm Transformers seating support X arms DTC-11 5.8 2 No 3.6
KIT DETAILS
7 MS Flat 50x6mm x 450mm 2 2.4 2 No 2.16
8 MS Flat 50x6mm x 465mm 3 2.4 4 No 4.46
9 MS Flat 50x6mm x 535mm 4 2.4 2 No 2.6
10 L&R MS Angle 65x65x6mm x 1025mm GOS & LA Support X-Arms DTC-4 5.8 2 No 11.89
11 MS Angle 45x45x5 mm x 1360 mm HG Fuse Support DTC-8 3.4 1+1 No 9.248
12 L&R MS Angle 65x65x6mm x 1100 mm GOS Handle Support X arms Brace DTC-13 5.8 1 No 6.38
13 L&R MS Angle 45x45x5mm x 1000 mm GOS Handle Support X arms Brace DTC-14 3.4 1 No 3.400
11kV H Frame Set details
MS Angle of size 45x45x6 mm x 2350 mm 4 2 No Each 18.8
14 40x40x5mm 340mm DTC-3 3 2 No Each 2.04
40x40x5mm 70mm 3 4 No Each 0.84
40x40x5mm 60mm 3 6 No Each 1.08
Clamps
15 MS Flat 50x6mm x 560 mm 5 2.4 2 No 2.7
16 MS Flat 50x6mm x 498 mm 1 2.4 2 No 2.39
17 MS Flat 50x6mm x 465 mm 3 2.4 2 No 2.22
FISH PLATE FOR 'H' Frame - GOS Mounting Frames
a) 285 mm 2 No 1.368
b) 320 mm 1 No 0.768
TOTAL a) Structure Steel 196.139
MS Bolts & Nuts Including H Frame
a) 16mm x 175mm 7 No
b) 16mm x 65mm 12 No
18
c) 16mm x 200mm 7 No 10 Kgs
d) 16mm x 50mm 4 No
e) 12mm x 50mm 4 No
TOTAL b) Bolt and nut 10 Kgs
Note: 1) The weight indicated is before punching of the holes.
2) Tolerance of ±4% is allowed on the weight.
BILL OF MATERIALS-7
SINGLE POLE MOUNTED TRANSFORMER STRUCTURAL MATERIALS ON 9 MTRS. LONG RCC POLE ( SQ.
SECTION) FOR 25/63 kVA TC SET
For OH line (Having Single H Frame with Transformer seating and seating angle support x-arm) for
11mtr Spun Pole for 25KVA Transformer.
Length Qty
Sl No Size of the steel section Kgs/Mtr Total Wt
(in mm) (in Nos)
TOP Bracket
1 100x100x8mm MS Angle 850 3 12.1 30.86
2 75x40x4.8mm MS Channel (MC75/MCP75) 2400 2 7.14 34.27
3 45x45x5mm MS Angle 850 3 3.4 8.67
4 75x40x4.8mm MS Channel (MC75/MCP75) 1040 2 7.14 14.85
5 50x50x6mm MS Angle 1000 2 4.5 9
6 50x50x6mm MS Angle 1000 2 4.5 9
7 65x65x6mm MS Angle 1440 2 5.8 16.7
Transformer Center
8 130x130x12mm Angle 1110 1 23.4 25.97
9 100x50x5mm MS Channel (MC100/MCP100) 1200 2 9.56 22.94
10 130x130x12mm MS Angle (with side plate) 1110 2 23.4 51.95
11 75x75x6mm MS Angle 1750 2 6.8 23.8
12 65x65x6mm MS Angle 1260 2 5.8 14.62
13 75x40x4.8mm MS Channel (MC75/MCP75) 1110 2 7.14 15.85
GOS Mounting Structure (Ladder)
14 45x45x5mm MS Angle 1640 2 3.4 11.15
15 45x45x5mm MS Angle (Cleat) 60 6 3.4 1.22
16 40x40x5mm MS Angle 335 2 3 2.01
Round clamps of different sizes made out of MS flats
suitable for fixing the above structural materials to the
17
pole.
a) 75x6 MS Flat 1000 6 3.532 21.19
MS Hexagonal bolts, nuts and washers of different 15kgs
18
sizes to sufficient in quantity for fixing clamps Approx. 15
Total in Kgs 329.06
Note
1. The weights mentioned are subject to tolerance as per IS
2. The weights mentioned are before drilling of holes
BILL OF MATERIALS – 10
For UG Cable network (Having 3 Nos H Frame with Transformer seating and seating angle support x-
Length Qty
Sl No Size of the steel section Kgs/Mtr Total Wt
(in mm) (in Nos)
TOP Bracket
1 100x100x8mm MS Angle 850 3 12.1 30.86
2 75x40x4.8mm MS Channel (MC75/MCP75) 2400 2 7.14 34.27
3 45x45x5mm MS Angle 850 3 3.4 8.67
4 75x40x4.8mm MS Channel (MC75/MCP75) 1040 2 7.14 14.85
5 50x50x6mm MS Angle 1000 2 4.5 9
6 50x50x6mm MS Angle 1000 2 4.5 9
7 65x65x6mm MS Angle 1440 2 5.8 16.7
GOS Mounting Structure (Ladder)
8 45x45x5mm MS Angle 1640 2 3.4 11.15
9 45x45x5mm MS Angle (Cleat) 60 6 3.4 1.22
10 40x40x5mm MS Angle 335 2 3.002 2.01
Round clamps of different sizes made out of MS flats
suitable for fixing the above structural materials to the
pole.
11 a) 75x6 MS Flat 1000 6 3.532 21.19
MS Hexagonal bolts, nuts and washers of different 10kgs
12 sizes to sufficient in quantity for fixing clamps Approx. 10
Total in Kgs 168.93
Note
1. The weights mentioned are subject to tolerance as per IS
2. The weights mentioned are before drilling of holes
BILL OF MATERIALS – 12
For UG Cable network (Having 3 Nos H Frame without Transformer seating and seating angle support x-
arm) for 11 mtr Spun Pole for 63/100/250/500 KVA Transformer.
Length Qty
Sl No Size of the steel section Kgs/Mtr Total Wt
(in mm) (in Nos)
TOP Bracket
1 100x100x8mm MS Angle 850 5 12.1 51.43
2 75x40x4.8mm MS Channel (MC75/MCP75) 2400 4 7.14 68.54
3 45x45x5mm MS Angle 850 5 3.4 14.45
4 75x40x4.8mm MS Channel (MC75/MCP75) 1040 2 7.14 14.85
5 50x50x6mm MS Angle 2000 2 4.5 18
6 50x50x6mm MS Angle 1000 2 4.5 9
7 65x65x6mm MS Angle 1440 2 5.8 16.7
GOS Mounting Structure (Ladder)
8 45x45x5mm MS Angle 1640 6 3.4 33.46
9 45x45x5mm MS Angle (Cleat) 60 18 3.4 3.67
10 40x40x5mm MS Angle 335 6 3 6.03
Round clamps of different sizes made out of MS flats
suitable for fixing the above structural materials to the
11 pole
a) 75x6 MS Flat 1000 8 3.53 28.26
MS Hexagonal bolts, nuts and washers of different sizes 10kgs
12 to sufficient in quantity for fixing clamps Approx 10
Total in Kgs 274.39
Note
1. The weights mentioned are subject to tolerance as per IS
2. The weights mentioned are before drilling of holes
Special Locality Allowance:
Locality allowance at the rate noted below is given over and above the schedule
of labour for the listed areas.
Percentage
Name of As
Sl. No. Area over &
ESCOM Existing
above SR
Davanagere District:
20 20
Channagiri, Honnalli Taluks
Tumkur District:
15 15
Pavagada Taluk.
1 BESCOM
All Divisions coming under Bangalore Metropoliton Area 30
30
Zone
2 MESCOM 35
Chickmagalur District:,Kadur, Tarikere Taluk NEW
35
Shimoga District: Soraba, Shikaripura 35
Dharwad District:
30
a) Kalghatagi 30
20
b)Dharwad Taluk 20
Haveri District:
30
a)Hanagal,Herikerur 30
20
b)Byadagi,Shiggon,Savanur Taluks 20
Belgaum District:
3 HESCOM 20 20
Hukkeri, Belgaum,Bailahongala Soundathi Taluks
Belgaum District:
20 45
Khanapura Taluk
Mysore District:
30 30
H.D.Kote, Hunsur and Piriyapattana
Note: In case of civil works where KPWD SR rates are adopted, the locality