Professional Documents
Culture Documents
Netapp 7MTT Third Module
Netapp 7MTT Third Module
IDENTIFYING WORKLOADS :
When You select volumes and configuration that you want to transition how it affects clients
The collect and access feature is available on Window only for Copy based transition, for copyfree
transition you work offline or use inventory collect tool :
Credential of system
7mtt also gives information whether device driver of the host is compatibile with cluster mode / not :
If the drivers is compatible, the 7mtt will says whether device is with latest version / not
7mtt doesn’t connect to imt online but it has build in version for these analysis.
7mtt check and provide the required version of Microsoft multipathing I/o drivers, host bus adapters
drivers, firmware and bios.
7mtt 2.2 where can import the latest IMT which we have to download from the site.
When you evaluate Transition feasibility, the level of details will come across that there are
number of differences between feature and functionality. The comparision is see overwhelming
but the goal is surprises
Collect and Tool access feature surprise you with all possible differences. The details are similar
as you see in 7MTT migration precheck
To see these details, you can look at summary precheck in workbook
IF YOU ARE PLANNING COPY FREE TRANSITION YOU USE THE REPORT GENERATED BY
INVENTORY COLLECT TOOL PAIR THE SYSTEM IN THE PROJECT
THAT IS DONE
YOU CREATE THE TRANSITION PROJECT IN 7MTT FOR COPY FREE TRANSITION
RUN THE BELOW COMMAND FROM WINDOW HOST WHERE INVENTORY COLLECT TOOL IS
INSTALL AND LIST THE WINDOWS HOST
RUNNING THE ICT TOOL
GENERATE THE INVENTORY REPORT RUN THE ICT COMMAND WITH SYSTEM IP ADRESS AND
CREDENTIAL
SECOND WAY :
EXPAND THE 32-BIT AGGREGATE TO 64-BIT AGGREGATE BEFORE GOING TO CLUSTER MODE :
GUIDE IS THERE : TO SEE HOW WE CONVERT
After you configure SP, verify that SP is online
2. ENABLE SNAPMIRROR :
6.
DISABLING THE VOLUME OPTION DOESN’T AFFECT ANYTHING ELSE :
7. THERE SHOULD BE NO OFFLINE VOLUME, AND AGGREGATE AND THERE SHOULD BE NO
HARDWARE FAILURE IN 7MODE :
1. Preparation
2. Datacopy
3. Precutover
4. Cutover
Durying the preparation phase you use the 7MTT to create transition session.
Use the tool to collect information about Data ontap 7mode, Cluster ontap systems,
Volumes and ip adresses
The tools then run transition precheck in preparation of Data copy operation.
The cluster volume is created as readonly volume
The tools collect the cluster at SVM information and add them to transition session
The tool also add the collected IP addresses to the SVM.
To trigger Ondemand update click on update button reduce the data delta between
7mode and cluster mode