1. 100% of billing was based on Approval and 0% of submission. Avoid signing one-sided contracts 2. Approval timeline was not in our control Taking 1 hour time twice a week to monitor drawings/ submissions/ approvals of the items only from billing perspective and actively following up with customer irrespective of the urgency of that drawing at site 3. Proof checker comments come randomly at any time and we Always have to be able to allot work to junior engineer readily to would not have engineer ready to work on revisions and revise and resubmit documents within 7 days of receipt of resubmissions. Delay in allocation of engineer to the work comments. Prompt resubmission will help in speeding up the entire causes lag in submission. Delayed resubmission causes proof cycle and will give us authority to follow up for approvals checker to further delay the review and approval unless there proactively. is site related pressure 4. Proper checking of drawing takes time. This time was not Prepare checklists of things to be checked in 10 minute time when allotted by me at the start of the day. That leads to 2 a new drawing comes from juniors/ drafting checker. Be that good possibilities: either delay the work in hand or submit drawing without proper checking. Both hurt the billing plan in different ways 5. Target of billing in such short span (1 month) is not helping Plan entire work of Month 1 to give billing planning at end of Month predictability. On the contrary, when dealing with govt clients, 1 for Month 2 any small issue will need 7-10 days for solution or opinions of all stake holders. That will make it impossible to make up for the lost time in the same month. 6. Taking up exhaustive works that need continuous and focused Delegate laborious work to juniors. Don’t hesitate to ask for extra work (modelling in sofistik, shell design of NDCT etc) demand manpower if not available. And keep discussing with them the keeping all other works waiting until these works are done. technical details. Technical checklist will help. That causes the billing/ Project management process to stand still, leading to delays. If that focus is disturbed by involving in Also, seek ways to improve focus on the “major work at hand for this project tracking activity (which will involve lot of drafting the day” while handling miscellaneous items elsewhere. involvement and phone calls), the work at hand will be delayed and worse, erratic. That causes the same problem we are trying to avoid. 7. REWORKS AND SITE QUERIES come all of a sudden and Track how many completed drawings have had queries from site take up many days sometimes. And the biggest reason they about discrepancies & mistakes come back is substandard output in the first place.