Professional Documents
Culture Documents
Capacities of Various Plant and Machinery
Capacities of Various Plant and Machinery
Capacities of Various Plant and Machinery
righteousncube96@gmail.com
Dashboard
Sign Out
Construction Updates
Tata Cliq
CAPACITIES OF VARIOUS PLANT AND MACHINERY
Search This Blog
Search
1. DOZER (D – 6)
Machinery
Levelling Earth (750 x 0.2) 150 Cum / Hr.
Fabrication and
Metalworking
equipment. Lathes,
2. LOADER
Milling Machines,
3. EXCAVATOR
Machinery
5. VIBRATORY COMPACTOR (Compaction) 8 to 10 T
Fabrication and
Metalworking
Report Abuse
Tipper capacity = 7.5 Cum.
Machinery
Metalworking
equipment. Lathes,
Milling Machines,
Open
Concrete Pump Capacity = 30 Cum/ Hr.
March (1)
November (2)
ASSUMPTIONS March (1)
June (1)
May (2)
November (1)
1. Out Put of the machines to be taken as calculated before,.
2. Working day per month = 26 days March (1)
July (1)
3. Working hours per day = 12 hours
4. Monsoon season is taken as 3 months. June (1)
Machinery
Metalworking
Erin Machine Tools
CONCRETE
Labels
Duration = 1 x 26 x 8 = 208 hours
Admixtures
Cement
Concrete
Construction Management
Formwork
Sr.No Machines Uom Peak Average
Pre Stress/Post Stress
Reinforcement
1 Canal Bed Cum/Months 90 54 Road
Soil
2 Canal Slopes Cum/Months 550 371 Structural Stability
Vaastu
Total Cum/Months 640 425 Waterproofing
WSP
Main Menu
Batching _ShortCodes
1 24 cum/hr 0.12 0.08 1
Plant _SiteMap
_Error Page
Concrete Documentation
2 24 cum/hr 0.12 0.12 1
Pump Video Documentation
Download This Template
3 Transit Mixer 5 cum/hr 0.615 0.40 2
Social Media Icons
Plate facebook
4 6
Vibrator pinterest
Posts
Comments
By
The Civil Engineer
at
February 10, 2012
Followers
Labels:
Construction Management