FEATURE SCOPE DESCRIPTION | PUBLIC

SAP Multiresource Scheduling, Option for SAP S/4HANA


2020-05-18

Feature Scope Description for SAP Multiresource


Scheduling, Option for SAP S/4HANA
Release 1.0, Support Package 6
© 2020 SAP SE or an SAP affiliate company. All rights reserved.

THE BEST RUN


Content

1 About This Document. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3


1.1 Document History. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

2 About SAP Multiresource Scheduling, Option for SAP S/4HANA. . . . . . . . . . . . . . . . . . . . . . . . 5

3 Product Documentation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

4 Key Features. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

Feature Scope Description for SAP Multiresource Scheduling, Option for SAP S/4HANA
2 PUBLIC Content
1 About This Document

This feature scope description shows you which features are provided with SAP Multiresource Scheduling,
option for SAP S/4HANA. In addition, this feature scope description defines the product documentation for
SAP Multiresource Scheduling, option for SAP S/4HANA.

Related Information

Document History [page 3]


Product Documentation [page 6]
Key Features [page 7]

1.1 Document History

See what changes have been made to this document since it was first released.

 Note

The latest version of this document is available on SAP Help Portal at http://help.sap.com/mrs_s4hana.

Date Change More Information

May 18, 2020 The following names were updated: Key Features [page 7]

SAP Hybris Cloud for Customer is now


SAP Cloud for Customer

SAP Hybris Cloud for Service is now


SAP Service Cloud

January 21, 2019 No new features, but updated docu­ In addition to this document history,
ment structure (including some more the following topics were added:
background information and this docu­
● About This Document [page 3]
ment history)
● About SAP Multiresource Schedul­
ing, Option for SAP S/4HANA
[page 5]
● Product Documentation [page
6]

Feature Scope Description for SAP Multiresource Scheduling, Option for SAP S/4HANA
About This Document PUBLIC 3
Date Change More Information

March 31, 2017 Release of Feature Package 2: Key Features [page 7]

● New feature added: Integration


with SAP Portfolio and Project
Management for SAP S/4HANA

November 11, 2016 Release of Feature Package 1: Key Features [page 7]

● New feature added: Integration


with SAP Hybris Cloud for Cus­
tomer

July 29, 2016 Initial version of this document

Feature Scope Description for SAP Multiresource Scheduling, Option for SAP S/4HANA
4 PUBLIC About This Document
2 About SAP Multiresource Scheduling,
Option for SAP S/4HANA

SAP Multiresource Scheduling, option for SAP S/4HANA helps you schedule the right people for the right
place, time, and purpose. Integrating SAP Multiresource Scheduling with core capabilities of the SAP S/4HANA
suite allows you to streamline the resource allocation process in various industries.

SAP Multiresource Scheduling, option for SAP S/4HANA supports the short-term and long-term planning of
projects, installations, and service activities. You can allocate various types of resources, such as employees,
materials, and tools, to demands from various industries.

 Note

Please note that the specific usage rights for SAP S/4HANA Compatibility Packs are set forth in the
Software Use Rights Document.

 Note

SAP S/4HANA is a prerequisite for using SAP Multiresource Scheduling, option for SAP S/4HANA. SAP S/
4HANA requires separate licenses.

Feature Scope Description for SAP Multiresource Scheduling, Option for SAP S/4HANA
About SAP Multiresource Scheduling, Option for SAP S/4HANA PUBLIC 5
3 Product Documentation

The product documentation describes the feature scope and provides you with information about how to
install, implement, and run SAP Multiresource Scheduling, option for SAP S/4HANA.

The following product documentation is available for SAP Multiresource Scheduling, option for SAP S/4HANA.
You can find all documentation deliverables on SAP Help Portal at http://help.sap.com/mrs_s4hana.

● This feature scope description


● Information about installation
Information about how to install the add-on
● Information about system conversion
Information about how to convert from the existing SAP Multiresource Scheduling add-on to SAP
Multiresource Scheduling, option for SAP S/4HANA
● Information about upgrade
Information about how to upgrade from a lower release of SAP Multiresource Scheduling, option for SAP
S/4HANA to a higher release
● Information about security
Security information for the add-on, including information on data protection and privacy
● Information about operations
Information about how to operate the add-on

 Note

The term “country” or “region” is used for convenience only and does not necessarily infer the existence of
a nation state.

Feature Scope Description for SAP Multiresource Scheduling, Option for SAP S/4HANA
6 PUBLIC Product Documentation
4 Key Features

This section describes the key features that are available for SAP Multiresource Scheduling, option for SAP S/
4HANA.

Key Feature Use

Integration with SAP S/4HANA HR You can use this feature to set up the use of HR persons in SAP Multiresource Sched­
uling. You can transfer HR persons and all relevant data from SAP S/4HANA HR to
SAP Multiresource Scheduling, where you can assign them as resources to demands.
You can also create and change certain resource-related data in SAP Multiresource
Scheduling. Changes to resource data (for example, changes to the resource availa­
bility) are transferred back to SAP S/4HANA HR.

Integration with SAP S/4HANA You can use this feature to set up the use of business partners in SAP Multiresource
Business Partner Scheduling. You can transfer business partners and all relevant data to SAP Multire­
source Scheduling, where you can assign them as resources to demands. You can
also create and change resource-related data, such as resource availability.

Integration with SAP S/4HANA en­ You can use this integration scenario to plan resources for orders from Plant Mainte­
terprise asset management nance (PM) and Customer Service (CS) and for networks from Project System (PS).
You can also perform capacity planning (such as capacity leveling) for these types of
demand in SAP Multiresource Scheduling.

Integration with SAP CRM You can use this integration scenario to plan resources for service orders from SAP
CRM. In this scenario, you can also use the appointment booking function to sched­
ule appointments for SAP CRM service orders.

Integration with SAP Portfolio and You can use this integration scenario to plan resources for project roles from SAP
Project Management for SAP S/ Portfolio and Project Management for SAP S/4HANA.
4HANA

Integration with SAP Cloud for Cus­ You can use this integration scenario to plan resources for work tickets from SAP
tomer Service Cloud. SAP Service Cloud comprises the service features offered by SAP
Cloud for Customer. In this scenario, you can also use appointment booking to
schedule appointments for work ticket service items.

Feature Scope Description for SAP Multiresource Scheduling, Option for SAP S/4HANA
Key Features PUBLIC 7
Key Feature Use

Scheduler Workplace (SAP GUI) The Scheduler Workplace provides easy access to all planning-relevant resource and
demand data. The resource planning layout of the Scheduler Workplace includes the
following areas:

● Resource Gantt chart showing the current planning situation, including resource
assignments and time allocations
● Demand worklists showing the demands for which you, as the resource planner,
are responsible
● Alert Monitor showing information, warning, and error messages that arise due
to the current planning situation

The demand planning layout of the Scheduler Workplace includes the following
areas:

● Demand Gantt chart showing the demands for which you, as the resource plan­
ner, are responsible
● Capacity View
● Dispatching View

You can customize the layout of the Scheduler Workplace according to your require­
ments. For example, you can hide areas and functions that are not relevant for you.

Web-based planning board As an alternative to the Scheduler Workplace (SAP GUI), you can use the Web-based
planning board for resource and demand planning. The following standard views are
available:

● Resource view, including a resource Gantt chart and screen areas for a demand
list and alerts
● Demand view, including a demand Gantt chart and screen areas for a demand
list and alerts
● List view for table-based resource planning, including screen areas for resour­
ces, assignments, demands, and alerts
● Staffing view for a table-based staffing overview and table-based resource plan­
ning

You can configure these views according to your requirements. For example, you can
hide areas and functions that are not relevant for you.

Finding suitable resources and de­ You have various options to search for employees with specific qualifications. You can
mands search for suitable employees for a specific demand, or you can search for employ­
ees with a specific set of qualifications without any reference to a demand. You can
also search for suitable demands for any employee within a period of your choice.

Integration of maps You can use this feature to integrate a map in the Scheduler Workplace (SAP GUI)
and in the Web-based planning board. This allows you to display geographic informa­
tion about the current planning situation.

Feature Scope Description for SAP Multiresource Scheduling, Option for SAP S/4HANA
8 PUBLIC Key Features
Key Feature Use

Automatic scheduling of multiday You can use this feature to automatically schedule assignments that span multiple
assignments days. For certain demand types, the system creates concrete or stretched assign­
ments for suitable resources. These resources can be personnel resources, N.N. re­
sources, or teams. In addition, the system can take the availability of technical ob­
jects into account as well as travel and processing times during the automatic assign­
ment creation.

Optimizer You can use the Optimizer to ensure that your personnel resources are used effi­
ciently and effectively when they are planned in SAP Multiresource Scheduling.

You can trigger the optimization process manually or you can schedule regular batch
jobs to have the system optimize your planning.

Resource planning for orders and You can use this feature to allocate suitable resources to order operations and notifi­
notifications from Plant Mainte­ cations from Plant Maintenance and Customer Service.
nance (PM) and Customer Service
The process starts in SAP S/4HANA with a requester creating a notification or order
(CS)
that is relevant for resource planning. The system then transfers all relevant data to
SAP Multiresource Scheduling and automatically creates a demand for each order
operation or notification. Using the Scheduler Workplace (SAP GUI) or Web-based
planning board, you can then search for suitable resources based on resource availa­
bility and qualifications. When you assign a resource to a demand, the relevant data
is transferred back to the SAP S/4HANA system.

Resource planning for networks You can use this feature to allocate suitable resources to network activities from
from Project System (PS) Project System (PS). If the integration is set up correctly, an additional tab page is
shown in the PS network. On this tab, the requester can make various settings that
are relevant for resource planning in SAP Multiresource Scheduling.

The process starts in SAP S/4HANA with a requester creating a network that is rele­
vant for resource planning. Once the requester saves the network and its activities in
PS, the system transfers all relevant data to SAP Multiresource Scheduling. The sys­
tem automatically creates a demand for each network activity that has been marked
as planning-relevant in PS. Using the Scheduler Workplace (SAP GUI) or Web-based
planning board, you can then search for suitable resources based on resource availa­
bility and qualifications. When you assign a resource to a demand, the relevant data
is transferred back to the SAP S/4HANA system.

Resource planning using Web-based You can use this feature to create resource requests and allocate suitable resources
resource management (RM) to requests using Web-based resource management. You can either use the Web
Dynpro version of the application or the resource management (RM) apps.

The process starts in Web-based resource Management with a requester creating a


request with at least one role. The system creates a Project System (PS) network in
the corresponding back-end system. You can use the RM Web Dynpro version or the
RM apps for creating requests, searching for candidates, and assigning them to
projects.

Feature Scope Description for SAP Multiresource Scheduling, Option for SAP S/4HANA
Key Features PUBLIC 9
Key Feature Use

Resource planning for work tickets You can use this feature to allocate suitable resources to work tickets from SAP
from SAP Cloud for Customer Cloud for Customer.

The process starts in SAP Cloud for Customer with a service agent creating a work
ticket with at least one scheduling-relevant item. Once the agent releases the item
and saves the work ticket, the system transfers the relevant data to SAP Multire­
source Scheduling and creates a demand for each item. Using the Scheduler Work­
place (SAP GUI) or Web-based planning board, you can search for suitable resources
based on resource availability and qualifications. When you assign a resource to the
service item, the relevant data is transferred back to the SAP Cloud for Customer
system.

Resource planning for service or­ You can use this feature to allocate suitable resources to service order items from
ders from SAP CRM SAP CRM.

The process starts in SAP CRM with a requester creating a service order that is rele­
vant for resource planning. If the required settings are in place, the requester can use
appointment booking to schedule a service appointment. Once the requester saves
the order and its items in SAP CRM, the system transfers all relevant data to SAP
Multiresource Scheduling. The system automatically creates a demand for each rele­
vant service order item. Using the Scheduler Workplace (SAP GUI) or Web-based
planning board, You can then search for suitable resources based on resource availa­
bility and qualifications. When you assign a resource to the service item, the relevant
data is transferred back to the SAP CRM system.

Resource planning for project roles You can use this feature to allocate suitable resources to project roles from Portfolio
from SAP Portfolio and Project Man­ and Project Management.
agement for SAP S/4HANA
The process starts in Portfolio and Project Management with a requester (project
manager) creating a Project Management project that is relevant for resource plan­
ning. Once the requester releases the project, the system transfers the project roles
to SAP Multiresource Scheduling and creates a demand for each role. Using the
Scheduler Workplace (SAP GUI) or Web-based planning board, you can then search
for suitable resources based on resource availability and qualifications. When you as­
sign a resource to a demand, the relevant data is transferred back to the SAP Portfo­
lio and Project Management for SAP S/4HANA system.

Capacity planning for demands The Scheduler Workplace (SAP GUI) and the Web-based planning board provide vari­
from Plant Maintenance, Customer ous functions for demand and capacity planning. For example, you can perform ca­
Service, and Project System pacity leveling to counterbalance the overload of work centers by shifting demands
to time slots with sufficient capacity. You can also display, change, and delete existing
relationships for demands, and you can create new relationships in SAP Multire­
source Scheduling.

Capacity planning functions are available for demands from Plant Maintenance (PM),
Customer Service (CS), and Project System (PS).

Feature Scope Description for SAP Multiresource Scheduling, Option for SAP S/4HANA
10 PUBLIC Key Features
Key Feature Use

Capacity and Demand Overview This feature supports you in medium-term and long-term capacity planning. The Ca­
pacity and Demand Overview report helps you to identify peak periods of high work­
load that may result in a shortage of resources. It also allows you to take into account
potential future demands that must be planned at short notice.

Feature Scope Description for SAP Multiresource Scheduling, Option for SAP S/4HANA
Key Features PUBLIC 11
Important Disclaimers and Legal Information

Hyperlinks
Some links are classified by an icon and/or a mouseover text. These links provide additional information.
About the icons:

● Links with the icon : You are entering a Web site that is not hosted by SAP. By using such links, you agree (unless expressly stated otherwise in your
agreements with SAP) to this:

● The content of the linked-to site is not SAP documentation. You may not infer any product claims against SAP based on this information.
● SAP does not agree or disagree with the content on the linked-to site, nor does SAP warrant the availability and correctness. SAP shall not be liable for any
damages caused by the use of such content unless damages have been caused by SAP's gross negligence or willful misconduct.

● Links with the icon : You are leaving the documentation for that particular SAP product or service and are entering a SAP-hosted Web site. By using such
links, you agree that (unless expressly stated otherwise in your agreements with SAP) you may not infer any product claims against SAP based on this
information.

Beta and Other Experimental Features


Experimental features are not part of the officially delivered scope that SAP guarantees for future releases. This means that experimental features may be changed by
SAP at any time for any reason without notice. Experimental features are not for productive use. You may not demonstrate, test, examine, evaluate or otherwise use
the experimental features in a live operating environment or with data that has not been sufficiently backed up.
The purpose of experimental features is to get feedback early on, allowing customers and partners to influence the future product accordingly. By providing your
feedback (e.g. in the SAP Community), you accept that intellectual property rights of the contributions or derivative works shall remain the exclusive property of SAP.

Example Code
Any software coding and/or code snippets are examples. They are not for productive use. The example code is only intended to better explain and visualize the syntax
and phrasing rules. SAP does not warrant the correctness and completeness of the example code. SAP shall not be liable for errors or damages caused by the use of
example code unless damages have been caused by SAP's gross negligence or willful misconduct.

Gender-Related Language
We try not to use gender­specific word forms and formulations. As appropriate for context and readability, SAP may use masculine word forms to refer to all genders.

Videos Hosted on External Platforms


Some videos may point to third-party video hosting platforms. SAP cannot guarantee the future availability of videos stored on these platforms. Furthermore, any
advertisements or other content hosted on these platforms (for example, suggested videos or by navigating to other videos hosted on the same site), are not within
the control or responsibility of SAP.

Feature Scope Description for SAP Multiresource Scheduling, Option for SAP S/4HANA
12 PUBLIC Important Disclaimers and Legal Information
Feature Scope Description for SAP Multiresource Scheduling, Option for SAP S/4HANA
Important Disclaimers and Legal Information PUBLIC 13
www.sap.com/contactsap

© 2020 SAP SE or an SAP affiliate company. All rights reserved.

No part of this publication may be reproduced or transmitted in any form


or for any purpose without the express permission of SAP SE or an SAP
affiliate company. The information contained herein may be changed
without prior notice.

Some software products marketed by SAP SE and its distributors


contain proprietary software components of other software vendors.
National product specifications may vary.

These materials are provided by SAP SE or an SAP affiliate company for


informational purposes only, without representation or warranty of any
kind, and SAP or its affiliated companies shall not be liable for errors or
omissions with respect to the materials. The only warranties for SAP or
SAP affiliate company products and services are those that are set forth
in the express warranty statements accompanying such products and
services, if any. Nothing herein should be construed as constituting an
additional warranty.

SAP and other SAP products and services mentioned herein as well as
their respective logos are trademarks or registered trademarks of SAP
SE (or an SAP affiliate company) in Germany and other countries. All
other product and service names mentioned are the trademarks of their
respective companies.

Please see https://www.sap.com/about/legal/trademark.html for


additional trademark information and notices.

THE BEST RUN

You might also like