CAPACITIES OF VARIOUS PLANT AND MACHINERY
Search This Blog
 
Search

 
1.               DOZER (D – 6)

  Speed                                    =          1.5 Km / Hr.

No. of Passes           =          3

Width of Blade          =          2 Mtr.

Operating Efficiency           =          75%

CAPACITY                =          (1500 X 2 X 0.75) /3


New & Used

  Machinery
Levelling Earth (750 x 0.2) 150 Cum / Hr.

 
Fabrication and

Metalworking

 
equipment. Lathes,

2.               LOADER
Milling Machines,

  Drills and Borers.


(a)  3.1 cum. Bucket

Bucket                        =          3.1 Cum Erin Machine Tools


Cycle Time in Plat= 1 Minute

Efficiency                  =          80%

CAPACITY = (3.1 X 0.8 X 60) /1 =            150 Cum / Hr. Open


                                                                                                                                                
     

(b)  1.7 Cum Bucket  

Bucket                        =          1.7 Cum

Cycle Time in Plant =          2.5 Minute

Efficiency                  =          80%

CAPACITY = (1.7 X 0.8 X 60) /2.5 =         35 Cum / Hr.

3.               EXCAVATOR

Ck – 90 (0.9 Cum Bucket)

Bucket                        =          0.9 Cum

Cycle Time in Plant =          35 Sec.

Efficiency                  =          80%

                                            CAPACITY = (0.9 X 60 X 0.8X 60) /35 = 75 Cum / Hr.


4.               GRADER (Spreading & Grading) BEML 165 HP

Speed                                    =          3 Km / Hr.

Blade                          =          1.7 Mtrs.

Layer Thickness       =          0.25 Mtrs.

No. of Passes           =          5  efficiency=75%


New & Used

CAPACITY = (3000 X 1.7 X 0.75 X 0.25) /5 = 192 Cum /Hr.

 
Machinery
5.               VIBRATORY COMPACTOR (Compaction) 8 to 10 T
Fabrication and

  Metalworking

Static wt. Dual Frequency, equipment. Lathes,

Speed                                    =          2 Km /Hr. Milling Machines,

Drum Width               =          2 Mtrs.


Drills and Borers.
Layer Thickness       =          0.25 Mtrs.
Erin Machine Tools
Efficiency                  =          80%

No. of Passes           =          6

CAPACITY = (2000 X 2.0 X 0.80 X 0.25) /6 = 130 Cum / Hr

6.                         TIPPERS


Open
 Earth Work

  Report Abuse
            Tipper capacity                     =          7.5 Cum.

            Cycle Time

            Average Lead                       =          5.5 Km (11 KM Bothway)

            Loading Time & Turning On=        7 Mins.

            Leading Average Speed (20 Km / Hr) = 33 Mins.

            Unloading & Turning On    =          5 Mins

            Total Cycle Time                  =          45 Mins. Say 45 Min.

            CAPACITY = (7.5 X 60) / 45 = 10 Cum / hour


New & Used

            Machinery
 

7.                          Batching Plant Cp 30


Fabrication and

Metalworking

 
equipment. Lathes,

  Milling Machines,

Batching Plant Capacity                 = 30 Cum/ Hr. Drills and Borers.


Efficiency                                          = 80%

Capacity                                            = 24 Cum/Hr. Erin Machine Tools


 

8.                          Concrete Pump

  Open
Concrete Pump Capacity               = 30 Cum/ Hr.

Efficiency                                          = 80%


Contributors
Capacity                                            = 24 Cum/Hr Swathi Melumalige
  The Civil Engineer

9.                          Transit Mixer


 

Transit Mixer capacity         =          6 Cum.

            Cycle Time

            Average Lead                       =          5.5 Km (11 KM Bothway)

            Loading Time & Turning On=        3.5  Mins.

            Leading Average Speed (20 Km / Hr) = 33 Mins.

            Unloading & Turning On    =          35 Mins

            Total Cycle Time                  =          71.5 Mins. Say 72 Min.

            CAPACITY = (6 X 60) / 72 = 5 Cum / hour

                       

ESTIMATING REQUIREMENT OF MACHINES ON THE PROJECT


June (1)

  March (1)
November (2)
ASSUMPTIONS March (1)
June (1)
  May (2)
November (1)
1. Out Put of the machines to be taken as calculated before,.
2. Working day per month = 26 days March (1)
July (1)
3. Working hours per day  = 12 hours
4. Monsoon season is taken as 3 months. June (1)

5. Monsoon season efficiency  is 75% December (2)


August (3)
  May (1)
REQUIREMENT OF MACHINES April (3)
June (2)
 
May (4)
EXCAVATION March (6)
February (47)
  January (26)

                                    QUANTITY Maximum = 20000 CUM/ Months December (5)


November (1)
                                    QUANTITY Average    = 10378 Cum/ Months   

                                    Duration = 1 x 26 x 12 = 312 hours

Sr.No Machines Capacity Peak Average Final

1 Excavator 75 cum/hr 0.85 0.44 1

2 Dozer 150 cum/hr 0.42 0.22 1

3 Loader 35 cum/hr 1.831 0.950 2

4 Tipper 10 cum/hr 6.410 3.32 5

 
                 

FILLING , SPREADING AND COMPACTION

                                    QUANTITY Maximum = 20000 CUM/ Months

                                    QUANTITY Average    = 12681 Cum/ Months  

                                    Duration = 1 x 26 x 12 = 312 hours

  New & Used

 
Machinery
 

Sr.No Machines Capacity Peak Average Final Fabrication and

Metalworking

1 Dozer 150 cum/hr 0.42 0.27 1


equipment. Lathes,

2 Grader 192 cum/hr 0.33 0.21 1 Milling Machines,

Drills and Borers.


3 Compactor 130 cum/hr 0.49 0.31 1

4 Tipper 10 cum/hr 6.410 4.06 5

 
Erin Machine Tools
 

CONCRETE

  
Labels
                                    Duration = 1 x 26 x 8 = 208 hours
Admixtures
  Cement
Concrete
 
Construction Management
Formwork
Sr.No Machines Uom Peak Average
Pre Stress/Post Stress
Reinforcement
1 Canal Bed Cum/Months 90 54 Road
Soil
2 Canal Slopes Cum/Months 550 371 Structural Stability
Vaastu
  Total Cum/Months 640 425 Waterproofing
WSP
 
Main Menu

Sr.No Machines Capacity Peak Average Final Home


Features

Batching _ShortCodes
1 24 cum/hr 0.12 0.08 1
Plant _SiteMap
_Error Page
Concrete Documentation
2 24 cum/hr 0.12 0.12 1
Pump Video Documentation
Download This Template
3 Transit Mixer 5 cum/hr 0.615 0.40 2
Social Media Icons
Plate facebook
4       6
Vibrator pinterest

 
Posts

 
Comments

By
The Civil Engineer
at
February 10, 2012

Followers
Labels:
Construction Management

You might also like