Construction Drawing: Propose Operator Workstation

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

CONSTRUCTION DRAWING

TO MODIFY EXISTING PUMP CONTROL


ROOM ELECTRICAL PANEL OUTGOING
FEEDER WITH A NEW 30A TPN MCCB C/W
EMERGENCY SWITCH CABLE
2 ACCESSORIES
1 X 2C/2.5MM /CU. PVC/SWA/PVC CABLE
LAID U/GROUND/ CONCEAL TAPPING FROM EXISTING
R
ATO (4NOS) PUMP CONTROL PANEL
PER
P O SE O ON
PRO KSTATI
SYMBOL DESCRIPTION WOR

EME P PANE
STO
RGE
ES

ES EMERGENCY STOP PANEL (FOR 4 UNIT PUMP) ES

NCY
ES

L
ES

ELECTRICAL CABLE PIT UMP


1 x 4C/10MM2/CU. ING P
EXIST OL ROOM

H
DB-G
PVC/SWA/PVC CABLE LAID R
DISTRIBUTION BOARD
U/GROUND/ CONCEAL CONT

3.258
H
EART
PIT

1 x 2C 6MM2/CU.
PVC/SWA/PVC CABLE
3.243
LAID U/GROUND

3.056
CABLE RISING THROUGH
HDG TRUNKING

TH
3.075
EAR
PIT
24689.3921

PH
DB-A

ING
PG RAD OUSE
EU PH
RO POS N PUM
P ND O
ABA

NOTES:

1. ALL DIMENSIONS AND LEVELS ARE IN MILLIMETERS AND METRES RESPECTIVELY.


2. ALL DRAWINGS SHALL BE READ IN CONJUNCTION WITH RELEVENT C&S, M&E AND SUPPLIER'S
DRAWINGS.
3. CONTRACTOR SHALL PREPARE AND SUBMIT ALL NECESSARY FULLY DIMENSION SHOP DRAWINGS
FOR APPROVAL PRIOR TO FABRICATION WORKS/COMMENCEMENT OF WORKS.
4. ALL DIMENSIONS SHALL BE VERIFIED ON SITE AND WITH EQUIPMENT'S SUPPLIER AND
ANY DISCREPANCIES RESOLVED BEFORE COMMENCEMENT OF WORKS.

5. DIMENSION DENOTES WITH ' * ' ARE INDICATIVE AND SHALL BE CONFIRMED BY M&E ENGRS
AND/OR SUPPLIER'S/MANUF'S AT THE SITE ACCORDINGLY.

ZHL Engineers Sdn. Bhd.


kementerian pertanian Consulting Engineers(656863-H) JABATAN PENGAIRAN DAN SALIRAN MALAYSIA
dan industri makanan No. 16A, Jalan Diplomatik 2/1,
Presint Diplomatik 15,
62502 PUTRAJAYA
MENAIKTARAF RUMAH PAM DAN 'INTAKE CHANNEL' DI KAWASAN TEL: 03-8888 1889 FAX: 03-8888 2889

PENGAIRAN BAGAN TERAP, DAERAH SABAK BERNAM, SELANGOR

You might also like